Stars marks the beginning or the end date without affecting a primary constraint

I'm working on 4 project consists of some 225 thousands of activities on p6v7 Primavera. All four EPC and supply projects are interconnected. I get the mark of the Star (*) at the start or end date without affecting any primary obligation. These activities are logically follow constraints also gives no relevant dates and negative float. I cannot import excel sheet too make any changes to my projects, it shows memory. Can someone confirm how many activities takes in charge the Primavera? There is no filter at the level of the WBS code, I need to put the filter at the level of the WBS code so that I could see that the activities that fall within these WBS. The UDF, I defined at the level of WBS code also not shown to global, how WBS UDF activity? I want to glue the print screen on this forum but impossible...

Hello

In P6 client, there is no filter available for view of WBS, so you play with the filters of activity only according to your needs...

And change overall WBS UDF feature isn't available in client P6... If you can not any calculation or changes...

What are all the limitations of primavera P6 customer.

See you soon...

Tags: Oracle Applications

Similar Questions

  • How can I eliminate the websites stored in the window bar 'about: home' with the yellow star at the end of the right hand. I don't want this meemory store.

    I use Windows XP. I get a list of web sites visited previously when I enter data in the navigation toolbar (topic: home... with the yellow star at the end of the right hand of it). I don't want to get this list of web sites due to privacy issues. I can't understand how to remove.
    I get a page of search of AVG, after that I entered the stuff in Google that I don't particularly want to.

    Entries in the bar location drop-down list with a yellow star (blue on Mac) at the right end of the bookmarks and Scripture cannot be cleared from the location bar menu drop down with the delete key.

    You can delete this an item marked with a bookmark that appear in the list, if you open this url in a tab and click on the yellow star in the address bar.

    This will open the "Edit this bookmark" dialog box and you can click on the delete button to delete the bookmark if you want to delete such an entry marked with a bookmark.

  • Determine if the end date is after the start date

    I have 2 date fields in a form.  When I click the button submit, that I'm trying to ensure that the end date is after the start date.

    Here is the code I use:

    var sDate = Date.parse (BackgroundInformation.Background.CheckingDateStart.rawValue);

    var eDate = Date.parse (BackgroundInformation.Background.CheckingDateEnd.rawValue);

    xfa.host.messageBox ("Start Date:"+ BackgroundInformation.Background.CheckingDateStart.rawValue ");

    xfa.host.messageBox ("eDate: sDate" + eDate + ":" + sDate);

    if(sDate > eDate)

    {
    valid = false;
    fieldName += "Start Date is greater than the end Date."
    }

    The message box displays the start date 2014-10-30 but sDate is Nan.

    I tried:

    var eDate = new Date (BackgroundInformation.Background.CheckingDateEnd.rawValue);

    sDate var = new Date (BackgroundInformation.Background.CheckingDateStart.rawValue);

    and when I display sDate says 'Invalid Date '.

    Any ideas?

    It should work...

    var sDate = BackgroundInformation.Background.CheckingDateStart.value.date.value;

    var eDate = BackgroundInformation.Background.CheckingDateEnd.value.date.value;

    xfa.host.messageBox ("eDate: sDate" + eDate + ":" + sDate);

    if(sDate > eDate)

    {
       valid = false;
       fieldName += "Start Date is greater than the end Date."
    }
  • update of the end date on the dates that overlap

    Hello
    I have this situation

    Status start_date end_date
    OP 1 January 2007 31 - dec - 2099
    W1 01-apr-2007 30-sep-2008
    October 1, 2008 31 - dec - 2099 W2
    W3 1 January 2009 31 - dec - 2010
    January 1, 2011 31 - dec - 2099 W4

    the December 31, 2099 end_date "is a conventional date and indicating the valid (current) state that should be the last"

    I want to update the value of the end date to the same value as the date of the next valid record

    result

    Status start_date end_date
    OP 1 January 2007 31 - mar - 2007
    W1 01-apr-2007 30-sep-2008
    October 1, 2008 31 - dec - 2008 W2
    W3 1 January 2009 31 - dec - 2010
    January 1, 2011 31 - dec - 2099 W4

    Any help?
    Thanks in advance
    lukx

    Hello

    Here's a way to do it:

    MERGE INTO     table_x          dst
    USING     (
              SELECT     start_date          -- or primary key
              ,     LEAD (start_date) OVER (ORDER BY start_date)
                        - 1     AS end_date
              FROM     table_x
         )               src
    ON     (src.start_date     = dst.start_date)     -- or primary key
    WHEN MATCHED THEN UPDATE
    SET     dst.end_date     = src.end_date
    WHERE     src.end_date     IS NOT NULL
    AND     end_date     = DATE '2099-12-31'     -- if wanted
    ;
    

    If you would care to post CREATE TABLE and INSERT statements for your sample data, and then I could test this.

  • IOM disables the user on the end date

    Hello

    We have inherited the IOM system therefore needs to check the default IOM. When we enter the current date as the end date, IOM automatically disables the user. This custom behavior or it's the default?

    I ask this question because the new requirement is that the user must be turned off at 18:00 the end day immediately after the reconciliations.


    Thanks in advance

    It is on the behavior of the box.

    Thank you
    Suren

  • Use the project start Date and duration to calculate the end Date of project

    I'm trying to calculate the end date of the project in a report using the project end Date and time entered on the opportunity.
    For example, if the start date of the project filled an opportunity is 31/01/2009 and the length (integer) is entered on the opportunity is 5, the project end date is in the report must be 30/06/2009.

    I'm trying to TIMESTAMPADD forumaul allows you to add the duration (number of months) to the project start date
    This Fx works TIMESTAMPADD (SQL_TSI_MONTH, 12, '-used Custom Attributes ".) DATE_40)
    But if I try to replace the number twelve by the length (integer field) I get an error when you try to save: TIMESTAMPADD (SQL_TSI_MONTH, "-opportunity Custom Metrics".) S_INT_0, '-used custom attributes. DATE_40)

    Any ideas on how I can get this to work would be greatly appreciated.

    Hi, try this. It might solve your prioblem TIMESTAMPADD (SQL_TSI_MONTH, CAST (YOUR FIELD AS INTEGER), account. (' "Last modified")

    -John CRMIT

  • Use the case of the Cluster data without DRS storage store?

    Can someone tell me please the use case of the Cluster data without DRS storage store?

    Virtually no,.

    The only one that is useful is the aggregation of resources of data warehouses in a cluster data store. But it is aggregation of resources in its crudest form. When you create a virtual machine and the use of a cluster as the destination data store, you must always select the data store that will store the virtual machine.

    Storage DRS off =

    No calculation of initial investment

    No space load balancing

    No I/O load balancing

    No rule affinity VMDK

    No maintenance mode

    For this purpose a group of data without active DRS storage store is a kind of a data store folder.

  • need to extend the end date of user using the API of the IOM

    Hello
    I have a requirement extension enddate to the user to some 30 days using IOM API-tcUserOperationsIntf. I know there is a Thor.API.Operations.tcUserOperationsIntf.updateUser (Thor.API.tcResultSet poUserResultSet, phAttributeList java.util.Map) method that can be used to update the data of the user in DB IOM.
    If someone has run this method then please let me know a procedure step by step to implement this method. I am new to using the API of the IOM.


    Thank you
    Kalpana.

    Try this:

    tcUserOperationsIntf userOperationsIntf = (tcUserOperationsIntf) getUtility ("Thor.API.Operations.tcUserOperationsIntf");

    protected void execute() {}
    try {}
    beginning of the custom code
    tcUserOperationsIntf oUserObj = (tcUserOperationsIntf) getUtility ("Thor.API.Operations.tcUserOperationsIntf");
                   
    System.out.println ("executing query");
    custom code starts
    tcUserOperationsIntf usrOps;
    The criteria map = new HashMap();
    Criteria.put ("Users.Key", "86821");
    System.out.println ("user key-86821");
                   
    tcResultSet users = oUserObj.findUsers (criteria);
    System.out.println (UsersList.getTotalRowCount ());
    Criteria.put ("Users.End Date 12:01:56.000000000 2012-06-24","" ");
    oUserObj.updateUser (users, criteria);
    } catch (Exception e) {}
                   
    }
    }

  • Asterisk on the end dates - unconstrained assigned

    I have 2 subprojects in P6: engineering and Construction. I got the update in English and downloaded using check-in option.
    Two problems occurred:
    (1) certain activities have end dates displayed with asterisks, even if no constraint not assigned, and
    (2) Float Total at least one activity in English is not calculated correctly: activity in English is open, TF = 10 days, what is wrong (should be: end of Eng + Construction = 100 days).

    Thanks to you all.

    Kind regards

    PNN

    Hi, PNN,.

    Control external in the beginning start first, then finish later than external. Here are the constraints created by P6 when subprojects are imported separately. This feature is intended to preserve the calculations for dates between networks. In your case, because the way you work (separate files) after that you receive al subprojects, you must re-create the relationships between them, and then remove the external dates. To remove external dates, display these columns (section Dates) on the layout. Then click the cell to change or remove it by using the BACKSPACE key.

    I suggest you to encode activities between projects and record any changes in ms Excel (gal changes, reason, etc.). Another suggestion is that a single date of data for all subprojects if possible because of the impact on the calculations for dates at the earliest of several dates. Finally, if you use 6.2 or later, it is also possible to calculate float Total based on the last end of all subprojects open dates.

    I hope this helps.

    Hugo

  • Filter to display the end date in the next 30 days

    Hello

    In OBIEE 11 g I have an attribute for the date of end of contract, how can I filter to show only the contract which will end only in the next 30 days - I need a filter to have like SQL

    Assuming that your LC End Date is indexed, you can get much better performance if you create a filter LC end date and place it between two Expressions, SQL: current_date AND TIMESTAMPADD (SQL_TSI_DAY, + 30, current_date)

  • The end or the end Date with a user role

    Hi Experts,

    Is there a way I can assign roles to users of the database with expiration date or end date with roles.

    My requirement is to assign a role to the users and the role should be deleted/removed after one week. Same user should continue to work with other assigned roles.

    My database is 11g.

    Thanks in advance,

    David

    Hi Santosh,

    such a device does not exist, so you will need to do this manually or to schedule a task to do it programmatically.

    Greetings,

    Damage ten Monkshood

  • You will need to add the number of days to the end date of the users.

    Hello
    I have a code where we adding the number of days (30) to the current date and update IDM DB user end date.
    Now, we have a requirement to add the number of days (30) to the existing fence of user instead of add to the current date.

    * public String incrementDate (int daysToAdd)
    {
    Start date
    log.info("NotifyLastDayOfService::incrementDate(): entrez»);
    SimpleDateFormat sdf = new SimpleDateFormat ("yyyy-MM-DD 00:00:00");
    Calendar c = Calendar.GetInstance ();
    c.Add (Calendar.DATE, daysToAdd); number of days to add
    String PROMOTIONDate = sdf.format (c.getTime ());
    log.info("NotifyLastDayOfService::incrementDate(): sortie»);
    return Nouvelle_date;
    }*/

    Have any body set up this scenario?
    Please suggest.


    Thank you
    Kalpana.

    You can try this as well

    where oimAttribute = "Users.End Date"

    public String updateOIMAttributeForDateType (String oimAttribute, Date endDate, long take, String daysToAdd)
    {
    tcUserOperationsIntf userOperationsIntf = null;
    HashMap modifyMap = new HashMap ();
    HashMap searchmap = new HashMap ();
    SimpleDateFormat formatter = new SimpleDateFormat ("yyyy-MM-DD hh: mm :"); ")
              
    try {}
    Calander cal = null;
    cal.setTime (endDate);
    Cal.Add (Calendar.DATE, Integer.parseInt (daysToAdd));
    Date Edate = cal.getTime ();

    modifyMap.put (oimAttribute, Edate);
    searchmap.put ("Users.Key", String.valueOf (take));
    userOperationsIntf = Platform.getService (tcUserOperationsIntf.class);
    tcResultSet searchset = (searchmap) userOperationsIntf.findAllUsers;
    userOperationsIntf.updateUser (searchset, modifyMap);
    return a SUCCESS;
    } catch (Exception e) {}
    If (Logger.isErrorEnabled ()) logger.error (e.getMessage ());
    error return;
    } {Finally
    try {}
    If (userOperationsIntf! = null) userOperationsIntf.close ();
    } catch (Exception e) {if (logger.isErrorEnabled ()) logger.error (e.getMessage ()) ;}}
    }

  • How to add a string to the end TLFTextField without losing the current text format!

    • I have a TLFTextField which loads the text of the external text file.
    • Then a function changes the format of certain parts.
    • Then, as soon as I add a string to the end my TLFTextField, all previous formatting is lost!

    I use this code to add the string:

    • myTLF.text += ".";

    or

    • myTLFText.text = myTLFText.text.concat(".");

    Should I use another method?

    Sample.png


    pass again the text through your function put shaped, or try appendText:

    • myTLF.appendText(".");
  • two different backup based CBT products can save the same vm without affecting the other?

    POS and Veeam use CBT for backups after the full initial.

    What will happen if they save both the same virtual machine?

    I checked on this several years ago and the information available at the time seem to indicate that it works very well (the details seem to have fled my organic storage)

    right now I use veeam backup replication and vsphere production Dr. (partly because I had hoped to go back to SRM).

    Several years ago I used WTP (when it was new) and it worked perfectly to recover from a failed san (luckily I had just updated to the first version of the direct recovery so it was easy and very fast).

    stop using POS due to problems of maintenance cycle in progress where he had run more and more long and never ended.  redeployed several times and even had not involved with support no resolution therefore had to move away from the product.

    now, I would like to back (especially since it is included with the enterprise license), but needed if ensure that it does not affect backups of production using the CBT.  I can do some testing of course, but thought ask and see if anyone has any information to share.

    Thank you

    From a technical point of view it should not be problems, unless the application of different run their backups at the same time.

    CBT marks the changed blocks using a ChangeID which is incremented whenever someone creates a snapshot. Applications determine the blocks changed since the most recent backup by requesting a list of blocks with a ChangeID higher than that of their last backup/replication.

    André

  • How to add the cover sheet without affecting the numbering of the pages?

    No response yet, so maybe I should change the question "Can we add a new section break at the beginning of a document?"

    Or "How do you apply a section on a Master Page break so that when the Master Page is added to the beginning of a document, it does not change the numbering of the pages that follow?"

    Thanks much for any help!

    [INITIAL QUESTION: is it possible to add a cover sheet to an InDesign document without affecting the numbering of existing page?] I have a series of chapters in a book that should be displayed individually and require a cover sheet. Each chapter to start on a recto page, and the page numbering is set with a prefix (the chapter number) and a page number, for example, page 1.1. I can manage to add the map coverage without other brewing pages, but the cover page becomes always page 1.1 and the text begins on page 1.2 (even if it's a front page). Is it possible to do without having to manually reset the numbering of the pages in the Section and Numbering Options window?

    Thanks for any help you can give – many of these documents to work on...  In addition, never submitted a question before, hope I did it correctly!  -JCI]

    Post edited by: J Shee

    Thanks for the reply. I found a different way to keep the pages of shift, but adding that the two pages and then deleting one of them is simpler, thank you!  The numbering of the pages still changes, then perhaps there is no other way than to manually change the numbering and section options afterwards (or writing a script, which is well above my head!). The rats, because I have about 160 of these documents to do. Ah, well!

    Thank you very much, once again!

Maybe you are looking for

  • New MacBook 2016 freezes often

    I bought this new 2016 MacBook a few months ago and it works all the latest OS X patches. I used to keep open Mail, Chrome, Evernote and Safari. Often, at least twice a week or more, this MB freezes. I could be browsing on Safari or reading emails wh

  • Search suggestions is enabled but does not work?

    The search bar in the "Awesome bar" has recently ceased to offer suggestions from research or from my search history Google itself. When I control-click in the search bar, "search suggestions" has a check mark next to it, and it is also checked in th

  • What accessory do I need?

    Dear Sir My backlight on my Toshiba Sattelite died. I brought to my local repair center and they said I need to replace a small card in the screen that is smaller than a RAM. What's her name and where can I find it? Kind regards

  • EliteBook 2740 (Energy Star): hardware problem

    HelloFirst and foremost, I must say that I didn't know where to put this question to me, so I apologize if my question here is fake, but I thank you if you answered my question is, I'll do it.I have a laptop, Elitebook 2740 (Energy Star) models.If I

  • Code 19 cd dvd not working not not with Windows Vista Business-failure to load the software driver for ATAPI DVD A DH16A6S ATA Device...

    Barely noticed as useless before using the dvd on this machine cd - error code indicates... .Configuration (in the registry) is incomplete or damaged. (Code 19) Having read the other answers and the last similar validation seems to be dated to April