IOM disables the user on the end date

Hello

We have inherited the IOM system therefore needs to check the default IOM. When we enter the current date as the end date, IOM automatically disables the user. This custom behavior or it's the default?

I ask this question because the new requirement is that the user must be turned off at 18:00 the end day immediately after the reconciliations.


Thanks in advance

It is on the behavior of the box.

Thank you
Suren

Tags: Fusion Middleware

Similar Questions

  • Determine if the end date is after the start date

    I have 2 date fields in a form.  When I click the button submit, that I'm trying to ensure that the end date is after the start date.

    Here is the code I use:

    var sDate = Date.parse (BackgroundInformation.Background.CheckingDateStart.rawValue);

    var eDate = Date.parse (BackgroundInformation.Background.CheckingDateEnd.rawValue);

    xfa.host.messageBox ("Start Date:"+ BackgroundInformation.Background.CheckingDateStart.rawValue ");

    xfa.host.messageBox ("eDate: sDate" + eDate + ":" + sDate);

    if(sDate > eDate)

    {
    valid = false;
    fieldName += "Start Date is greater than the end Date."
    }

    The message box displays the start date 2014-10-30 but sDate is Nan.

    I tried:

    var eDate = new Date (BackgroundInformation.Background.CheckingDateEnd.rawValue);

    sDate var = new Date (BackgroundInformation.Background.CheckingDateStart.rawValue);

    and when I display sDate says 'Invalid Date '.

    Any ideas?

    It should work...

    var sDate = BackgroundInformation.Background.CheckingDateStart.value.date.value;

    var eDate = BackgroundInformation.Background.CheckingDateEnd.value.date.value;

    xfa.host.messageBox ("eDate: sDate" + eDate + ":" + sDate);

    if(sDate > eDate)

    {
       valid = false;
       fieldName += "Start Date is greater than the end Date."
    }
  • update of the end date on the dates that overlap

    Hello
    I have this situation

    Status start_date end_date
    OP 1 January 2007 31 - dec - 2099
    W1 01-apr-2007 30-sep-2008
    October 1, 2008 31 - dec - 2099 W2
    W3 1 January 2009 31 - dec - 2010
    January 1, 2011 31 - dec - 2099 W4

    the December 31, 2099 end_date "is a conventional date and indicating the valid (current) state that should be the last"

    I want to update the value of the end date to the same value as the date of the next valid record

    result

    Status start_date end_date
    OP 1 January 2007 31 - mar - 2007
    W1 01-apr-2007 30-sep-2008
    October 1, 2008 31 - dec - 2008 W2
    W3 1 January 2009 31 - dec - 2010
    January 1, 2011 31 - dec - 2099 W4

    Any help?
    Thanks in advance
    lukx

    Hello

    Here's a way to do it:

    MERGE INTO     table_x          dst
    USING     (
              SELECT     start_date          -- or primary key
              ,     LEAD (start_date) OVER (ORDER BY start_date)
                        - 1     AS end_date
              FROM     table_x
         )               src
    ON     (src.start_date     = dst.start_date)     -- or primary key
    WHEN MATCHED THEN UPDATE
    SET     dst.end_date     = src.end_date
    WHERE     src.end_date     IS NOT NULL
    AND     end_date     = DATE '2099-12-31'     -- if wanted
    ;
    

    If you would care to post CREATE TABLE and INSERT statements for your sample data, and then I could test this.

  • Use the project start Date and duration to calculate the end Date of project

    I'm trying to calculate the end date of the project in a report using the project end Date and time entered on the opportunity.
    For example, if the start date of the project filled an opportunity is 31/01/2009 and the length (integer) is entered on the opportunity is 5, the project end date is in the report must be 30/06/2009.

    I'm trying to TIMESTAMPADD forumaul allows you to add the duration (number of months) to the project start date
    This Fx works TIMESTAMPADD (SQL_TSI_MONTH, 12, '-used Custom Attributes ".) DATE_40)
    But if I try to replace the number twelve by the length (integer field) I get an error when you try to save: TIMESTAMPADD (SQL_TSI_MONTH, "-opportunity Custom Metrics".) S_INT_0, '-used custom attributes. DATE_40)

    Any ideas on how I can get this to work would be greatly appreciated.

    Hi, try this. It might solve your prioblem TIMESTAMPADD (SQL_TSI_MONTH, CAST (YOUR FIELD AS INTEGER), account. (' "Last modified")

    -John CRMIT

  • need to extend the end date of user using the API of the IOM

    Hello
    I have a requirement extension enddate to the user to some 30 days using IOM API-tcUserOperationsIntf. I know there is a Thor.API.Operations.tcUserOperationsIntf.updateUser (Thor.API.tcResultSet poUserResultSet, phAttributeList java.util.Map) method that can be used to update the data of the user in DB IOM.
    If someone has run this method then please let me know a procedure step by step to implement this method. I am new to using the API of the IOM.


    Thank you
    Kalpana.

    Try this:

    tcUserOperationsIntf userOperationsIntf = (tcUserOperationsIntf) getUtility ("Thor.API.Operations.tcUserOperationsIntf");

    protected void execute() {}
    try {}
    beginning of the custom code
    tcUserOperationsIntf oUserObj = (tcUserOperationsIntf) getUtility ("Thor.API.Operations.tcUserOperationsIntf");
                   
    System.out.println ("executing query");
    custom code starts
    tcUserOperationsIntf usrOps;
    The criteria map = new HashMap();
    Criteria.put ("Users.Key", "86821");
    System.out.println ("user key-86821");
                   
    tcResultSet users = oUserObj.findUsers (criteria);
    System.out.println (UsersList.getTotalRowCount ());
    Criteria.put ("Users.End Date 12:01:56.000000000 2012-06-24","" ");
    oUserObj.updateUser (users, criteria);
    } catch (Exception e) {}
                   
    }
    }

  • The end or the end Date with a user role

    Hi Experts,

    Is there a way I can assign roles to users of the database with expiration date or end date with roles.

    My requirement is to assign a role to the users and the role should be deleted/removed after one week. Same user should continue to work with other assigned roles.

    My database is 11g.

    Thanks in advance,

    David

    Hi Santosh,

    such a device does not exist, so you will need to do this manually or to schedule a task to do it programmatically.

    Greetings,

    Damage ten Monkshood

  • You will need to add the number of days to the end date of the users.

    Hello
    I have a code where we adding the number of days (30) to the current date and update IDM DB user end date.
    Now, we have a requirement to add the number of days (30) to the existing fence of user instead of add to the current date.

    * public String incrementDate (int daysToAdd)
    {
    Start date
    log.info("NotifyLastDayOfService::incrementDate(): entrez»);
    SimpleDateFormat sdf = new SimpleDateFormat ("yyyy-MM-DD 00:00:00");
    Calendar c = Calendar.GetInstance ();
    c.Add (Calendar.DATE, daysToAdd); number of days to add
    String PROMOTIONDate = sdf.format (c.getTime ());
    log.info("NotifyLastDayOfService::incrementDate(): sortie»);
    return Nouvelle_date;
    }*/

    Have any body set up this scenario?
    Please suggest.


    Thank you
    Kalpana.

    You can try this as well

    where oimAttribute = "Users.End Date"

    public String updateOIMAttributeForDateType (String oimAttribute, Date endDate, long take, String daysToAdd)
    {
    tcUserOperationsIntf userOperationsIntf = null;
    HashMap modifyMap = new HashMap ();
    HashMap searchmap = new HashMap ();
    SimpleDateFormat formatter = new SimpleDateFormat ("yyyy-MM-DD hh: mm :"); ")
              
    try {}
    Calander cal = null;
    cal.setTime (endDate);
    Cal.Add (Calendar.DATE, Integer.parseInt (daysToAdd));
    Date Edate = cal.getTime ();

    modifyMap.put (oimAttribute, Edate);
    searchmap.put ("Users.Key", String.valueOf (take));
    userOperationsIntf = Platform.getService (tcUserOperationsIntf.class);
    tcResultSet searchset = (searchmap) userOperationsIntf.findAllUsers;
    userOperationsIntf.updateUser (searchset, modifyMap);
    return a SUCCESS;
    } catch (Exception e) {}
    If (Logger.isErrorEnabled ()) logger.error (e.getMessage ());
    error return;
    } {Finally
    try {}
    If (userOperationsIntf! = null) userOperationsIntf.close ();
    } catch (Exception e) {if (logger.isErrorEnabled ()) logger.error (e.getMessage ()) ;}}
    }

  • Filter to display the end date in the next 30 days

    Hello

    In OBIEE 11 g I have an attribute for the date of end of contract, how can I filter to show only the contract which will end only in the next 30 days - I need a filter to have like SQL

    Assuming that your LC End Date is indexed, you can get much better performance if you create a filter LC end date and place it between two Expressions, SQL: current_date AND TIMESTAMPADD (SQL_TSI_DAY, + 30, current_date)

  • Stars marks the beginning or the end date without affecting a primary constraint

    I'm working on 4 project consists of some 225 thousands of activities on p6v7 Primavera. All four EPC and supply projects are interconnected. I get the mark of the Star (*) at the start or end date without affecting any primary obligation. These activities are logically follow constraints also gives no relevant dates and negative float. I cannot import excel sheet too make any changes to my projects, it shows memory. Can someone confirm how many activities takes in charge the Primavera? There is no filter at the level of the WBS code, I need to put the filter at the level of the WBS code so that I could see that the activities that fall within these WBS. The UDF, I defined at the level of WBS code also not shown to global, how WBS UDF activity? I want to glue the print screen on this forum but impossible...

    Hello

    In P6 client, there is no filter available for view of WBS, so you play with the filters of activity only according to your needs...

    And change overall WBS UDF feature isn't available in client P6... If you can not any calculation or changes...

    What are all the limitations of primavera P6 customer.

    See you soon...

  • Asterisk on the end dates - unconstrained assigned

    I have 2 subprojects in P6: engineering and Construction. I got the update in English and downloaded using check-in option.
    Two problems occurred:
    (1) certain activities have end dates displayed with asterisks, even if no constraint not assigned, and
    (2) Float Total at least one activity in English is not calculated correctly: activity in English is open, TF = 10 days, what is wrong (should be: end of Eng + Construction = 100 days).

    Thanks to you all.

    Kind regards

    PNN

    Hi, PNN,.

    Control external in the beginning start first, then finish later than external. Here are the constraints created by P6 when subprojects are imported separately. This feature is intended to preserve the calculations for dates between networks. In your case, because the way you work (separate files) after that you receive al subprojects, you must re-create the relationships between them, and then remove the external dates. To remove external dates, display these columns (section Dates) on the layout. Then click the cell to change or remove it by using the BACKSPACE key.

    I suggest you to encode activities between projects and record any changes in ms Excel (gal changes, reason, etc.). Another suggestion is that a single date of data for all subprojects if possible because of the impact on the calculations for dates at the earliest of several dates. Finally, if you use 6.2 or later, it is also possible to calculate float Total based on the last end of all subprojects open dates.

    I hope this helps.

    Hugo

  • Get the end date as effective date of the previous record

    < p >


    Hello.



    I have a table as follows:



    employee_id

    position_number

    effective_date



    The primary key is (employe_id, position_number)



    An employee of a company may hold several positions during their tenure, but support one position at a time.



    for example,.

    employee 1, position 10 from 01/01/07

    1: 17 employee's position, effective 03/02/08

    employee 1, 5 post, effective 06/01/08



    I need return the date of end of previous, if possible:



    1 position 5 of 01/06/08 to present

    1 post 17 02/03/08 to 05/31/08

    employee position10 1 outfit since 01/01/07 to the 02/02/08



    I have no idea how to proceed. Can someone help, please?
    < /p >

    use "lag (effective_date) over (partition by employee_id order by effective_date)" in your query

  • Compare start date with the end date

    Hello

    I'm a newbie in the apex. And my plsql programming skills are also not much.

    I have a request to the apex. I have a page where I insert the username and organization and begindate and the enddate.
    A user can belong to more than one organization.
    A user can also be belong to the same organization, several times, but then the new begindate must be greater than the old endate that already exist for this user and the organization.

    Can someone please help me on my way with the code?

    Thank you

    Instead of using a button, use a PL/SQL Expression:

    : ASK ('CREATE', 'APPLY_CHANGES')

    Be careful, the CREATION and the APPLY_CHANGES are the names of button the text displayed on the button. These two things can be different.

    Denes Kubicek
    -------------------------------------------------------------------
    http://deneskubicek.blogspot.com/
    http://www.Opal-consulting.de/training
    http://Apex.Oracle.com/pls/OTN/f?p=31517:1
    -------------------------------------------------------------------

  • Added the calendar after the end dates

    I have just completed a family calendar, but I forgot to put in the Canadian vacation at the time of my template.  Can I add them now my calendar is finished and ready for printing?

    Yes, you can add the holiday to her calendar.  Just click on the settings button in the upper part of the window and select the additional calendar you want to add:

    Don't forget to check the calendar as described in the present document Apple before ordering: get an overview of a project on paper in Photos, iPhoto or Aperture to avoid problems - Apple Support. Save the PDF file to compare it to the printed version when it arrives.

  • Error received during the update of the end in IOM date

    Hello

    I'm running on IOM 11gr2ps1 and fell on the following error trying to the end date of the users:

    [2016 01-21 T 17: 40:37.936 - 07:00] [WLS_OIM1] [WARNING] [OVD-40082] [oracle.ods.virtualization.engine.backend.jndi.oid1.ConnectionHandle] [tid: OIMQuartzScheduler_Worker-7] [username: oiminternal] [ecid: 0000L9Seke7Fg400jzwkno1MbiF ^ 1:20429 000003,] [APP: IOM #11.1.2.0.0] could not change entry. [[

    javax.naming.directory.SchemaViolationException: [LDAP: error code 65 - cannot find orclactiveenddate in the list attribute is mandatory or optional.]; remaining name ' [email protected] , cn = external, cn is users, dc = mycom'

    at com.sun.jndi.ldap.LdapCtx.mapErrorCode(LdapCtx.java:3098)


    When I logged in using DOHAD OID, I couldn't see the orclactiveenddate attribute.


    On users that I finish correctly dated, I could see the attribute OID orclactiveenddate.


    How can I solve this problem?


    Thank you


    Khanh

    Your user name has the correct object classes in the directory?

    -Kevin

  • How to make the default end date

    Hi friends,

    I need like

    Planted in the page (/ oracle/apps/by/self-service/absence/webui/AbsenceCreatePG)

    We have message choice field (type of absence). In this user can select type of leave-> hadj/sick/maternity leave.

    and

    We have categorized start date.  In this user will give start date.

    and

    We filed to end date end date must here be missed.

    After having these two values the end date should be missed, having the corresponding calculation. According to the type of the leave is

    If Hajj leave selected... .end date should be start date + 21 days

    If the sick leave selected... .end date should be the date of departure + 1 days

    If the selected maternity leave... .end date should be start date + 60 days

    For other types of date field leaves .end should be entrable only.

    How to get there. Help, please.

    Let me know for any clarification.

    Thank you

    Aravinda.

    I FOUND THE SOLUTION

    If a need for this type of req., try this

    ' public void processRequest (OAPageContext oapagecontext, OAWebBean oawebbean)

    {

    super.processRequest (oapagecontext, oawebbean);

    OAMessageDateFieldBean oamessagedatefieldbean = (OAMessageDateFieldBean) oawebbean.findIndexedChildRecursive ("HrAbsenceStartDate");

    oamessagedatefieldbean.getHelper () .setFireActionForSubmit (oamessagedatefieldbean, "HrAbsenceStartDate", null, null, true, true);

    }

    ' Public Sub processFormRequest (OAPageContext oapagecontext, OAWebBean oawebbean)

    {

    super.processFormRequest (oapagecontext, oawebbean);

    OAApplicationModule am = oapagecontext.getApplicationModule (oawebbean);

    OAViewObject vo = (OAViewObject) am.findViewObject ("AbsenceVO");

    String sHrAbsenceType = oapagecontext.getParameter("HrAbsenceType").toString ();

    OAException message = new OAException ("HrAbsenceType is" + sHrAbsenceType, OAException.INFORMATION);

    oapagecontext.putDialogMessage (message);

    String s = oapagecontext.getParameter ("event");

    If ("HrAbsenceStartDate". Equals (oapagecontext. GetParameter (EVENT_PARAM)).  "absenceTypeChange".equals (s)) / / ' | HrAbsenceType".equals (oapagecontext.getParameter (EVENT_PARAM)))

    {

    If (oapagecontext. GetParameter ("HrAbsenceType")! null = &! » ». Equals (oapagecontext. GetParameter ("HrAbsenceType")))

    {

    If (sHrAbsenceType.Equals("61") | sHrAbsenceType.equals("62") | sHrAbsenceType.equals("65") | sHrAbsenceType.equals("1070") | sHrAbsenceType.equals("66") | sHrAbsenceType.equals("67") | sHrAbsenceType.equals("2069"))

    {

    vo.getCurrentRow (.setAttribute("EndDate",""));

    }

    on the other

    {

    If (oapagecontext.getParameter ("HrAbsenceStartDate")! = null &!) » ». Equals (oapagecontext. GetParameter ("HrAbsenceStartDate")))

    {

    days int = 0;

    If (sHrAbsenceType! = null & sHrAbsenceType.equals("63"))

    {

    days = 20;

    }

    ElseIf (sHrAbsenceType! = null & sHrAbsenceType.equals("1069"))

    {

    days = 0;

    }

    ElseIf (sHrAbsenceType! = null & sHrAbsenceType.equals("64"))

    {

    days = 55;

    }

    String sStartDate = oapagecontext.getParameter("HrAbsenceStartDate").toString ();

    If (null! = sStartDate &!) "". Equals (sStartDate)) / / & oapagecontext! = null)

    {

    SimpleDateFormat sdf = new SimpleDateFormat("dd-MMM-yyyy");

    Calendar c = Calendar.GetInstance ();

    String finDate = null;

    Date sdate = new Date();

    Date udate = new Date();

    Try

    {

    sdate = sdf.parse (sStartDate);

    java.util.Date utilDate = (java.util.Date) sdate;

    java.sql.Date sqlDate = new java.sql.Date (utilDate.getTime ());

    oracle.jbo.domain.Date jboDate = new oracle.jbo.domain.Date (sqlDate);

    jboDate.addJulianDays(days,0);

    vo.getCurrentRow () .setAttribute ("EndDate", jboDate);

    }

    catch (ParseException exception) e

    {

    throw new OAException ("xxxxxx... » + e) ;

    }

    }

    }

    }

    }

    }

    }

    }

Maybe you are looking for