Instantis project and the Phase Dates

Is it possible to link the project and dates for the activities under Phase of their planning?

Can you not make the dates don't defer?

Instantis schedules Oracle roll in the traditional way.  Normally, when someone creates your calendar templates, add it to the effort and the duration of the child of the tasks for the summary tasks or phases.  The project leader can keep these totals to date in their schedules.

If your activities are related to the use of dependencies, Instantis can be used to recalculate all the dates and the hours that remain for activities (annex manage > Project reschedules > calculate the Dates [and update Plan or Plan/Baseline]).  This should keep your calendar up-to-date.

Tags: Oracle Applications

Similar Questions

  • project and the strange behavior of FPGA v

    I had a strange problem with my main project and the FPGA inside screws.

    It seems than a recent revision/replacement of a part of the code (replaced subVIs with the latest revisions with different names) prompted the VI to load screws unused when I save it.

    The story gets more strange because I can create a totally blank FPGA VI within the project and it still load the same SubVIs when I save it.

    I can save repeatly the VI and the same (now nonexistent) subVIs will be charged each time before the economy can complete

    The SubVIs are not displayed in the VI hierarchy and are no longer in the project at all - but are always loaded by a VI that does no resemblance or relationship to the original VI.

    Is my project completely broken?

    If Yes is there a way to fix without starting from scratch ?

    Thanks for any help in advance

    Dan

    you have a screw under the fpga target who could still make reference to the missing subvis? If the project think that you still have a dependency on these missing subvis, they will appear (with a warning that I think) to under the item "dependencies" of the target fpga. When you save a vi in the context of fpga, labview support the other screws in the same target to ensure they are still valid and up to date of the accounting information. If you have any other screws which are still divided on disc (even if they set up on top of the load), you will have to wait until they take whenever you save the vi in question.

  • I just replaced my MB Pro with a MB Air. Air has less memory and will not support a full restore of files and the saved data. How to do a partial restore

    I just replaced my MB Pro with a MB Air. Air has less memory and will not support a full restore of files and the saved data. How to do a partial restore

    Do you still have the MBP? If so you can manually copy and paste the files you need.

    If you do not have the pro more, you need to buy a USB key and plug it into the MBA... use it as a target. Once you have a system file of the previous laptop again, you have to manually choose what to copy across.

  • Error: 0xc000012f and the KERNEL DATA PAGE FAULT

    My son has a laptop of game.  Since last week, he experienced extreme problems.  A constant if the following errors: 0xc000012f and the KERNEL DATA PAGE FAULT.  Although I'm not technologically savvy, I tried the obvious in running virus scan and visiting different communities for troubleshooting tips.  When you run the antivirus (paid service) analysis, the system hangs and the system restarts.  I attended ASUS website in the hope of getting more advice than to have to provide access to the laptop of my son to a technician who gave me some insurance for the better part of 45 minutes that he help and troubleshooting problems.  He highlighted a very detailed chart of downtown action (reliable?), which looked pretty serious.  Suffice it to say, the conversation ended when he asked a one-time fixed fee of $200.  When I refused, he went to stop everything.  I would simply like to take any action that will further damage the laptop of my son. I paid $3K for this system.  Is someone can you please help me solve these problems?  I was going to buy a registry cleaner but was informed in an online community chat room not to do so that these products are not reliable.  Thank you all in advance for your review and taking the time to help me.

    Original title: need assistance immediately please.

     We need the log files themselves (called a DMP files) because they contain the only record of the sequence of events that led to the accident, what drivers have been loaded, and what has been loaded.


    Please follow our instructions to find and download the files, we need to help you fix your computer. They can be found here

    If you have any questions regarding the procedure, please ask


    I find the files DMP prayed and tried their zip.  I received the following: file not found or no read permission.

    I took it to a repair shop for yesterday I had to argue that these issues were well beyond my skill level.  The owner of the store insisted that the 'hard drive' was "fried".  It was agreed to replace the necessary parts (gave me a "Crucial - M4 Solid State Drive - 128 GB), this is the info on the box, to replace my 750Go son.  He said that, even if was less "room" it would "fly".  The original price was $ 200 and climbing!  Give me the question my faith in humanity at this time.  Is not relevant to the prey on someones lack of knowledge.  You and the other hand, all those who try to make a difference... who are trying to help is welcomed.  I wish offered troubleshooting would come to maturity.  Nonetheless, I humbly thank you for your support and follow-up in this case.

    I took it to a repair shop for yesterday I had to argue that these issues were well beyond my skill level.  The owner of the store insisted that the "hard drive"was"French fries".»  It was agreed to replace the necessary parts (gave me a "Crucial - M4 Solid State Drive - 128 GB - INFORMATION ON LISTED), to replace my 750Go son.  He said that even if it was less "room" it would "fly".  The original quoite was $ 200 and climbing! Give me the question my faith in humanity at this time.  Seems very inappropriate to prey on someones lcak of knowledge.  You on the other hand and those who try to make a difference... who are trying to help, should be commended.  I wish offered troubleshooting would come to maturity.  Nonetheless, I humbly thank you for your support and follow-up in this case.

  • Windows Live Alerts to the email address and the password, date of birth, ect... to veryify the e-mail account is active for real?

    Victorinox original title: Windows Live Mail alert.

    WIndows Live Alerts to the email address and the password, date of birth, ect... to veryify the e-mail account is active for real?

    Hello

    The question you have posted is better suited to the support of Windows Live Mail. I recommend you ask your question to the Windows Live Mail support for assistance.

    Hope the helps of information.

  • I hit a button on the accident and lost my bar with my open projects and the bar to maximize reduce it and close the program, I don't know what buttons to press to get back them

    Just like the post said.  I accidentally fat fingers and when I did I lost my navigation bar that has my open projects and the outline view bar that allows you to minimize, maximize, and close Adobe.  Any help yall could give would be great.

    Press the F button to change the workspace or the Tab key to leave the rear panels.

  • Filling of updated by and the last Date of update in Wizard generated shape tab

    Version 4.2.6.00.03

    Hello

    I have a wizard generated shape tab and I have to fill two columns last updated by and last Date of update.

    I have a horrible time to do something which should be easy enough.

    I created a page process:

    BEGIN

    BECAUSE me in 1... APEX_APPLICATION.g_f01. COUNTY

    LOOP

    UPDATE high_level_estimate

    SET last_updated_date = SYSDATE

    , last_updated_by =: APP_USER

    WHERE high_level_estimate_id = APEX_APPLICATION.g_f03 (i);

    END LOOP;

    END;

    But the columns are not updated.

    The primary key column and the primary key column appears in do not appear that's why I think the columns are not updated.

    So when a new row is added or an existing row is updated when the user clicks on the button submit these two columns need to be updated.

    Can someone help me get this to work?

    Can what information I provide?

    Thank you

    Joe

    Jen,

    Wow! Thanks for checking back!

    I had finally it works. Sorry I didn't update the post.

    I used the trigger approach, although I do not like but it is.

    What I did try to find out which of these two areas were the origin of the problem. So said the two fields in the query and ran the page and update the page and there is no error of course since I commented on the columns.

    Then I've uncommented a column, repeated updates, and worked, and this column has been updated.

    I uncommented the other column, repeated that updates and work again and again update the two columns.

    I have NO IDEA why. Somehow something has been corrupted, and comment and uncomment the columns set.

    I have no change to relax during this process. The relaxation I posted earlier is the same code.

    Thank you very much for your help Jen!

    Thank you

    Joe

  • How can I select the first date (at least) and the corresponding date of two different tables source?

    I have 2 tables, INVOICE and INVOICE_REFNUM similar to below. I'm writing a query that withdrawing the first date (less) for a single record remaining the two tables. Each table records the receipt of invoices, but according to the source of the received invoice some may reside in INVOICE_REFNUM and others the INVOICE table. I also use DECODE on the topic of INVOICE_SOURCE, when the date less is taken from the INVOICE table that contains that field, so if the date is in the field INVOICE_REFNUM DECODE is not necessary. Example:

    INVOICE (table)

    INVOICE_GID INVOICE_SOURCE INSERT_DATE

    ABC. AVRT123 I HAVE 11/03/2012-15:49:32

    ABC. CNWY234 G 12/03/2012 14:07:30

    ABC. UPGF678 M 15/03/2012 20:21:54

    INVOICE_REFNUM (table)

    INVOICE_GID INVOICE_REFNUM_QUAL INVOICE_REFNUM_VALUE INSERT_DATE

    ABC. AVRT123 SOURCE ACS 11/03/2012 14:49:32

    ABC. CNWY234 SOURCE CSA 12/03/2012 13:07:30

    ABC. UPGF678 SOURCE ACS 15/03/2012 21:21:54

    My decode statement is: DECODE ("INVOICE_SOURCE, 'I', 'IDE', 'G', ' Auto-Pay", ', 'Manual')

    If I were to write a query on these two tables, the output will resemble the following:

    INVOICE_GID INVOICE_SOURCE INSERT_DATE

    ABC. AVRT123 ACS 11/03/2012 14:49:32

    ABC. CNWY234 ACS 12/03/2012 13:07:30

    ABC. UPGF678 Manual 15/03/2012 20:21:54

    I worked on it for 2 days, and I was able to pull a date by using the following SQL code, but cannot determine how to extract the corresponding source:

    SELECT THE LEAST (GLOGOWNER. INVOICE_REFNUM. INSERT_DATE, GLOGOWNER. THE INVOICE. INSERT_DATE) AS 'DATE OF THE INVOICE.

    GLOGOWNER. THE INVOICE. INVOICE_GID,

    DECODE (GLOGOWNER. THE INVOICE. INVOICE_SOURCE, 'I', 'IDE', 'G', 'Auto-Pay', ', 'Manual').

    GLOGOWNER. INVOICE_REFNUM. INVOICE_REFNUM_VALUE

    OF GLOGOWNER. INVOICE

    LEFT JOIN GLOGOWNER. INVOICE_REFNUM

    ON GLOGOWNER. THE INVOICE. INVOICE_GID = GLOGOWNER. INVOICE_REFNUM. INVOICE_GID

    WHERE GLOGOWNER. INVOICE_REFNUM. INVOICE_REFNUM_VALUE = "ACS."

    AND GLOGOWNER. INVOICE_REFNUM. INVOICE_REFNUM_QUAL_GID = 'SOURCE '.

    AND GLOGOWNER. THE INVOICE. INVOICE_TYPE = 'I '.

    ORDER OF GLOGOWNER. THE INVOICE. INVOICE_GID

    Any help is greatly appreciated!

    Best regards

    -Adam

    Hello

    Is that what you want?

    SELECT i.invoice_gid

    CASE

    WHEN ir.insert_date<= i.insert_date ="" then ="">

    WHEN i.invoice_souce = 'I' and THEN 'EDI '.

    WHEN i.invoice_souce = 'G' THEN 'debit '.

    WHEN i.invoice_souce = am' THEN 'manual '.

    END AS invoice_source

    , The LEAST (i.insert_date, ir.insert_date) AS insert_date

    I have the Bill OF

    JOIN invoice_refnum ON i.invoice_gid = ir.invoice_gid ir

    WHERE ir.invoice_refnum_value = 'ACS '.

    AND ir.invoice_refnum_qual_gid = 'SOURCE '.

    AND i.invoice_type = 'I '.

    ORDER BY i.invoice_gid

    ;

    There is no reason to do an outer join if you only want the lines with specific values anyway.

    What happens if the 2 tables have exactly the same invoice_date?  The query above takes the invoice_source of invoice_refnum in this case, but that can easily be changed.

    Or the other of the insert_dates can be NULL?

    I hope that answers your question.

    Otherwise, thank you post a small example data (CREATE TABLE and only relevant columns, INSERT statements) for all of the tables involved and also after the results you want from these data (otherwise what you have already posted).

    Explain, using specific examples, how you get these results from these data.

    Always say what version of Oracle you are using (for example, 11.2.0.2.0).

    See the FAQ forum: https://forums.oracle.com/message/9362002#9362002

  • RMAN duplicate for standby the active database and the missing data files

    We have a car of 2 node ASM 11 GR 2 and 11.1 of database and a standby with ASM also. Our database is relatively low (300 GB)

    and in one recent event the day before was such a departure from the primary that we decided to "repopulate" the data using duplicate RMAN.

    I deleted the data files of the previous day and followed the Oracle documentation to duplicate a database. In the waiting

    I created a static listener and a pfile containing only the essential information (db_unique_name). I started the day before with nomount using the 'empty' pfile.

    I run RMAN, connected to the target and ancillary catalogues and run this command:

    run {
    allocate channel prmy1 type disk;
    allocate channel prmy2 type disk;
    allocate channel prmy3 type disk;
    allocate channel prmy4 type disk;
    allocate channel prmy5 type disk;
    allocate auxiliary channel stby1 type disk;
    duplicate target database for standby from active database nofilenamecheck;
    }
    

    RMAN duplication completed without errors, so I started the rescue database and got

    an error saying that datafile XXX is missing. I checked XXX datafile at the primary level

    and it is in a DISCONNECTED state. In the standby database the same data file is in the online state.

    So I think the problem is that during the duplication, RMAN (as documentation States) does not work

    Copy the files of data in offline mode, but the standby control file seem to think that these data files

    are online and should be present.

    Can someone please help me solve this problem? From my understanding, I could just copy the missing persons

    data files (there are many however) and in the standby go offline, but I don't think it's

    the right solution, edit this file for control of the standby? I would add another option

    in the RMAN script?

    Take the data file in offline mode on the site of the previous day.

    I don't think that two COPIES try to manage separately offline files.

    Hemant K Collette

  • How to organize the project and the files associated with the Premier Pro

    I tried to hold the input and output files to the Premier Pro (body) to optimize PC speed and keep different projects in separate folders.

    To optimize speed, I try to balance the I/O to the body on different drives. I'm editing on a dedicated PC i7 - 3930K, OS W7, 32 GB of RAM, with 2 SSD and 7200 4 discs arranged in 2 RAID 0.  A SSD (C drive) contains the files program, Documents, Photos and Audio.  The other 3 are used to store the video media.  The second SSD is used for the Cache and editing intermediate files. A RAID contains the video and audio Source, the other RAID files, export files.  I try to balance the input/output between readers.

    To organize files, I try to place each project with its related assets in a separate file.  In Production Premium CS6, default organization of the C:\Documents\Adobe\6.0 projects.  I'm confused because when I put Destination project in the project manager to another location, it always end up in the default location.  To change the location of the project, I find that it is initially allocated to the default, then I manually move it to another folder.  After you restart the body I open a project in the new folder.  Even though I have been editing for many years, I do not edit full time, so I need to refresh my knowledge for the fair distribution of the files such as the Scratch disks...

    To make life interesting, different programs spread differently.  Mocha, the project folder and the default output to the same location.  I found Mocha has a project and output destination allocation of menus that once I put them in different places always end up together.  I was advised to change the location of the moka project as I do with the body, but nothing has changed.  Speed and coordination PC file locations is a challenge.

    I have reviewed the training locations in the body.  Please direct me to the training to refresh my understanding on how correctly assets and distribution projects in the organization.  I also want to understand all the terms and possible menu assignments, if training is available.  A video presentation is preferred.

    The 'libraries', never use integrated in Windows. Those who are buried on the C drive in a rat hole of a tree of files to implement for backup and everything. Really, quite a stupid implemented well. And having the documents on your system drive is very well... doesn't really matter, those not need for speed of access. Put YOUR assets, such as pictures, images, graphics and stuff, in the folders that you create on the drives for them to the best "work" for you.

    So anything I have listed (quite well off of the page of this Tweaker) interferes, or interfaces with Microsoft stupidity wonderful intentions. One just go to the configuration of the places one wants to work as you want for better performance. It is STRONGLY recommended that in these various drives you set up folder trees that are easy to understand AND easy to use for the implementation of backup programs. The Tweaker has rather detailed suggestions tell for the settings of the cache for the Windows system files, which drive page size parameters to use. Those are the only things we change concerning the functioning of the system, and MS is only available for users to use. What readers and how much drive space you want to * system * using the cache? Your choice.

    PrPro has its own set of cache, database, project, and preview file default locations, so that the program won't work if nobody use it knows how to correctly set things upward. These default values are the folders system/users/blah/blah/blah/blah blah... not particularly easy to access for backup configurations, cleaning, that sort of thing, and not JUST because Adobe prefers you use those. In fact, they recommend that YOU set for the best working speed. The default values are all system-car and ensure the performance of the slug-bug.

    When you go to edit-> Preferences dialog box, you will find a number of these things assorted options for which you want to put them. The project settings dialog box is for each project, and it is where tell you him to put THAT prproj main project file & some other assets. It is generally recommended that you put each project in its own folder on a folder tree of files to the disc that you put your project files on.

    Note... all the different bits of the project files, database, cache and preview files have both read & write processes under constant operation. These things need quick access, usually put one shown previously one or two of them to a drive with SATAII internal best matches, or a 4/5 RAID 0/5 array disk.

    Images (media) and rendering (final exports) are mostly one-way moves. Images is primarily a read-only, and export operation is mainly a single write operation. So those who can live on slightly slower connections to the need to obtain. As to say the very fast 128 GB USB3.0 flash drive PNY I acquired in the user suggestions a couple. I tested it, and 1080 p images and exports can be handled by that without slowing down everything else... but ONLY one of these. Either images or exports, NOT both! Few people have found that say that an external SSD with images on a USB3.0 connection is usable in the things their system and speeds but spread across these disks in read/write to access tasks on several pipelines. Some have tried and found that their USB bus is also used for other internal disc or other connections, and so they had no gain speed or slow things down. Test... test.

    Neil

  • Problem finding tables of project and the repository working interface

    Hello

    Under a project (p. ex. - customer_m_table), with two interfaces (cust_regular and cust_special) and a package (cust_m).

    In working repository schema I had the table (snp_session) to the interface where I get the session Id, interface ran, etc...

    There is an even project table giving details of the project as the project name (snp_project).

    But is there any table where I can get information as part of a project, what are interfaces and what are packages?

    Thank you.

    Hello

    You can see how ODI under table SNP_TRT

    Select the RPD. Project_name, SF. Folder_name, SPA. PACK_NAME, SP.pop_name, P.TRT_NAME

    Of

    ODEV91119_ODI_WORK. SNP_POP SP,

    ODEV91119_ODI_WORK. SNP_folder SF,

    ODEV91119_ODI_WORK.snp_project RPD,

    ODEV91119_ODI_WORK.snp_package SPA,

    ODEV91119_ODI_WORK. SNP_TRT P

    where

    RPD. I_PROJECT = SF. I_PROJECT AND

    PFM I_FOLDER = SP. I_FOLDER AND

    PPM I_FOLDER = SPA. I_FOLDER AND

    PFM I_FOLDER = P.I_FOLDER

    AND RPD. I_PROJECT = 2010

    and spa.i_package = 3010

    If you're ok with this, please mark as correct or useful

    Thank you

  • I've already paid the license and I always get the notice 'We are unable to verify your subscription' every time I open the program, and the expiration date is tomorrow. What should I do?

    I have the following problem. Yesterday, I paid the license for Illustrator with my credit card and I received correctly in my e-mail, the confirmation of payment. However, whenever I try to open the program I get the following message "we are unable to verify your subscription. You are offline or there is a problem with your billing account. Sign in manage your account and check the billing data. If you have any problem or question, contact the "customer service". So, what should I do?

    Maca,

    You can try to restart the application of Creative cloud of smoke and he raises.

    Default you can try creative support Cloud (cloud creative all the customer service issues).

    http://helpx.Adobe.com/x-productkb/global/service-CCM.html

    or Support from Adobe (phone),

    http://helpx.Adobe.com/Adobe-Connect/Adobe-Connect-phone-numbers.html

  • Re: specification for parameters of the project and the final delivery of the animations for broadcast HD

    Hi all

    I just finished reading the book of techniques of studio by mark christiansen and I have I have some doubts, maybe, someone working on similar projects can help out me, I hope!

    I live in a PAL country and I especially design and animate the graphics in AE with layers of shape, the illustrator files and psd files. I can work in a proyect for broadcast HD tv and some questions and insecurities had crawled in. I would describe who will be I guess than the workflow:

    1 - setting up the project in AE:

    Captura de pantalla 2014-02-14 a la(s) 14.44.19.png

    of course, the working color space should be consistent between applications. Linearize is important, but I Don t well grasp the concept.

    (2) my master composition:

    Captura de pantalla 2014-02-14 a la(s) 14.51.00.png

    Here, the choice of the frame rate should be 25/50 according to the... ? is just a choice if you work with live images of the hd cameras? apply to animations, graphics?

    And last question, which would be the preferred delivery format and the encoding of the file? I know that there is a wide choice, but if you have a set that s works for you and your customers then i´ll be useful.

    Also. If you have an article, you can recommend where there is an explanation very clear be appreciatted, it seems (to me) the deeper you digg I get more confused.

    Thanks in advance!

    You should check with the diffuser. Either they publicly publish their requirements or that they are in a contract. There is not one size fits all here. The best option for the broadcast work is to make a copy almost without loss or loss of your job as a DI (digital intermediate) and then compress the project specifications accurate diffuser using Adobe Media Encoder or another application specifically designed for video compression for delivery. The only time you ever look like an amateur is when you do not ask the specifications. I regularly get the same images different distributors in 6 different formats.

  • Version of the product and the Expiration Date

    I just created and imported a file of 1000 products product only to find out that I can't import a product release-date of expiration.

    I have to manually set a version and the date limit for each product?

    There is no work around?

    The catalog import file has release and expiration dates. What's more to ride the release and product expiration dates?

    Seems another limitation of ecommerce and inconsistency between the products and catalogs.

    Any ideas appreciated graciously

    Fraser

    Hi Fraser,.

    It is correct, you can set output/expiration for catalog import dates but not for products that will have to be applied manually at this stage.

    Kind regards

    -Sidney

  • First of all, I got the last date to the top and the last date under the list of incoming emails, how do I get last date back to the top of the list is now all of a sudden

    I hope you understand what I mean, because English is not my language, but Dutch.

    Example: 17/11/2014

                    16-11-2014
                    15-11-2014   so I recieved my e mails and now
    

    15/11/2014
    16/11/2014
    17/11/2014

    and I want that the date of most recent entry up

    I hope that there is someone to help me.
    Thank you.

    Heinja

    Click the header to sort the column.

Maybe you are looking for