New calculator?

Hi all!

I tried to find some information about it! So I couldn't find, that's why I'm here asking you guys!

I used to have a 35s calculator, however, I had a few problems with mine... Not really a problem if... My calculator got stolen!

Now I use my 50g for doing things, in which is a great calculator, but you guys know, the 50g is not possible to take with you as the 35 s is... and for the tasks that I am doing, it is not necessary to have all the potential 50 g with me...

So, I have to buy a new and I started to look around for new HP calculators, the only thing I discovered is that a new first called HP Calculator is coming, but this calculator is a new model for the graphics...

Does anyone know if HP is about to release new albums a scientist such as 35s? I want to know, because if a new scientific model is coming I would wait for him to make an another 35 s!

Thank you!

RE: HP 39gII

If you live in the United States, I'm not sure that it is on sale here.

It is a very different graphing calculator in size to 50g in any case and has no RPN.

Unfortunately there is currently not an update to the 35s.

Tags: HP Tablets

Similar Questions

  • Add % sign after figures in the "New calculated item" column in the PivotTable?

    Hello

    Table view
    ----------------

    A1... Jan1... 10
    A1... jan2... 12
    A1... jan3... 13
    A2... Jan1... 20
    A2... jan2... 24
    A2... jan3... 25



    I need result like...

    Jan1... (20/10) * 100%
    jan2... (24/12) * 100%
    jan3... (25/13) * 100%

    where... % of the value for jan 1 = (value of a2 / a1 value) * 100%


    To do this, I used the PivotTable and used a new calculated item for calculating the % value right but I'm not able to add the percent sign after the value.
    Can u please help me add the % sign in the value of the result.

    Thank you

    Hmm! only useful! ;-(
    I thought it was the right answer...

  • Where can download Adobe photoshop CS3 extended from the internet - I need to reinstall on a new calculated that doesn't have a CD player!

    My calculated new does not have a CD player and to transfer the software on a key USB is not working even after disabling of the software on the old computer.  Download Adobe photoshop CS3 extended from the internet?

    Make sure that you have enabled cookies and clear your cache.  If he continues to not try to use a different browser.

    Here is an alternative download...  You can download the demo version of the software through the page linked below and then use your current serial number to activate it.

    Don't forget to follow the steps described in the Note: very important Instructions in the section on the pages of this site download and have cookies turned on in your browser, otherwise the download will not work correctly.

    CS3 and CS4: http://prodesigntools.com/download-adobe-cs4-and-cs3-free-trials-here.html

  • Create the new table with the new calculated entries

    Hello
    I had a little problem.
    I have a table which includes the employee vacation time. Vacation time was periodic, so I divide them into days. Now, I want to calculate the exact days. Sometimes ago weekends included I need to subtract. I have flaged everyday, I know exactly what day is a business day and that one is not. Is it possible that I have only the sum of the days without weekends?

    Table Vacation_Times:

    EMPL - V_Start_D - V_End_D - Date-day - D_Name
    Mr.A---01.05.11---06.05.11---01.05.11---6---mercredi
    M.-a---01.05.11---06.06.11---02.05.11---6---jeudi
    Mr.A---01.05.11---06.05.11---03.05.11---6---vendredi
    M.-a---01.05.11---06.06.11---04.05.11---6---Samedi
    Mr.A---01.05.11---06.05.11---05.05.11---6---dimanche
    M.-a---01.05.11---06.06.11---06.05.11---6---Lundi

    NEW table:

    EMPL - V_Start_D - V_End_D - Date-day - D_Name - Actual_Days
    Mr.A---01.05.11---06.05.11---01.05.11---6---mercredi---4
    M.-a---01.05.11---06.06.11---02.05.11---6---jeudi---4
    Mr.A---01.05.11---06.05.11---03.05.11---6---vendredi---4
    M.-a---01.05.11---06.06.11---04.05.11---6---Samedi---4
    Mr.A---01.05.11---06.05.11---05.05.11---6---dimanche---4
    M.-a---01.05.11---06.06.11---06.05.11---6---Lundi---4


    THX

    Hello

    VR;

    SELECT Empl ,V_Start_D ,V_End_D ,Date ,Days ,D_Name , count(*) as Actual_Days
    FROM vacation v
    JOIN datelist d ON d.day between  V_Start_D and V_End_D and d.is_working_day='Y'
    GROUP BY Empl ,V_Start_D ,V_End_D ,Date ,Days ,D_Name 
    

    Kind regards
    Carsten.

  • New calculation of simple form

    I create a new form that users will enter amounts such as $100.00 or $300,00 in. I have 3 or 4 users fileds enter the amounts. Basically, I have a total field. How can I make the total field display the sum of the amounts which is entered in the field?

    Here's a screen shot for your help...

    Thank you

    Srini

  • Create a new calculated columns

    Hi all

    I want to create a calculated column with the following formula:

    Sales/Sum (Sales) * 100

    I got an error saying:
    ERRORS:
    [14041] error in the measure for the test of the column definition. Nested aggregate measure definitions are not currently supported.

    I can of course create in response but the user like a column or a shared measure (which may be reusable).

    Concerning

    In fact, you must create two columns in the business model.

    First, create a column of the measure based on the level for the denominator. It must be a measure of the year-level.

    Then, create the measure part as a separate column. Select 'Sales' in your business model, right click and select "Wizard of calculation" in the context menu. You can create an action that compares the year-level measurement.

  • best way without glich to transfer files, contacts, Favorites, folders, etc from old to new calculation?

    All the folders of files, photos. email addresses almost everything except programmes. Diffrerence btwn XP32bit and Win. 7 64-bit?

    Hello

    To connect two computers with a cable, not a router, it must be a crossover cable.
    These are special cables, but they are not expensive.

    Connect two computers using a crossover cable (XP - Windows 7 may be the same)
    http://Windows.Microsoft.com/en-us/Windows-Vista/connect-two-computers-using-a-crossover-cable

    It is a description however computer stores will sell them at low cost.
    http://en.Wikipedia.org/wiki/Ethernet_crossover_cable

    Amazon - example of a crossover cable
    http://www.Amazon.com/Belkin-components-CAT5e-crossover-cable/DP/B000067RFT

    --------------------------

    You can also use Easy Transfer

    Transferring files and settings: frequently asked questions
    http://Windows.Microsoft.com/en-us/Windows-Vista/transferring-files-and-settings-frequently-asked-questions

    Windows 7 Easy Transfer
    http://Windows.Microsoft.com/en-AU/Windows7/products/features/Windows-easy-transfer

    How Windows Easy Transfer makes setting up a computer easier?
    http://Windows.Microsoft.com/en-us/Windows7/how-does-Windows-easy-transfer-make-setting-up-a-computer-easier

    How to get an easy transfer cable
    http://Windows.Microsoft.com/is-is/Windows7/how-to-get-an-easy-transfer-cable

    ------------------------

    These should help:

    Share files and printers between Windows 7 and XP
    http://www.howtogeek.com/HOWTO/Windows-7/share-files-and-printers-between-Windows-7-and-XP/

    Configuration network host connection windows 7, xp and vista
    http://Techblissonline.com/home-network-setup-connecting-Windows-7-XP-and-Vista/

    Networking of computers running different versions of Windows
    http://Windows.Microsoft.com/en-us/Windows7/networking-home-computers-running-different-versions-of-Windows

    =========================================

    More help at these locations: (Vista references also apply to Windows 7)

    Vista - LAN
    http://www.onecomputerguy.com/Networking/vista_network.htm

    Vista network and sharing Center
    http://www.onecomputerguy.com/Networking/vista_network_sharing_center.htm

    Setting up a network home
    http://Windows.Microsoft.com/en-us/Windows-Vista/setting-up-a-home-network

    Home network, wireless network and computer networking Made Easy
    http://www.home-network-help.com/

    Windows Vista tip: How to install and connect to a wireless network
    http://www.watchingthenet.com/Windows-Vista-tip-how-to-Setup-and-connect-to-a-wireless-network.html

    Networking tutorial home
    http://www.tehnomagazin.com/computer/home-networking-tutorial.htm
    Practically networked - everything you could possibly want to know.
    http://www.practicallynetworked.com/

    I hope this helps.

    Rob Brown - Microsoft MVP<- profile="" -="" windows="" expert="" -="" consumer="" :="" bicycle=""><- mark="" twain="" said="" it="">

  • New calculated column MDB table indeed

    Hello

    I have a requirement to calculate the total cost. I have the quantity as a field and the actual cost as another field. Quantity * cost = total cost. How can I do this in the MDB.

    Thanks for your time and your help.

    Hi user,
    Done create a logical column in this table.
    layer of MDB-> made-> right click - Create a logical column (or table) duplicate a measure column in the table and rename it as Total cost.

    "Then name it as Total cost and mark physical sources using existing and click on the '... »
    Here, we see the logical tables and columns.give the formula using arrays of logiccal in functions that
    Quantity * cost

  • How to create a condition on a "news of the calculated items" of a PivotTable

    Hello

    Would you know how to set a condition on a new calculated item in a pivot table dynamic.
    Example to show what < 0 in red for the new calculated item 'Différence' obtained under $1-$2
    The link shows an example of an existing report, but I don't understand how this has been achieved.

    http://a.imageshack.us/img838/9851/conditioncolour.jpg

    Thank you

    Vincent,

    Yes, I know what you're saying. But please look over the page clearly.

    I said the conditional format is for revenue, Adr column, room, this three columns are numeric columns. So if we value conditional formatting for these columns, it will use the same State of PivotTable

  • JDE error: cannot find the symbol: the class Calculator

    I am trying to transfer the code that I wrote in a test over a clean workspace application and I'm missing class errors.

    I created a new workspace (abacus) and a new project (abacus) with the path com\sample\abacus and Calculator.java copied to the new folder.  In my project, I have added Calculator.java and it appears in my list of files.

    When I build I get

    D:\Program Files\Research In Motion\BlackBerry JDE 4.2.1\bin\CAbacus\com\sample\abacus\Abacus.java:22: cannot find symbol
    symbol  : class Calculator
    location: class com.monkeymade.cabacus.CAbacus
        Calculator calc = new Calculator();
        ^
    

    with the code

    class Abacus extends MainScreen{
    
        // create a new calculator
        Calculator calc = new Calculator();
    

    It's been long enough that I worked in Java and clearly, I missed a step somewhere.  Could someone straiten me?

    Seems I forgot to update the declartion of pacake in Calculator.java

    package com.sample.abacus;
    
  • Traded to the new computer hard drive.

    I moved a hard drive with photoshop on it to a new computer and when I launch photoshop I get error error 16 photoshop cc 2015.5

    Was you swap a boot disc and did start you the new calculated with the OS on this drive.  If this isn't the case, you must install Photoshop on the new computer.  The Photoshop Installer must configure Photoshop in the new computer system configuration. You can not simply launch Photoshop.exe located on the shared disk.

  • How is due date calculated in Oracle accounts payable

    Hello

    On what basis is calculated to the due date of an invoice.

    Say that payment terms are 10 days.

    That only takes into account the days or weekends and holidays as well.

    The due date is calculated on the basis of the date of invoice or the date of receipt?

    Kind regards

    Amanda

    Hello

    Please see the following content.

    Of the APLIST, the calculated due Date is correct. The invoice was created the

    May 17, 2010 and received was created on May 20, 2010. Later, when the Bill was

    validated, the system has recalculated the payment as plans ' recalculate payment

    Schedules has been activated.  The system has generated the due date as June 19, 2010, for a term of

    -Net30.

    Here's how the calculation of the due date:

    ---------------------------------------------------------------

    --> In general, Due date get calculated based on the most recent available departure dates. Date the most recent available beginning is derived according to the following formula.

    Greatest (Goods_Received_Date + Receipt_Acceptance_Days, Invoice_Date, Terms_Date).

    -> In the algorithm above, Goods_Received_Date is a date which is filled on the invoice based on terms_date_basis to the provider/site level.

    a. If terms_date_basis = "Goods received" so Goods_Received_Date get filled.

    (b) if terms_date_basis = "Invoice received" or anything else then, Goods_Received_Date is null.

    -> Receipt_Acceptance_Days is the number of days defined for "Receiving acceptance days" the tab invoice Options in Payables.

    -> So, the due date is the most recent DATE of INVOICE, DATE CONDITIONS, GOODS RECEIVED ACCEPTANCE DATE + RECEPTION DAYS.

    -> In the case of a corresponding invoice, the system takes into account the date of the Transaction of reception of the

    Reception for the calculation of a recent start date, because sometimes the DATE OF RECEIPT of GOODS is zero.  This feature is available from the beginning only 11i. See bug #1655225 for more details.

    a.So first system determines the recent date of GOODS RECEIVED DATE + RECEPTION ACCEPTANCE DAYS and TRANSACTION DATE of RECEIPT.

    b.After that checks most recent date from the defined formula again.

    -----------------------------------------------------------------------------

    If the customer does not want the system to use "Date of receipt" and then disable "recalculate the payment plans.

    If the customer wishes a new calculation, the system considers "Date of receipt" to a corresponding invoice.

    Concerning
    Gavin.

  • measures calculated in awm

    Hello

    I have not used in AWM calculated measures so far. I have the duration stored as. Now I need to calculate the average duration per month as a calculated measure. When I chose to create new calculated measure, I find these types of calculation: simple math, rating and sharing, user-defined expression and olap dml expression. I don't know what kind of calculation to use for my case and how to use... ??

    can anyone help me pls on this?

    Suppose that:
    (1) your level of TIME dimension are DAY-> MONTH-> standard QTR-> YEAR, with the help of the Gregorian calendar.
    (2) the name of your cube is CUBE1, and name of the stored measurement is DURATION
    (3) measure of TIME is charged at the level of the DAY and its aggregation is SUM
    (4) TIME dimension has an attribute TIME_SPAN

    Create the calculated measure AVG_DURATION by using an OLAP Expression Syntax, like:
    CUBE1. DURATION / 'TIME '. TIME_SPAN

    So when you look at data level DAY, then AVG_DURATION will be equal to LENGTH/1
    and when you ask (lets say) JUNE data level, then AVG_DURATION will be automatically TIME/30
    for data at the level of Q2, then AVG_DURATION will be LENGTH/91
    etc.

    You can add a CASE statement, if you only want to display the data at the MONTH level and NA for other levels.

  • PivotTable: new measure

    I wanted to create a new message based on those already existing in the PivotTable, but the section measures has no option to create a new calculated item.

    Thank you
    Ted

    Hi Ted
    If it works award points and to close the debate.  :-)

    Thank you
    Disney

  • Field calculated MDB a max date using rank

    Hello

    I need to get a maximum date within projects, and the date max must be a computed column. In the database there is the query I would use, how can I implement this in BMM, need help please, let me know if there is another way?

    Select a.commitment_date from
    (SELECT project, stage_id, commitment_date,
    DENSE_RANK() over (PARTITION BY project ORDER BY commitment_date desc) as rank
    of prod_detail) a
    Where rank = 1 a.project_id group;

    Thanks for your time and your help.

    Hi ssk.

    Your query in the DB online help, you can do 1 thing directly use this query in the physical layer and go to the-> new physical table and choose table type-> select and write SQL inside and paste this query it and joins appropriate to this table so he realized the extraction you want. So draw from this table to also be layer MDB.

    (GOLD)
    Take a new calculated column in the layer of MDB write it as max (commitment_date) and check the query SQL generated by BI server when you use this column in your application, by default, need to add group by clause adding columns to it.
    If you want to change the group by according to your requirement, and then go to the advance in the response criteria, find you the section group you specify a.project_id and check the results.

    Award points and close your previous message also @ssk field calculated MDB in the fact Table?

    See you soon,.
    KK

Maybe you are looking for

  • Problems Photoshop CS6 with El Capitan

    I just upgraded my iMac and I now use El Capitan. I want to continue to use Adobe CS6, Illustrator seems ok so far, but Photoshop is pretty sticky, and many of the keyboard shortcuts are not working do not, or only work occasionally. Does anyone know

  • System is not suitable to install a few games

    hey im a relative novice, but had no problem when I bought my computer laptop satellite pro a40 back in October last year. in recent months I have had the problem that some games cannot be installed as a message:16 bit windows subsystem: the system f

  • power supply for hall sensor

    Hello!! I ordered NI DAQ 6008, now my question is what do I need external power for my hall sensor or the hall sensor is powered by data acquisition itself? thanq

  • How to disable windows 7 AUTORUN

    I have Windows 7 Home Edition. I want to COMPLETELY disable the Autorun feature. I would use the "gpedit" basic tool but it is not available on home edition (it is very sad!) I tried the config of auto in the Control Panel/hardware and audio playing,

  • Using a Mac to partition a USB external hard drive to use to start Windows 7 on a PC

    Hello My PC hard drive died recently, and I need to reinstall Windows 7. Fortunately, I have a Windows 7 .iso file on my Macbook Pro. I also have an external hard drive USB empty. I try to use the Mac (in particular the disk utility program) partitio