Two Date Picker

Hello

How to use both selectors of dates in the apex.

First Date picker for Start_Date

Second Date Picker for end_date

Please guide me. How to implement a dynamic action two date picker.

in the reports, selector of dates must use.

I used the application of follow-up for the date picker.

Select * from IM_PR_REQ where PR_DATE between TO_DATE (TO_CHAR(:P1_START_DATE), ' MM/DD/YYYY') and TO_DATE (TO_CHAR(:P1_END_DATE), "MM/DD/YYYY");

Kind regards

Thérèse

Check it out now, I've made a few changes, his works now

Kind regards

Mohan.

Tags: Database

Similar Questions

  • How can insert us Date beetwee two date in two tables

    Hi friend

    I have two date picker control point and the selection list an item in a list. Select form a value SL, PL, CL
    1 - section A
    2 b.
    3 point C

    When I entered dates to the point was and point B and select 'SL' to point C and press the submit button.

    I have a table with two columns ABC

    DTE Date;
    Let Varchar2 (12);

    for example, section A - January 16, 2009
    Item B - January 25, 2009
    point C - SL

    value sholud be enter ABC table as:

    JANUARY 16, 2009 SL
    JANUARY 17, 2009 SL
    JANUARY 18, 2009 SL
    JANUARY 19, 2009 SL
    JANUARY 20, 2009 SL
    JANUARY 21, 2009 SL
    JANUARY 22, 2009 SL
    JANUARY 23, 2009 SL
    JANUARY 24, 2009 SL
    JANUARY 25, 2009 SL


    Thank you

    Jean-Yves

    You need a pl/sql process that might look like this:

    begin
    
    while :P1_DATEPICKER1 != :P1_DATEPICKER2
    loop
      insert into ABC (DTE, LEAVE)
      values (to_date(:P1_DATEPICKER1,'dd.mm.yyyy'), :P1_SELECTLIST);
    
      :P1_DATEPICKER1 := to_date(:P1_DATEPICKER1,'dd.mm.yyyy') + 1;
    end loop;
    commit;
    end;
    

    Best regards

    Tobias

  • Help with Date Picker months classic display in 4.2.5.00.08

    Version: 4.2.5.00.08

    Topic: business 3

    Hello

    I have two selectors classical fields of dates that represent a Date "from" and "to this day".

    When you click on the calendar icon and change the month in the select list on the "Date from" and selecting a date, and then by opening the 'to Date' by clicking on the icon of the month calendar is displayed corresponds to the current month (sysdate) in the Select list.

    Demand for the user must have the month in the match of the calendar 'To Date' the month selected on the calendar "Date from" when you click on the calendar icon on "Date to the.

    Since this announcement, the current month is September. If the month is changed in October and a date is selected in the 'Date' then I click on the 'To Date' calendar icon the month displayed in the list select should be October not September.

    How can this be achieved?

    Thank you

    Joe

    Joe R wrote:

    Version: 4.2.5.00.08

    Topic: business 3

    I have two selectors classical fields of dates that represent a Date "from" and "to this day".

    The two dates selectors 'Business' and classic theme 3 are well beyond their expiration date. A modernization program for this app would be a very good idea...

    When you click on the calendar icon and change the month in the select list on the "Date from" and selecting a date, and then by opening the 'to Date' by clicking on the icon of the month calendar is displayed corresponds to the current month (sysdate) in the Select list.

    Demand for the user must have the month in the match of the calendar 'To Date' the month selected on the calendar "Date from" when you click on the calendar icon on "Date to the.

    Since this announcement, the current month is September. If the month is changed in October and a date is selected in the 'Date' then I click on the 'To Date' calendar icon the month displayed in the list select should be October not September.

    How can this be achieved?

    It can be done with dynamic action of executing JavaScript Code. I'd like to think that there is a better way to do it than that, which basically extract the picker of the year and month, then rewrites the JS code that triggers the date picker To use them as parameters month and year.

    Dynamic action

    Event: Mouse enter

    Selection type: jQuery Selector

    jQuery Selector: #P1_TO_IMG

    Real Actions

    Action: Run the JavaScript Code

    Fire on Page load: NO.

    Code:

    var from, d, y, m, button, href, js, p;
    
    from = $v('P1_FROM');
    
    if (from) {
      d = new Date(from);
      y = d.getUTCFullYear().toString();
      m = (d.getUTCMonth() + 1).toString();
    
      button = $('#P1_TO_fieldset.datepicker a');
      href = button.attr('href');
      js = href.match(/^(javascript:void\(\$p_DatePicker\()(.+)(\)\);$)/);
      p = js[2].split(',');
    
      p[8]  = "'" + y + "'";
      p[13] = "'" + ((m.length === 1) ? "0" + m : m) + "'";
    
      href = js[1].concat(p.join(), js[3]);
      console.log(href);
      button.attr('href', href);
    }
    

    Replace P1_FROM and P1_TO with the names of your items as needed.

  • Date Picker APEX 4.2 validation

    Hi all

    In our application, we created a date picker in the format below.

    1 the name of the article-> P1_ENG_DATE

    2. under settings-> Format mask-> fmDay, months GFMD, YYYY

    3. under default-> to_char (sysdate, ' fmDay, months GFMD, YYYY')

    4. once the application under the ar-ticle column loading Date that we can see the release date

    5 now if they choose to date picker application survey allows you to submit the form.

    6 but if they change the date manually i., e instead of Thursday, if we enter Wednesday, June 18,2015 while that submit the form she will the error ' error ORA-01861: literal does not match the format string "because they change from day.

    7. not only change the day, if change us on the wrong day, wrong Date and delete last two digits of the year we can see literal error problem.

    Methods:

    1. If we want to read only option date picker where we do.

    2. how to manage the validation of using Java date picker script & PL/SQL.

    Could you please help me with this request.

    Kind regards

    Sruthitamiri

    Hi Nanoo Tamiri,

    Sruthi Tamiri wrote:

    1. If we want to read only option date picker where we do.

    2. how to manage the validation of using Java date picker script & PL/SQL.

    The first thing: access the datepicker-> settings section element and value

    • See her-> when click on icon

    In the section of the element:

    • CSS classes to elements of HTML form-> apex_disabled
    • Attributes of the HTML Form element-> readonly = 'true '.

    This will force the user to select a date in the date only picker and avoid the mistakes of your format.

    The second point is not clear as to how you want to manage the validation of the datePicker using JavaScript / PL/SQL.

    I hope this helps!

    Kind regards

    Kiran

  • Date picker control limit

    Hello all;

    I have a date picker I want to limit: of sysdate sysdate + 10 days. I tried to use this solution: Oracle & Apex Geekery: Dynamic Date Range in APEX Datepicker - no need to Plugin

    but it did not work for me. I created two hidden and picker dates min max and created dynamic actions, but it does nothing. I don't know if I'm away from the steps. Please notify.

    Thank you

    Hi Haisai,.

    If you try the following:

    in your article in date picker under the section 'Settings' for 'Minimum Date' add + 0 d and for 'Maximum Date' add + 10 d

    Hope this helps

    Paul

  • Place a value max and min on the date picker

    Apex 4.2

    I have a report interactive apex which is framed by a start_date and end_date a. We will call P1_START and P1_END. They are the two fields of date picker. Once the user selects a date, the report is updated accordingly display the results falling between the date ranges. Pretty sImple. As we know, the date picker has throughout the calendar year. Is there a way to limit the date picker to go only to come or already in a month? So if the user were using the application today, would later return they might choose 24/10/2013 and the furthest in the future would be 12 24, 2013, honorably.

    Any help on this would be greatly appreciated. Thanks in advance.

    Change your date picker control object

    Go to the settings section

    The value of minimum date to "-1 m".

    Maximum date "m + 1"

    Click on the legends of the attribute for more options.

  • Function to calculate the Minutes of business between two Dates

    Hello

    I use the version of database Oracle 11.2.1. I would like to calculate the number of minutes of work between the two dates where working hours are Monday - Thursday from 08:45 to 17:00 and Friday from 08:45 to 16:30

    I found the following function useful in a similar position but wanted help picking up the days and the hours above into account

    CREATE OR REPLACE
      FUNCTION get_bus_minutes_between(
                                       p_start_date DATE,
                                       p_end_date DATE
                                      )
        RETURN NUMBER
        IS
            v_return NUMBER;
        BEGIN
            with t as (
                       select  case level
                                 when 1 then greatest(p_start_date,trunc(p_start_date) + 9 / 24)
                                 else trunc(p_start_date) + level - 15 / 24
                               end start_dt,
                               case connect_by_isleaf
                                 when 1 then least(p_end_date,trunc(p_end_date) + 18 / 24)
                                 else trunc(p_start_date) + level - 8 / 24
                               end end_dt
                         from  dual
                         connect by level <= trunc(p_end_date) - trunc(p_start_date) + 1
                      )
            select  sum(greatest(end_dt - start_dt,0)) * 24 * 60 work_minutes
              into  v_return
              from  t
              where trunc(start_dt) - trunc(start_dt,'iw') < 5; -- exclude weekends
            RETURN v_return;
    END;
    /

    Can anyone help?

    Hello

    Think about what you do.

    sliderrules wrote:

    SELECT TO_CHAR (DATE ' 1-1-1' + business_end_time, 'HH24:MI:SS')-TO_CHAR (DATE ' 1-1-1' + business_start_time, 'HH24:MI:SS') * 24 * 60

    of time_dim

    where full_date = July 1, 2013.

    AND working_day = 'Y ';

    The following error is returned:

    ORA-01722: invalid number

    The time is converted to character reslting with this error. Is there a better way to subrtacting types of data INTERVAL DAY (1) SECOND (2) (business_end_time - business_start_time)

    To_char, as its name implies, returns a string of characters.  You say that

    TO_CHAR (...) - TO_CHAR (...) * 24 * 60

    If you ask for the string returned by the 2nd TO_CHAR be multiplied by 24.  Does make any sense to you?

    Maybe you wanted to do the subtraction first, which would be

    (TO_CHAR (...) - TO_CHAR (...)) * 24 * 60

    but still would be a mistake, because you can't subtract a string to another string (or anything else).

    .

    Last Friday, I proposed this:

    SELECT SUM (LESS (end_dt, v_end_dt)

    -Most GREAT (start_dt, v_start_dt)

    ) * 24 * 60...

    where start_dt and end_dt were the DATE in the table columns, as the value returned by TO_DATE (08 11 July 2013:45 ', "DD-Mon-YYYY HH24").

    If I understand correctly, you would store stores rather 3 columns: full_date (a DATE, where the time part is 00:00:00) as well as business_start_time and business_end_time (the two INTERVAL DAY TO SECOND).  In this case, you can modify the code above to say:

    SELECT SUM (LESS (full_date + business_end_time, v_end_dt)

    -GREATEST (full_date + business_start_time, v_start_dt)

    ) * 24 * 60...

    You can add a DATE at an INTERVAL;  the result will be a DATE.  There is no need to convert anything to a data type to the other.

  • Date Picker Format/Edit recommended

    APEX 4.0 - by using the date picker and mask format is DD/MM/YYYY.
    When a user enters the 15/02/12, he spent the mask of MM/DD/YYYY format and stores it in the database with a year = 0012.
    Years have always been problematic, because what is valid one year at? He accepts a year = 1234...
    Ignoring that, what I want to do is enforce a year 4-digit.

    I can add my OWN validation, but if I do, why bother with the mask of MM/DD/YYYY format and not only do in my own validation with to_date(:P_date,'MM/DD/YYYY')? If I add a year to 4-digit check on mine and let the mask MM/DD/YYYY, and the user enters 02/99/12, then they will receive two errors. (1) the mask JJ/MM/AAAA, mistake the day = 99 and my own for the 2 digits of the year...

    I prefer a single place to keep the validations to date, not twice a day, but this seems too complicated, which means usually I forget something obvious.

    Suggestions on best practices for APEX date picker validation?
    Thank you.

    Maybe this isn't what you are looking for but instead of AAAA RRRR can give you a year 2000 +.

  • Date picker - strange behavior?

    Hi all

    I'm playing with a system of reservation and thought, a date picker could suit my needs.

    Each 'series' opening scene button (makes visible) the same DateChooser component and what is the

    Click on frame 1 script code provides the data in a dynamic text box (code at the end of this post).

    My problem is when you click on the date in the 'calendar', the info is delivered to a dynamic text box and it displays

    in one of the two apparently random formats (see photo) that is with or "GMT + 0100" on the end of the string.

    So my question is how can I handle / manipulate / control the formatting of the data?
    I ideally want it presented like this: Tuesday, September 27, 2011 (with NO time included).

    NB - the 'game' on the left and the 'am' on the right are just buttons and graphics on my scene.

    dates2.jpg

    All and any help / advice / links tutorials much apprecited.

    Best wishes

    Tony

    Code of the button "set":

    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

    on (release) {}
    calendar_dc._visible = 1
    Quando = 1;
    }

    chronology (image1) code:

    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

    var dcListener:Object = new Object();
    dcListener.change = {function (evt_obj:Object)}
    var thisDate:Date = evt_obj.target.selectedDate;

    If (_root.quando == 1) {}
    Date1 = thisDate;
    } Else if (_root.quando == 2) {}
    date2 = thisDate;
    } Else if (_root.quando == 3) {}
    Date3 = thisDate;
    } Else if (_root.quando == 4) {}
    Date4 = thisDate;
    } Else if (_root.quando == 5) {}
    Date.5 = thisDate;
    };

    calendar_dc._visible = 0;
    };

    calendar_dc.addEventListener ("change", dcListener);

    use:_ _ _ _ _ _ _ _ _ _ _ _ _

    var monthA:Array = ["Jan", "Feb", "Mar", etc...];  Use any format you want

    var dcListener:Object = new Object();
    dcListener.change = {function (evt_obj:Object)}
    var d: Date = evt_obj.target.selectedDate;

    "var thisDate:String=d.getDay() + ' ' + monthA [d.getMonth ()] + ' '+ d.getDate ();

    If (_root.quando == 1) {}
    Date1 = thisDate;
    } Else if (_root.quando == 2) {}
    date2 = thisDate;
    } Else if (_root.quando == 3) {}
    Date3 = thisDate;
    } Else if (_root.quando == 4) {}
    Date4 = thisDate;
    } Else if (_root.quando == 5) {}
    Date.5 = thisDate;
    };

    calendar_dc._visible = 0;
    };

    calendar_dc.addEventListener ("change", dcListener);

  • Date Picker year drop duplicated!

    He is behaving very strangely, I see.

    We use a date picker, and when you click on the calendar icon, there is a pop-up that shows every day to choose from.
    At the top of the calendar.
    There are two drop-down lists:
    the drop down menu of the months and the years drop-down.
    For some reason, in the years to drop all years are duplicated... (the months are fine)
    1999
    1999
    2000
    2000
    2001
    2001
    etc.
    How to debug this? Has anyone encountered this problem?
    Where is the JavaScript code for this popup calendar?
    I know it's the /i/javascript/apex_3_1.js that calls the $p_DatePicker, but what I do from here? The JavaScript doesn't look at other tables or something?
    I'm a developer, so I can't really go back on side server to update the JS. Why would this happen?
    Any clue?

    Thank you!
    Ann

    Published by: ApexNewbie on January 20, 2010 12:30

    Published by: ApexNewbie on January 21, 2010 08:34

    Hello

    Well, I think you found the problem, but I have no idea of how solve it or how that could happen. Sorry

    BR, Jari

    Published by: jarola on January 21, 2010 20:30

    You must contact DBA. Is of the opinion

  • Tabular read only Date Picker

    Hello
    I have two or three items with dates selectors and do not want to implement
    This code because it will be too many buttons on my form. I need to delete an element
    at a time when the date picker is read-only, but in tabular form.
    function f_clear_items()
    { 
        {$x('P1_ITEMA').value = ''};
        {$x('P1_ITEMB').value = ''};
        }
    Then after that I created a button url and pass this function I can erase the datepicker. But, I
    has been wondering is there a cleaner way to do this.

    I have other items on the page that are the same name but in different tables. I only want
    to clear each item date picker at the same time. This code works very well for a regular shape.
    -Item after item to erase text element
    a href="javascript:setValue('P1_ITEMA','');">Clear Date</a
    There is a named thread "how to delete a page only reading point...?" that shows how this code works, but does not work
    work for a table shape in a page master detail. There is a link on the side of the switch of dates to delete the item specified, but in a tabular form point, there is no tab of the item, any ideas on how to clear a date picker component readonly by using a tabular form
    and not with a button for each item, thanks in advance. I use the Application Express 3.2.0.00.27.

    Charles,

    I did a little more for you...

    Kind regards
    Dan

    http://danielmcghan.us
    http://sourceforge.NET/projects/tapigen
    http://sourceforge.NET/projects/plrecur

    You can reward this answer by marking as being useful or correct ;-)

  • Can I do a meeting maker that gives participants the possibility to choose from two dates to attend the event?

    I send a manufacturer of meeting staff and would they be able to choose one of the two dates to be trained. Is this possible without the separate meeting decision makers?

    Sorry, who is not related to Firefox. Seek assistance on the site to help with this program.

    Firefox 3.5.2 is a version of Firefox does not support, you need to update.

    http://www.Mozilla.com/en-us/Firefox/

  • photo selection between two dates

    In Photos

    It is possible to select photos between two dates?

    In Photos,.

    is it possible to select the photos between two dates?

    Thank you, thank you

    Yes.  With a smart album like this:

  • How to make a table with all dates between two dates

    Basically, I need a vi that returns an array with elements containing all individual dates between the two dates. I am trying to build one myself... but obviously if there is already a few vi do that I would use it instead. Anyway, any help is appreciated... I'll just be over here write it too hard to pass the time.

    Just an idea

    Output is the table of dates (like timestamps) between the timestamps 'Start' and 'end '.

    Marco

  • How to compare two dates and find exactly

    How to compare two dates and find the exact age of the person, no one could be an age of child 2 days or a month, or other.

    I'd really appreciate if someone help o

    Concerning

    After spending 2 hours, I go out with a solution by myself, how ever the function can be customize to check if the user enters date right.

    function findAge(subjectName,fromdate, todate) {
        console.log("findAge(fromdate, todate) is called now "+subjectName+"-->"+fromdate+"-->"+todate);
        if(todate) todate= new Date(todate);
        else todate= new Date();
    
        var age= [], fromdate= new Date(fromdate),
        y= [todate.getFullYear(), fromdate.getFullYear()],
        ydiff= y[0]-y[1],
        m= [todate.getMonth(), fromdate.getMonth()],
        mdiff= m[0]-m[1],
        d= [todate.getDate(), fromdate.getDate()],
        ddiff= d[0]-d[1];
    
        if(mdiff < 0 || (mdiff=== 0 && ddiff<0))--ydiff;
        if(mdiff<0) mdiff+= 11;
        if(ddiff<0){
            fromdate.setMonth(m[1]+1, 0);
            ddiff= fromdate.getDate()-d[1]+d[0];
            --mdiff;
        }
        if(ydiff> 0) age.push(ydiff+ ' year'+(ydiff> 1? 's ':' '));
        if(mdiff> 0) age.push(mdiff+ ' month'+(mdiff> 1? 's':''));
        if(ddiff> 0) age.push(ddiff+ ' day'+(ddiff> 1? 's':''));
        if(age.length>1) age.splice(age.length-1,0,' and ');
        console.log("===============================");
        console.log("Subject age is = "+age.join(''));
        console.log(" age Day = "+ddiff);
        console.log(" age Month = "+mdiff);
        console.log(" age Year = "+ydiff);
        console.log("===============================");
        var subjectAGE =  age.join('');
    
    }
    

    peardox Thanks for the reply