The so-called first fieldChanged or fieldChangeNotify?

Hi all

I stumbled upon something that has completely baffled me and I was wondering if I could get a second set of eyes on a problem I encounter.

I have a page that I build buttons to display with a class of CustomButtonField. In the class, I use the fieldChangeNotify to set the current text of the selected button, thus:

    protected void fieldChangeNotify(int context) {
        try {
            this.getChangeListener().fieldChanged(this, context);
        } catch (Exception e) {}  

        setCurrentLabel(this.label);
    }

then call the getCurrentLabel in the main class to retrieve the text of the label and do whatever I want, using the fieldChanged method that comes with FieldChangeListener

   public void fieldChanged(Field field, int context) {
        CustomButtonField cbfi = new CustomButtonField();
        Dialog.alert("Button pressed: " + cbfi.getCurrentLabel());
    }

However, this dialog.alert shows null when I test it, but if it is places in the first method, it works as expected. I wonder if I might have the wrong order in when these methods called when clicking on a button, and the call for a new instance of CustomButtonField is to obliterate the value stored in getCurrentLabel. Either I missed something very simple in reterieving data.

Regardless, if I could have some thoughts about why it would not work, I would be most grateful...

Honestly, I'm ready to comment out. The only reason why I currently is to capture the current name of the button that is that is clicked on screen. Cant' seem to find a way to have that captured in the fieldChanged method, which is in the main class instead of the class CustomFieldButton. If there is a way to capture this information within the fieldChange, I'm happy.

EDIT: I found a solution which is simply embarrassing. Instead use the setCurrentLabel method in the fieldChangeNotify method in CustomButtonField, what I did have points to the current instance of the label of the channel, instead of having a variable so the currentLabel of the getCurrentLabel string value. And in the main class fieldChanged method, I have the following code.

     CustomButtonField cbfi = (CustomButtonField) field;
        Dialog.alert("Button pressed: " + cbfi.getCurrentLabel());

Ugh so simple. Thanks for the help of the people! Very much appreciated.

Tags: BlackBerry Developers

Similar Questions

  • PS ask activetion again. the worm is first CS PS v8, it fails, I tried to call help number given on the page but service does not exist, redirect to .../go/activation statement fails, it causes some assistance - activate is not possible to click

    PS ask activetion again. the worm is first CS PS v8, it fails, I tried to call help number given on the page but service does not exist, it redirects to .../go/activation

    statement fails it causes some assistance - activate is not possible to click

    Adobe has disabled the server activation for pre CS3 products a long time ago and that's why you are unable to activate your product. I can not to suggest what to do, but I don't know that CS2 owners with this problem can download a version specially created that doesn't require activation. To my knowledge, no such version exists for CS. If it was me, then as the real owner of the software and just unable to use it due to having no mechanism to activate, I download CS2 and use it until someone from Adobe told me to stop. It is a sensitive issue because the download site clearly indicates that there must be an existing CS2 owner. However, the url to the download was posted the pirate not many Adobe Web sites not as a way to free download the CS2. I imagine that there have been hundreds if not thousands of downloads from 2013 when it became first available and so far Adobe has not made any attempt to restrict the download to current owners of CS2. Their policy is quite clear if CS2 is not given away for free. Fortunately, I use CC2015, I can't make a call on it, but the URL is below if you want to move forward.

    Download Adobe Acrobat 7 and Adobe Creative Suite 2

    Terri

  • I called to cancel my subscription to the month for first adobe adobe support.  The representative told me that my membership was cancelled successfully.  But when I checked my account, it says my subscription needs to be renewed within a few days. Hoes i

    I called to cancel my subscription to the month for first adobe adobe support.  The representative told me that my membership was cancelled successfully.  But when I checked my account, it says my subscription needs to be renewed within a few days. Hoes it mean, the representative has not really cancelled my subscription?

    Hello

    You will need to contact support by calling/chat for this request.

    Contact the customer service

    * Be sure to stay connected with your Adobe ID before accessing the link above *.

    Kind regards

    Sheena

  • not able to hear the sound of the cellular caller

    my brother bought a Apple Watch 38 mm sport. But after the update to os 2.1 we couldn't here the voice of the caller please say a quick solution

    Rgds

    Ajith

    Hi asmaa

    It can help to turn off pairing your brother in a Bluetooth headset iPhone, if it is currently associated with it.

    Otherwise, it can help to restart the iPhone and his watch. Turn on both devices off the power together first, then restart the iPhone before you restart the Watch:

    -To switch off your watch: press and hold the button side until you see the cursor off the power; slide it to turn off;

    -To switch on: press and hold the side button until you see the logo.

  • Error-50103 during the VI call for the second time

    I have a main VI who, after the initial installation, called a VI that reads and writes several times to a data acquisition (USB 6356). This VI subroutine is called several times for each of the stages of the program. On the first pass through, there is no problem. During subsequent calls to the sub VI, however, it throws error-50103. I've identified the task that resolves this error. I made sure to do a self-cleaning on the task, create the task outside of loops and stop and clear the task after all the iterations are performed. To check if it is only the following calls may cause the error, I created a simple VI who just ran the sub VI twice now, and there are no errors.

    Any ideas on what is causing my problem or why it does occur during subsequent calls to my VI more complex?

    A picture of the frame and the task which gives me the number is attached.

    Thank you!

    I finally found the problem, although it was not the task that LabVIEW had identified. The problem task was a separate sub - VI who was called from the main VI and the Subvi that threw the error. I got this task stopped and cleared and it's not like he has over the matter.

    Thanks to all who have contributed.

  • Start the asynchronous call brutal Typedef Bug

    There is a nasty bug which I think is the cause of many anomalies weird I see with the events of the user, like where some get fired and if I probe the refnum of the event on a VI that was launched using the asynchronous call node start I get some weird value for reference as 8450 or 5500 instead of some great typical integer. It is not also match the value that I get when I initialize the reference. This happens only intermittently, but I can reproduce the bug that I see on a smaller scale to a certain extent. This is not exactly the same as what I see in my current project, but I guarantee you both are related. Also, I'm pretty confident that this has to do with the help of LVlibs as well.

    So... to reproduce some questions:

    Unzip the attached code and open the project

    Open Main.vi. It is hard to see because it's pink, but notice the point of constraint on the node to call asynchronous start. This is provided at this point because I have a cluster of non-typedef in the connector pane, but a TD cluster plugged into it.

    Now open AsyncCall.vi

    Drag the eventcluster.ctl of the project on the façade of the asynccall.vi

    CTRL + x on the typedef cluster that has placed you on the front panel

    Select the non-typedef cluster by clicking it

    CTRL + v to replace the TD not cluster with the cluster of TD and save

    Return to main.vi, you will notice that the point of constraint does not go far.

    Open context-sensitive help and notice that the ctrl types match, but it's as if LV does not recognize it on the beginning of the node of the asynchronous call.

    Remove the node from asynchronous start call, then replace it. The cluster to the top wire. Voila, no point of constraint.

    Second question - same result but different method to get there.

    Now that you have components of connector typedef stress points and no more because you've taken the first steps of this 'exercise', remove the EventCluster.ctl from the library and record.

    WOAH, look the points of back strain, because node call asynchronous start still referencing the typedef cluster that he thinks that should be in the library. This can be seen by removing the cluster on main.vi and then right-click on the node to call asynchronous start on the side of the connector and creating a new constant of cluster

    It is creates a greyed out of control! Why? Well, we will reopen the context-sensitive help. Whadda you know, it's always looking for the control in Bug.lvlib that no longer exists.

    Now, the question that I'll have in my complete project that I can't post and can not reproduce on a smaller scale updates the typedef causes the dot of coercion. Otherwise I can't update my typedef cluster that contains all my events without going and replacing EVERY SINGLE launch async call node EVERY time I have add a new event.

    Major problem.

    Please let me know if these steps to reproduce were not clear or you have difficulties to reproduce the problem. I use LV2013 SP1. I opened the project in 2014 to see if it has been fixed in a later version, but I saw the same thing.

    I can repro with measurements of @GregFreeman and also confirm that I saw this same issue at least since the LV2012, but they have not reported it having not been able to provide a minimum test (thanks, @GregFreeman!) scenario

    For the record, it seems that the bug here, it is the spread of type sometimes makes an incorrect assumption / optimization as to if the conpane of the start the asynchronous call node must be updated when the source changes.

    A more obvious change - say, add/remove an entry, reverse order, or change data types altogether - always seems to spread properly.

    Incorrect optimization seems to be a terminal retains the same type of database, but transforms the type definitions - or, if the type definition is re-related or related outside a library owner.

    @GregFreeman watch the bug goes from non-typedef typedef, but it's actually worse in the other direction - when a link to a missing file is maintained.

    Call the asynchronous starting node seems to maintain a list of links that is distinct from that of the VI, and this list of links separated, this is what seems to not be properly invalidated. For example, in the screenshot, I illustrated example of Greg that the node generates no error in the compiler even after parenthood and rename the Typedef...

    ... even when we "Create Constant" on this terminal incriminated with list obsolete links, we get a compilation error. Since then, the grayed out type highlighted in the contextual help cannot be found, because 'Bug.lvlib:EventCluster.ctl' no longer exists, but the list of links separated from this node was not notified:

    It is worth noting that "Bug.lvlib:EventCluster.ctl" does not appear in the list of links of the VI at this stage.

    Often, no compiler error is generated after this failure occurs and as Greg reports, you could end up with undefined behavior (e.g. suspicious Refnums and events that seem to not fire not) (and I'll add it to this list a hearty portion of DAborts with diversion total number of messages).

    In addition, you * could * receive errors of cryptic linker for generations, but maybe not (the above screenshot, you'll notice I added two builds, neither of which seems to have a problem of building). (It seems that the broken link is travel with the distribution of the source, even if 'Disconnect the definitions of Type' is selected during the build process. That is why I believe anecdotally that node maintains a list of link separately the list of VI, and it's maybe part of the problem).

    It is noted that during this refactor (de-parent and rename) all screws and control remained open and in memory and all files have been saved. No funny business where LabVIEW would be unable to update links in a file that was not in memory.

    Another note - in the original example, all source files have been unifiles, and I can add anecdotal report this bug is much more insidious when separate compiled Code is active on the source files. In this case, the source may appear to be perfect - no point of constraint, no link expired - but the code that is currently running can be broken. In other words, what you see is not what you get, which makes debugging impossible. (This bug in particular is one of the few who makes "Cache of compiled clear objects" become a normal procedure controlled throughout the application development)

    Anyway, I wanted to draw attention to this issue, given that this thread is not yet associated with a CAR and it's a serious bug that generates a behavior undefined performance caused by a fairly normal refactor now has a well-characterized small repro case.

  • Report Generation Toolkit, production of the 2147417842 error, "The application called an interface that was marshalled for a different thread."

    Hello world

    I have an application that stores data in an Excel worksheet by using the report generation tool.  My VI have worked well in the past using Excel XP, but since I have upgraded to Excel 2007, I get COM errors like this:

    "2147417842 error occurred while the application called an interface that was marshalled for a different thread. in Excel_Insert_Text.vi', this is the exact wording, even with the odd punctuation and capitalization.

    The first occurrence of the error is not determined.  Sometimes, to the record 10 sessions, involving a new .xls file, may occur before this error.  Once this error occurs, I must leave LabVIEW to solve.  If I try to do something with Excel, I still get this error, even if sometimes it comes out different source Excel_Open.VI is another.

    These screw logging worked fine until upgrading to Excel 2007.  I checked and I have been using a very old version of the report generation tool, v1.0.1.  I read the documentation and had a big sigh of relief when I realized that I needed to upgrade to v1.1.2 for Excel 2007 help.  However, even after the upgrade, I still get the same errors.  I'm using LabVIEW 8.0.1 and I also build these screws in an application.   The error occurs in the application built both in the IDE of LabVIEW.  Anyone out there have any idea what I can do to fix this?  I google a bit and discovered it is a COM error, but I can't find any reference to the report generation tool specifically.

    Thank you

    Phil

    I think that suits him!

    Here's what I did: I left privileged execution environment level upper VI as "as the appellant.  I tried the "user interface" configuration, but it seemed to slow down considerably the program.

    Then, I found each sub - VI, calling the report generation tool and define the environment for running favorite "user interface".  All the errors went away, and the program is much happier now.

    Big assumption on what a Christian, thank you!

  • Memory from the Flushing call library function node

    I use the function call library (COLD LAKE) node to load some dll dynamically in a same vi.

    I use a loop for to send the DLL files or a table to COLD LAKE to load the different dll.

    For the first iteration, the COLD LAKE works very well, but for the second iteration and so on can not replace the output variable, and continue to repeat the result of the first iteration.

    Is there anyway to clear the memory of COLD LAKE, so that I will get the correct result for DLL 2nd and so on?

    I understand your message, you have different dll, which returns an array of LabVIEW.

    This table can be of different sizes according to the DLL you are calling.

    I think that you are having a general misunderstand about LV memory management. I think that your comments refer to the data space LV has allocated for the table, this has nothing to do with the DLL itself said!

    LV works memory about conservative. So if you allocated a data space, execution of a new of the same VI will try to reuse this dataspace. So the tables are not released if the VI will slow.

    That being said, the table itself will not reduce its size.

    The only question I have on this: you still have all the available values? If the new call returns the three values (out of 33), is the rest 30 items "the old value"?

    For ANSI C dll - it is common that the DLL also returns a scalar value "arraysize". If you got that, you can use the Array subset function to retrieve valid values.

    Norbert

  • A correlation must be established at the level of the process calling or called?

    In the Oracle BPM Suite 11 g: advanced topics of BPMN book, the authors wrote:

    When you use the message-based correlation, don't the called process must be aware of the correlation, the appeal process. The runtime will take care of the details for the calling process, you don't need to include details of correlation in the process model for the calling process.

    In the called process, you must include the definition of correlation set and specify the tasks or events appropriate to use correlation. Let's look at an example in the following diagram:Capture.PNG

    In the example above, the authors introduce a correlation on the called process.

    Capture.PNG

    However, documentation of Oracle on the correlation, the typical design for correlation flow mentions that the correlation is initiated by the sender of the message, as shown below.

    1 design processes that communicate with each other.

    2. in the calling process, add the stream object that sends a message to the other process.

    3. define a correlation to the stream object that sends the message and configure it to initiate the property aliases.

    4. in the called procedure, add the stream object that receives the message.

    5. configure the stream object that receives the message using the correlation you defined and assign a value to the property alias.

    I also found this article - work with Custom correlation in Oracle BPM Suite 11 g, in which the author gave 2 examples of correlation in a taxi booking process. In these two examples, the author has also launched the correlation on the sender of the message.

    In the same section in the book, the authors also wrote:

    You need not set properties of correlation on the outputs of the process, for example, his task to send, or any nodes (message) or throw the message events. Only the entries have correlation properties.

    I would be very grateful if you could help me with the following questions:

    1. When is the right time to launch a correlation of the receiver / called process side?
    2. How the calling process can decide that the answer message he receives come from what conversation if the calling process is not the man who hired the conversation?
    3. Regarding the last quote, is there something wrong if I define a correlation on the output to send to a specific process instance?

    After spending some time more twisting my brain, I think I got a better understanding of the correlation now. Please correct me if I am mistaken on all parties. It is important to me.

    Where and when to define the correlation depends on 2 rules:

    1. Who needs conversation?
    2. Who is 1st to 'talk' in the conversation?

    There are a few scenarios that can occur:

    1. Only the called process needs a conversation.

    • This scenario has been well illustrated by Arun Pareek in his blog - working with Custom correlation in Oracle BPM Suite 11 g, in which he created a process for the taxi booking. As shown in the image below, there is a subprocess embedded to cancel a reservation. In this case, when another part of the system (process BPEL, BPMN process, etc.) sends a message "Cancel booking" in this process of 'CabBooking', he cares not the conversation. It is the process of 'CabBooking' who needs conversation in order to correct one of its instances running unreserve. The system of 'other', it's just a normal service with the ID of the booking must be cancelled.

    • Commercially, this kind of procedure should be the case for most popular use for correlation. Technical side, this is where Mark Nelson is correct. As only the called process needs the convesation, the calling process has no need to be aware of the correlation. According to rule 2, it is clear that the activity of "Booking request" is the place to initiate the correlation, as has been done by Arun Pareek in his blog. Subsequently, the "cancel booking" activity can make use of this initiated correlation.
  • Only the calling process must a conversation.
    • This scenario was presented by Mark Nelson in his book - Oracle BPM Suite 11 g BPMN topics advanced, in which he had 2 processes: process a to calculate a square of a number and process B to submit the number of input in the process a as shown below. In this example, the correlation was launched on the 'send task' B and used by the task "receive" B processes processes. In the process, he doesn't care the conversation; his only responsibility is to calculate the square of the number of input. It's the process B who needs conversation in order to map the correct response to the Service call message.
    • A.
    • B.
  • Technically, the motivation for this scenario is usually the case in which the called process is a reusable service that does not support WS-addressing. Generally, within the Oracle stack, as WS-addressing is supported, simply use the default conversation without having to manually create correlations. On the business end, one of the reasons for having such a correlation are to ensure that there is only one instance of execution with a special at any time correlation key. For example, for procedure B, it is not possible to have 2 instances with the same number of entries as the correlation key. After the 2nd rule, it is easy to know where to start the correlation - the activity of the 'task to send' process B.
  • The appeals process and need a conversation.
    • This scenario is also confirmed in blog Arun Pareek. In the 'Get booking availability' embedded sub-process, he throwed a 'send booking confirmation' signal and then took in the primary process to the activity of «Get answer of Confirmation booking»
  • . In fact there are 2 ways to implement correlation in this case.
    • Assuming that no correlation has been created in the process of "Taxi booking" (ignore the use case for "Cancel booking" above), sequel to the 2nd rule, as the "send Booking Confirmation" is the activity 1 to join the conversation, this is the place to initiate the correlation, as has been done by Arun Pareek. Subsequently, the 'Booking Confirmation Response Get' will make using the correlation of insiders.
    • We can push this scenario 1 scenario - "only the called process needs a conversation", by launching the correlation directly on the first activity, "Booking request", "cabin booking" in the process of. Using this approach, the 'availability reservation get' subprocess embedded as well as any other external processes that need to communicate with the 'Cabin booking' process will not be aware of the conversation. In this case, all the 'other' process is enough to call a favor. Correlation initiated on the 'Cabin booking' process will take care of the rest.
    • The 2nd approach should be the best practice, because it helps ensure that the correlation is initiated in only 1 place - the 1st activity of the process called and reused by anyone.
  • Subprocess multi-instance incorporated.
    • This scenario was presented by Mark Nelson will use a process C, which is a sub-process multi-instance incorporated, to call multiple service to the process above. In this example, the correlation was launched on the 'task to send' C process and used in the 'task to receive' C processes. Once A process has no need to be aware of the conversation. In addition, a conversation of scope must be defined inside the embedded sub-process.

    • The reason why the correlation must be initiated the calling process is because only one instance of the calling process is several service call to the same process in parallel at the same time. On arrival, the calling process response messages must know what answer message is requiring the Service. Again, within the Oracle stack, as WS-addressing is supported, it is sufficient to use brought the conversation without having to manually define correlations.
  • This is how I understand the correlation at this stage. Please let me know if I misunderstood something.

    Thanks a lot for your help!

  • Camera Raw as the interface for first Pro CC

    Hello Adobe

    I am a photographer and video producer looking for an easier way to file and adjust the levels of my first images.

    The DynamicLink with SpeedGrade is really nice and fast, but getting my head around the new SG interface and to be able to get the best results out of it is a real challenge. Recently, I discovered that I can open video files in Photoshop CC and use the Adobe Camera Raw interface as an effect on images and apply the changes of color and levels it. This has really opened the process of grading for me and from a background of stills with many years of using Lightroom to process my photos, I find the Camera Raw interface much more intuitive. It allowed me to get better much faster out of SpeedGrade. The only issue is the workflow and rendering time involved in the dissemination of the video from first to Photoshop and then new back is drawn out and complicated.

    My questions are:

    Is there a current effect or the plugin that replicates the Camera Raw interface and functionality defined in Premiere Pro / SpeedGrade?

    Is it a characteristic Adobe seeks to include in future updates of first?


    It may be laziness in my name, not taking the time to learn the SpeedGrade interface, but I know that Adobe is a sensitive developer and that this feature would accelerate the process of classification and it would really call the community DSLR who use your products for the production of pictures and videos.

    Screen Shot.png

    Thanks in advance

    Dan

    --

    ---------------------
    Dan Murphy
    Photography & video Production
    + 61 0449 53 9797

    www.mandurphy.NET

    And there it is!

    Come to Adobe Premiere Pro - the new color Panel Lumetri - YouTube

  • How to pass attribute values after ExecuteWithParam to the method call

    Hello

    I use Jdev 11.1.1.6.

    My use case, is that I have mainPage BTF which has ExecuteWithParam as the default activity. It filters the VO using params. I have a requirement to store some of the attributes of current line to pageFlowScope which must be sent to several taskflows child.
    I present a method call after the ExecuteWithParam event and before the page is rendered but do not know how should I pass the current line (or something) in this method call to store values on pageFlowScope.

    What should I switch to this bean managed to store values on pageFlowScope? Is there an alternative?

    Thank you
    JAI

    I see two possible ways to get to the attributes. First of all, you can get the iterator current rank and get attributes here. Secondly, add you links attribute in the file pageDef methods for all attributes that you are interested in. Then you access it by using the attribute binding. I never tested the 2nd method, but I guess that the framework will fill the attribute links, as it does in a normal page.

    Sorry, can't give you enjoy this code adds that I'm not in front of a PC.

    Timo

  • The procedure call?

    Hello
    That's what I try to do, if you have some context to my problem.

    1. I'm putting some details for a command in a rowtype variable.
    2. I then tries to call a procedure that inserts data in providing this rowtype as a parameter variable.


    My code:

    DECLARE
    order_info mytable % rowtype;
    BEGIN
    order_info.ID: = '1';
    order_info. Name: = "lollipops".
    END;
    /

    create or replace procedure orderinsert (order_info in mytable % rowtype)
    AS
    BEGIN
    INSERT INTO mytable
    values order_info;
    END;
    /





    How do I get this to actually change the fact table? I'm on track for what I'm doing?

    Thank you

    >
    OK sorry I didn't know that he could compile and still be wrong.
    >
    What are you talking about? There's NOTHING wrong with the code of procedure you have posted.

    And there is nothing of syntactically wrong with the code of the anonymous block that you posted. The only thing missing, it's that you NEVER called the procedure.
    >
    Especially because the way that I am asked to do is... I guess that weird because there are easier ways to accomplish the task.
    >
    Yet, what are you talking about? What, exactly, is asked to do?
    >
    So in PL/SQL, you can use SQL, but you cannot combine elements of SQL and PL/SQL in the same statement, they stay separate?
    >
    What do you mean by any of this? Please explain.
    >
    I'm at least correct in declaring the rowtype first, then by assigning values to the columns, then by calling the procedure that the data will be transmitted via the parameter 'in '? Or is there a better way / okay to do that?
    >
    Never I demonstrated just to you when I added the procedure call to the anonymous block that you created?
    >
    If that is correct then I need to just find a way to put these data in the table of my database
    >
    Please explain. The procedure will be "put this data in the table" in your database.

    Almost nothing of what you say in this last answer makes no sense. What, exactly, you try to do?

  • JDeveloper 11 g - value of bean to access after the method call.

    Hello

    I created a command button to run a PL/SQL method, as shown in the example call: http://download.oracle.com/docs/cd/E17904_01/web.1111/b31974/bcadvgen.htm#BABEIFAI 37-11

    I have the following code, to fill a java bean in my ApplImpl class.

    Result APIResultBean = new APIResultBean();
    // 7. DateValue property value using in-first OUT param
    result.setResultValue (st.getString (28));
    // 8. StringValue property value using THE param 2nd
    result.setMsgValue (st.getString (29));
    System.out.println ("Bean defined:" + st.getString (28) + "and:" + st.getString (29));

    The java bean has the following code and is defined as a java class in my model of controller:

    package CELPAY.model;

    import java.io.Serializable;
    Import oracle.jbo.domain.Date;

    / public class APIResultBean implements Serializable {}



    String ResultVal;
    String MsgVal;

    public setResultValue (String ResultVal) Sub {this. ResultVal = ResultVal ;}
    public String getResultValue() {return ResultVal ;}
    public setMsgValue (String MsgVal) Sub {this. MsgVal = MsgVal ;}
    public String getMsgValue() {return MsgVal ;}

    }



    The procedure runs, but I have no idea how to do to retrieve the output variables in a form as a text of output. That is to say, how can I access this bean? I tried to create a data control, but the methods come not through. I also tried this entry in the adfc. - config.xml and refercing variables.

    My question is tha that the getResultValue methods are not displayed in Jdevloper?

    Great satisfaction to all helped, because I was stuck on this all day

    Your Get accessor method is getMsgValue(), the rule says remove the GET and change case of the first character of the remaining string. If getMsgValue()-> MsgVale-> msgValue.
    Try #{bindings.element.inputValue.msgValue}

    Timo

  • invoke the action called more times

    Hi all
    I use call action that runs the query with parameters of request and extracts in a scope of the request bean. The problem is that the action is executed more than once during a single request. I tried all the value of possible action to invoke refresh. I also tried to put the table in a region "page fragment, but it does not help." The action called even when the table is scrolled.
    RefreshCondition property does not help, because it is too complicated to define whether or not this is the first call.
    Is it possible to invoke the action only once after receiving the request?
    Thank you
    SNikiforov
    11.1.1.2.0

    Use a workflow and to action invoke as a step in the workflow.

    John

  • I know where the last call from my iphone stolen?

    I know where the last call from my iphone stolen?

    Not anyone here, not Apple. You can check with your operator if they used your SIM card, and you may have to get the police involved for the information about the location. If it was not your SIM card, you would not be able to.

Maybe you are looking for

  • How can I change the logo in the Firefox brand to a different image on the topic: home page using CSS?

    I would like to insert my own image where the Firefox brand newspaper appears on the topic: homepage.I already use a custom CSS and cannot replace the content of the element "brandLogo". Any experience out there?

  • Satellite L500 - lost wireless connection

    My Satellite L500 recently lost the wireless connection. I looked towards the top of the Realtek wireless device in Device Manager and it says that the device is functioning properly. I tried to use "ping 192.168.1.1" join the router, and I get "erro

  • Satellite A100-259 WinXP - BlueScreen Unmoutable Boot-Volume

    For computer laptop brother does not start in any mode etc. (safe), blue screen flashes up a quick "Unmountable Boot Volume"message before disappearing. There is no option to "Repair" in the advanced options that hit the F8 key at startup.The only th

  • PXI external trigger jitter

    Hi all I use a Board PXI-5422 generator of finished generation mode signals to generate an external trigger signal (PFI0) about every 5ms. There is a nominal 1.7µs delay of the input trigger for the start of the generation. That in itself isn't a pro

  • Windows Media Player 11 won't play CD, MP3, WMA etc. error C00D11B1.

    Windows Media Player 11 won't play CD, MP3, WMA etc. error C00D11B1. I tried MS solve this problem, uninstalling, reinstalling, etc. Same problem on 2 computers. Winamp and Itunes play fine, its not hardware or drivers. Windows XP SP3 & Media Player