How do I copy one project to another test cases?

Currently we have several within projects oracle test manager following test cases in each of them. I need to be able to copy some of these test case to other projects or at least select them to run under a new project rather than retype it each time. Is there a way to do this? I see that I can copy in a project and the dough, but do not have be able to find a way to make outside of a project. Maybe there is a way to export and then import? Any ideas would be helpful?

Thank you

Hello

You can still export a summary table of the test report in XLS and import it into the new project, but it won't give you the results or test steps, but at least is a start.

There is also something called data links take a look at the help file you may be able to use when creating test scenarios, you can create the test in CSV case first and then download on several projects using data binding.

Hope this helps

Alex

Tags: Oracle Development

Similar Questions

  • How can I copy one page to another one of my Web sites and publish it on one of my sites?

    How can I copy a page from one of my Web sites and display it on another?

    For any page either direct or added to your muse site, but not included in the navigation, you can use

  • Is there a way to copy properties to disable conditional from one project to another?

    I have a bit of code in a project that I want to back off to a colleague and want to do a new 'reduced' project with only a few subvis.  I don't want to necessarily or need him for the entire project, but only access to a privileged few.  Is there a way to copy the conditional disable properties from one project to another?

    Thank you

    Tech12

    Thanks, it works, but I couldn't get the symbols will appear in the 'project' "Properties..."

    Tech12

  • Rotoscoping mask copy from one project to another

    Hello:

    I did some rotoscoping and put in several hours animating the mask only to realize that I'm not in the project, which is intended to Rotoscoping. Is it possible to copy a layer mask animation of one project to another?

    Save the project with the new name.  Open the correct project and import the project roto.  Copy the layer for the correct model and reduce the project down.  Save as a new name.

  • How can I copy Firfox bookmarks from another computer to this one?

    How can I copy Firefox bookmarks from another computer Windows running Firefox (which is also a Windows machine)?

    The profile is a file that store your personal information in a safe place
    Here explain how to save the profile

    Here explain how to restore

  • If you use vista, how to move from one account to another windows messaging?

    My set cable company in place for e-mail accounts.  One for my wife and one for me.  My wifes account is the default value.  How to switch from one account to another?

    I searched through default settings, account information, etc. anything. I believe that under XP, you could choose an account or another.

    OE has the option of identities, Winmail opener does not work. Unless you have separate Windows logons, you use the same instance of WinMail and share the same Inbox, unless you create another and divert the mail with message rules. The only "switch" you have at the moment is when you compose a new message, there is an arrow down to the right of the field to choose the account, the message will be.

  • How nagivate values from one page to another page as well assured in different modules like po and pon

    How nagivate values from one page to another page as well assured in different modules like po and pon?

    I tried using the session values, hashmap, and Transaction. But none worked.

    Please help me on this.

    Dilip thanks.

    My problem is solved.

    I solved the issue.using the main concepts of java.

    By importing a package into other package and then instantiate the required class.

    Kind regards

    2793235.

  • The fastest way to copy one schema to another.

    Hi guys

    Oracle11gr2
    OEL 5

    I have a requirement to copy one schema to another. I don't have access to linux for the server hosting the database. So I guess that the datapump cannot be used. exp/imp conventional takes too long. Another way I can achieve the goal? What is the best way. is it possible to copy all the object using a dblink (triggers to tables, views, procedures etc.)

    PS: Both the schema are in the same database.

    Thank you
    Ankurk

    They are in the same database, so no db connection is necessary; Fatest? It depends on my factors;
    Why no loop all the sources of the tables in the schema and do;

    insert into target_schema.target_table
    select * from source_schema.source_table;
    

    You are 11 GR 2, datapump could be a solution...

    Directory user/pwd Impdp = DMP_DIR dumpfile = source_schema_dmp.dmp logfile = impdp.log remap_schema = source_schema:target_schema

  • How to navigate from one page to another page.

    I'm trying my hands on Flex by building a sample application.

    After the user connects I want it to be on the home page. So in Flex how to navigate from one page to another on certain conditions?

    A way I thought is to make invisible visible n components, but which does not seem a good idea.

    What approach allows us to reach this goal?

    Please suggest.

    For your scenario, you really have to use the ViewStack (do not use States for this).

    Here is a link:

    http://livedocs.Adobe.com/Flex/3/HTML/Help.HTML?content=navigators_3.html

    And here is a very simple code:


    http://www.Adobe.com/2006/mxml">
     
     
       
         
       

       
         
       

       
         
       

       
         
       

     

    If this post answers your question or assistance, please mark it as such.

  • How to transfer or copy a title/text from one project to another element?

    I have a text with sequences of movement custom built into one project, I would like to transfer to another project.  How can I do?

    Hi, once again...

    This works!  In GIMP (sorry, no photoshop, but it would have worked, too!), I created an image of 1920 x 1080 green, pure and put it back plan of my animation, moving text.  Then I exported the animation using my usual AVCHD, high option resolution 1920 x 1080 p MP4 H264 30.

    When I add that as an asset, I put just the effect of saturation on the animation and I'm all set.  I have to adjust my colors a little, as the Chroma find little green in my text - but I can do without any problem.

    We are all together!  Thank you, AT - problem!  The solution was not in export, but how to communicate the transparency of the project has project B.

    Thanks for your help!  You got me on the right track...

    -Tom

  • Can I copy and paste from one project to another?

    I have a scrolling title works very well in a single project and wanted to "simply" copy and paste into another project.  After the copy on the project 1, when I come to 2 project to make the dough, there are nothing to paste.  Is it something with Premiere elements 12, or with my iMac for not keeping that I copied into the memory buffer appropriate?  I found something online which implies there was a software to do this, but I can't believe that this is the only solution.

    I also created a "temporary project" for easier editing with images, transitions and added I want to put into my project "master."  I could create an avi and bring it back on, but I was hoping to get the project finished in a single source.  Any thoughts would be appreciated. Merci.

    Rick

    Rick

    The merger of two projects into one is not relevant and overlooks the important of Premiere Elements concepts if all you want to do is to use a title of a project in another.

    There is a simple and effective way to do it. Essentially, you create your title in the Titler to project 1 and then 'save' as a CTR file which can be imported into another project of Premiere Elements through the Add Media/files and folders.

    1. in the project 1, create your title in the Titler. Close to there.

    2. always in 1 project, go to the active project and it highlight / select the thumbnail for the title.

    3. can I go to Menu/export/name of the file and export/save your title as a file .prtl.

    4. If necessary, import the .prtl file project 2... Add media/files and folders/projects active where drag you it to its destination of chronology.

    Conventional techniques to transfer the contents of one Premiere Elements project to another will not apply to your situation somehow.

    Please see the newsletter and let us know how the above worked for you.

    Remember, you don't want to highlight the title in the timeline to get an active file Menu/Export/Title...needs to be the highlight / select the

    title in the active project, then Menu/export/name of the file.

    RTA

  • Copy a project to another computer without recompiling FPGAS

    Hello

    I copy project LabVIEW FPGA from one computer to another and found that the FPGA program needs to be recompiled. Is there a way to bypass? Thank you!

    Tom

    Try to set up 'Open VI FPGA reference.vi' (right-click it) so that it directly opens the compiled file .lvbitx instead of the VI project

  • How do you burn one cd to another? Using windows xp.

    How to burn one cd to another...

    Hi amiot,.
     
    Here are some articles that you might find useful:
     
     
  • How to place partially one layer under another layer? (Photoshop CS6)

    Hello! Currently, I am working on my art project which consists of collage work.

    So my question is how can I place a layer under another layer partially?

    The result I get:

    Photo on 18-9-15 at 8.27 pm copy.jpg

    Thank you!!

    Hi birdwith1eye,

    You that would achieve with the help of a layer mask.

    Check these:
    Photoshop CS6 Tutorial - understand layer masks - YouTube

    Use masks to hide the Photoshop layers

    I hope this helps?

  • Copy one file to another layer in PScc2014

    I think I saw a way to copy a layer from one file to another, when I'm in the consolidate all to tabs mode. Visible image one slide, or otherwise a layer to one of the tabs at the top of the window and this copy the layer to the image on this tab.

    I can't get it to work,

    I don't know about the 'double layer' selection in the layers panel, but there seems to be another faster way. I imagine this?

    I use iMac, Yosemite.

    Thank you

    Vince

    Same thing here. Photoshop CC, Yosemite.

    What you are to select the layer on the source document that you will move. Use Opt + eyeball to hide all other layers, so you can see clearly what you are moving. Do not do anything dragging them from the layer panel, open the document window.

    Then select the tool travel, go in the document window and drag this layer on the other file document tab until it opens.

    Then, drag and drop in your destination document. You could hold down the SHIFT key if you want to Center until you drop.

    It works in CC and CC 2014.

    Gene

Maybe you are looking for