End alerts from over one month

We had a problem with our vCOPs about a month ago and it is running already not fully executed for about 3 weeks.  VMware has finally fixed it and we're up and running now.

The challenge now is that these alerts a month ago are now getting email to us.   No idea how to turn on or off the queue in vCOPs so we have a fresh State of work instead of months warns finally come?   We run vCOPs 5.8.0.

Yes, but it would make sense. You had a persistent cleaning that had to be done to flush out old alerts since the adapter had connectivity problems and may have had some orphaned resources. Let us know if something pops up again, but I suspect you'll just new alerts to bind with impatience.

Tags: VMware

Similar Questions

  • If no end date is specified, the learners will take one month complete their apprenticeship.

    Hello

    I need to ask a question about this statement in connect because it is confusing, unfortunately.

    I have to confirm that, if "No closing date" is selected and the user does not enter or click on the link to enter teaching, within one month of the start date, the student will no longer access to the currlculum (the link to the course and content no longer works). If they come, they have access to their content indefinitely

    image of currci.png

    Is there another way to interpret this statement which is missed by the Group?

    Thanks for any input.

    This statement means that they will have one month from the first access to training to complete it.

    Thus, the program will be available to start indefinitely, but access is limited to one month.

    If you put a definitive end date, the individual will have until that date to complete the statement, even if this date is 31/12/2099.

  • I can't rename my files photo and document from one month. What happened and how can I solve this problem?

    I can't rename my files photo and document from one month. What happened and how can I solve this problem?

    Hi robertjefferies,

    You get the error message?

    Method 1: Run the fixit available in the links below and check if that makes a difference-Worth to try
    Diagnose and repair Windows files and folders problems automatically

    Method 2: Start the computer in safe mode, and then check. To do this, follow the steps below:

    Access Advanced Startup menu options by turning on your computer and pressing the button F8 continuously until Windows starts. In the boot advanced options, select Mode safe

    Startup options (including safe mode)

    http://Windows.Microsoft.com/en-us/Windows-Vista/advanced-startup-options-including-safe-mode

    Let me know if the problem persists in this mode

  • I paid for a subscription of one month to muse from adobe, but I can't access it!

    I paid for a subscription of one month to muse from adobe, but I can't access it!

    Hi Nada,

    Your order is being processed, and the subscription will be activated within 24 hours.

    In case you want to check the status of your order, please contact support to contact customer service

    Kind regards

    Akshay

  • My one month for Photoshop free trial ended after three days to install it how can I fix this to get the rest of my free one month trial?

    Hi I have just installed adobe Creative Cloud and bought my one month for Photoshop free trial. I loved, but it ended after three or four days to make it. Is their anyway for me to finish my one month of CC of Photoshop free trial?

    http://helpx.Adobe.com/x-productkb/global/trial-software-expired-early.html

  • Can I install an application from one month to the next?

    Can I install an application from one month to the next? I want to try Indesign CCfor a month or two, so I don't want to pay for a full year. Can I do this?

    Here is a link to a page that contains descriptions for the plans that are available...

    Creative cloud plans

    https://creative.Adobe.com/#plans

  • 14 times in one month!

    Hello - we have a business area that has defined 14 'months' periods in their periods of GL ERP.   When you try to create a simple select query that compares a period for the last day of the previous month of sysdate, it fails with ' ORA-01843: not one month valid. "

    Defined ' periods' are:

    period_num Start_Date Start_Date

    1 1 JANUARY 13 12:00 1 JANUARY 13TH 12:00

    2 1 JANUARY 13 12:00 JANUARY 31, 13 12:00

    3 1ST FEBRUARY 13 12:00 FEBRUARY 28, 13 12:00

    4 1ST MARCH 13 12:00 31 MARCH 13 12:00

    5 APRIL 1, 13 12:00 APRIL 30, 13 12:00

    6 1 MAY 13 12:00 31 MAY 13 12:00

    7 1 JUNE 13 12:00 JUNE 30, 13 12:00

    8 1 JULY 13 12:00 31 JULY 13 12:00

    9 AUGUST 1 13 12:00 31 AUG 13 12:00

    10-01-SEPT-13 12:00 13-SEP-30 12:00

    11 1ST OCTOBER 13 12:00 OCTOBER 31, 13 12:00

    12 1ST NOVEMBER 13 12:00 NOVEMBER 30, 13 12:00

    13 1ST DECEMBER 13 12:00 DECEMBER 31, 13 12:00

    14 DECEMBER 31, 13 12:00 DECEMBER 31, 13 12:00

    Example SQL is less (if the line is uncommented, it fails commented).  We want to select the dates of beginning and end of the period of the month just completed.  So if it's today, November 18, 2013, we want to draw subtract 1 month of sysdate and use as a result "October" to get the START and END dates for the period ranging from the table.

    SELECT glp.period_num-this value is from 1 to 14

    GLP. START_DATE,

    GLP. END_DATE

    Of

    mppf.GL_PERIODS GLP

    WHERE the glp.period_year | TO_CHAR (decode (glp.period_num, 13, '12', 12, '12', 11, '10', '0' | to_char(GLP.period_num-1))) > = '201301'

    - and trunc (to_date (glp.period_year |)) (GLP.period_num-1), "YYYYMM")) < = trunc (last_day (add_months (sysdate-1)))

    and glp.period_type = '21'

    and glp.period_num in (2,3,4,5,6,7,8,9,10,11,12,13)

    and glp.period_set_name = 'Calendario.

    ;

    seems even if we are subtracting 1 from the glp.period_num, the declaration considers that 13 is not a valid month for the format mask - regardless of the fact that never leave us the resulting value reach 13 (elaborate on ' glp.period_num - 1 ')...

    is there a simple way to fix this error?

    Thank you

    Hello

    user11985498 wrote:

    Hello - we have a business area that has defined 14 'months' periods in their periods of GL ERP.   When you try to create a simple select query that compares a period for the last day of the previous month of sysdate, it fails with ' ORA-01843: not one month valid. "

    Defined ' periods' are:

    period_num Start_Date Start_Date

    1 1 JANUARY 13 12:00 1 JANUARY 13TH 12:00

    2 1 JANUARY 13 12:00 JANUARY 31, 13 12:00

    3 1ST FEBRUARY 13 12:00 FEBRUARY 28, 13 12:00

    4 1ST MARCH 13 12:00 31 MARCH 13 12:00

    5 APRIL 1, 13 12:00 APRIL 30, 13 12:00

    6 1 MAY 13 12:00 31 MAY 13 12:00

    7 1 JUNE 13 12:00 JUNE 30, 13 12:00

    8 1 JULY 13 12:00 31 JULY 13 12:00

    9 AUGUST 1 13 12:00 31 AUG 13 12:00

    10-01-SEPT-13 12:00 13-SEP-30 12:00

    11 1ST OCTOBER 13 12:00 OCTOBER 31, 13 12:00

    12 1ST NOVEMBER 13 12:00 NOVEMBER 30, 13 12:00

    13 1ST DECEMBER 13 12:00 DECEMBER 31, 13 12:00

    14 DECEMBER 31, 13 12:00 DECEMBER 31, 13 12:00

    Example SQL is less (if the line is uncommented, it fails commented).  We want to select the dates of beginning and end of the period of the month just completed.  So if it's today, November 18, 2013, we want to draw subtract 1 month of sysdate and use as a result "October" to get the START and END dates for the period ranging from the table.

    SELECT glp.period_num-this value is from 1 to 14

    GLP. START_DATE,

    GLP. END_DATE

    Of

    mppf.GL_PERIODS GLP

    WHERE the glp.period_year | TO_CHAR (decode (glp.period_num, 13, '12', 12, '12', 11, '10', '0' | to_char(GLP.period_num-1))) > = '201301'

    - and trunc (to_date (glp.period_year |)) (GLP.period_num-1), "YYYYMM"))<=>

    and glp.period_type = '21'

    and glp.period_num in (2,3,4,5,6,7,8,9,10,11,12,13)

    and glp.period_set_name = 'Calendario.

    ;

    seems even if we are subtracting 1 from the glp.period_num, the declaration considers that 13 is not a valid month for the format mask - regardless of the fact that never leave us the resulting value reach 13 (elaborate on ' glp.period_num - 1 ')...

    is there a simple way to fix this error?

    Thank you

    In the data that you have posted above, there are 2 columns called start_date.  Should one of them be something else, like called end_date?

    At the time above, 12:00 always means 12:00 'AM', i.e. of midnight?  If so, it seems that 2 periods have a length of 0, and the others are just months of calendar.  If this is the case, why didn't you use

    TRUNC (ADD_MONTHS (SYSDATE-1), 'MONTH') for the start of the previous period, and

    TRUNC (SYSDATE, 'MONTH') to the end?

    Whenever you have a problem, post a small example data (CREATE TABLE and only relevant columns, INSERT statements) for all of the tables involved and also publish outcomes from these data.
    If the results depend on SYSDATE, give a couple of examples using the same sample data.

    Explain, using specific examples, how you get these results from these data.  E.g. "if I run the present on 18 November 2013, then the output should be... because..., but if I run December 1, 2013, while the results should be... because...". ».
    Always say what version of Oracle you are using (for example, 11.2.0.2.0).

    See the FAQ forum: https://forums.oracle.com/message/9362002

  • Values for timestamp default XMLTable causes ORA-01843: not one month valid

    When I try to provide a default value for a timestamp value in the function XMLTABLE, I am greeted with an error - ORA-01843: not one month valid -no matter how to give this default value. If there is a value in the XML or not is irrelavant to this bug occurs. It seems to be an incomplete correction of bug number 9745897 (thread).

    Select x.*

    Of

    XMLTable ('/ DOC' from xmltype ("< DOC > < DT > 2013-08-14T 15: 08:31 < /DT > < / DOC > '"))

    DT COLUMNS timestamp default sysdate) x;

    Select x.*

    Of

    XMLTable ('/ DOC' from xmltype ("< DOC > < DT > 2013-08-14T 15: 08:31 < /DT > < / DOC > '"))

    By default systimestamp timestamp COLUMNS DT) x;

    Select x.*

    Of

    XMLTable ('/ DOC' from xmltype ("< DOC > < DT > 2013-08-14T 15: 08:31 < /DT > < / DOC > '"))

    DT of COLUMNS timestamp default to_char (systimestamp, ' ' YYYY-MM-DD "T" HH24:MI:SS)) x;)

    Edit: somewhat more followed.

    It works:

    Select x.*

    Of

    XMLTable ('/ DOC' from xmltype ("< DOC > < / DOC > '"))

    Date of the dt of COLUMNS by default sysdate) x;

    It works, too, with the exception of its just the date and not the time

    Select x.*

    Of

    XMLTable ('/ DOC' from xmltype ("< DOC > < / DOC > '"))

    DT COLUMNS timestamp default sysdate) x;

    It does not work

    Select x.*

    Of

    XMLTable ('/ DOC' from xmltype ("< DOC > < / DOC > '"))

    By default systimestamp timestamp COLUMNS DT) x;

    ORA-01861: literal does not match the format string

    Hello

    First of all, let's check the manual for the DEFAULT clause:

    Function SQL/XML XMLTABLE in Oracle XML DB

    The optional parameter DEFAULT clause specifies the value to use when the PATH expression results in an empty sequence (or NULL ). His expr is an XQuery expression that is evaluated to produce the default value.

    According to the documentation, the DEFAULT clause must specify an XQuery expression.

    However, is false, the implementation only expects an expression that matches a string, the content is not interpreted.

    Bottom line is, if we specify directly a string, the expression is implicitly converted into one, and everyone knows how things can go when implicit conversions appear, especially when the dates or timestamps are involved.

    Now let's focus on the impact of the DEFAULT clause on the evaluation of the query.

    When a DEFAULT clause is specified, Oracle has rewritten projection differently and does not use the native format of XS: DateTime to convert the value:

    Select x.*

    Of

    XMLTable ('/ DOC' from xmltype ('))

    2013-08-14 T 15: 08:31
    ')

    DT of COLUMNS by default systimestamp timestamp

    ) x

    becomes:

    SELECT THE EXISTSNODE (VALUE(KOKBF$), '/ DOC/DT')

    WHEN 1 THEN LAUNCH (TO_TIMESTAMP (SYS_XQ_UPKXML2SQL (SYS_XQEXVAL (SYS_XQEXTRACT (VALUE(KOKBF$), '/ DOC/DT')), 50.1, 2)() as a timestamp)

    ELSE CAST (TO_TIMESTAMP (TO_CHAR (SYSTIMESTAMP (6)), 'SYYYY-MM-DD "T" HH24:MI:SSXFF') AS timestamp)

    END "DT".

    TABLE ("SYS". "XQSEQUENCE"(EXTRACT ("SYS"." XMLTYPE"(")

    2013-08-14 T 15: 08:31
    (((,'/ DOC'))) ' KOKBF$ '.

    See the red part: it does not use the format parameter, the conversion depends on NLS session parameters.

    When there is no DEFAULT clause, the TO_TIMESTAMP function uses an explicit format:

    Select x.*

    Of

    XMLTable ('/ DOC' from xmltype ('))

    2013-08-14 T 15: 08:31
    ')

    Dt timestamp - default systimestamp COLUMNS

    ) x

    rewritten to:

    SELECT CAST)

    TO_TIMESTAMP)

    SYS_XQ_UPKXML2SQL (SYS_XQEXVAL (SYS_XQEXTRACT (VALUE(KOKBF$), '/ DOC/DT'), 0,0,20971520, 0), 50.1, 2)

    "SYYYY-MM-DD"T"HH24:MI:SSXFF"

    )

    BY timestamp - default systimestamp

    ) "DT".

    TABLE ("SYS". "XQSEQUENCE"(EXTRACT ("SYS"." XMLTYPE"(")

    2013-08-14 T 15: 08:31
    (((,'/ DOC'))) ' KOKBF$ '.

    So yes, maybe there is a bug here.

    Edit: somewhat more followed.

    It works:

    Select x.*

    Of

    XMLTable ('/ DOC' from xmltype (""))

    Date of the dt of COLUMNS by default sysdate) x;

    Actually no, it does not work. Certainly, maybe it produces no error, but the result is incorrect.

    As explained, the conversion is based on the NLS (NLS_DATE_FORMAT in this case) session:

    SQL > show nls_date_format settings

    VALUE OF TYPE NAME

    ------------------------------------ ----------- ------------------------------

    string of NLS_DATE_FORMAT JJ/MM/RR

    SQL >

    SQL > select sysdate to double;

    SYSDATE

    --------

    16/08/13

    SQL > select x.*

    2 from

    3 xmltable ('/ DOC' passing xmltype (""))

    4 COLUMNS dt date default sysdate) x;

    DT

    --------

    13/08/16

    Oracle first converts SYSDATE to a string using current NLS_DATE_FORMAT, having for result Aug 16, 13 '

    Then this string is converted to a DATE as XS: date is 'YYYY-MM-DD' leading 13/08/16 (13 August, 0016) which is incorrect.

    The obvious solution to this problem is to control how Oracle converts implicitly string to timestamp format:

    SQL > alter session set NLS_TIMESTAMP_FORMAT = "YYYY-MM-DD"T"HH24:MI:SS."

    Modified session.

    SQL > select x.*

    2 from

    3 xmltable ('/ DOC' from xmltype ('))

    2013-08-14 T 15: 08:31
    ')

    4 dt of systimestamp default timestamp COLUMNS

    (5) x;

    DT

    ---------------------------------------------------------------------------

    2013-08-14 T 15: 08:31

    SQL > select x.*

    2 from

    3 xmltable ('/ DOC' passing xmltype (""))

    4 dt of COLUMNS by default systimestamp timestamp) x;

    By default systimestamp timestamp COLUMNS DT) x

    *

    ERROR on line 4:

    ORA-01861: literal does not match the format string

    SQL > select x.*

    2 from

    3 xmltable ('/ DOC' passing xmltype (""))

    Cast of default timestamp COLUMNS dt (systimestamp timestamp) 4) x;

    DT

    ---------------------------------------------------------------------------

    2013 08-16 T 12: 32:58

  • Can I add a high-end Nvidia card to one of my workstations?

    Can I add one or more high end Nvidia card to one of my workstations?

    One is a SR5125CL, the other is a d5200t.  The software I want to run over them does not accept ATI cards of rather.

    The GPUGRID project, where I want to participate more, prefer cards in the GTX 275 GTX 295 range. I won't buy one until we know if they will even in the case.

    I read that they may require an upgrade of the power supply; No information on this?  What about information on the question of whether the cooling is likely to be adequate?

    No need matching between new checks, just the graphics cards.

    Also, where can I find estimates on the number of watts of power these machines use now, so I guess if I can handle the heat of the use of the rise to power?

    Message edited by milesrf on 10/18/2009 14:54

    milesrf wrote:

    Can I add one or more high end Nvidia card to one of my workstations?

    One is a SR5125CL, the other is a d5200t.  The software I want to run over them does not accept ATI cards of rather.

    The GPUGRID project, where I want to participate more, prefer cards in the GTX 275 GTX 295 range. I won't buy one until we know if they will even in the case.

    I read that they may require an upgrade of the power supply; No information on this?  What about information on the question of whether the cooling is likely to be adequate?

    No need matching between new checks, just the graphics cards.

    Also, where can I find estimates on the number of watts of power these machines use now, so I guess if I can handle the heat of the use of the rise to power?

    Message edited by milesrf on 10/18/2009 14:54

  • Apple still has a spare battery for Macbook late 2008 13 "aluminum unibody? My battery status shows the service battery. I have reset the alert status about 6 months ago, but he will not be reset again. Thinking I need a new battery Apple

    My battery status shows the service battery. I have reset the alert status about 6 months ago, but he will not be reset again. Thinking I need a new battery Apple!

    Batteries are no longer available on the Apple online store but can be at your nearest Apple Retail Store, you must check with your store. A better option is probably buy one yourself and replace it. Buy a quality like this http://eshop.macsales.com/shop/apple_laptop/batteries/MacBook_13_Unibody battery

    Avoid imitations cheap as those who are sold on auction sites.

  • New G4 active there are based on Motorola one month auditor of IMEI security

    Just got a brand new motorcycle G4 of Amazon UK, but when I look to the top of its warranty status here http://www.imeipro.info/check_motorola.html it is said that it has been activated on 26 July 2016, i.e. one month! Now, it also shows a manufacturing date: July 27, 2016 then the tool indicates that could there be some confusion in the news?

    Has anyone used this tool? Thank you!

    Webvan wrote:

    Just got a brand new motorcycle G4 of Amazon UK, but when I look to the top of its warranty status here http://www.imeipro.info/check_motorola.html it is said that it has been activated on 26 July 2016, i.e. one month! Now, it also shows a manufacturing date: July 27, 2016 then the tool indicates that could there be some confusion in the news?

    Has anyone used this tool? Thank you!

    You use one tool OTHER than motorola to perform the audit. So yes, there is confusion, but it's with the tool. The tool demonstrated when blocks of IMEI numbers are recorded. This 3rd party company is just making assumptions.

    Your warranty is with Motorola - not the site to check IMEI - and the warranty is from time of purchase.

    Your receipt, that's what counts. And any date IMEI you see things really is indicative and no longer be bound to make the date then date guarantee. After all, a site part 3 cannot know when the phone was sold and the warranty began. But the IMEI does not give them any idea when the phone was manufactured.

  • Dates of the Restore Points are one month in advance

    For reasons I don't understand, the date of the day on my computer was changed to one month before the effective date, for example from May 13 to June 13, 2013. As a specialist, I kept getting messages that my Microsoft Security Essentials were outdated. Later, I discovered that all the restore points created after May 13 are dated June 13. I corrected the date and have updated Security Essentials and things are back to normal, but I have several restore points, a month in advance. Restore recent points are correctly dated now, but what can I do on these wrong, before the restore points. Thank you.

    If the pc works fine, then 2 options:

    1 turn off the system restore, which will remove all items, reboot, restart System Restore, and a system checkpoint will be created.

    2. go to disk cleanup, use the tab options, System Restore, cleanup, it will erase everything but the last system restore points.

  • I have, just, paid, for, one, monthly, how, long ago, in fact, she, for take, LR and PS, to, work?

    I have, just, paid, for, one, monthly, how, long ago, in fact, she, for take, LR and PS, to, work?

    I have a receipt from paypal for payment, do you want the order of point number?

  • If possible a month subscription is canceled after one month

    If possible a month subscription is canceled after one month

    Cancel see answer #1 in https://forums.adobe.com/thread/2023066 - includes a link to Chat from Monday to Friday

  • Offers for only one month?

    Hello, I would like to take the offer to €199.99 VAT / month, but I have a question. I want to have this offer for only one month and thus pay only once.  I'm not anywhere that the offer is only for a month and I'm afraid it is renewed at the end of the month. But I can't pay this subscription twice.  Can you confirm that if I take the offer at €199 per month will be charged once?  Thank you

    Hello

    With one month subscription, you can stop the renewal through your account page if you do not want to renew for a second month.

    See cancel your membership of Stock

    Thank you

    Bev

Maybe you are looking for