Oracle job move on schedule, at the time of creation
How can I have a job when I frist create it and then on a schedule here. Code I am currently using is attached but it works only when it hits the scheduled time and not when I create.Version: 10g
-Create the program
DECLARE
v_programName varchar2 (32): = "P_Customer";
v_programAction varchar2 (1024): = ' begin customer_pkg.data; end;';
v_programType varchar2 (128): = "PLSQL_BLOCK";
BEGIN
dbms_scheduler. () CREATE_PROGRAM
program name = > v_programName
, program_action = > v_programAction
, program_type = > v_programType
enabled = > True
);
EXCEPTION
WHILE OTHERS THEN
dbms_output.put_line ('ERROR in the PROGRAM CREATE' | v_programName |)
SQLCODE |' -' || SQLERRM);
END;
/
-Define MetadataArguments for the program
DECLARE
v_programName varchar2 (32): = "P_Customer";
v_attributeName varchar2 (64);
BEGIN
NULL;
-DBMS_SCHEDULER. () DEFINE_METADATA_ARGUMENT
-program name = > v_programName
-, argument_position = > 1
-, metadata_attribute = > v_attributeName
-- );
-dbms_scheduler.enable (v_programName);
EXCEPTION
WHILE OTHERS THEN
dbms_output.put_line (' ERROR DURING THE CREATION OF METADATA ARGUMENT for ' | v_programName |)
SQLCODE |' -' || SQLERRM);
END;
/
-Create the schedule for the work to be performed
DECLARE
v_scheduleName varchar2 (32): = "S_Customer";
v_schedule varchar2 (512): = ' FREQ = DAILY; BYHOUR = 18';
v_schedStart Date;
v_schedEnd Date;
BEGIN
v_schedStart: = sysdate;
v_schedEnd: = NULL;
DBMS_SCHEDULER. () CREATE_SCHEDULE
schedule_name = > v_scheduleName
, start_date = > v_schedStart
, repeat_interval = > v_schedule
, end_date = > v_schedEnd
);
EXCEPTION
WHILE OTHERS THEN
dbms_output.put_line (' ERROR CREATING OF SCHEDULE ' | v_scheduleName |)
SQLCODE |' -' || SQLERRM);
END;
/
-Create the work to be performed
DECLARE
v_jobName varchar2 (32): = "J_Customer";
v_scheduleName varchar2 (32): = "S_Customer";
v_programName varchar2 (32): = "P_Customer";
BEGIN
DBMS_SCHEDULER. () CREATE_JOB
job_name = > v_jobName
, program_name = > v_programName
, schedule_name = > v_scheduleName
enabled = > True
, auto_Drop = > False
);
EXCEPTION
WHILE others THEN
dbms_output.put_line (' ERROR during the CREATION OF JOB ' | v_jobName |)
SQLCODE |' -' || SQLERRM);
END;
/
It's an extra step, call:
dbms_scheduler.run_job (job_name-online v_jobName);
HTH
Enrique
Tags: Database
Similar Questions
-
Windows Movie maker crashes all the time on Windows 8!
Just try to use Movie Maker on Windows 8 to make a DVD of my vacation and my files are stored on my NAS to format AVCHD (MTS) and I have a lot of files on the project (100 +). I can see that the files are placed in a temporary folder, but I now have the following in the event viewer whenever I try to edit the videos or even just play a preview:
Name of the failing application: MovieMaker.exe, version: 16.4.3508.205, time stamp: 0x5111fa77The failed module name: igd10umd32.dll, version: 9.17.10.2849, time stamp: 0x5044220bException code: 0xc0000005Offset: 0x0006d82fID of the process failed: 0 x 58Start time of application vulnerabilities: 0x01ce8bacc8b3d3d5The failing application path: C:\Program Files (x 86) \Windows Live\Photo Gallery\MovieMaker.exePath of the failing module: C:\Windows\system32\igd10umd32.dllReport ID: 5d3c399b-f7a1-11e2-bea4-5cf9dd52b07bFaulting full name of the package:ID of the failed package-parent application:Can you please help? I've already updated the app and don't know what I can do?The failed module name: igd10umd32.dl
Run the Intel® driver update utility (you need Java to run it) to get the latest driver for the graphics device Intel (r) in your computerIt displays a list of detected drivers like thisSearch for graphics Intel (r) (or something similar) with the download now button and download & install themThat should fix it, but I recommend download & install all drivers with download now button -
How to specify the time zone in the quartz Scheduler
Hello
I want to get a job at some point - every Monday 6 pm EST. The cron expression can help me to be a part of ' 06:00 Mondays ", but not the part IS. How can I specify a time zone. I couldn't find any examples pertaining to make quartz used in a web application. I found some links that talked about this in the spring - http://forum.springsource.org/archive/index.php/t-16381.html
My web.xml currently looks like this:
<? XML version = "1.0" encoding = "windows-1252"? >
< web - app xmlns: xsi = "http://www.w3.org/2001/XMLSchema-instance".
xsi: schemaLocation = "http://java.sun.com/xml/ns/j2ee http://java.sun.com/xml/ns/j2ee/web-app_2_4.xsd".
version = "2.4" xmlns = "http://java.sun.com/xml/ns/j2ee" >
empty < description > web.xml file for Web Application < / description >
<!-servlet >
< name servlet - > QuartzInitializer < / servlet-name >
> the servlet class < org.quartz.ee.servlet.QuartzInitializerServlet < / servlet-class >
< load-on-startup > 1 < / load-on-startup >
< init-param >
configuration file < param-name > < / param-name >
bpel_quartz.properties < param-value > < / param-value >
< / init-param >
< / servlet->
< servlet >
< name servlet - > BPELSchedulerServlet < / servlet-name >
> the servlet class < com.otn.samples.BPELSchedulerServlet < / servlet-class >
< init-param >
cronExpr < param-name > < / param-name >
< param-value > 0 0 6? * MY < / param-value >
< / init-param >
< load-on-startup > 2 < / load-on-startup >
< / servlet >
< servlet-mapping >
< name servlet - > BPELSchedulerServlet < / servlet-name >
<>url-pattern / bpelschedulerservlet < / url-pattern >
< / servlet-mapping >
<>session-config
< session-timeout > 35 < / session-timeout >
< / session-config >
< mapping mime - >
HTML < extension > < / extension >
<>mime-type text/html < / mime-type >
< / mime map >
< mapping mime - >
txt < extension > < / extension >
<>mime-type text/plain < / mime-type >
< / mime map >
< / web - app >
TIA
AmitNot sure that this is possible. Quartz Scheduler uses the time / date of the machine it is installed on. Is so for SOA suite is not installed on a PC that is on EST then make the settings manually.
In the case of summer time, when you implement the quartz Scheduler it allows you to make changes on the fly in the console. You have to bounce the server however.
see you soon
James -
How to start a job using DBMS_SCHEDULER depending on the result of other JOBS
How to start a job using DBMS_SCHEDULER depending on the result of other JOBS
For example I have two jobs A and B of EMPLOYMENT, I would like to start JOB B only when a JOB is complete, is an option like that?
Hello
Yes, you can create a channel with the Scheduler, see the documentation:
Creation and management of channels of employment
http://docs.Oracle.com/CD/E11882_01/server.112/e25494/scheduse.htm#ADMIN10021
-
difference between deletion archive using until the time and completed before
Hello
Can someone please let me know what is the difference between the following commands below.
DELETE ARCHIVELOG UNTIL ' SYSDATE - 1';
and
DELETE ARCHIVELOG ALL COMPLETED BEFORE ' SYSDATE - 1';
Thank youThe UNTIL clause specifies a Recovery Point.
The COMPLETED clause indicates the time of creation of the journal.
So until ' SYSDATE-1' specifies ' all archivelogs needed to recover the database from 24 hours ago. " If it is 09:00 28 - Jun and ArchiveLog Seq # 1001 was created 08:45 27 - Jun and Seq # 1002 was created at 09:10 27 - Jun, then Seq #1002 is required for recovery as at 09:00 27 - Jun.
Hemant K Collette
-
Oracle does not try to run the scheduled job
Hi experts,
We have a scheduled task that runs a procedure every 15 minutes... the procedure is written so that it retrieve data in a cursor in the remote location and insert it into a table server...
It was working fine, but at 6:00 in the morning the link is disconnected from the remote site (as it it connected through lease line and RF) then oracle has not tried to perform the work, and when I see tasks it shows that work always running from 06:00 morning...
I have check all views, dba_jobs, dba_scheduler_jobs, but in no view or a table, it is shown broken... anyway now I recreated and it works well.
but I would like to know how to force oracle to re-run performance if it is not run on a specified due to connection failure? I read in the documentation of oracle running oracle work try if it is not performed after 1 min, 2 min, 4 min and so on for 16 times, then declare it as broken...
and I also saw column "retry schedule" in dba_scheduler_jobs...
Can someone tell me how to plan this new attempt explicitly?
Thanks and greetings
VDVikrant,
Not going to publish a solution, but would advice to take your question to the forum of the annex. I'm sure someone would be able to give the answer.
PlannerAman...
-
How to increase the time of validation in oracle?
Dear Oracle Guru-
My database is OLTP system.
Oracle Database 11 g Enterprise Edition Release 11.2.0.2.0 - 64 bit Production
PL/SQL Release 11.2.0.2.0 - Production
CORE Production 11.2.0.2.0
AMT for Linux: Version 11.2.0.2.0 - Production
NLSRTL Version 11.2.0.2.0 - Production
The time of the validation of each transaction is currently 20-30 milliseconds. Is there another way, we can improve the time of validation?
I understand that the time of validation is quite reasonable. But is there another way, we can inprove the moment of validation?user8904001 wrote:
Dear Oracle Guru-My database is OLTP system.
Oracle Database 11 g Enterprise Edition Release 11.2.0.2.0 - 64 bit Production
PL/SQL Release 11.2.0.2.0 - Production
CORE Production 11.2.0.2.0
AMT for Linux: Version 11.2.0.2.0 - Production
NLSRTL Version 11.2.0.2.0 - ProductionThe time of the validation of each transaction is currently 20-30 milliseconds. Is there another way, we can improve the time of validation?
I understand that the time of validation is quite reasonable. But is there another way, we can inprove the moment of validation?
But what exactly is the time you are looking for? The reason for asking is that now the time is 20ms so exactly what point would be a suitable time? For the improvement of the validation, a possible solution would be to move the files, redo log on faster SSD support, but it's a statement very very generic and should be taken with a grain of salt.
HTH
Aman... -
move multiple objects at the same time?
I made a flag which consists of about 15 pieces. I need to focus this flag. How can I move all parts of the flag at the same time?
CCombine the 15 items into a compound clip and then move the compound.
-
Using the MS ODBC driver to connect to Oracle and MS SQL DB - get a time-out error
I have the driver installed and configured on the Linux host where sits the Oracle DB. I worked through the configuration and tested along the way.
If I execute the following SQL statement I get a timeout error after only 15 minutes:
SQL > select * from host_table@UCMDB806;
Select * from host_table@UCMDB806
*
ERROR on line 1:
ORA-28511: interruption of the RPC connection to heterogeneous remote agent to help
SID = ORA-28511: lost RPC connection to heterogeneous remote agent to help
SID = (Description = (Address = (Protocol = TCP)(Host=localhost) (port = 1521)) (CONNECT_DAT
A = (SID = UCMDB806)))
ORA-02063: preceding the line of UCMDB9
Process ID: 4070
Session ID: 392 serial number: 40935
If I limit the SQL to give hosting me only that start with 'a', I get this:
SQL > select * from host_table@UCMDB806 where (name) lower like 'a % ';
ID
------------------------------------------------------------
NAME
--------------------------------------------------------------------------------
TenantID
------------------------------------------------------------
name of the vendor
--------------------------------------------------------------------------------
softwarename
--------------------------------------------------------------------------------
4616
AHOST-B
76436
ID
------------------------------------------------------------
NAME
--------------------------------------------------------------------------------
TenantID
------------------------------------------------------------
name of the vendor
--------------------------------------------------------------------------------
softwarename
--------------------------------------------------------------------------------
SYMANTEC
.
.
.
It seems to be a time-out on this query. My software is located 20 minutes for a query. MS SQL server is set to unlimited for remote queries (we did it to help isolate the timeout). So, I guess the wait time that is happening at the level of ODBC driver. Someone has all understand how to solve this problem?
Hello
Your question is beyond the scope of this community.
Please repost your question in the SQL Server TechNet Forums.
https://social.technet.Microsoft.com/forums/SQLServer/en-us/home?category=SQLServer
See you soon.
-
Change the time for the scheduled task, I added
I created a schedular system file (.vbs) that supports the backup of the database of one of my application. I added this file to the scheduled task. I put the time of execution to 15:00 daily, now I want to update at the time of execution of the task sacheduled. How can I do? I use Windiws 7 Home premium.
Hi Aurélie Rozier,.
Click on the Start button and type "Calendar" in the search box. The option tasks planning must appear in the search list. Click (or double-click) on this option to launch scheduled tasks. When the window tasks planned opens leaves the Task Scheduler list fill out and then look to the bottom of this list for planning thye name, that you want to change. When you have found, right-click on it and choose Properties. In the Properties window, click the triggers tab and then click Edit at the bottom of the special editing window. You should be able to change the time from there.
This forum post is my own opinion and does not necessarily reflect the opinion or the opinion of Microsoft, its employees or other MVPS.
John Barnett MVP: Windows XP Expert associated with: Windows Desktop Experience: Web:http://www.winuser.co.uk; Web: http://xphelpandsupport.mvps.org; Web: http://vistasupport.mvps.org; Web: http://www.silversurfer-guide.com
-
Expand collapse folders in my documents is not and jumps down and so I have to move the folders I want to actually see this all the time is there a default to always develop?
Also I have to move the colum line to the right all the time to see the date size etc. is there a default value or why not microsoft built in a value by default do not cut off the name of the file that I always have to make more time to see the full file name
Thank you
Greg
Hello
Unfortunately, you cannot save the settings for the fall down in my documents. As this is normal.
If you want to suggest changes in the design here is the link you can make reference to: Microsoft Connect - back products and bug reports. Microsoft.
https://connect.Microsoft.com/dashboard/Info/To resize the size of the column:
1. you can resize the column by pointing the mouse on the name of the category.
2. Once you can drag the slider to the right, double click it to get the optimal size.Thank you, and in what concerns:
Swati Keni-Microsoft Support Engineer -
How to display the time of growth of the autoextended oracle files?
Hello
How to display the time of growth of the autoextended oracle files?
Hello
1. do you have re - seen view data dictionary in the oracle documentation?
DBA_DATA_FILES
dba_free_space
dba_Tablespaces
-Regarding (updated)
DBA_HIST_SEG_STAT
DBA_HIST_SNAPSHOT
DBA_TABLESPACE_USAGE_METRICS
DBA_HIST_TBSPC_SPACE_USAGE
2. If not, then re - discovers once and understand the use of columns and build the query.
3. If Yes, then why you have not tried to build queries
4. again, if you're lazy, search in google or forums. ton of translates queries
5. What are the disadvantage of step 4 - you will not get to learn something (0% gain of knowledge). If you really want to learn, then try to learn to build query, and try to understand the views of data dictionary
6. When you spend above task at the end of the task you will get satistided with two things
--> Understand how to use the Oracle docs for help and where to look in the future
--> Your skills / knowledge gain - trust me it will make you another step to learn new things.
7. If you don't know SQL, learn the basics takes hardly 2 to 3 hours and then you can build query.
It may be useful
-Pavan Kumar N
-
How to move audio files of the program in the time line?
All of a sudden I can't move audio files of the program in the time line - I read that Adobe said in previous forums click with the right button on the A1, but nothing in this discussion has helped me solve this problem. It was working before. I am a beginner user, so I could be missing something really obvious. My time scale is in blue. I noticed in some tutorial videos that it was yellow.
Hi lauranoel,
The reason is due to a bug, explained here: FAQ: why no audio or video will not at the track where I drop?
Next time, just remove and In or Out to mark, and then drag the clip.
Thank you
Kevin
-
The ORACLE job does not manually - start schedule_limit
Hello
I have a job that needs to be run once a day on a daily basis. The job runs successfully the calendar every time.
However, every time I want to manually run the command below it does not work and gives me this msg:
Select operation, additional_info dba_scheduler_job_log
OPERATION ADDITIONAL_INFO
TIMED OUT REASON = "periodicals work postponed until after the time limit exceeded.
> > > My work:
BEGIN
sys.dbms_scheduler.set_attribute (name = > 'myjob', attribute = > 'job_action', value = > ' start myjob (P_BY = > planner of "');)
End ;') ;
END;
> > > > > FREQ = daily; BYHOUR = 9;
> > > > > try to run it manually like this:
Start
DBMS_SCHEDULER. RUN_JOB ('myjob', false);
end;
Zemzem explained the problem, and you asked a question on the schedule_limit parameter for your work.
Would you care checking and post the answer here?
Select schedule_limit
of user_scheduler_jobs
where job_name = 'MYJOB ';
-
Is there a script to move several tabs at the same time
Is there a script or a way of being able to move several tabs at the same time - I need to change the size of a document and all the tabs need to move at the same time - is it possible to do so. Have several financial sheets should reformat - thank you very much!
Jjust found a cool script of Shane Stanley moving several tabs in indesign [Archives] - Desktop Publishing Forum that works just the way I want it – here it is:
say application "Adobe InDesign CC 2014"
the value theMeas to my doIDdialog()
set theTabList to tab list of the paragraph 1 of the selection
set theTabPositions to position of tab stops to paragraph 1 of selection as points
Repeat with I from 1 to the number items in theTabList
set the position of the point of theTabList to 'p' i & ((point I of theTabPositions) + theMeas)
end Repeat
define tab list some points of selection at theTabList
end say
on doIDdialog()
say application "Adobe InDesign CC 2014"
the value measUnits to measure horizontal units of view preferences of the document 1
Try
destroy each dialog box
end try
Set restart to make dialogue with properties {name: "Putting the selection handles"}
the value C1 to do dialogue column restart
do static text in C1 with properties {dynamic label: "' amount to move all tabs:" "}
the value C2 do to column of the dialog box to restart
the value mComb1 to do measure combobox to C2 with properties {min width: 80, content Edition: '1', big helping hand: 10, nudge: 1, string list: {'-25', '-20', '-15', '-10', '-5', '5', '10', '15', '20', '25'}, change the units: measUnits, value: 1000 maximum, minimum value:-1000}
activate
with timeout to 10000 seconds
Show reboot
If result = false then
beep
Restart to destroy
Error number-128
end if
end timeout
the value comboMeasNum1 to change value of mComb1
Restart to destroy
end say
return comboMeasNum1
end doIDdialog
Maybe you are looking for
-
iPhone ringtone on my computer
How do I disconnect my iPhone ringtone on my computer? This is a clean install. I was able to disable the notification of the Office previously, but for the life of me I can't find it now.
-
How can I find the latest version of windows will support my pc?
I have an older desktop, there is no problem with him. I'd like moving from XP to windows 7, I'm not sure how to determine if my pc takes care of this.
-
my browser is set to block cookies, how l can unlock?
my browser is currently set to block cookies, so I cannot get into my hotmail what need to do to unlock the cookies?
-
the upgrade of rogers online protection
I am trying to upgrade my rogers online protection & when I do she starts then after a message is lit at the end that he had failed. He said: The Microsoft Windows installers may not be access or a faiked. This can happen if the a of Windows IS NOT P
-
Nvldd.sys driver failure BSOD HELP!
Problems persisted since 9/14 (the last Patch Tuesday). Initially, I thought it was MSUpdate (which I still think is). BSOD: error 0 x 0000016, nvldd... failed pilot sys. Windows will be BSOD randomly (and whenever I have to use a graphic intense pro