Flex in first week - day - fail!

Seems I can't yet in step 1, it's really confused me...

I downloaded the sample files and put them in what I think is the right directory, but they are not displayed in the package Explorer.

I'll be the Sun?

Thanks for any help.

Liz

Screen shot 2011-07-09 at 13.51.48.pngScreen shot 2011-07-09 at 13.52.18.pngScreen shot 2011-07-09 at 13.52.45.png

Hey,.

Flash Builder does not always matter project files that you placed in your workspace file.  You must manually import using Flash Builder by selecting file > import... then to expand the General folder and selection of existing projects into workspace (see image).  Click on the Next button and use the dialog box to select the directory root (your workspace file) and import the projects you want.  All those you select will now be shown in the Package Explorer.

Tags: Flex

Similar Questions

  • Flex in a week - available in printed form?

    Is the Flex in a week available in print material?

    Hello

    I don't know if it's exactly what you need, however, both the video transcripts and exercises are available for download:

    You can print these stars, if you wish. I hope this helps you!

    Thank you

    Craig

  • sum of the months of data first weeks

    1 January 09 5
    January 2 09 3
    January 3 09 2
    :
    :
    :
    1 February 09 1
    February 2 09 1
    February 3 09 1
    4 February 09 1
    5 February 09 1
    6 February 09 1
    February 7 09 1

    For any date in January I should get the sum of the values of the next month first week i, e 1 February to 7 February 09 09
    for example, 01 - jan - 09 = 7
    :
    :
    29 jan - 09 = 7
    It will be better if you give the query I have terms of

    Sum (a) over (partition by order b by c lie between the interval Trunc (Trunc (sysdate, 'MONTH') + 1, 'MONTH') day following and '7' next day)

    Hello

    When you use a DATE column, specify the RANGE as a number of days:

    SELECT  SUM (a) OVER ( PARTITION BY     b
                                   ORDER BY          c
                     RANGE BETWEEN     ADD_MONTHS (TRUNC (c, 'MM'), 1)           - c  FOLLOWING
                              AND     ADD_MONTHS (TRUNC (c, 'MM'), 1) + 6.99999 - c  FOLLOWING  -- Not 7, as origninally posted
                   )  AS next_month_week_1_a
    

    Published by: Frank Kulash, March 11, 2009 12:41

    Fixed bug reported by Blushadow.

  • Use the level of battery to only 7% of the first week.

    I just bought a Toshiba NB250 about a week ago

    I was checking my autour hardware and installed Notebook Hardware Control and she showed me the level of wear on a battery of 7% only in the first week.

    Why is this? Is this normal? I have my Qosmio X 300 for a year now and its battery wear level is 0%

    What is the level of minimum wear acceptable to be responsible for the change of the battery under warranty?

    Thank you!

    > What is the level of acceptable minimum wear is responsible for the change of the battery under warranty?
    It is a very complicated issue and I don't think that someone here will give you an accurate answer to this question.

    Notebook hardware control is good tool but if this tool is really relevant is another question.
    What is the maximum length for computer laptop battery power?

  • How to set the flag for the first 3 days

    Hi all

    I have a table with a complete list of April and may 2015 date month and his working days (just for example, I have included only in April and may 2015 data but the table has data for 20 years since 2000).

    Below is the table create and insert scripts for complete data.

    CREATE TABLE dates_dim(day DATE, business_day NUMBER, month NUMBER, day_of_week VARCHAR2 (100));
    
    Insert into DATES_DIM Values (TO_DATE('05/01/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 1, '201505', 'FRIDAY');
    Insert into DATES_DIM Values (TO_DATE('05/02/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SATURDAY');
    Insert into DATES_DIM Values (TO_DATE('05/03/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SUNDAY');
    Insert into DATES_DIM Values (TO_DATE('05/04/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 2, '201505', 'MONDAY');
    Insert into DATES_DIM Values (TO_DATE('05/05/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 3, '201505', 'TUESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/06/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 4, '201505', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/07/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 5, '201505', 'THURSDAY');
    Insert into DATES_DIM Values (TO_DATE('05/08/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 6, '201505', 'FRIDAY');
    Insert into DATES_DIM Values (TO_DATE('05/09/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SATURDAY');
    Insert into DATES_DIM Values (TO_DATE('05/10/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SUNDAY');
    Insert into DATES_DIM Values (TO_DATE('05/11/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 7, '201505', 'MONDAY');
    Insert into DATES_DIM Values (TO_DATE('05/12/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 8, '201505', 'TUESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/13/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 9, '201505', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/14/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 10, '201505', 'THURSDAY');
    Insert into DATES_DIM Values (TO_DATE('05/15/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 11, '201505', 'FRIDAY');
    Insert into DATES_DIM Values (TO_DATE('05/16/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SATURDAY');
    Insert into DATES_DIM Values (TO_DATE('05/17/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SUNDAY');
    Insert into DATES_DIM Values (TO_DATE('05/18/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 12, '201505', 'MONDAY');
    Insert into DATES_DIM Values (TO_DATE('05/19/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 13, '201505', 'TUESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/20/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 14, '201505', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/21/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 15, '201505', 'THURSDAY');
    Insert into DATES_DIM Values (TO_DATE('05/22/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 16, '201505', 'FRIDAY');
    Insert into DATES_DIM Values (TO_DATE('05/23/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SATURDAY');
    Insert into DATES_DIM Values (TO_DATE('05/24/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SUNDAY');
    Insert into DATES_DIM Values (TO_DATE('05/25/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'MONDAY');
    Insert into DATES_DIM Values (TO_DATE('05/26/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 17, '201505', 'TUESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/27/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 18, '201505', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/28/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 19, '201505', 'THURSDAY');
    Insert into DATES_DIM Values (TO_DATE('05/29/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 20, '201505', 'FRIDAY');
    Insert into DATES_DIM Values (TO_DATE('05/30/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SATURDAY');
    Insert into DATES_DIM Values (TO_DATE('05/31/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SUNDAY');
    Insert into DATES_DIM Values (TO_DATE('04/01/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 1, '201504', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('04/02/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 2, '201504', 'THURSDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/03/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 3, '201504', 'FRIDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/04/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SATURDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/05/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SUNDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/06/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 4, '201504', 'MONDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/07/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 5, '201504', 'TUESDAY  ');
    Insert into DATES_DIM Values (TO_DATE('04/08/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 6, '201504', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('04/09/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 7, '201504', 'THURSDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/10/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 8, '201504', 'FRIDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/11/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SATURDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/12/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SUNDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/13/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 9, '201504', 'MONDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/14/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 10, '201504', 'TUESDAY  ');
    Insert into DATES_DIM Values (TO_DATE('04/15/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 11, '201504', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('04/16/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 12, '201504', 'THURSDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/17/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 13, '201504', 'FRIDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/18/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SATURDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/19/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SUNDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/20/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 14, '201504', 'MONDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/21/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 15, '201504', 'TUESDAY  ');
    Insert into DATES_DIM Values (TO_DATE('04/22/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 16, '201504', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('04/23/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 17, '201504', 'THURSDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/24/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 18, '201504', 'FRIDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/25/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SATURDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/26/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SUNDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/27/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 19, '201504', 'MONDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/28/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 20, '201504', 'TUESDAY  ');
    Insert into DATES_DIM Values (TO_DATE('04/29/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 21, '201504', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('04/30/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 22, '201504', 'THURSDAY ');
    COMMIT;
    

    I'm looking for a select statement that defines the indicator 'Y' for April records months and "n" for records in may for the first 3 days of the request. Here's the difficult thing, the results should vary depending when they run the select query.

    For example:

    Scenario-1: If I run the SQL code may 1st, 2nd, 3rd, 4th, or 5th (with in the first 3 days), FLAG must be set on 'Y' for records in April and "n" for records in May.

    Scenario 2: If I run anywhere between May6th 31, FLAG must be set to ' do for April month and 'Y' for records in May.

    Search results for scenario 1 should look something like this the results of the SQL query below (as I can't keep the complete set of results, I wrote a select query which will give you the expected results if you run the DDL and DML scripts above)

    select day,case when day between '01-APR-2015' and '30-APR-2015' then 'Y' else 'N' end flag from dates_dim;
    

    Results for the scenario-2 should look something like this the results of the SQL query below (as I can't keep the complete set of results, I wrote a select query which will give you the expected results if you run the DDL and DML scripts above)

    select day,case when day between '01-APR-2015' and '30-APR-2015' then 'N' else 'Y' end flag from dates_dim;
    

    Please let me know if it is confusing. Thank you.

    Hello

    Thanks for posting the CREATE TABLE and INSERT statements; It's very helpfu.

    Month article it should really be a DATE, not a NUMBER. This issue (and many others) would be simpler and more effective it was a DATE, rather than a NUMBER, since it must be compared with the DATEs.

    As the month is a NUMBER, do not insert VARCHAR2 values, such as '201505', in it.

    Why is-day_of_week 100 characters?  The longest name in English ("WEDNESDAY") is 9 characters.  Day_name fairer apply in trouble.

    Here's a way to do what you asked:

    DEFINE SYSDATE = "DATE" "2015-05-05.

    DEFINE SYSDATE = "DATE" "2015-05-06.

    WITH got_effective_month AS

    (

    SELECT TO_NUMBER (TO_CHAR (ADD_MONTHS (& SYSDATE

    CASE

    WHEN COUNT (*)<=>

    THEN-1

    0 OTHERWISE

    END

    )

    , "YYYYMM.

    )

    ) AS effective_month

    OF dates_dim

    Day WHERE BETWEEN TRUNC (& SYSDATE, 'MONTH')

    AND & SYSDATE

    AND business_day > 0

    )

    SELECT d.

    CASE

    WHEN month = e.effective_month

    THEN 'Y '.

    ANOTHER "N".

    Flag of the END as the

    OF dates_dim d

    CROSS JOIN e got_effective_month

    ORDER BY d.day

    ;

    I used the proxy & SYSDATE to test.  In Production, you will use the SYSDATE function instead.

    A calendar table, like days_dim, is really a good idea.  You may consider adding a column business_day_count cumulative, a NUMBER that increments of 1 every day business.  To find out how many days passed since any day x (for example, the 1st of this month), you would only need extract the 2 rows in the table: line x and the line today.

  • Como puedo cancel y tener mi refund if I am in first 14 days

    How can I cancel and get my refund if Im in the first 14 days

    Hi Julio,.

    Please contact support by calling/chat for cancellation requests and billing queries:

    Contact the customer service

    * Be sure to stay connected with your Adobe ID before accessing the link above *.

    You can also check the help below document:

    Cancel your membership creative cloud

    It could be useful!

    Rayyan

  • I want to cancel my membership and it is within the first 30 days. How can I do this? This forum seems to be my only option to get help, you do not have a phone number to call?

    I want to cancel my membership of the Adobe Creative cloud and it is always in the first 30 days of purchase.  However, I need help to do this, as this forum is the only form of communication you have? Please help, thank you in advance.

    Kim

    Look through the links below and use the option to chat if needed for your situation:

    Cancel your subscription or membership. Creative cloud

    https://helpx.Adobe.com/x-productkb/policy-pricing/cancel-membership-subscription.html

    https://forums.Adobe.com/thread/1703848

    Chat support - the link below click the still need help? the option in the blue box below and choose the option to chat...

    Creative cloud support (all creative cloud customer service problems)
    http://helpx.Adobe.com/x-productkb/global/service-CCM.html ( http://adobe.ly/19llvMN )

  • Flex in a week: run the mxml, but nothing shows

    Hello

    I do the flex in a week course. Pain in the ass to see the design mode is gone but good no worries.

    In any case, I run the mxml and nothing shows. I also ran the swf that was produced and Yes - empty. However, the code seems fine so I am confused.

    < / s:Application >

    <? XML version = "1.0" encoding = "utf-8"? >

    " < = xmlns:fx s:Application ' http://ns.Adobe.com/MXML/2009 "

    xmlns:s = "library://ns.adobe.com/flex/spark".

    xmlns:MX = "library://ns.adobe.com/flex/mx".

    minWidth = "955" = "850" minHeight >

    <!-exercise 1.01: implementation of your project-> files

    <!-- Styles ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ -->

    < fx:Style source = "Styles.css" / >

    <!-- Script ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ -->

    <!-statements ~ ~ ~->

    < fx:Declarations >

    <! - Place non-visual elements (e.g., services, items of value) here - >

    < / fx:Declarations >

    <!-UI components ~ ~ ~->

    < s:Label x = "10" y = "34".

    width = "690" height = "40".

    Text = "" Employee Portal: vehicle request form ""

    styleName = "titleHeader" / >

    < s:Form x = "10" y = "70" >

    < s:FormItem label = "employee:" >

    < s:DropDownList / >

    < / s:FormItem >

    < s:FormItem label = "office phone:" >

    < s:TextInput / >

    < / s:FormItem >

    < s:FormItem label = "Mobile phone:" >

    < s:TextInput / >

    < / s:FormItem >

    < s:FormHeading label = "Dates" / >

    < s:FormItem label = "pickup Date:" >

    < mx:DateChooser / >

    < / s:FormItem >

    < s:FormItem label = "Date of return:" >

    < mx:DateChooser / >

    < / s:FormItem >

    < s:FormItem >

    < s:Button label = "Submit Request" / >

    < / s:FormItem >

    < / s:Form >

    Are you sure that you run the mxml right? A few time to create a new also helps. Sometimes templates html (js files) are absent from this cause an error javascript and nothing to load. Usually, the own generation project done. If you right click on the generated swf file that shows?

  • I deleted my subscription for first month within the first 30 days, and I want my refund

    I deleted my subscription for first month within the first 30 days and I want my refund

    This is a forum for user to user with the space provided by Adobe, not the Adobe support

    Adobe contact information - http://helpx.adobe.com/contact.html

  • get the first week of the month

    Hello
    How to get the first week of the month of request

    I tried this, but not gwtting

    SELECT THE DOUBLE TO_CHAR('09/30/2007','W')

    Thank you

    Published by: 896398 on January 18, 2012 03:17
    SQL> select to_char(to_date('07-12-2008', 'DD-MM-YYYY'), 'W') from dual; 
    
    T
    -
    1
    
    SQL> select to_char(to_date('14-12-2008', 'DD-MM-YYYY'), 'W') from dual; 
    
    T
    -
    2
    
    SQL> select to_char(to_date('23-12-2008', 'DD-MM-YYYY'), 'W') from dual;
    
    T
    -
    4
    

    HTH

    Kind regards
    NORTH CAROLINA

  • First week of 2010

    Hi all

    I'm using CFMX 6.1 and facing a problem in obtaining the current number of week starting the week of January 3, 2010.

    ColdFusion returns 2 for #Week('03-Jan-2010') #, but I wanted that is 1, as it is the first week of the year.

    Is there a way to do this with CFMX 6.1?

    Thank you very much

    Roll: http://en.wikipedia.org/wiki/ISO_week_date.

    But first check if somebody has already done and posted to cflib.org.

    --

    Adam

  • Find first &amp; last day of the week of the given date

    Hi all

    I have the input query, below

    WITH TEM AS (SELECT 11 January 13 ' DT dual union SELECT June 16, 12 'from dual union SELECT 4 July 12' dual Union SELECT 9 January 13 'from dual union SELECT 10 January 13' dual Union SELECT 4 January 13 'from dual union SELECT 7 January 13' from dual union SELECT 4 June 13 'from dual union SELECT 8 January 13' double) TO_DATE (DT) SELECT D1 ,' WEEK ' | To_char (to_date (DT), 'IW-YYYY') tem WK;

    I would like to get output that is below start date week (Saturday) & the end of the week (Friday)

    DTPeriod of the WEEKMax Date in this weekMin Date this week
    June 16, 12WEEK 24-2012June 16, 1222 June 12
    July 4, 12WEEK 27-201230 June 12July 6, 12
    January 4, 13WEEK 01-2013January 4, 1329 December 12
    January 7, 13WEEK 02-20135 January 13January 11, 13
    January 8, 13WEEK 02-20135 January 13January 11, 13
    January 9, 13WEEK 02-20135 January 13January 11, 13
    January 10, 13WEEK 02-20135 January 13January 11, 13
    January 11, 13WEEK 02-20135 January 13January 11, 13
    June 4, 13WEEK 23-20131 June 13June 7, 13

    Indicate also if a function available in oracle for this one.

    Like this? I think in your required output, 3rd line data, MAX_DATE should be 29 December 12 and MIN_DATE should be January 4, 13.

    WITH TEM AS

    (SELECT 11 January 13 ' DT double Union)

    SELECT 16 June 12 ' Union double

    SELECT 4 July 12 ' Union double

    SELECT January 9, 13 ' Union double

    SELECT 10 January 13 ' Union double

    SELECT 4 January 13 ' Union double

    SELECT January 7, 13 ' Union double

    SELECT 4 June 13 ' Union double

    SELECT 8 January 13 ' double)

    SELECT D1 DT,

    WK WEEK_PERIOD,

    BOX WHEN (TRIM (TO_CHAR (D1, 'DAY')) = 'SATURDAY') THEN D1

    ANOTHER NEXT_DAY(D1,'SATURDAY')-7

    END AS MAX_DATE_IN_THIS_WEEK,

    BOX WHEN (TRIM (TO_CHAR (D1, 'DAY')) = 'FRIDAY') THEN D1

    OF OTHER NEXT_DAY(D1,'FRIDAY') END AS MIN_DATE_IN_THIS_WEEK

    DE)

    SELECT TO_DATE (DT) D1,' WEEK ' | To_char (to_date (DT), 'IW-YYYY') tem WK)

    ORDER BY DT;

    OUTPUT:

    DT WEEK_PERIOD MAX_DATE_ MIN_DATE_

    --------- ------------ --------- ---------

    JUNE 16, 12 WEEK 24-2012 16 JUNE 12 22 JUNE 12

    4 JULY 12 WEEK 27-2012 JUNE 30, 12 6 JULY 12

    4 JANUARY 13 WEEK 01-2013 29 DECEMBER 12 JANUARY 4, 13

    JANUARY 7, 13 WEEK 02-2013, JANUARY 5, 13 JANUARY 11, 13

    JANUARY 8, 13 WEEK 02-2013, JANUARY 5, 13 JANUARY 11, 13

    JANUARY 9, 13 WEEK 02-2013, JANUARY 5, 13 JANUARY 11, 13

    10 JANUARY 13 WEEK 02-2013, JANUARY 5, 13 JANUARY 11, 13

    JANUARY 11, 13 WEEK 02-2013, JANUARY 5, 13 JANUARY 11, 13

    4 JUNE 13 WEEK 23-2013, JUNE 1, 13 JUNE 7, 13

    9 selected lines.

  • Date by default on the ground a week day?

    Hello:

    I've almost finished a new package of rental, and our company's traditional first day is Monday and so would automatically informed the field "Start Date" as the next Monday after... But of course I want to be able to be replaced by another train date (e.g. vacation, get a head start on the hiring of new employees for 2 weeks of absence, etc.).

    Example: If today was Tuesday, May 24, 2016, I want the default date to automatically populate the area 30/05/2016 (on Monday)... But since our company closed actually in honor of the remembrance day (our hero can rest in peace), I want to be able to change it manually to the 31/05/2016 (and Yes, I do this on my day).

    Can someone do me a huge favor and postcode for me since I'm not an expert on coding (the most relevant answer was just to get "getDay()" and I have no idea where from there)? Thank you very much!

    I suggest you use a button to fill in the field if you want to be able to override the Auto value.

    This code should do the trick:

    var day = 86400000;
    var d = new Date();
    var currentDay = d.getDay();
    if (currentDay==0) { // Sunday
        d.setTime(d.getTime()+day);
    } else if (currentDay>1) { // Tuesday - Saturday
        d.setTime(d.getTime()+day*(7-(currentDay-1)));
    }
    this.getField("Start Date").value = util.printd("mm/dd/yyyy", d);
    
  • First Vista installation failed: what to do now?

    I bought a Satellite L300-19F Notebook with preinstalled Vista Home Premium. Without the backup DVD, which Toshiba does not provide.

    I started the computer, still had to make choices to complete the installation and then power went. If the Vista installation has failed. It says 'install again', but since I don't have any DVD, what can I do?

    This is an OEM version. OEM is related to the motherboard. This means it is possible to borrow a Vista DVD of detail, install it from there and activate it with my OEM code?

    I agree with sascha. To be honest is none other than the first option. Just try to start the HARD drive recovery process. I hope that the next time you're lucky and also able to install and start Vista.

  • What cancellation would be paid should I cancel the month by month plan ' photography' after the first 14 days?

    Adobe said that after the first days 14 cancellation period of reflection would make me responsible for '50% of the remaining contract obligation '. I can't find another explanation as to what is the obligation of contract. Common sense would make me think that would mean 50% billable months remaining. However, the lack of transparency makes me suspicious that it could be defined as the total of the annual contract.

    Can someone tell me permanently? And show me where in the terms it says this?

    Thanks in advance

    R

    The contract is for 12 months. If you cancel after cooling then you pay 50% of however much of the 12 months is remaining.

    Adobe - General conditions of subscription

Maybe you are looking for

  • I have an error of comms EOS 24-105mm

    I have a 24-105, attached to a 5 d Mk III EOS and get an error message: 'Err 01 communication between the athd goal is defective. Clean the contacts of the lens. "This happens when you try to shoot at any focal length except wide open. If you try to

  • Why my computer won't start with the DDR RAM?

    eMachines T5026 Memory Specifications Standard memory 512 MB (removable) Maximum memory 4. 0 GB Memory expansion 4 Sockets Memory comments PC2700 DDR SDRAM DIMM. Supports Dual Channel DDR. Type of processor Processor Intel Pentium 4 519 3.06GHz Model

  • How can I send a laptop to HP for repairs?

    I have a laptop HP Pavilion with a cracked screen. This is the second time that the screen is cracked. The first time, we had a technician HP come to the House to fix it. He seemed a bit inexperienced and nervous and had difficulty getting the displa

  • Not COOL!

    Why in the world that my laptop acer aspire 5515 say is not authentic windows? What happened to my laptop? Please asnwers as soon as possible. You can solve this problem? send me an email with "remove personal information".

  • Required for NAC firewall ports manager manage/add the Cisco switch

    Hello I am trying to add switches cisco for the NAM, but I am not able to add the switch I get the error "unable to control switch" I tried opening ports 161-162 on the firwall; If I were to allow all traffic between the NAM and the switch, cisco NAM