What is the value axis y axis in the time Panel

Hello

I'm a newbie to AE and I came across a sign different time than usual yesterday. I don't know what means the coordinate axis y and how to pass this bizarre situation to the normal layer... I'd appreciate any help and suggestions!

Screenshot 2014-05-19 12.59.38.png

This is the graph Editor. This is a very useful tool to control your animations.

To return to the regular view, you are used to, click this little graphic icon which is located immediately to the left of the indicator of the timeline at the top of your screen capture.

Tags: After Effects

Similar Questions

  • What is the time takes to charge iPad air at 100%

    What is the time takes to charge iPad air at 100%.

    It take me 10 hours to charge the iPad. Kindly update there is no fault on iPad.

    It is difficult to know if there is anything wrong with the device, but it's more than twice as long it should take to recharge a weak battery on an iPad.  You charge the unit with cable, adapter and plugged into a wall outlet? You use while loading it and if you are, which applications (games) are you running?

  • cannot update Windows XP (KB2345886). What is the time required to download "fix It."

    I downloaded the fix to resolve the problem. It is said that difficulty it will not work with our runtime. Q - What is the time required for an alternative for the update above. Thank you

    Hi TorahHavurah,

    For two updates install, have you tried to download directly to install.  You can go here for KB2718704 and you can go here for KB2345886.

    For the .NET error, I suggest to try for the .NET Framework cleanup tool to see if that helps.

    I hope this helps!

  • Beta Analytics: what units the "time spent" measured in?

    Hello team DPS,

    I have 2 questions:

    (1) I have searched but cannot find in what units the "time spent" measured in. I think it's in the years . Please add this to both graphics and mouse-over-discriptions.

    2) also have the folio Total time spent: 17018 units, but for the same period total for all the items of the same folio to addition the: unspecified: one is 14885 units. I understand that clean up statistics 'unspecified' will also correct these Total time spent for the folio number.

    > We will be solve this in our next realease by cleaning the "not specified".

    -This means in R30, R29 was just realeased?

    Thank you

    Gennady

    Gennady salvation,

    Thanks for the comments, the total time spent is in seconds and it would be included in the release of the phase 2 of R29 coming out in early January.  #2 in will be also fixed in the release of the phase 2 of R29.

    Shikha

  • What is the time indicated on the incoming mail? Is - this time of the shipment or the arrival time on my box of reception/ISP server?

    I know that if I compose an email from test to myself, while working offline and then send it some time later, when he gets back with me the time indicated is time, he entered my Outbox no time, it has been sent.
    I would like to know what time on an incoming third party e-mail represents.
    Is this time what was typed to the sender of the Outbox. the actual sending time; the time of arrival at my ISP server or other time?
    I would like to know because I am trying to settle a dispute on the time shown on a couple of emails.

    I think you need to spend time in the headers of an email.

    Time is created when the composer creates the mail. If you want the dates and times of things like arrival at the level of the different sections on the transmission headers to have this information.

    CTRL + u indicates the source of the message.

  • What is the time it takes to run out of memory and cpu between the hypervisor and vm?

    I wanted to know the time for the performance of CPU and memory between VMS and the hypervisor.  I know that there is a sort of delay when the virtual computer runs cpu or memory because it has transmitted to the hypervisor and handed over to the virtual machine.  Thanks for the help.

    It depends on the workload and server usage.  If the system is not completely loaded and active code is in user space there is zero delay.  If the host is used then the virtual machine is provided a slice of time to system resources and will have to wait his turn to access the CPU.  In this case, the time is according to the system load.

    In short, delay of CPU and memory can be and is often zero.

    Scott

    More information on my blog of the communities and on Twitter:

    http://communities.VMware.com/blogs/Drummonds

    http://Twitter.com/Drummonds

  • What is the time interval between two Oracle certification exams?

    Hello world

    I'm looking forward to associate level certification in SQL and PL/SQL.

    According to a link from the official website of Oracle, I need to spend the next two STAGES to win the Oracle PL/SQL Developer Certified Associate Certification. The two steps are:

    URL of the location where the screenshots below (measures) is as follows:

    https://education.Oracle.com/pls/web_prod-PLQ-dad/db_pages.GetPage?page_id=653 & get_params = P_ID:162 #tabs - 1

    Capture1.JPG

    Capture2.JPG

    There are to options available in two stages , so I chose to give the two following tests:

    1 (from step 1) EXAM: 1Z0-061 (database Oracle 12 c: basic SQL)

    REVIEW 2 (step 2): 1Z0-144 (Oracle Database 11 G: program PL/SQL)

    Now my questions are these:

    Question 1: I intend to take the exam 1Z0-061 first (lets say in June), may therefore take the second exam (1Z0-144) at any time after appearing for the first review or is there no specific time frame in which I'm suppose to take the second review?


    Question 2: will what type of certification I get if I take only one exam (1Z0-061 or 1Z0-144)? I know Oracle's official website said that in order to get "Oracle PL/SQL Developer Certified Associate Certification", I need to pass the two exams; but what happens if I chose to give only a single review at the present time? In the case giving a single review, what type of document of certification will I right to (wave speculation: right to half certification Oracle PL/SQL Developer )?

    Thanking you.


    Best regards

    Ankit

    Answer 1: He is there no time limit/limit. Finally, I guess Oracle takes his retirement 1Z0-144, but which does not occur for many years.  They have not even removed from the earlier incarnation (1Z0-147).

    Answer 2: Passing a review in itself does not have a certification or credential.  The only "book", you will have is the sheet of test results.

  • Siri could talk what is the time?

    Thinking we could set some app with Siri, as if you're running and your phone is with you. Just if you could ask time and Siri will say for you, simply because it would be easy to push the hands-free key or caps and ask then how much the clokc is or how long I been launched? Would be great so happy just Siri with her beautiful voice "clock is 11:30" or "you have 30 minutes left"!

    Many applications running you will give its stats updated by the voice that you spend a long, either at specific intervals, of distance intervals, on demand. RunKeeper is a. Many of them will allow you to use the "answer"button on your headset to get the statistics."

    Third-party applications do not directly have access to Siri. You can submit any comments you have to Apple here:

    http://www.Apple.com/feedback

    Although they have read all the comments, they are not necessarily.

  • Buy photoshop elements 13 and cannot download because of a message in red, indicating that it may take uo for 24 hours... its been more than that... What is the time?... DSB. # AD016363676?

    why it takes so long to get my download started, its been more than 24 hours.

    Hello

    My apologies for the frustrating experience.

    Your order is complete and is ready for download. Please follow the instructions here quickly find your serial number to download the software.

    Alternatively, you can also download a copy of the installer from here products download Photoshop Elements | 10, 11, 12, 13 and use the serial number during the installation of the software.

    ^ Ani

  • What is the default bufferTime to the OSMF player?

    Hello

    I want to know what is the time of default buffer for the OSMF player. And can we set using NetMocker package using netStream.bufferTime? And when we put once there subsequently?

    Kind regards

    Amit

    NetMocker is used for OSMF features that depend on NetStream of unit tests, it is not something that would be very useful in a production application.

    OSMFPlayer (and OSMF) uses the default values for the buffer for the progressive and video streaming RTMP.  For HTTP, OSMFPlayer (but not OSMF) streaming video uses a speculative algorithm to set the buffer (see HTTPStreamingNetLoaderWithBufferControl). You can set the length of the buffer via MediaPlayer.bufferTime, and it should retain its value.

  • How to find the time between two channels of entry in the data acquisition card or pci 6036

    Hello

    I read a lot-related posts on the simultaneous measurement of two input voltage of similar channels in map data acquisition. I know that the best material is "simultaneous measurments of the Series DAQ cards" but I only pci data acquisition card 6036 and I try to understand what is the time between the reading of the two channels . This period is always constant? (must it rely on a voltage (amplitude, frequency, waveform..). I send the sine wave (s) to the two channels and read the values of V, if they read the same value, the difference should always be zero but I get-0,002 to 0.002 Volt difference (I must find a way to convert it in time). A screenshot of my VI is attached. I wonder how I can accurately measure the time delay between the channel.

    I am open to any suggestion, my final goal to read exactly two channels at the same time ((ou connaître le délai exact donc je peux correspondre les données correspondantes étant donné le temps de retard))

    Hi spinup,

    better you should post your question in the forum of LabVIEW, LabWindows/CVI is used

    Good luck.

  • How to calculate hours worked, excluding the time overlapping.

    Hello gurus,


    I need like calculating the gain for the hours worked on different projects. But I don't want to pay twice if they have overlapping of the work period.

    I was wondering if someone can suggest a better way to calculate the hours.

    I have a data in the following format:
    select 1111 as person_id, '01-AUG-11' as event_date, to_date('01-AUG-11 18:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('02-AUG-11 06:00', 'DD-MON-YY Hh24:MI') as end_time, 'AAA' project_id from dual union all
    select 1111 as person_id, '02-AUG-11' as event_date, to_date('02-AUG-11 03:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('02-AUG-11 06:00', 'DD-MON-YY Hh24:MI') as end_time, 'BBB' project_id from dual union all
    select 1111 as person_id, '02-AUG-11' as event_date, to_date('02-AUG-11 05:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('02-AUG-11 08:00', 'DD-MON-YY Hh24:MI') as end_time, 'CCC' project_id from dual union all
    select 1111 as person_id, '03-AUG-11' as event_date, to_date('03-AUG-11 11:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('03-AUG-11 15:00', 'DD-MON-YY Hh24:MI') as end_time, 'AAA' project_id from dual union all
    select 2222 as person_id, '02-AUG-11' as event_date, to_date('02-AUG-11 18:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('03-AUG-11 08:00', 'DD-MON-YY Hh24:MI') as end_time, 'AAA' project_id from dual union all
    select 2222 as person_id, '03-AUG-11' as event_date, to_date('03-AUG-11 01:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('03-AUG-11 10:00', 'DD-MON-YY Hh24:MI') as end_time, 'BBB' project_id from dual  union all
    select 3333 as person_id, '03-AUG-11' as event_date, to_date('03-AUG-11 01:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('03-AUG-11 10:00', 'DD-MON-YY Hh24:MI') as end_time, 'CCC' project_id from dual 
    I would like to output following the path:
    select 1111 as person_id,     '01-AUG-11' as event_date,     '01-AUG-11'     as start_time,'02-AUG-11'     as end_time,'AAA' as project_id, 12 as hours from dual  union all
    select 1111,     '02-AUG-11',     '02-AUG-11'     ,'02-AUG-11'     ,'BBB', 0 as hours from dual  union all /*overlaps with row 1 */
    select 1111,     '02-AUG-11',     '02-AUG-11'     ,'02-AUG-11'     ,'CCC', 2 as hours from dual  union all /* overlaps with row 1 upto 06:00 AM */
    select 1111,     '03-AUG-11',     '03-AUG-11'     ,'03-AUG-11'     ,'AAA', 4 as hours from dual  union all  /* No overlaps */
    select  2222,     '02-AUG-11',     '02-AUG-11'     ,'03-AUG-11'     ,'AAA', 14 as hours from dual  union all 
    select  2222,     '03-AUG-11',     '03-AUG-11'     ,'03-AUG-11'     ,'BBB', 2 as hours  from dual   union all /*Overlap with row 5 upto 6:00 AM*/
    select  2222,     '03-AUG-11',     '03-AUG-11'     ,'03-AUG-11'     ,'CCC', 0 as hours  from dual   /* complete overlaps with row 6 */
    I don't like how they are showing on each line and the hours are calculated. My only requirement is that calculated hours aren't twice if there is overlap for each person.

    I really appreciate it if someone can help me.
    Thank you.
    with data as (
    select 1111 as person_id, '01-AUG-11' as event_date, to_date('01-AUG-11 18:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('02-AUG-11 06:00', 'DD-MON-YY Hh24:MI') as end_time, 'AAA' project_id from dual union all
    select 1111 as person_id, '02-AUG-11' as event_date, to_date('02-AUG-11 03:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('02-AUG-11 06:00', 'DD-MON-YY Hh24:MI') as end_time, 'BBB' project_id from dual union all
    select 1111 as person_id, '02-AUG-11' as event_date, to_date('02-AUG-11 05:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('02-AUG-11 08:00', 'DD-MON-YY Hh24:MI') as end_time, 'CCC' project_id from dual union all
    select 1111 as person_id, '03-AUG-11' as event_date, to_date('03-AUG-11 11:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('03-AUG-11 15:00', 'DD-MON-YY Hh24:MI') as end_time, 'AAA' project_id from dual union all
    select 2222 as person_id, '02-AUG-11' as event_date, to_date('02-AUG-11 18:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('03-AUG-11 08:00', 'DD-MON-YY Hh24:MI') as end_time, 'AAA' project_id from dual union all
    select 2222 as person_id, '03-AUG-11' as event_date, to_date('03-AUG-11 01:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('03-AUG-11 10:00', 'DD-MON-YY Hh24:MI') as end_time, 'BBB' project_id from dual  union all
    select 2222 as person_id, '03-AUG-11' as event_date, to_date('03-AUG-11 01:00', 'DD-MON-YY Hh24:MI') as start_time, to_date('03-AUG-11 10:00', 'DD-MON-YY Hh24:MI') as end_time, 'CCC' project_id from dual
    )
    --
    -- end of test data
    --
    select
    person_id, start_time, end_time, project_id,
    (end_time - start_time) * 24 hours,
    greatest((
      end_time - greatest(start_time, nvl(lag(end_time) over (partition by person_id order by start_time,end_time),start_time))
    ) * 24, 0) hours_no_overlap
    from data
    order by
    person_id, start_time, end_time
    ;
    

    With the [http://download.oracle.com/docs/cd/E11882_01/server.112/e17118/functions082.htm#i1327527 url] analytical function GAL, you can get what was the time of the end of the previous row. Greatest() function then takes the value of a line start_time or end_time from previous row, whichever is the greater.

    It is a way to do that is fairly simple. If you have multiple overlaps, so it may not work completely in all cases. But maybe it can serve as a starting point for you ;-)

  • How to identify the time required to run a package

    Hi all

    Is the method without TKPROFF to find the time to run a package that calls a procedure.

    for the examples

    Lets say I run a packaage to SQLplus window

    SQL > Execute my_pack.bal_proc;

    (It took some time may be 4 hrs according to my watch).

    At this point if I want to find the time by a sql command that after running the package, which was the time.

    can someone help me find a query which tell what was the time required to run a package.

    Thanks n rgds
    Saaz

    Before execution:
    SET TIMING ON

    Then run your procedure. For example:

    SQL> SET TIMING ON
    
    SQL> Execute my_pack.bal_proc;
    
    PL/SQL procedure successfully completed.
    
    Elapsed: 00:00:00.00
    

    Miguel

  • You cannot change the chart value axis when there are several types of graphics in a single diagram

    Illustrator can do graphics with bars and lines / columns, for example in the docs:

    http://help.adobe.com/en_US/illustrator/cs/using/images/gr_15.png

    http://help.Adobe.com/en_US/Illustrator/CS/using/WS3f28b00cc50711d9fc86fa8133b3ce158e-8000 .html

    However, when I create a chart like this, I seem to lose the ability to manually set the y-axis using 'override calculated values.

    To reproduce this problem:

    1. Create a chart as in the example, with bars and an axis on the left, lines and an axis on the right. Unlike the example, don't fix the numbers as well as the lines align perfectly - have a go until just less than 20, a up to a little less than 250, therefore it do not markers and the number of divisions on each side.
    2. Try to make the markers and numbers of divisions to the height, so in fact, the side that is going up 20 going up to 25 and has the same number of divisions on the other side.

    Everything I have tried does not work:

    • If I select the entire chart and go to the "Chart Type", I can not set the options for the value axis. In earlier versions, it's gray, in CS6 I can access, but clicking on 'OK' does nothing.
    • If I select the entire chart and chose the type of a chart, I can set options for the axis value, but that the selected chart type, and then applies the entire table.
    • If I use the direct Selection tool to select one of the series and open the "Chart Type" options, changing the options of the y-axis has no effect
    • If I use the direct Selection tool to select all series that share an axis and open the "Chart Type" options, changing the options of the y-axis always has no effect
    • If I use the direct Selection tool to select the Group of ticks axis itself, or the axis line and groups of ticks axis themselves, of axis labels, axis and graduations of the axis line, or axis labels, axis line, graduations of the axis and series of related data, etc., by changing the options of the axis also has no effect

    It seems that this feature is broken and it seems that the example in the manual has been carefully chosen to use a rare combination of numbers where it would actually look right.

    I thought about it. Like everything to do with the horrible ancient neglected graphic Illustrator tool, it is ridiculously clumsy and involves the caution around what is shamefully bad programming for a professional expensive product.

    It is timing - to do things in a sequence of rigid counterintuitive that seems not to work then meets at the end:

    1. Create the chart but, for now, keep all the same chart type. If you've already set to have different graphics types, put the same thing for now.
    2. Select the entire chart and in the main window of Chart Types, set the value to "Both sides" axis
    3. In the drop-down menu, there should be a left and right axis (or top and bottom...). Set the parameters of the value axis for these now. It will look like it does for a single axis, because it will not change the other axis - naked with her...
    4. Select the data series you want to use the other axis using group selection. Go to graph Type and the value of the y-axis to the other and set the chart type that you want. All of a sudden all be put in place.
    5. If you need to change the settings for the value axis, select the entire chart, set the whole chart type to a chart, change the appropriate value axis by choosing it from the menu drop down and the re - apply types of graph as above.

    (the bug is - it should not necessary to set the graphic object to only have only one chart of type in order to access the axis options of value for two different y-axis)

  • Programmatically change the name of the value axis on a second value axis

    Hello, I mixed graph signal on which I'm traced two signals.  I created a second value axis, while I have one left and right of the graph.  I am interested in the designation of the value on both axis and were able to appoint only the HR one by using the YScale.NameLbl.Text property.  How can I control the left side?

    Thank you!

    Hello

    You are in the right place, there is a property for this node, I think you should first set the scale is active, then set the property. Sorry I don't have the code I did it at hand for the moment.  It seemed that by using the node property of the top to the bottom, I have would be input to the axis, then change the properties, then another line of entry, change the properties and so on (I did x, but also two Y axis).

Maybe you are looking for