Creation of ODI process flow

Hello

How to create flow process in ODI 10 g?

Please let me know.

Kind regards
Rama

>

Beginning--> Interface1--> Inteface2---> End .if interface 1 can't get the packages should stop.

In Odi you don't have another activity/utility.
What object even fell in the package elsewhere it will be treated as a default starting point, but you can always change the starting point by clicking with the right button on the object and the box chooseing first step.

Now, for the example given

create a package of odi
Drag and drop Interface1 in this package... by default, it will become the starting point
Now drag and drop Interface2 in this package
in the Web package, you will find something called 'Next step success', 'OK' on them.
Join Interface1, Interface2 by this line of 'OK '.

That's all.

Thank you
Fati

Tags: Business Intelligence

Similar Questions

  • Creation of audit process

    I am running Windows server 2008 R2. Our local security policy requires that we allow the Audit process of creating success. I need to know if there is a way to exclude a particular audit process as it fills up my logs. I'm running a HP6000 EVA controller with double fabric FC. Since I first introduced virtual disks to other host systems, I was inundated with 4688. It looks like this: C:\Progra~2\Hewlet~1\EVAPA\POSTGR~1\bin token elevation default Type (1)

    It seems to be a message from check status or health between the controller and the server. However, I gained about 30K per day!

    Is there a way I can exclude this audit process without disabling the Audit process of creation?

    Thank you very much.

    Brian

    Hi Brian,.

    To get the correct information on the exclusion of a single audit process without disabling the creation of verification process, you can post the question on article in the TechNet Windows Server forums.

    They will be able to guide you to the best.

  • How to you start ODI processes in your projects?

    Hello

    I was wondering how you guys run your ODI process to your customers?

    I use the scheduled tasks that call utility startscen, but a very inelegant solution. I explores FDQM days and has not found a way to call an ODI package independently, because it seems to integrate with staging of FDQM are and then a validation, mappings and filter options, but what I was looking for was an interface to launch the packages where users could see directly the result of executing and so on.

    How do you do it?

    Concerning

    Hi Pedro,

    That's what I meant by specific requirements. If you just need an interface for the user to display the status, etc., you can use the Console to the ODI. It is a vision based on the web in the metadata of the ODI. All the same information you will find in the operator in ODI Studio can be accessed through the Console of ODI.

    If the end user needs to run processes on an ad hoc basis, you can use ODI Run-Time Web Services to launch an ODI or support Plan (integration running process) scenario. It might take a bit of development to create an interface which the end user can launch services, but it would allow for the ad-hoc process execution.

    I'm not sure what you mean by "...". they are not defined periodically (not yet closed account IE) how it will launch? ». Are you referring to the schedule, search for a specific value before starting a process?

    Kind regards

    Michael Rainey

  • What version of Oracle workflow is required for owb 11.2 process flow.

    Hello
    I want to implement the process flow for my mapping.
    But I get the error message like,
    "The connection has been successful, but not to the version of workflow to recover."

    Also the OWF_MGR user is not created.

    Oracle 11g on RHEL database is
    and autonomous OWB 11.2 under Windows.

    I create user owf_mgr who have the schema for the objects in a workflow?
    Also what version of workflow required oracle to the process flow. I need to install
    Server of Oracle to Oracle db server workflow or it'll get installed with 11g.

    Where I'll get measures details to implement the process flow from scratch.

    Help, please.

    Published by: TN November 21, 2011 06:01

    >

    I create user owf_mgr who have the schema for the objects in a workflow?

    Yes

  • How to add a procedure for a process flow, but PF continue immediately

    Hi all

    In my process flow, I would like to be able to launch a procedure. However, I wish the process flow to continue immediately regardless of the status of the proceedings. I want the procedure that is called, and I want the process flow in order to continue its not regardless of the status of the proceedings. Is there a good / better way to do this?

    The following method seems to work. But I don't know if it's the right / best way to do it:

    Start-> forks > procedure-> one (must only launch) OR (method A and B card feed the RO)-map C (fill)-> END
    Plan B (must successfully complete)

    In case the "schema" above is not clear I "FORK" which divides to call the procedure has as b. mapping Procedure A and B map go to a 'GOLD '. The gooes 'OR' la carte b. plan B goes to the 'END '.

    Thanks in advance for your ideas and experiences.

    -Sam
    P.S. I'm on OWB 10.2.0.1

    If you want a plan B to wait that the procedure is made

    proceed this way

    Start-online fork => Proc-OR online-online success

    -Online card-online A-online the Condition for success-online card B (OR)

    HTH
    Mahesh

  • WFT OWB migration process flow

    We have a workflow process defined with Oracle Workflow Builder 2.6 Version. Keep us the workflow in a wft file and deploy it in Oracle 9 and 10 databases with the wfload utility.
    The process basically called stored procedures and OWB mappings.

    We now want to migrate to 11G.

    Is there a way upgrade workflow process in Oracle Warehouse Builder?

    Do we need a seprate license to run the engine in Oracle 11 G using Worklfow process flow?

    Thank you

    y at - it all automated migration workflow process flow again OWB.

    I do not hear on the means for processflows UAS of OWB migration (at least there is no standard for this task Oracle utility).

    Kind regards
    Oleg

  • Using an OUT in a process flow parameter

    I have a SUBPROC1 process flow that contains a PL/SQL procedure. This procedure generates an integer value. PL/SQL procedure output parameter is bound to a variable VAR1 process flow, so that the value can be used by other processes of sub and in conditions of transition in SUBPROC1.

    So far so good. Now I also have the same value of the process flow to a process flow parent output so that it can later be used by other processes of void. I have created an OUT parameter PAR1 attached to Start1 of SUBPROC1 activity, but I can only bind the output parameter in PL/SQL to the variable VAR1 process flow or the parameterPAR1 of output, not both.

    The only way I can think to do that is to change the signature of the PL/SQL procedure to generate the same value twice through two parameters, one that I can link to VAR1 and the other I can bind to PAR1, but that seems messy.

    Is there a trick I'm missing here?

    You can set the output processflow (from variable) with the Assign activity parameter

    Kind regards
    Oleg

  • How to run an OWB 11 GR 2 process flow using OEMs jobs?

    How to run an OWB 11 GR 2 process flow using 11 g OEM jobs?

    In other words, iam trying to create a work of Oracle Enterprise manager for planning and executing an OWB process flow.

    Can one of you please heading me to the same documentation or enlist the steps?

    Hello
    Watch OWB QAnywhere (it's the release of 11 GR 1 OWB material but you can apply this procedure to OWB11gR2 as well)
    http://download.Oracle.com/docs/CD/B28359_01/OWB.111/b31279/api_4sqlforjobs.htm#BABEBGHA

    Kind regards
    Oleg

  • Kill a process flow that is add

    Hello
    I have a problem with a process flow that is append (I see BUSY_FAILURE State on repository Explorer) and it does not allow me to start another workflow process.
    How can I kill the BUSY_FAILURE process?

    Thanks in advance

    Steve

    Hi again, try this:

    / * This query, you get the ITEM_KEY * /.
    SELECT * FROM wf_item_activity_statuses_v WHERE
    ACTIVITY_TYPE_CODE = 'PROCESSES' AND ACTIVITY_STATUS_CODE! = "FINISH."

    / * With this query, you get the type of the object that is running * /.
    Select *.
    of WF_ITEM_ACTIVITY_STATUSES
    where item_key = "

    / * And with that, you kill the process that writes first place the type you got in the second query, then the key of the element of the first * /.
    Start
    wf_engine. AbortProcess ('WF_GC', 'WB_IK_20100408_024043_394762');
    end;

    I hope this helps you

  • Call a script shell to an OWB mapping or process flow

    Hello

    is it possible to call a shell script for a mapping owb or process flow and how can I do this?

    Greetings

    Check this box: -.

    http://blogs.Oracle.com/warehousebuilder/2010/05/how_to_use_user_defined_activity_in_owb_process_flow.html

    See you soon
    Katia

  • Mapping full - process flow occupied

    Hi all

    I have a problem with a process flow that I imported from another server.
    If I run this process flow in the test server it runs and finish without problem.

    Now, I imported this workflow process in the production server, but it is not complete. In the browser of the Audit, I see that all mappings have the status "complete", but the process flow is still busy after 1 hour.

    In the process flow, there are 7 maps and 3 user-defined operations that use shell scripts.

    What did I miss?

    Oracle and OWB 11 GR 1 material
    OS: Sles 10

    Thank you
    Gul.

    Hi Gul,

    We use OWB 11.1 and we went through the same thing.

    We solved this by:
    -Adding an index on the runtime repository
    -clean the runtime verification tables
    -collect statistics on the tables at runtime

    It should be much information on the previous step.
    If you're not familiar with it, then I can understand it in a next message.

    -check the process flow of errors.
    We discovered that some process flow has been corrupted after import.
    Some transitions had flase numbering.
    Example: mapping has been a success (0), (1) error and the warning (1).
    The error and warning lines had the same number.
    After correcting this flow worked properly.

    Kind regards

    Emile

  • Process flow

    Hello

    OWB should he a different license for the process flow? Or is it available with license OWB?

    In addition, the process flow module is has any dependencies on other software?

    Rgds
    S

    OWB process flow requires Oracle Workflow.

    In 10g, you can install Oracle Workflow from the database companion CD.
    From 11 g, Oracle Workflow comes with OWB11g.

    in 11g
    You'll find a directory called "wf" under OWB_HOME.
    Under that there is a folder called install.
    Work flow configuration script wfinstall.bat/sh will implement the necessary schema required by OWB process flows.

    Thank you
    Fati

  • Cannot run CodeTemplate in parallel using process flow

    Hello

    We use oracle warehouse builder 11 g 2 on Linux.



    Created two mappings of model code, built a process flow to perform these mappings at the same time. When I run this workflow process run only mappings and the second map ends with errors.



    But when I run the same workflow process re-designed to perform the mapping that sequentially, it works fine.



    Thank you

    J

    For execution of the mapping, you can right-click on the enforcement unit and select 'Open Details', here to change the name.

    See you soon
    David

  • Enter the date of transformation in the process flow

    Hello

    I have a transformation (stored procedure) in a process flow that requires that two input variables. If I execute this stored procedure directly from the database I would use:

    Start
    package_name. Procedure_name (to_date ('20100101', 'YYYYMMDD'), to_date ('20100102', 'YYYYMMDD'));
    end;
    /

    The problem in the process flow, it's that I'm not able to give the input parameters for the transformation in the correct manner. The process flow is valid, but when I run the workflow process I get ORA-01830 and PRE-02241. What I have in the process flow is:

    START-> procedure_name--> END

    I also tried with:

    START-> ASSIGN--> procedure_name--> END

    Someone would ask me how do I pass two input parameters for the transformation are the type of date (format: YYYYMMDD)?

    Thank you

    Andreas

    Hi Andreas,

    5472814 UNABLE TO PASS DATE PARAMETERS WITH THE HELP OF RUN_TASK OR SQLPLUS_EXEC_TEMPLATE

    No, it has different bug for your problem. Now I can not find this bug on Metalink...

    Look at this thread (read the last message in the user philip_b)
    Re: Passing Date value to the parameter mapping entry

    This is the same problem and the same OWB version

    I hope this helps!

  • Process flow of objects in a database diagram

    Hello

    I want to find a database schema, objects created by the Oracle Workflow. Is this possible?
    For example, when I create and deploy a mapping in OWB, a package is created in the target schema. I can manage by using SQL only.
    When I create a package, module, and process flows in OWB, is it possible to visualize in a database schema (for example, owf_mgr)?

    Thank you.

    Hello

    When you deploy a process flow, it is transformed into an Oracle Workflow and stored in the workflow diagram. There is a client of design (Workflow Manager) and monitor tool (Workflow Monitor) for design/editing workflows and their follow-up during execution as it is seen to display the workflow created.

    What do you do with the workflow deployed? Do you want just a few views SQL to see being deployed or you want to run the object 'natively' (such as the HAND of the generated package PLSQL?).

    See you soon
    David

Maybe you are looking for

  • Whenever I have raise Firefox happens to powered by screen ASK, how can I get rid of him?

    I forgot to do something different on my computer today, but everytime I open Firefox I get this screen Ask not my default screen that should be there. I'm supposed to have www.comcast.net as my screen not repaid.

  • Is it safe to install Adobe Flash Player on my computer?

    I need to go further in my search, but it is asking for the AdobeFlash Player pre-installed.  It from the wreck of my computer, and it will make my unsecured computer. Original title: my computer asks Adobe Flash Player must be installed.  Is it safe

  • Support of course Microsoft CBSE

    Hello I read topic microsofts course offers CBSE subjects, as mentioned in YOU according to this link below http://timesofindia.Indiatimes.com/tech/careers/education/Microsoft-launches-teaching-tools-for-schools/ArticlesHow/13959646.CMS I've also rea

  • Optional update for Canon MP560 offered repeatedly after being installed

    Canon MP560 Canon - printer - printer series The optional update above has been installed on my system four times and indicates that, in my history of update.  Yet it keeps appearing whenever I check updates as an optional update. Why is this happeni

  • Spectrum x 2 and Micro SDXC

    Hello I recently bought a spectrum x 2 (product number: F7T43EA #ABU) and the manual says it has a Micro Sd slot but not will is compatible with Micro SD, Micro SDHD and or Micro SDXC.  I don't want to spend the money on a card that is not taken in c