XLS2COLLECTION in the collection date format

Recently, I noticed the Date format imported into the collection as part of the XLS2COLLECTION is to come across as DD/MM/YYYY even if the XLS format is DD/MM/YYYY.  I can't seem to find a setting anywhere where it would change someone knows all the parameters that affect this format?

XLS2COLLECTION

I actually reached out to my contact at Oracle to get some clarification on this and he was kind enough to return after scanning through the code that is actually a HARD-CODED in the earphone date format.  He recommended to post something in the forum of listener to try and address the potential for improvement, but for now it looks like it's like that and in my case, I need to code exception to reformat the date in my application.

Thanks for your comments to Mike!

Tags: Database

Similar Questions

  • How can I configure the cell data format

    How can I configure data format of cell numbers: for example, I want to capture 123456.78 and need to be 12A3456.78?

    I tried to put #A # #. # format option, but it didn't work a few time and it became A123456.78.

    I also tried on excel and it worked very well, but I like the numbers better. is there a solution to this problem?

    Thank you

    HEY Chi - Lun,

    I don't think that this is possible as many number format. You should be able to insert A in a text string using a formula, but this would happen in a second cell, not that the number has been entered.

    "Assuming all the"numbers require the same inserted letter after the second number, this should do the work."number" entered in column A; the formula in column B. In the table below, your value as an example is A6.

    = Left (A, 2) & "A" & RIGHT (A, LEN (A) - 2)

    Kind regards

    Barry

  • Possible to get the European date format by default without UK correction?

    I have some terrible evil with the terrible in Excel and other programs American date format when I have my computer, the value of the American region.

    I thought I fixed that by changing just my computer region UK but now I have GBP currency by default and autocorrects obnoxious affecting my Z s and add unnecessary U in every way.

    I live in a non-English speaking part of Europe, but my native language is English and I work mainly with the dollar sign ($).  Is there anyway to get the normal spelling, the right currency by default ($), 24 hours, but without the fool US default date format?

    Thank you.

    Explore SystemPreferences settings: language and region and the Advanced button.

  • Cannot save the incorrect date format

    I keep trying to save my computer... tells me incorrect date format?

    I had the same problem and ended up going through the online chat.  I guess there is a problem with the site, but they managed to sign up to my computer via chat.  Hope that helps

  • PCT_GRAPH in the number/date format

    The version of the APEX, we're currently on is 4.1.1.00.23. I'm trying to get a progress bar to display in a report. I use the PCT_GRAPH:330099:CC0000:100 in the number/date of the bar column format. It does not work. I will attach what it looks like. Is there anything else I need to do?

    Thanks for your help!

    PAM

    PAM wrote:

    The version of the APEX, we're currently on is 4.1.1.00.23. I'm trying to get a progress bar to display in a report. I use the PCT_GRAPH:330099:CC0000:100 in the number/date of the bar column format. It does not work. I will attach what it looks like. Is there anything else I need to do?

    Set the column attribute display as Standard report column and not display text (escape special characters, does not save the State).

  • Convert the AM/PM chain to the legit Date format AM/PM

    Hello

    I would like to convert a string field, including a date (2014-02-11 07:13:14) in a legitimate date using the attribute 'string to date. ' Unfortunately, I can't turn these.

    I tried to add a new date format to the standard list.

    YYYY-MM-DD hh: mm: tt

    However, above was not accepted, and all dates cannot be converted.

    Thanks in advance for you help on this topic

    Hello

    Try to use the format string:

    YYYY-MM-DD hh: mm: one

    Kind regards

    Nick

  • In the RPD date format

    Hi gurus,
    The RPD, I have a condition where

    If (received_date-current_date) < X then...

    the date of receipt in the database is digital. Ex: 20040810

    How can I change the date format to match the default value for the current date in the expression builder.

    Thank you
    Avinash

    Looks like you use the calculations based on the fact table or could be physical columns.
    I suggest you use the logical columns so that you can use the column date (by received_date) your day sun.
    or else
    map the day Sunday to the fact table and to use physical expression for the same, the same as your other post with status = completed as I said in my last email.

    You must use the timestampdiff function.

    If brand aid

    Published by: Srini VIEREN on February 20, 2013 14:47

  • Set the default Date Format in 4.2 jQuery Mobile Smartphone

    Hi guys,.

    on 'normal' office interfaces, you can set a default date format in the globalization settings. Currently I am working on an application JQM and I noticed that the same settings I have to format date in other applications, take effect.

    I read today in the 4.2 notes version, that somehow this question was a bit buggy. If this problem is corrected? I would firstly like JJ German date format. "" MR. YYYY "; (such that it works in office applications). How can I do? This entry is saved in the global settings.

    But whenever I want to put a date-picker-merchandise in this format, it changes again in 'YYYY-MM-DD' after registration. And I don't really want to enter a dml processing conversion function writing now.

    Thanks for all tips, best looks,.
    Tobi

    Hey Tobi,

    the item type of ' date picker (HTML5) "corresponds to the type of input HTML5 = 'date', which requires that the internal format of the value date must always be YYYY-MM-DD, but he returned to the browser to display the date in the format of the local operating system parameter. The browser of the iOS for example displays the date in the format of my setting local language/country.
    See also http://stackoverflow.com/questions/7372038/is-there-any-way-to-change-input-type-date-format

    To make a long story short, it is not possible to specify the display format for dates selectors, because this is not supported by the HTML5 specification.

    Concerning
    Patrick
    -----------
    My Blog: http://www.inside-oracle-apex.com
    APEX Plug-Ins: http://apex.oracle.com/plugins
    Twitter: http://www.twitter.com/patrickwolf

  • Why PE10 uses the incorrect date format when it creates the files during import?

    Hey,.

    Since I upgraded to 10 EP, I had a problem with the date when the import format.  I have always used the format yyyy-mm-dd when I import my pictures, and this is the format that I choose when I import using Organizer, but it invariably creates files in the format yyyy-mm-dd.  It becomes tedious to rename folders.  Any advice?

    Thank you!

    Hello

    Try the appropriate fix

    Mac: http://kb2.adobe.com/cps/930/cpsid_93...

    Win: http://kb2.adobe.com/cps/930/cpsid_93...

    Brian

  • How does the RR Date Format?

    Please explain the logic or the exact mechanism behind the * "RR" Format of Date in to_date() and to_char() DATE functions *. I can't understand the explanation of text book. If possible, please provide examples in real time.

    Otherwise, provide a URL with a good explanation.

    Thank you

    Hello

    In addition to what Anurag says:

    "RR" is designed to complete the format 'AA '; It's the same kind of thing inside a different window of the years.

    In the 'AA' format, a 2 digit year is assumed to be in the 100 consecutive starting with the most recent xx00 years and ending with the next xx99.
    In format "RR", a 2-digit year is assumed to be in the 100 consecutive starting with the most recent years xx50 and ending with the next xx49. In other words, the window of dates is off 50 years.
    Currently, and until now 2049 (inclusive) years "RR" will always be in the range from 1950 to 2049, inclusive. In other words, the years returned by TO_DATE (x, "RR") will be between 1950 and 2049.
    From 2050 years "RR" will always be in the range 2050 thanks 2149, inclusively.

    "YY" format as "RR" are bad. You should not use 2-digit years. Use 4 digit years always. The small amount of extra typing that users will need to do whenever they enter a 4-digit year is very little compared to the work necessary to correct errors that always occur when you use 2 digit years.

  • How to change the default date format in guests

    Hello
    I have two guests start date, end date. I get these using the results of Sql as 02/01/2009.I need to change the format for the type char... because over one is the DATE data type. I tried with
    to_char(start_date,'DD-mon-YYYY') of results sql but its not give good results!

    My results are like like that on February 1, 2009. How can I do this using Sql result in guests himself.

    Thank you
    Ravi

    Hello Nico,

    Thanks... that is exactly, what I'm talking about...

  • error file name of report with the Chinese Date format

    Hello

    I see an error in the DUT report stage writing in the standard template files.  This step is calling the API method save on the Runstate.Report object.

    This problem occurs on computers using localization in Chinese with the date in the name of the report file.

    Is this a known issue?  Is it possible to change the name of the file before calling the method above to eliminate the problem?

    Mike,

    You have the ability to recognize characters multi-byte enabled? Please navigate to configure"Station and select the location tab. There should be a checkbox to recognize multibyte characters. This box is checked? Otherwise, try to check the box and re-run your movie file.

    Please let me know the results of this test. Thank you!

  • The collection of accurate data of visa format read

    Hello

    I'm new in labview. I do a labview software to control and collect data for the ASL F900 Thermo Bridge. But I don't know how to get the correct visa read data format.

    Example:

    The Correct data format is: +0.123456789E\r\n (15 bytes)

    but sometimes the format of the data that I get is 56789E\r\n+0.1234 or .123456789E\r\n0

    I have attached the F900 user guide!

    Hi, VMI,.

    but sometimes the format of the data that I get is 56789E\r\n+0.1234 or .123456789E\r\n0

    During the initialization of the serial port you should leave and enbale the TermChar is the default setting for '0x0A' = LF = "\n". Then just read something like 99 bytes / VISARead: you will receive complete messages (after the first message).

  • Can not put date format as "yyyy-MM-dd" for Chinses (PRC) and English (United States) at the same time. Win 7 PRO

    Step 1. I choose Chinese (PRC) in the list format (region and language) and set the format of 'YYYY-MM-dd' date, apply. It is ok.

    Step 2. I choose English (United States) in the list format (region and language) and set the format of 'YYYY-MM-dd' date, apply. It is ok.

    Step 3. I chose the back to Chinese (PRC) in the format list (region and language), format date is reset to "YYYY/M/d", it is not ok for me.

    How can I set the format of a two language. ?

    Because I use the siemens industry software, when to change language it will read the date format different from the language that is displayed. My client want to see the same format.

    I tested under Win XP, it may set the format even in different languages

    Hi Jerry,

    Thanks for posting the request in Microsoft Community Forums.

    It is normal that you can not set the same date format for both languages at the same time. You will need to use the drop-down list to choose a date format customized if necessary.

    Hope this information helps.

  • How to change the date format of dd/mm/yyyy to dd/mm/yyyy in the digital signature certificate?

    Digital signature means sign documents as we do by hand; the need for the signature also means that the document has official relevance. In this case, the right date format is absolutely essential. Don't know if this thing depends on Acrobat Reader Dc or the certificate itself, but I have not found a way to move from dd/mm/yyyy to dd/mm/yyyy. The only option that I found in the AR is to print or not the date of the signature. If the problem persists, I could work with other software to sign. Please help is necessary! Thank you guys

    Hi carlop16325670,

    I'm sorry, but this is how it works. There is no way to change this.

    Kind regards
    Nicos

Maybe you are looking for