The synchronous BPEL process HelloWorld deploy Time Error

Hi all

I am a newbie. created a helloworld synchronization. BPEL process.

There is no error in compilation. but get the error while deploying the jar file on server bpel process. The error message is:

"
Deploy the new BPEL process

bpel_SyncHelloWorldBpel_v2009_09_01__50895.jar failed to deploy.
Error loading process. The field of process encountered the following errors when loading the "SyncHelloWorldBpel" ("v2009_09_01__50895" revision) process: null. If you installed a hotfix on the server, verify that the ownership of the bpelcClasspath domain includes patch classes.

"

Note: I have not installed patches on the server.

Please let me know the reason for this error.

-Irfan Khan

10133 and 10134 versions, Oracle said that the version of designer (JDeveloper) BPEL that matches/certified with the version of the runtime (SOA Suite BPEL PM) BPEL. I suggest you upgrade your BPEL PM to 10135 or use JDev 10131.

Tags: Fusion Middleware

Similar Questions

  • How to return the data type complex of a synchronous BPEL process

    Hi all
    I have created a synchronous BPEL process, so a partner customer link was automatically created in the project. Now the link partner of this client is to have input and output variable of type normal string where as my BPEL process finally returns a complex data type.
    In order to solve this problem, I took a processing activity and mapped the collection [variable returned by my BPEL process] to the chain of production of the customer but in this way I just get a single string to store the entire collection but I want that they separately.

    Can someone tell me, how to manage this scenario.

    Concerning
    Lokesh

    After creating the partner link and the invoke (to create the variables), change the element type of the response message to the complex type definition of your collection that appears in the XSD. You can do the same thing if you want to change the element type of the payload of the request message as well.

  • Error time-out in the SOA BPEL process

    Hello

    I just started using SOA Suite. My first project is a simple process, initialized by querying the database for the new records. This documents should be addressed to the competent authority by electronic mail. But anyway ends place blamed with this error:

    Anomaly of the non-recoverable system:
    Waiting for reply has expired. The conversation id is 1% 401312896230. Please check the detail process instance.

    WLS LOG:

    < 10.8.2011 17:24:52 CEST > < error > < oracle.soa.adapter > < BEA-000000 > < JCABinding = f
    Pozadavky PozadavkyAdapter Service Pozadavky was unable to make the delivery o
    message entering for the composite by default/Test! 1.0 * soa_78cd9122-b083-4d4f-b123 -.
    0f09a466d511 reason: waiting for reply has expired. The conversation id is
    1% 401312989840. Please check the for detail process instance. >

    I get emails despite the error. But the records in the database are not removed after their reading that I put in the db adapter Setup Wizard, so my e-mail client is spammed with the same messages all the time.

    Any advice will be appreciated.

    In step 6 of the wizard configuration of adapter, you specify the primary key correctly? And also did you see any error message in the soa server diagnostic log file?

    And also, when querying the database; by default, the interface of the BPEL would be one-way unless you check the option in step 4 of the Setup Wizard that is the synchronous post to BPEL.

    If you check this option, your BPEL interface would be come synchronous, and if you do a lot of things in the BPEL flow, there is a chance that the customer gets

    the time-out waiting for the answer.

    Thank you
    N

  • SOADEMO: How to start the Application BPEL Process Manger Worklist on Linux

    Chapter 3 of the SOA Suite Quick Start Guide tells the user to start the BPEL Worklist Application (step 3.1.1) and lists the instructions that are clearly intended for Windows:





    < p >
    {color: #0000ff} To start the Application from the list of tasks:

    {color} < strong > {color: #0000ff} 1.Select Start & gt; All programs & gt; Oracle - Oracle - soademo & gt; Oracle BPEL Process Manager & gt; Task list application.



    {color}

    < facilities > I don't see any instructions for starting the application from the list of tasks in a Linux environment. I found nothing like the screen "BPM Worklist" indicated in the Guide: I can access a page 'BPEL Control' from the homepage of SOA demo, but this page doesn't seem to be something like the screen BPM Worklist documented in the Quick Start Guide.



    Can someone help me out here? Thank you.











    < /p >

    Hello

    Try:

    http://host/int integration/worklistapp /.

    Best regards, Ronald

  • Update the names of queue at deployment time

    Hello
    I want to know, how we can change the names of queue for environment targets such as DEV, etc. PRD?

    Hi Raghu,
    use below code in terms of the configuration of the target environment.



    TargetQueueName

    Please replace the names given in the "BOLD". Filename.JCA is the file that contains the details of the queue.
    TargetQueueName is the name of the queue that is located in the target environment.

    Thank you
    Ashu

  • Synchronous and asynchronous BPEl process

    Hi all

    1. when we can create a synchronous bpel process

    2. when we create a synchronous bpel process

    3. when we can create empty bpel processes

    4. how to deploy a project using a script? with the example.

    Thanks in advance...

    4. how to deploy a project using a script?
    http://jianmingli.com/WP/?p=2584

    1. when we can create a synchronous bpel process
    Synchronous process must create in case if you expect the answer immediately.
    e.g. it is useful in case if you use a card database as partner link in the BPEL process. Because the data base of operation of the adapter used to give the answer immediately.

    2. when we can create asynchronous bpel process
    Asynchronous process must create in case if you when will come answer are not have limitation in time.
    Example:-assume that if you have a single loan process in which we are citing some of the webservices (ex-United Star ready, loan HDFC) who will send interest charges in its response, but in this case the answer can come at any time. Until that time there need to wait an indeterminate BPEL process. If the BPEL Sync process will be used in the above case, then the BPEL process will expire and which will report to the failed State.

    3. when we can create bpel processes empty
    Define the Service later: Select this option to create an empty BPEL process service component without activities.

  • Deploy BPEL processes

    Hello



    I'm trying to deploy my first to JDeveloper BPEL process to get this error:



    < p >
    Error (121):
    < /p >
    < p >
    [Error ORABPEL-10024]: variable part pending
    < /p >
    < p >
    [Description]: line 121 "C:\Project\PO\bpel\PO.bpel", part "payload" of the variable "variableentree" is not defined in the messageType «{http://xmlns.oracle.com/pcbpel/adapter/mq/headerPOIn/} PODesc_msg»
    < /p >
    < p >
    [Potential fix]: make sure the part "payload" is defined in messageType "{http://xmlns.oracle.com/pcbpel/adapter/mq/headerWMSPOIn/} PODesc_msg", which is defined in "file:/C:/Project/PO/bpel/POIn.wsdl".



    Please help as soon as possible.



    Thank you...
    < /p >

    The input variable is not correctly set to manage your message type. Set the variableentree to manage a message type.

    Marc

  • How to change a sync to forget the service and fire bpel process

    Hi all

    I need to change a synchronous BPEL process in a fire and forget service in SOA 11 g.

    If anyone have implemented the same thing in their projects, please provide your inputs/suggestions.

    Thanks in advance

    Hello

    You will need to change the WSDL operation to a one-way asynchronous type.

    i.e.






    TO





    Otherwise, no matter what it is calling the service will wait for a response.

  • How to connect the Ombudsman with several bpel process

    Hi Please someone tell me how to connect the Ombudsman with several processes bpel in soa 11g

    And here

    http://eoracleapps.blogspot.com/2009/11/how-to-call-synchronous-BPEL-process.html

  • Sync and async bpel process

    Hello

    I was reading about the process of synchronous and asynchronous in the forum, I also have a similar problem.

    some of my questions are:

    If suppose my BPEL process will take approximately 2 minutes or more to complete, so I can't not chosen synchronous BPEL process as the default period is 45 sec and do not recommend to increase the time.

    As the above is true, that I created an asynchronous BPEL process, now, I want the asynchronous response, is that this is possible? even I found that when I invoke the asynchronous process BPEL partner links it does not ask for the output variable. SO if all process will take more time and answer to that need, what is the solution.

    Kind regards
    Abdou

    You must use a receipt to get the response from the asynchronous process.

    That's why you need a call and a reception.

    Create a receive activity, and then drag the connection to your link partner. You will see that only the exploitation of the response is there.

    see you soon
    James

  • GMail notification in BPEL process

    Dear Experts,

    Could someone suggest me that how to configure the ns_emails.xml file to notify with Gmail. Also, please explain the role of the Mail of Activation Agent < activationAgents >. Already tried with samples, but not able to send a notification email (gmail) yet. Please suggest.

    Thank you
    Rajesh

    This will be one of the unexplained errors that I mentioned earlier. If there is one thing that has chnaged significantly since 10.1.3.1 is human workflow. It has been almost a complete rewrite.

    Once you get the synchronized versions you can deploy in one step of ANT or JDev. The human task is in the BPEL project.

    see you soon
    James

  • 1 WSDL include multi BPEL processes?

    Hello

    I use Jdev 12.1.3, I create multi BPEL processes and deploy on the server, the problem is that each BPEL process have different WSDL link, it means that if I have 10 BPEL process, then I have 10 different WSDL link, how can I get 1 WSDL include multi method (process BEPL)

    Thank you

    Hi Hani,

    You can create a WSDL with several operations. Then, you can use the pick activity to respond on different operations. Replace the first reception in the with a pickaxe and be sure to check the box 'create a forum '. See http://blog.darwin-it.nl/2009/12/multi-operations-bpel.html. (I think this example is BPEL 1.1, but it works for BPEL 2.0 accordingly).

    For the re-use of wsdl in several SOA Suite components, store an abstract version of the wsdl file in the MDS and reference it by using the "oramds://apps/...". "URL in the Compsite.xml see, for example Oracle SOA / Java blog: SOA Suite PS6 (11.1.1.7); Loose coupling and chips of service.

    Kind regards
    Martian

  • Error in the call to an asynchronous BPEL process

    Hello

    I try to call an asynchronous BPEL process via java client.
    Here is the code I got from present SOA bpel samples in the following location

    < SOA_HOME > \bpel\samples\tutorials\102.InvokingProcesses\rmi\com\otn\samples\async

    The code does not work when you register the callback

    String convId = GUIDGenerator.generateGUID ();
    nm.setProperty (NormalizedMessage.CONVERSATION_ID, convId);

    deliveryService.post ("HelloWorld", "initiate", nm);

    register the callback
    watchdog.registerAsyncCallback (convId, testAsyncHandler,
    locator.getDomainAuth ());

    The error indicates java.lang.NoClassDefFoundError: org/collaxa/thirdparty/json/JSONString

    I tried to search for it in google. But it seems that nobody had this error or maybe that nobody used it at all.

    Maybe I'm missing a jar file, but I can only find.


    Can someone help me in this please.

    Hello

    This kind of class not found errors come when you run from a client that does not all jar files required to call using the BPEL client API.

    org/collaxa/thirdparty/json/JSONString is orabpel - thirdparty.jar.

    The full list of Jar files, you would need in the classpath are:
    EJB.jar ($ORACLE_HOME/home/lib)
    OC4J - internal .jar ($ORACLE_HOME/home/lib)
    Optic.jar ($ORACLE_HOME/opmn/lib)
    ORABPEL-.jar ($ORACLE_HOME/bpel/lib)
    ORABPEL - thirdparty.jar ($ORACLE_HOME/bpel/lib)
    ORABPEL.jar ($ORACLE_HOME/bpel/lib)

    Hope this helps,
    Kind regards
    Yohanna.
    http://www.prshanmu.com/articles/

  • CAN´t burn on a DVD. Process went up to 98% and then rejected the disc. The message is "run time error: unknown exception."

    Can´t burn on a DVD. Process went up to 98% and then rejected the disc. Is the message "run time error: unknown exception. . Cannot burn to a folder either. Process finishes, but the folder is empty. The pc has 474 GB of space. The 61-minute video has some photos 1000 x 750 pixels in size; files (.m2ts and .mp4). using DVD - R. What can I do?

    Rayo

    Thanks for the reply.

    Have been able to translate what I wrote in the numbered validation 1? There's a translate button in the bottom right of each message. Just don't combine English and Spanish in the post. Must there not having that one language in the post of the button translate work. Do not know why. But that's the way it seems to be.

    Given that you can't burn your Timeline on disk or on the record, it seems that the problem is probably in the timeline content somewhere.

    Please reread what I wrote in post numbered 1 to explore the contents of the timeline. If you did that? I will write more on that the next

    If necessary.

    If you have problems in communication, please let me know. I'll re - write my suggestions if necessary.

    Thank you.

    RTA

  • Tracking records of only error Batch file in the BPEL process

    Hello

    I'm reading file of 1,000 records from the file adapter and debatching in two instance of each 500 folders. And with the help of written appeal insert in the database operation.

    The first batch of 500 cases with success and entered in the database table custom.

    The second series of 500 records created WARNING instance with an error message and nothing is written to the database in the second series.
    The error is due to erroneous data in a line in the second series of 500 records. Because of this error in row, the 499 left rejected and nothing of the second series is inserted into the database.

    We do not have control over the only document of the second set (500records) and BPEL process should write to remaining 499 files of database.

    Please help me on this issue. It would be very useful. Thank you inadvance.

    Waiting for your answers.

    Thank you.

    Published by: PraveenT2 on May 13, 2009 04:27

    Can you just clarify something for me.

    The first test has worked perfect, correct?

    The second test took the expected result, for example 3 valid lines have been correctly loaded. The issue was that the release manager behaves as expected. You expect to see a single line in the file for rejection.

    see you soon
    James

Maybe you are looking for