Multiple page / work within a project plan

I know this question has been asked in the past, but it's on the burner for the next update? Multiple pages (work multi-plan) projects would be a remarkable feature. Perhaps adding the button "+" in a project that duplicates your first page. This way, you keep the elements such as navigation and manually delete everything you don't want. Export indesign and Illustrator, work plans and the pages could be filled. It would be great intuitive to the design community and closely replicate the workflow in the office.

I hope it's the mix of the upcoming updates!

Matt

Hi Matt,

The ability to add multiple pages of a 'project' model is definitely coming to an update. Probably before the summer. In the meantime, it is possible to duplicate a model work plan (just will remain a stand-alone project). When you tap View Gallery on the project you want to duplicate, and then press the two-squares-with-a-plus-sign icon.

Hope that helps.

Sue.

Tags: Adobe Comp CC

Similar Questions

  • Handling of multiple video exports within a project (first 14 elements)

    I have a @ 10 short video clips that I consider a 'project' and wants to use several common parameters on too many interview (WB / noise reduction etc.) but I want to release that 10 separate video files to the client.

    Is there a way to keep them all within a 'project', handle them one at a time, leaving one at a time, but use (if necessary) of the common parameters through clips? Or should I create 10 separate "projects"?

    Thanks in advance.

    Put them on the timeline back to back, by separating each video with a short black video clip if you wish.  You can copy and paste effects from one clip to another or create presets. When you're ready to export (share), set the work area bar to make sure that the part you want to export.

  • Cannot print multiple pages of works

    9.0 Windows using Windows Vista, I can not print multiple pages of any file Works with the command 'print' in the 'folder '.  I checked the solution center but found no help.  The manufacturer of the computer/printer says it's a problem of application (e.g. Microsoft) and they can help.  Can you HELP me?

    After a uninstall and reinstall the complete software, I can print several pages ONCE.  All attempts after which fail - this is why an application... problem apparently.

    The Windows 7 upgrade would solve this problem?

    The upgrade of operating systems does not normally solve problems, especially as you say that it is a problem of work.

    http://www.Microsoft.com/communities/newsgroups/list/en-us/default.aspx?DG=Microsoft.public.works.win&cat=en_us_9804e2ac-c762-44C9-9c6f-90e45f32d772&lang=en&CR=us

    Discussions in microsoft.public.works.win

    They will help you with your question of work in the work above Newsgroup.

    See you soon.

    Mick Murphy - Microsoft partner

  • Adobe Acrobat XI Standard stops working whenever I try to delete multiple pages.

    I repaired the installation and even removed and re-installed and it still happens.  Help, please.  And if programs does not work, stop it indicates one or several pages are in use and could not be deleted

    Abhishek,

    I don't know where to find the Windows preview pane to see if it is enabled.  Nevertheless, I got the TerraGo toolbar and so I thought that this could be the problem, so I disabled it.  And voila!  I was able to delete multiple pages without problem.  If I run into it again (oh don't like it), I'll try to close the file Explorer as you suggest.  Thank you.

  • How to resize the print size of an item within my PDF to multiple pages? For example a receipt or another image that can scan in bigger or smaller than my 8.5 x 11 Bill?

    How to resize the print size of an item within my PDF to multiple pages? For example a receipt or another image that can scan in bigger or smaller than my 8.5 x 11 Bill?

    Hello

    In the print dialog box, you would get options to resize your document.

    Try them and see if that helps.

    Once you choose the print option, it would give options to change the size of the page you need.

    Please check and see if it suits you or not.

    Concerning

    Sukrit diallo

  • I get the error as adobe Illustrator crashes when loading multiple pages PDF. Please help me. Thanks in advance.

    Hello

    I get the error as adobe Illustrator crashes when loading multiple pages PDF.

    Please help me. Thanks in advance.

    Adobe error.PNG

    Illustrator is limited to 100 work plans. Up to 120 pages will never work.

  • [10g] Best to fill and update multiple calendars work?

    I would like to create multiple calendars working and be able to update as needed. Each work schedule would be for 5 years at the most (right now), but it is possible that at some point in the future, I might want to extend that.

    A work schedule can be applied to a single resource or group of resources. Each individual belongs to a group of resources. What I think, is that if an individual resource has a calendar of work involved, this calendar is used, but if not, it uses the calendar of its resource group, and if the group does not have one, the default schedule is used. Theoretically, each resource can have its own schedule of work, and there would be probably 500 resources to the maximum. In practice, many resources will have the same or similar work schedules.

    Each calendar will be based on one of the 3 standards: all calendars days are working days, on a daily basis, but weekends are working days, or every day except weekends and holidays are working days. (Weeks begin on Sunday and Saturday and Sunday are weekends). The standard calendar would be then modified to create each unique timing as required. For example, if a resource has been used, their calendar is perhaps the standard of works not on weekends and holidays, but could also include a stay of one week in February and stay for a week in July. I'm not sure what the best approach is to define a calendar in the first place and then be able to update an employee decides to holiday (or any other situation that may affect the working days).

    In addition, I really want to be able to integrate the working hours, which can vary daily, but would probably would be pretty standard. I don't know if this information is part of the work table, or as something separate to be combined with work table.

    My ultimate goal in doing all this is to try to plan a project of great amongst the many resources.

    Some examples of data showing where I am so far:
    CREATE TABLE     work_groups
    (     group_id     VARCHAR2(5)     NOT NULL
    ,     group_name     VARCHAR2(25)     
    ,     group_desc     VARCHAR2(200)
    ,     CONSTRAINT     work_groups_pk     PRIMARY KEY (group_id)
    );
    
    INSERT INTO     work_groups
    VALUES     ('A','Group A','Group A description');
    INSERT INTO     work_groups
    VALUES     ('B','Group B','Group B description');
    INSERT INTO     work_groups
    VALUES     ('C','Group C','Group C description');
    INSERT INTO     work_groups
    VALUES     ('D','Group D','Group D description');
    
    CREATE TABLE     resources
    (     resource_id     VARCHAR2(20)     NOT NULL
    ,     type          VARCHAR2(1)
    ,     description     VARCHAR2(200)
    ,     group_id     VARCHAR2(5)     
    ,     CONSTRAINT     resources_pk     PRIMARY KEY (resource_id)
    ,     CONSTRAINT     group_id_fk     FOREIGN KEY (group_id)
                             REFERENCES  work_groups (group_id)
    );
    
    INSERT INTO     resources
    VALUES     ('A001','M','text here','A');
    INSERT INTO     resources
    VALUES     ('A002','M','text here','A');
    INSERT INTO     resources
    VALUES     ('A003','M','text here','A');
    INSERT INTO     resources
    VALUES     ('B001','M','text here','B');
    INSERT INTO     resources
    VALUES     ('B002','M','text here','B');
    INSERT INTO     resources
    VALUES     ('C001','M','text here','C');
    INSERT INTO     resources
    VALUES     ('C002','M','text here','C');
    INSERT INTO     resources
    VALUES     ('C003','M','text here','C');
    INSERT INTO     resources
    VALUES     ('D001','M','text here','D');
    INSERT INTO     resources
    VALUES     ('12345','L','text here','A');
    INSERT INTO     resources
    VALUES     ('12346','L','text here','A');
    INSERT INTO     resources
    VALUES     ('12347','L','text here','B');
    INSERT INTO     resources
    VALUES     ('12348','L','text here','B');
    INSERT INTO     resources
    VALUES     ('12349','L','text here','C');
    INSERT INTO     resources
    VALUES     ('12350','L','text here','C');
    INSERT INTO     resources
    VALUES     ('12351','L','text here','D');
    I don't know if I should have a separate table to define a relationship between a resource or resource groups and a calendar id (each resource or group would be able to assign 1 calendar unique id, although several resources/groups could share the same schedule id), or if I have to add an additional column to each table above to assign the calendar id.
    CREATE TABLE     calendars
    (     cal_id          NUMBER(4)     NOT NULL
    ,     cal_title     VARCHAR2(25)
    ,     cal_desc     VARCHAR2(200)
    ,     CONSTRAINT     calendars_pk     PRIMARY KEY (cal_id)
    );
    
    INSERT INTO     calendars
    VALUES     (1,'Default','This is the default calendar to use for workdays');
    INSERT INTO     calendars
    VALUES     (2,'All Days','This calendar treats all days as workdays');
    INSERT INTO     calendars
    VALUES     (3,'Weekends Off','This calendar gives weekends off, but no holidays');
    INSERT INTO     calendars
    VALUES     (4,'Holidays Off','This calendar gives weekends and holidays off');
    
    CREATE TABLE     workdays
    (     cal_id          NUMBER(4)     NOT NULL
    ,     cal_date     DATE          NOT NULL
    ,     cal_year     NUMBER(4)
    ,     work_day     NUMBER(3)
    ,     work_date     DATE
    ,     work_week     NUMBER(2)
    ,     work_year     NUMBER(4)
    ,     work_days     NUMBER(5)
    ,     cal_days     NUMBER(6)
    ,     CONSTRAINT     workdays_pk     PRIMARY KEY (cal_id, cal_date)
    ,     CONSTRAINT     cal_id_fk     FOREIGN KEY (cal_id)
                             REFERENCES  calendars (cal_id)
    );
    cal_id - refers to the calendars table
    cal_date - the date of the current calendar
    cal_year - the actual year of calendar for the calendar date
    work_day - work in this year of work (resets every year, starting from 1 is 0 if this calendar date is not a working day)
    work_date - if a day of work, date calendar, otherwise, the date of the schedule for the last day of work (or the first week of the calendar, the next working day)
    work_week - the work date work week (numbered from 1, reset each year the first Sunday of the year, before the first Sunday will be the week last year, and the first year of the calendar will be every day before the Sunday included in the first week, until the first week of a calendar may be more than 7 days)
    work_year - year of the work date
    work_days - day of work shop (except in the first calendar week, before the first shop day is 0), starts at 1 (initially), cumulative (does not reset each year)
    calendar cal_days - day of the work date, starts at 1 (initially), cumulative (does not reset each year)

    Assuming that the calendar starts on 01/01/2010 (these values are less correct - I just do my best guess to provide the sample data):
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/01/2010','mm/dd/yyyy'),2010,0,TO_DATE('01/04/2010','mm/dd/yyyy'),1,2010,0,1);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/02/2010','mm/dd/yyyy'),2010,0,TO_DATE('01/04/2010','mm/dd/yyyy'),1,2010,0,2);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/03/2010','mm/dd/yyyy'),2010,0,TO_DATE('01/04/2010','mm/dd/yyyy'),1,2010,0,3);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/04/2010','mm/dd/yyyy'),2010,1,TO_DATE('01/04/2010','mm/dd/yyyy'),1,2010,1,4);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/05/2010','mm/dd/yyyy'),2010,2,TO_DATE('01/05/2010','mm/dd/yyyy'),1,2010,2,5);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('12/23/2010','mm/dd/yyyy'),2010,250,TO_DATE('12/23/2010','mm/dd/yyyy'),51,2010,250,357);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('12/24/2010','mm/dd/yyyy'),2010,0,TO_DATE('12/23/2010','mm/dd/yyyy'),51,2010,250,358);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/01/2011','mm/dd/yyyy'),2011,0,TO_DATE('12/23/2010','mm/dd/yyyy'),51,2010,250,366);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/02/2011','mm/dd/yyyy'),2011,0,TO_DATE('12/23/2010','mm/dd/yyyy'),1,2011,250,367);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/03/2011','mm/dd/yyyy'),2011,1,TO_DATE('01/03/2010','mm/dd/yyyy'),1,2011,251,368);
    I tried Googling work calendars, and similar things, but I can't seem to find something that fits my situation. If someone could point me in the right direction, I would appreciate it.

    I work in 10g (XE).

    Published by: user11033437 on July 19, 2011 15:05

    Also, I do not know if it would be better to store just somehow days, each group of resources/doesn't work and generate a schedule on the fly as needed, rather than trying to eventually store thousands of dates in the database?

    Hello

    Interesting problem!

    I don't know exactly what you want, however. Are you are looking for a way to answer such questions "resource A001, what are the first 6 days of work or after January 4, 2010?" or "how many working days does have resource A001 between January 4 and January 12, 2010? Post a few examples of the questions that you might ask, as well as desired outcomes, given the sample data you posted.

    user11033437 wrote:


    I would like to create multiple calendars working and be able to update as needed. Each work schedule would be for 5 years at the most (right now), but it is possible that at some point in the future, I might want to extend that.

    A work schedule can be applied to a single resource or group of resources. Each individual belongs to a group of resources.

    Is a 'group resouce' identical to a 'working group '?
    If a resource moves from one group to another, you need to keep track of historical information? For example, if the resource is A001 not havfe its own calendar and is part of the work_group A Juanuary 1, 2010, but then moves to work_group B July 1, 2010, you will need to answer questions like "how many days have you A001 have in 2010", where it must be remembered that the work_group has apllied calendar during the first half of the year , but work_group Schedule B has been used for the second half?

    What I think, is that if an individual resource has a calendar of work involved, this calendar is used, but if not, it uses the calendar of its resource group, and if the group does not have one, the default schedule is used. Theoretically, each resource can have its own schedule of work, and there would be probably 500 resources to the maximum. In practice, many resources will have the same or similar work schedules.

    Each calendar will be based on one of the 3 standards: all calendars days are working days, on a daily basis, but weekends are working days, or every day except weekends and holidays are working days. (Weeks begin on Sunday and Saturday and Sunday are weekends). The standard calendar would be then modified to create each unique timing as required. For example, if a resource has been used, their calendar is perhaps the standard of works not on weekends and holidays, but could also include a stay of one week in February and stay for a week in July. I'm not sure what the best approach is to define a calendar in the first place and then be able to update an employee decides to holiday (or any other situation that may affect the working days).

    It seems that the easiest thing would be to save only the base calendar exceptions. In other words, because the employee normally respect the calendar ' no weekend or holidays ", simply enter 5 rows for that particular employee Mark 5 days of work, he will be missed in February. If the emplyoee will work Saturday in June (in addition to its regular schedule), then enter a line for each Saturday in June.
    >

    In addition, I really want to be able to integrate the working hours, which can vary daily, but would probably would be pretty standard. I don't know if this information is part of the work table, or as something separate to be combined with work table.

    It depends on what you want exactly. Post a couple opf examples of questions you do not want to answer and the real answers, given the sample data that you post.

    My ultimate goal in doing all this is to try to plan a project of great amongst the many resources.

    Some examples of data showing where I am so far:

    CREATE TABLE     work_groups
    (     group_id     VARCHAR2(5)     NOT NULL
    ,     group_name     VARCHAR2(25)
    ,     group_desc     VARCHAR2(200)
    ,     CONSTRAINT     work_groups_pk     PRIMARY KEY (group_id)
    );
    
    INSERT INTO     work_groups
    VALUES     ('A','Group A','Group A description');
    INSERT INTO     work_groups
    VALUES     ('B','Group B','Group B description');
    INSERT INTO     work_groups
    VALUES     ('C','Group C','Group C description');
    INSERT INTO     work_groups
    VALUES     ('D','Group D','Group D description');
    
    CREATE TABLE     resources
    (     resource_id     VARCHAR2(20)     NOT NULL
    ,     type          VARCHAR2(1)
    ,     description     VARCHAR2(200)
    ,     group_id     VARCHAR2(5)
    ,     CONSTRAINT     resources_pk     PRIMARY KEY (resource_id)
    ,     CONSTRAINT     group_id_fk     FOREIGN KEY (group_id)
                             REFERENCES  work_groups (group_id)
    );
    
    INSERT INTO     resources
    VALUES     ('A001','M','text here','A');
    INSERT INTO     resources
    VALUES     ('A002','M','text here','A');
    INSERT INTO     resources
    VALUES     ('A003','M','text here','A');
    INSERT INTO     resources
    VALUES     ('B001','M','text here','B');
    INSERT INTO     resources
    VALUES     ('B002','M','text here','B');
    INSERT INTO     resources
    VALUES     ('C001','M','text here','C');
    INSERT INTO     resources
    VALUES     ('C002','M','text here','C');
    INSERT INTO     resources
    VALUES     ('C003','M','text here','C');
    INSERT INTO     resources
    VALUES     ('D001','M','text here','D');
    INSERT INTO     resources
    VALUES     ('12345','L','text here','A');
    INSERT INTO     resources
    VALUES     ('12346','L','text here','A');
    INSERT INTO     resources
    VALUES     ('12347','L','text here','B');
    INSERT INTO     resources
    VALUES     ('12348','L','text here','B');
    INSERT INTO     resources
    VALUES     ('12349','L','text here','C');
    INSERT INTO     resources
    VALUES     ('12350','L','text here','C');
    INSERT INTO     resources
    VALUES     ('12351','L','text here','D');
    

    It seems that all lines have the same description. If the description of the issues in this problem, would not better illustrate how this is important, having different descrioptions which appeared in different outputs? However, if the description plays no role in this problem, then why include in the sample data at all?

    I don't know if I should have a separate table to define a relationship between a resource or resource groups and a calendar id (each resource or group would be able to assign 1 calendar unique id, although several resources/groups could share the same schedule id), or if I have to add an additional column to each table above to assign the calendar id.

    CREATE TABLE     calendars
    (     cal_id          NUMBER(4)     NOT NULL
    ,     cal_title     VARCHAR2(25)
    ,     cal_desc     VARCHAR2(200)
    ,     CONSTRAINT     calendars_pk     PRIMARY KEY (cal_id)
    );
    
    INSERT INTO     calendars
    VALUES     (1,'Default','This is the default calendar to use for workdays');
    INSERT INTO     calendars
    VALUES     (2,'All Days','This calendar treats all days as workdays');
    INSERT INTO     calendars
    VALUES     (3,'Weekends Off','This calendar gives weekends off, but no holidays');
    INSERT INTO     calendars
    VALUES     (4,'Holidays Off','This calendar gives weekends and holidays off');
    

    What is cal_id = 1? How is it different from the other three?

    
    CREATE TABLE     workdays
    (     cal_id          NUMBER(4)     NOT NULL
    ,     cal_date     DATE          NOT NULL
    ,     cal_year     NUMBER(4)
    ,     work_day     NUMBER(3)
    ,     work_date     DATE
    ,     work_week     NUMBER(2)
    ,     work_year     NUMBER(4)
    ,     work_days     NUMBER(5)
    ,     cal_days     NUMBER(6)
    ,     CONSTRAINT     workdays_pk     PRIMARY KEY (cal_id, cal_date)
    ,     CONSTRAINT     cal_id_fk     FOREIGN KEY (cal_id)
                             REFERENCES  calendars (cal_id)
    );
    

    I suspect that there is a simpler way, especially if there is a regular order to types of day (e.g., people who take vacations outside normally get weekeneds, too).
    You may have a table like this, that was a line a day:

    CREATE TABLE  days
    (       a_date      DATE     PRIMARY KEY
    ,     day_type    NUMBER (1)              -- 1=Weekend, 2=Holiday, 3=Other
    );
    
    INSERT INTO days (a_date, day_type) VALUES (DATE '2010-01-01', 2) /* New Years Day */;
    INSERT INTO days (a_date, day_type) VALUES (DATE '2010-01-02', 1) /* Saturday */;
    INSERT INTO days (a_date, day_type) VALUES (DATE '2010-01-03', 1) /* Sunday */;
    INSERT INTO days (a_date, day_type) VALUES (DATE '2010-01-04', 3) /* Monday - back to work */;
    ...
    

    Another table (I'll call him work_sched) shows what resources are not working when:

    CREATE TABLE  work_sched
    (       p_key          NUMEBR     PRIMARY KEY     -- Arbitrary Unique ID
    ,     group_id         VARCHAR2 (5)          -- Exactly one of the columns group_id or ...
    ,     resource_id      VARCHAR2 (20)          --     ... resource_id will always be NULL
    ,     a_date              DATE
    ,     works_on     NUMBER (1)          -- works when days.day_type >= this value
    ,     remarks          VARCHAR2 (40)
    );
    

    To indicate that work_group 'L' is working normally on type 3 days only (i.e., weekends and public holidays):

    INSERT INTO work_sched (group_id, a_date, works_on) VALUES ('L', NULL, 3);
    

    (Assume that p_key is filled by a trigger).
    The NULL value in the column a_date indicates that it applies to every day, unless another line in the work_sched table. Instead of NULL, mabe some date impossible (for example, January 1, 1900) would be more convenient to specify default values.
    Exceptions to this schedule would be indicated by other lines in work_sched. For example, if "12345" is an employee who is on vacation for a week in February:

    INSERT INTO work_sched (resource_id, a_date, works_on, remarks) VALUES ('12345', DATE '2010-02-08', 4, 'Vacation');
    INSERT INTO work_sched (resource_id, a_date, works_on, remarks) VALUES ('12345', DATE '2010-02-09', 4, 'Vacation');
    INSERT INTO work_sched (resource_id, a_date, works_on, remarks) VALUES ('12345', DATE '2010-02-10', 4, 'Vacation');
    INSERT INTO work_sched (resource_id, a_date, works_on, remarks) VALUES ('12345', DATE '2010-02-11', 4, 'Vacation');
    INSERT INTO work_sched (resource_id, a_date, works_on, remarks) VALUES ('12345', DATE '2010-02-12', 4, 'Vacation');
    

    And if that employee works Saturday in June:

    INSERT INTO work_sched (resource_id, a_date, works_on, remarks) VALUES ('12345', DATE '2010-06-05', 1, 'Fiscal year-end crunch');
    INSERT INTO work_sched (resource_id, a_date, works_on, remarks) VALUES ('12345', DATE '2010-06-12', 1, 'Fiscal year-end crunch');
    INSERT INTO work_sched (resource_id, a_date, works_on, remarks) VALUES ('12345', DATE '2010-06-19', 1, 'Fiscal year-end crunch');
    INSERT INTO work_sched (resource_id, a_date, works_on, remarks) VALUES ('12345', DATE '2010-06-26', 1, 'Fiscal year-end crunch');
    

    Where to find the number of days of work, we would join work_sched in days using these two conditions:

    ON   work_sched.date           = days.a_date
    AND  work_sched.works_on  <= days.day_type
    

    cal_id - refers to the calendars table
    cal_date - the date of the current calendar
    cal_year - the actual year of calendar for the calendar date
    work_day - work in this year of work (resets every year, starting from 1 is 0 if this calendar date is not a working day)
    work_date - if a day of work, date calendar, otherwise, the date of the schedule for the last day of work (or the first week of the calendar, the next working day)
    work_week - the work date work week (numbered from 1, reset each year the first Sunday of the year, before the first Sunday will be the week last year, and the first year of the calendar will be every day before the Sunday included in the first week, until the first week of a calendar may be more than 7 days)
    work_year - year of the work date
    work_days - day of work shop (except in the first calendar week, before the first shop day is 0), starts at 1 (initially), cumulative (does not reset each year)
    calendar cal_days - day of the work date, starts at 1 (initially), cumulative (does not reset each year)

    There is a large amount of denormalized data. in other words, you should be able to easily deduct cal_date cal_year, but sometimes it is convenient store denormalized data.

    Assuming that the calendar starts on 01/01/2010 (these values are less correct - I just do my best guess to provide the sample data):

    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/01/2010','mm/dd/yyyy'),2010,0,TO_DATE('01/04/2010','mm/dd/yyyy'),1,2010,0,1);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/02/2010','mm/dd/yyyy'),2010,0,TO_DATE('01/04/2010','mm/dd/yyyy'),1,2010,0,2);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/03/2010','mm/dd/yyyy'),2010,0,TO_DATE('01/04/2010','mm/dd/yyyy'),1,2010,0,3);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/04/2010','mm/dd/yyyy'),2010,1,TO_DATE('01/04/2010','mm/dd/yyyy'),1,2010,1,4);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/05/2010','mm/dd/yyyy'),2010,2,TO_DATE('01/05/2010','mm/dd/yyyy'),1,2010,2,5);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('12/23/2010','mm/dd/yyyy'),2010,250,TO_DATE('12/23/2010','mm/dd/yyyy'),51,2010,250,357);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('12/24/2010','mm/dd/yyyy'),2010,0,TO_DATE('12/23/2010','mm/dd/yyyy'),51,2010,250,358);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/01/2011','mm/dd/yyyy'),2011,0,TO_DATE('12/23/2010','mm/dd/yyyy'),51,2010,250,366);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/02/2011','mm/dd/yyyy'),2011,0,TO_DATE('12/23/2010','mm/dd/yyyy'),1,2011,250,367);
    INSERT INTO     workdays
    VALUES     (3, TO_DATE('01/03/2011','mm/dd/yyyy'),2011,1,TO_DATE('01/03/2010','mm/dd/yyyy'),1,2011,251,368);
    

    I tried Googling work calendars, and similar things, but I can't seem to find something that fits my situation. If someone could point me in the right direction, I would appreciate it.

    I work in 10g (XE).

    Published by: user11033437 on July 19, 2011 15:05

    Also, I do not know if it would be better to store just somehow days, each group of resources/doesn't work and generate a schedule on the fly as needed, rather than trying to eventually store thousands of dates in the database?

    That's what I thought, too.

    Post some sample data (if it is not what you have already posted), some examples of questions and the right answers you want from each question given that the sample data.

  • HAVE CS4 - multiple pages, PDF format

    I just upgraded to CS4 and can understand is no longer how to create a pdf from multiple page from Illustrator.  The option has been deleted or moved from the pdf save menu.

    Currently, I'm saving up to CS3and opening again in CS4 to create existing work plans which then translate into multi pages in acrobat.  I'm sure that there is a way easier and more efficient.  Does anyone know?

    Thank you!

    Each work in the CS4 plan is equivalent to a PDF page. Simply save to PDF and make sure the option 'Use work plans' is checked.

  • Multiple page sizes

    Hello

    In Quark, I used projects to work in a single Document and have several layouts that are different sizes.

    This makes it easy to share images, style sheets, etc. for similar parts, really just need to different sizes.

    Is there something similar to having multiple page sizes in InDesign layout.

    Thank you!

    Babs

    http://www.DTPtools.com/product.asp?ID=PCID

    Bob

  • Scan multiple pages into a single .pdf document

    This may be a beginner question, and if there was such a thing as the user manual accompanying the Officejet Pro, I'd be a happy camper.  How to scan multiple pages in a .pdf document is - a?  TIA.

    It's how to scan several pages of glass to create a PDF file.

    http://bit.LY/HPscan2011

    This will work with the new HP software for the 6500 has and other similar new HP printers, using the same type of software.

    HP needs to update their software ALT tags and names of button, as well as manuals.  The instructions for the accomplishment of this task should be easy for all users of HP for a long time to figure out.  I'm almost back my new HP printer because I thought

  • How to scan multiple pages into a single document

    I use XP SP3 on the HP 510 laptop and printer HP Photosmart 7510e. How to scan multiple pages in 1 document? PDF is also only available document format?

    Thanks for the tips

    Hello

    Please perform the below mentioned steps that should solve the problem.

    Click the icon of the printer (on the desktop), select the scanned under the side of right, notice in the window of advanced settings under file type is a checkbox called "creating a separate file for each scanned page. Make sure it is not checked.

    Kind regards
    Jabzi

    Give Kudos to say 'Thank you' by clicking on the White Star under my name.

    Click on 'accept as Solution' if it has solved your problem, while others may find it.
    I work for HP

  • Manually to scan multiple Pages into a single PDF file.

    Gentlemen:

    My gear - 4620 HP all-in-One.

    Problem:

    I prefer to scan multiple pages into a single PDF file and save them on the hard drive manually.

    The ADF is twisting the pages that are saved in the PDF file.

    Please notify.  An upgrade of the software will be available for manual use set up of the

    pages on the glass?

    No other problems with the HP 4620.  I use Windows 7, 64 bit.

    Just reply to your convenience.

    PDF4ME

    PDF4ME,

    Watch it again once and document Scanning how-to - for Windows 7, I don't see that Preview Scan must be turned on to scan several pages.

    You can check again to see if you can get this works by following the instructions in the document.

    HP Officejet 4620 e-all-in-one printer support - scanning - Windows 7

    Click on the thumbs-up Bravo !

    It's a nice way of saying 'Thank you' for help.

    While I strive to reflect best practices of HP, I do not work for HP.

  • Photosmart 5510 all-in-one: chromebook, scanning, multiple pages

    Several pages on a chromebook scanning is not possible, it seems. I use webscan but installation that only allows you to save a page at a time. I then use PDF love to combine the files, and although it works well there must be an easier way. Is there another brand or model All In ONE that will make a go?

    Hello Automec,

    Welcome to the Forums of HP Support!

    I see that you are looking for a more easy why scan multiple page. PDF with the 5510 and a Chromebook. The way you do it is the best, because the Chromebook isn't any software which can be installed for the printer. Here I had a way, but if you find one, let me know.

  • How to scan a document multiple pages in a single PDF, photosmart 5510e?

    I need to know how to create a multiple-page document in a single pdf I tried advaced settings and unchecked creat new file for each page and it does not work...

    Found the solution elsewhere on the forum, you need the resolution to 300 dpi or lower for the button Add/Remove is displayed. Go figure...

    http://h30434.www3.HP.com/T5/scanning-faxing-and-copying/the-button-to-add-remove-pages-when-creating-multiple-page-PDFs/m-p/1869117/highlight/true#M43767

  • Scanning multiple Pages at once

    Can I scan a doc page on the HP Envy 4501 multi or what 1 page at a time?

    Hello

    You can scan multiple pages of the HP scanning software.

    The HP Envy 4500 software click on scan a document or photo.

    Select PDF or TIF and set the resolution to 300 DPI or below, then make sure the scan oreview is checked and press Scan.

    Use the button Add page under the preview of the scan to scan additional pages, once you have finished click Save to complete the analytical work.

Maybe you are looking for

  • install on the new iMac from apple yosemite El Capitan 10.11.3 running version 4 k

    I'm trying to downgrade 4 new k supplied with installed El Capitan in yosemite on a retina of iMac from apple.

  • XPS 1710 &amp; Windows 10

    Aloha, I decided to give it a try because I always have my spare in excellent condition XPS1710 gaming laptop and update Windows 10. Installation went smoothly in Windows 7 with without a hitch. Everything seems to be in order to market and also brou

  • Is it possible to integrate Android app on BlackBerry OS 10.2.1 BBM

    BlackBerry OS 10.2.1 announced NYI. Is it possible to add BBM support using jni code or java with the new version of the OS? Thank you!

  • Problems with Windows 7 64 bit IE

    I have windows 7 64-bit os and IE9 has been installed when I did the transfer of windows as a 32-bit I want to uninstall IE9 and instal IE11 but can't get rid of IE9 not tried the ususal, but it does not show even in programs and features to uninstal

  • Package Rollback

    HelloIs it possible to restore a package created? How else rollback changes made by the package using the RESTORE; Statement?create or replacethe pckg as packageprocedure (column number) CPP;end;-RESTORATION?create or replacethe pckg as packageprc (c