Movement of deviation average, allowed, & stamp measure of time

Hello

I have this vi that measures data, findings, average cost, and suppose that to count the number of times wherever it exceeded the permitted deviation and the time stamp of every time a measure is greater than the threshold value of the running average. There is a problem in my algorithm, can someone please take a look?

Known issue:

-number of exceeds time should reset only when cycle time = time spent.

I'll be happy to hear any suggestions you may have.

Thank you

You can go there. I think that's what you want.

Tags: NI Software

Similar Questions

  • How can I move my head in the exact measurements of time?

    Relatively new to AE and want to know how can I move my head in the exact measurements in time.

    For example in a 59.94 project, I am to 01:00:14 and want to return 36 executives. In Premiere Pro I just type "-36" and I jump back 36 frames.

    I tried in AE and it went to 36 images in the comp. basically before my ever started time line. I tried '. ' " "" ' 0.36 ' "36.0036"with identical results back to-36 before the beginning of the model.

    Does anyone have a solution? I can't find it in the manual.

    Thanks in advance

    of after effects using:
    "To move forward some time or number of frames, click the display of the moment and then enter a plus sign (+) followed by the timecode or number of frames to advance." For example, enter + 20 to go forward 20 images or 01:00 to go forward one second. Precede the value with the sign (-) to go back. For example, enter +-20 to go backward 20 frames or + - 1:00 to go back a second. »

  • Get the average of the measurements in an image

    Hello everyone.

    First of all I thank very you much to be able to help and read this post.

    I'm trying to measure an object. Do I use the CLAMP block (horizontal clamp, it doesn't matter if it's the distance max or min).

    The problem is that you can calculate the maximum distance or minimum between the edges which lie in a return on investment with this VI.

    But I would get the average of all measurements in the KING, because it can be obtained because this VI use them to know what is the maximum and the minimum, but the problem is that I do not how to access.

    Any ideas to get the average?

    Thank you very much.

    I suggest using the IMAQ rake instead of the clip because it returns all edges detected.

    Take a look at the attached vi, I started from the example of the clamp vi and adding an option of rake.

  • Measurement of time in a While loop

    Greetings gentleman;

    I'm kinda new to Labview, and although I sought an answer without assignment, I wasn't able to find one.

    So here my question, I would like to know how I can measure the time a loop sequence, in other words, what time is my point of view VI to run the main loop together?

    A little explanation, the attached VI tries to be a Markov chain, it takes some values in the first case structure based on the previus loop, then, if the values are correct, it passes to the next step and so on. It's pretty simple, and yet, my problem lies in the measurement of time. Since it is a 'distribution', it would take infinite time to execute a simple loop if it does not fulfill the characteristics, but it is scheduled to meet them so an average time should work.

    So, if you look to the while loop, should the big one, I want to measure how long I take for a ride.

    Thanks for the help, I'd be happy to read some ideas on how to measure this.

    Kind regards

    IRAN.

    You will find examples in the example Finder OR by searching for 'speed test' or ' reference '.

    Essentially, you create a flat sequence structure inside of your loop. In the first image, you measure the current number of cycles. In the middle frame, you run your code. In the last image, you measure the number of cycles again and subtract the first number of this. This gives you the run time to execute the code.

    You can see a page of the community about it here.

    There is a high-resolution time tick count VI hang out somewhere which is great for benchmarking and improving efficiency, used instead the number of cycles (ms) primitive.

    Edit - remember where he was

    https://decibel.NI.com/content/blogs/EvanP/2010/10/04/tick-count-us--microsecond-timing-granularity-...

  • NMH300 not allowed to change the time

    Okay, would normally not be a problem but I'm streaming video clips on the HUB and they are stamped with a time of 6 hours hurt.

    The 'Time' button is RED and does not allow me to change it.

    1 you already have reset.

    2. they took out hard drives and re-deleted all partitions.

    3. do you have a new installation.

    4. always in red.

    OK, what is there besides the reset button that may sneak in and attach it to the back?

    The initial installation, I had the opportunity to take my city.  Given that the installation, I needed to do a reset.  I don't know whether or not it is when time went red.

    I guess the time running IT / IN HD the self?

    Thank you

    Steve

    It is fixed.  I don't know what it is.  Here's what was going on at the time.

    Whenever I went into the HD and go to the System Configuration, I would get an error message, cannot be found, check the network, etc..  Click OK and I was in and could make changes, but not the time or the button below.  Firmware version was "unknown".

    After all the above stuff to this thing, I returned to my computer 'master' and pulled upward "Easy Link Advisor" for my router in Linksys 610.  I noticed that my computer was red with a stop sign at this topic.  There was an update of the software available.  (note, I was able to venture out into the internet, so I was surprised. not sure it should have intervened, but it seems that, as he might have)

    Updated my PC 'master' software "Easy Link Advisor", I was in the green... and HD system configuration parameters were still available.

    It was very weird.

    But it works now.

    Concerning

    Steve

  • Measure the time difference between a digital output and an analog input that responded to the questionnaire

    Hallo,

    I use the following system:

    • OR PXI-1044 with controller NI PXI-8109

    • OR PXI-2564 switch module to turn on the monitor of my test device

    • Data acquisition multifunction NI PXI-6259 to measure the signal that responded to the questionnaire jump

    The two cards are the same - PXI trigger bus. For both, PXI-2564 and PXI-6259 I use DAQmx to set the reading and writing of the channels.

    Now, I want to measure the time between the digital output, my unit turns and the analog input, which measures the response of my system.

    I can't do work by myself, please help me!

    I thank Ludwig.

    Hi Ludwig,.

    If you can't give us any VI we have difficulties with to help you.

    Because I Donat knowledge how your program is mounted it is not easy to know where you should enter signals.

    Here's a question similar to yours:

    http://forums.NI.com/T5/LabVIEW/best-way-to-measure-time/TD-p/178704

    and 2 external links:

    http://www.ehow.com/how_8698983_measure-time-LabVIEW.html

    http://objectmix.com/LabVIEW/385152-how-can-i-use-LabVIEW-measure-time-between-analog-pulses.html

  • Measure the time between the ridges of the periodic input signal

    We have built a circuit which is supposed to mimic an Exercycle.  We have an IR switch and a spinning wheel, the rccb meets a comparator circuit and the output of the element of comparison, we have running in LabView.  We successfully were able to measure the number of rotations of the wheel and the total distance travelled by the wheel, but are struggling to measure speed.  We cannot find a way to measure the time between picks in real time, which we could then divide the wheel circumference and calculate the speed in real time.  The VI I posted has a square wave simulated rather than the signal we receive on our circuit.  Thanks in advance for the help.

    Jon and David

    I think you're overloading the things trying to get the time between two pulses.  Instead, you can use the VI Express your measures and select frequency for her custom. Then, you can multiply the circumference of the wheel of the frequency to get the speed.

    I hope this helps.

    -Christina

  • How to measure the time elapsed between two steps?

    Hello

    In my script, I ask the subsequences. How can I measure the time it takes each subsequence?

    Something like:

    Statement: StationGlobals.TimeElapsed = 0

    -> SOMETHING HERE TO START A COUNTER<>

    call sous-suite

    Popup: Str (TimeElapsed)

    Thanks for help

    StationGlobals.Time = Seconds()

    ... / / stuff in time

    StationGlobals.Time = Seconds() - StationGlobals.Time

    You can also view the sample report of basic step in 2012 TestStand time (you can now download an eval).

  • How can I measure the time between the two edges of successive increase, using digital input...

    Hello

    I'm trying to measure the time in seconds between each two successive rising edges on a digital input.

    So far I managed to detect the rising edge, increment a counter at each rising edge and take the time during which the increase is edge

    all I need now is subtract edge currently rising from the previous era of edge rising to calculate (T), which can be 1/frequency and display in real time for the user.

    but I do not know how to do this

    Can someone help me please!

    Note: while I am in a position varies between 200 ms - 2 seconds


  • How can I measure the time between each two successive increase edges, using digital input?

    Hello

    I have tried two measure the time in seconds between each two successive rising edges on a digital input.

    So far I managed to detect the rising edge, increment a counter at each rising edge and take the time during which the increase is edge

    all I need now is subtract edge currently rising from the previous era of edge rising to calculate (T), which can be 1/frequency and display in real time for the user.

    but I do not know how to do this

    Can someone help me please!

    Woah!

    Sorry Apok, but your code becomes much too complicated and salty. I don't think that all records to offset or Boolean conversion/operators are necessary at all.

    If you want to measure the time between two keys so it's another (much less complicated) way. It simply records the time when press button in a registry change, then compares the two.

  • Measurement of time for various pulses end

    Hello

    I need help in the measurement of time.

    Is attached to the question,

    As a microcontroller, we can use of timer count between pulses of variable duration N. say N Pulse 1 pulse 10ms, 2 20 ms pulse and pulse 3 duration of 30ms.

    Even as I will measure the time between two pulses as marked in the picture, please give me a solution, I tried to use the number of samples/sampling rates that it does not work.

    Pulse I'm acquisition is of variable duration.

    Concerning

    Nitin

    Hi Nitin,

    What has changed since your other thread for you to believe that you must create a double post in a new thread?

    Why not stick with your old thread?

  • Measure the time between two digital pulse

    Hello

    For a non-critical calendar application, I need to measure the time interval between consecutive TTL pulses, ranging from the order of 0.5 s for a few seconds, with a low accuracy of +/-10-50ms. The interval being measured varies between the rising edge of the first pulse and the front of the next and so on.

    I have several input lines I need to deal with. Because it's a critical machination low cost, I don't want to use digital counters for each line, so I work with an acquisition of data USB6008 and have connected the input rows TTL on the digital inputs of the device. Avoiding will be sufficient.

    I found a good example of VI on discussion forums that does almost the same thing, only it uses instead of the DAQ Assistant user input. The VI works including the time the program going on in a while loop. I replaced with the DAQ Assistant output (a channel) user input in the hope that it is still work.

    When I run the program in "run once" mode, it seems to work perfectly. However, in "continuous run" it measures only a very small interval, probably just the time between two samples.  I think it has something to do with the help of a while loop in combination with the DAQ Assistant. Anyone who has any suggestions how to solve this problem?

    Thank you!

    OK... first of all, you should never use the button "run continuously.  I wish that NEITHER would be to eliminate it, but told me that it is sometimes useful for debugging.  If you want your program to run over and over again, use a while loop with a stop"" button.

    If I'm reading your code correctly, you make your initial moment, and then collect data from data acquisition.  When one of the channels is "T", you stop your loop and the end time of capture.  (By the way, why you convert your table to a cluster?  Why not just index the appropriate channel in the table directly?)

    Since you want to capture the time between two consecutive pulses, you need to know when a transition has occurred... i. e when your digital line went from F (no pulse) to T (pulse start).  This will give you your forehead.  Right now, all you're doing is looking for a value T - so you have no way of knowing if you are looking for to the previous impulse again, or a new impetus.  You also burn 100% of your processor with the way you have your programme in place.

    You need a small loop delay so that your VI is not 100% of your hogs CPU time.  Given that you can live with an accuracy of 50msec, what I suggest that you use.

    See attached picture for you give an idea of how to implement.  He will probably need some refining operations, but it should point you in the right direction.

    I hope this helps.

  • How to move audio files of the program in the time line?

    All of a sudden I can't move audio files of the program in the time line - I read that Adobe said in previous forums click with the right button on the A1, but nothing in this discussion has helped me solve this problem. It was working before. I am a beginner user, so I could be missing something really obvious. My time scale is in blue. I noticed in some tutorial videos that it was yellow.

    Hi lauranoel,

    The reason is due to a bug, explained here: FAQ: why no audio or video will not at the track where I drop?

    Next time, just remove and In or Out to mark, and then drag the clip.

    Thank you

    Kevin

  • Measurement of time

    Hello
    I developed a Flex-Java simple using Blaze DS application.
    I click on a button to fill the DataGrid using Blaze DS.
    I want to measure the time required for the operation.
    On the side of Java, I have already added statements that helps measure the no. of seconds to complete the Java Service calls. I want to do the same thing on the side Flex.
    How can I do?
    I am very new to Flex and not found any class as a system in Java that could help me.
    Thank you
    Amit

    Hi all
    I am very pleased to let you know I found something with which I can measure the time for the entire operation.
    It was just the matter through Flex documents carefully.
    There 'flash.utils.getTimer"which can be used to get (int) start time and then end time (int) to calculate the difference.
    It was as simple as the code below. He also reflex at the correct time (time required for execution of Java Service(IBatis Stored Proc execution) + time to generate the flex DataGrid.

    Thank you very much
    Amit

  • FIRST HP: Deviation average and a discrete random Variable probability Distribution

    Hello

    Can comeon please help me with the calculation of the average and standard deviation of the discreet following random variable probability distribution.

    * k = 0.14

    I would like to the average and the standard deviation of the number of people per car.

    I used the 'statistics 1 VAR App' and I entered in the following:

    When I click on 'Statistics', the following text is displayed:

    Responses (rounded to two decimal places) for the mean and the standard deviation should be:

    Average = 3.67

    SD = 1.31

    It seems that the statistical calculations are based on the column "D1" only.

    Is someone can please show me how I can put the statistical calculations to include the data in the columns "D1" and "D2"?

    Thank you

    Arthur

    I solved my problem.

    I read the pdf document "HP first AP statistics Summer Institute ' and it explains how to use the app from Var Satatistics 1 more in detail.

    Concerning

    Arthur

Maybe you are looking for

  • launch Subvi in the background on target RT

    I would like to run a Subvi in the background on a RT of RIO target.  I did it in the past on the local computers by using references and knots, but not on the RT RIO target.  I need the vi to run in the background and transfer data to the main vi ru

  • With the help of VISA Write in parallel loops (multithreading)

    Hello I got the idea to set up four parallel loops on a quad core with four EHR via serial port independently. I use the PXI-8430/8 and I was told that an independent operation of ports is possible. What I did was simply to put in place four parallel

  • Quality of music file

    Hello, new to this, what quality should I I rip my music to my sansa clip?  I understand the lower quality will allow me to put more on the clip, but is there really any difference in quality on the video sould? Swampy thanks

  • I need to open files with an extension__ of pgm file

    files *. PGM

  • Brother HL 1430 printer driver available?

    My Telechareger Windows 7 x 64-bit home edition has been installed by engineers since then Brother HL 1430 printer will not intall error code 0 x 800 f0214 his disc spring. Have you tried all sorts of ways to install of the web no joy before windows