Anyone know how to date stamp a contact at a later date?  I would like to have the software expiry dates in the contact record so I can send reminders to periods before the date.  I just can't get enough accurate comparisons of past dates, the system is not an option for email 50 weeks after a certain date, for example.

I think you are looking to use between it, which can be a number of days, weeks, months, hours, date specific or General of the time, today, yesterday or tomorrow.

Work backwards with the filter between - is between 335 days ago 340 days ago

Second filter would be - is between 351 days ago 361 days ago

You can create a test filter to play on any date field and test.

Tags: Marketers

Similar Questions

  • calculate the day of the year using the date.

    Hi all
    Can calculate us the day of the year using the date form? Is this possible? Please help me thanks in advance
    Like this
    30/08/2009-30/08/2010 after calculation - 365


    Sarah

    Published by: SarahSarahSarah on August 30, 2009 12:49 AM

    Sarah.

    : ins1.noday must be a part of number!

    Create a function in forms like this:

    function get_nodays ( f_dtm_start in date,
                          f_dtm_end   in date ) return number is
    begin
    if
      f_dtm_start is null OR
      f_dtm_end is null
    then
      return ( null );
    end if;
    return ( trunc ( f_dtm_start ) - trunc ( f_dtm_end ) );
    exception when others
    then message ( sqlerrm || ' in function get_nodays occured.' );
    return ( null );
    end;
    

    Call this function in the when-validate-point triggers on ins1. INSPERIOD and: ins1.end love

    :ins1.noday := get_nodays ( :ins1.INSPERIOD, :ins1.end );
    

    It is redundant to have the: noday as a cause of part of database
    the value may by calculated every time using the values INSPERIOD and: end.

  • How can I create a chart that creates new series each year when the data are not collected on a daily basis?

    I collect numbers "occasionally" of my solar system and to create a standardized chart that shows that the generation on an annual basis, so I can compare fall in the fall of each year, etc..

    Because the information is not strictly 'daily' (just whenever I get to it), I don't know how it normalize for several years.

    For example, if I had

    Date - Kw/day

    15/01/10 - 14

    03/04/10 - 18

    18/04/10 - 17

    01/06/10 - 19

    21/09/10 - 15

    03/12/10 - 9

    07/02/11 - 13

    02/05/11 - 16

    17/08/11 - 18

    01/11/11 - 12

    02/11/11 - 12

    05/01/12 - 9

    04/06/12 - 12

    and so on.

    What I'd like to see is a line graph for each year from January to December with these datapoints on it. I have much more "incremental data" that I presented above, but it's on "random dates" during the last 8 years, and I'm just trying to see how each year compared to other years.

    To be at the front, I tried to understand how this in Excel as well, but he could not understand where the other.

    DRM for any tips/tricks/tips!

    Steve

    This might work for you...

    I placed your data in a table named "Data."

    Create a second (in this example, titled 'Table 1')

    In the table 'Table 1' months are in the first column and the first row (which is a header row) contains the years - add columns to add new year:

    B2 = if (SUMIFS (data: $B, data: $A, "> =" & (B$ 1, $A2, 1), DATE data: $A, "<" & EOMONTH(A1,0) will GET (DATE B$ 1, $A2, 1, 0) "" "") > 0, SUMIFS (data: $B, given: $A, "> =" & (B$ 1, $A2, 1), DATE data: $A, "<" & EOMONTH(A1,0) will GET (DATE B$ 1, $A2, 1, 0) "" ""), "")

    It's abbreviation dethrone select cell B2 and type (or copy and paste it here) the formula:

    = IF (SUMIFS (data: $B, data: $A, "> =" & (B$ 1, $A2, 1), DATE data: $A, "<" & EOMONTH(A1,0) will GET (DATE B$ 1, $A2, 1, 0) "" "") > 0, SUMIFS (data: $B, given: $A, "> =" & (B$ 1, $A2, 1), DATE data: $A, "<" & EOMONTH(A1,0) will GET (DATE B$ 1, $A2, 1, 0) "" ""), "")

    Select copy of cell B2

    Select the cells B2 at the end of F13, dough

    now select cells A2 through F13 and add a graphic (the XY scatter diagram)

    Add new year add one (or more) new columns for "table 1", then add the year to the top:

    Now alone, click the chart to activate the chart.  then click on the button 'change data references '.

    now, drag the data reference control handle to the right to add the new year to the table:

    You can add several years to the time, so you don't have to it very often

  • How to get out the year following the date

    Hi all

    I'm couldn't get out of the year to date.
    in my table it has been stored in varchar format on January 11, 2005
    If I want to display the year of the column, then
    I tried with year (to_date (' ' jan 11 2005 ', ' mm dd yyyy ' "))
    but I get an error then, how should I go out the year of the date_column

    thnks

    Hello

    Use RIGHT(DATE_COLUMN,4)

    Thank you
    Saichand.v

  • Default year in the Date field

    I am creating a Date of birth in form field and I was wondering if there was a way to change the year deafult. Most of the users will be at least 25, so it would make sense to have my date drop-down show you 1987 (for example) when he comes down below so that users have a far behind to navigate.  Is this possible?

    Thank you

    Here is a generic script which may help you... I used this JavaScript in "docReady" event from the drop-down list of the year...

    If (this.rawValue == null | this.rawValue == "") {}

    var d = new Date();

    setValue var = d.getFullYear () - 25;

    this.rawValue = setValue.

    }

  • the date stamp photos

    I need to date photos of stamp as proof for purposes of verification

    Download a utility such as SKTimeStamp on internet, you can set what timestamp you want on any file.

    You must then set the file read-only, but even then, someone would be able to find a way around it, then you must also set permissions on the folders used so that only approved personnel may write in this safety record.

    http://www.google.co.uk/url?sa=t&rct=j&q=sktimestamp&source=web&cd=3&sqi=2&ved=0CFQQFjAC&url=http%3A%2F%2Fdownload.cnet.com%2FSKTimeStamp%2F3000-2094_4-75445419.html&ei=-gsIUNr-COWd0QXR75mKBQ&usg=AFQjCNE73WlPpGP9LUjje-Zs0pHoic4XXA

  • How to create an automatic text field - has a date of three years from the current date?

    I'm trying to create a PDF form that is automatically entered a three-year expiration date in the future of the current date in a created text field.

    Text field name: ExpDate

    Text field format: mm/dd/yy

    So far, I entered in the following in the Page Properties-> Actions-> Add Action (trigger = Open Page, Action = run a JavaScript script):

    var ExpDate = new Date();

    ExpDate.setYear (ExpDate.getYear () + 3);

    var f = this.getField ("ExpDate");

    f.Value = util.printd ("mm/dd/yy", ExpDate);

    We will attend the correct expiration date the day where I do the certificate (i.e. There will be 07/06/16, June 7, 2016), but when I open it the next day will be always ready 07/06/16 instead of 06/08/16. I'm sure it is something simple that I need to change. Any ideas?

    If she says ' 07/06/16"on 7 June 2016, which means that it does not work properly, either, as it does not add 3 years to the date of the day... It should show ' 07/06/19.

    You see error messages in the console (Ctrl + J) JS when you open the file?

  • Dynamic date stamp along the page border

    I have a javascript to put a stamp on dynamic date vertically along the left edge of a PDF document.  This script works very well for the first page.  However, on a document of several pages, that the date stamp is not turned 90 degrees, so on the 2nd page, there are just a few letters horizontally.  Here's the script.

    var inches = 72;

    for (variety p = 0; p < this.numPages; p ++) {}

    / / create rectangle to field quads

    aRect var = this.getPageBox ({nPage: p});

    aRect [0] = 0.0;

    aRect [1] = 0.0;

    aRect [2] = 26.0;

    aRect [3] = 792;

    / / now to build text field to fill with date information

    var f = this.addField ("PrintField", "text", p, aRect)

    f.delay = true;

    f.rotation = 90;

    f.textSize = 16;

    f.textFont = fonts. HelvB;

    f.textColor = color.black;

    f.alignment = 'center ';

    f.readonly = true;

    f.print = true;

    f.hidden = true;

    f.delay = false;

    }

    Adds a script level doc to fill out the text field when doc prints from

    Acrobat or Adobe Reader free. Note: the character '\r' represents a

    carriage return.

    var myWillPrintScript = ' var f = this.getField("PrintField"); \r' + ' f.hidden = false; \r' + ' var d = new Date(); \r' + ' year var = d.getYear () + 1900; \r' + ' var minutes = d.getMinutes (); \r' + ' if (mn < 10) {\r' + ' min = "0" + min}; \r' + ' if (d.getHours () > = 12) {\r' + ' mins = minutes + "H"; \r' + '} else {\r' + ' mins = minutes + 'AM' ;} \r' + ' f.value = 'CE DOCUMENT ONLY EFFECTIVE ON' + (d.getMonth () + 1) + "/" + d.getDate () + ' / ' + year;} \r'

    var myDidPrintScript = ' var f = this.getField("PrintField"); \r'

                               + ' f.value = ""; \r'

                               + ' f.hidden = true; \r'

    Now define scripts to run on the will / did print events.

    this.setAction ("WillPrint", myWillPrintScript);

    this.setAction ("DidPrint", myDidPrintScript);

    FYI: This script came from the following options other threads and links

    http://www.PlanetPDF.com/developer/article.asp?contentid=AddingdynamicstampstoPDFswhenprin ting

    http://forums.Adobe.com/thread/286289

    http://forums.Adobe.com/message/1097488#1097488

    Can someone understand why this script does not work on all pages?

    Thank you

    This is a bug in Adobe Acrobat. Add the following code after your loop for:

    for (variety p = 0; p)< this.numpages;="" p++)="">

    var f = this.getField ("PrintField." + p);

    f.Rotation = 90;
    }

  • Compare a date with the date system

    Hello

    I use the script (that I found in this forum) in below in order to obtain a date of datefield1, add a year and give the date of datefield2.

    It works very well.

    Kai var = util.scand ("yyyy-mm-dd", this.rawValue);
    var sFullYear = oDate.getFullYear ();
    var sMonth = oDate.getMonth ();
    sDate var = oDate.getDate ();
    Datefield2.FormattedValue = util.printd ("JJ", new Date ((sFullYear+1), sMonth, sDate));
    Datefield2.RawValue = Datefield2.formattedvalue;

    But now I would compare the new date (David [added a year]) with the date current system (cDate).

    Does anyone have an idea how to compare dates? The result should change color as below.

    If (David < cDate) {}
    Datefield2.fontcolor = "255,0,0";
    }

    Thank you very much.

    Kind regards

    ra_be

    Try to use the Date of Javascript object:

    var myDate = new Date();
    myDate.setFullYear (2010,0,14);
    var today = new Date();

    If (myDate > today)
    {
    Alert ("the date is before January 14, 2010");
    }
    on the other
    {
    Alert ("today, it is after January 14, 2010");
    }

    If this does not work, try the analysis on the month, day and year, and then do a comparison on all of them (without forgetting to convert strings of months an integer. For example if you store the release date: February 2, 2009, February goes to 2).

    Then your comparison would look like:

    if(myYear == sysYear) {}

    if(myMonth == sysMonth) {}

    if(myDay == sysDay) {}

    days are equal

    }

    Else if (myDay<>

    myDay is before sysDay
    }

    else {}

    myDay is after sysDay

    }

    }

    }

    essentially to follow this same logic for comparisons of month and year and it should work as well.  It would be certainly cleaner and much easier using this Date however (http://www.w3schools.com/jsref/jsref_obj_date.asp)

  • Insert the date and time in a model of Pages 5,6

    When I open one of the default templates provided with 5.6 Pages (for example, a letter), I noticed that the document opens with the current date correctly inserted. Yet when I create my own model and save it as a document template (if in my models or elsewhere) the date stamp is no longer up-to-date. Whenever I have create a new document from the template, it gets stuck on the date that I created the template. This means that I have to click on the date each time and select 'Set today' (it's easy to forget).

    My understanding is that the inserted date stamps have is no longer an option of automatic update in Pages 5.x, so I was surprised to see their update automatically in the default templates provided with Pages. How Apple did this, and how do I get the same effect in my own registered designs?

    Pages v5.6.2 and OS X 10.11.5.

    I do not believe that something has changed with the way that Pages manages the dates that we insert into documents, or our new custom templates. The date will not automatically update for me when I create a new custom with a date of month template or a new document with a stamp of date/time in it. In both cases, wait 15 minutes, when I open it or the other, the date of the month in the model does not change and or don't have time in my document on my desktop.

    It stays with v5.6.2 Pages, if you want a date automatically update a model, or in a document current/Sour, you need to use a single table cell, without borders, which is the date of formatting, and has a single equation: = now.

    What I can not explain, for example, is the model of research paper that uses a date inserted regular field current date will appear automatically when opened for the first time in a new document. There are no tables in this model. There is no new parameters in v5.6.2 of Pages that can explain this behavior. This does not work for the user created templates. Pages could have been programmed to update only the date in the models grouped fields, but not user models - and if that were true, then it conforms to the demi-cuite nature in all of this application.

  • How to remove the time &amp; date stamp

    Hi, I'm still learning Adobe Photoshop Elements 9, which is preloaded on my new computer. I don't have a user manual.

    Can someone tell me how to remove the date stamp and time of a photo.

    Try the spot Healing Brush tool or the Clone Stamp tool.

  • Vista is that advancing the date of years in the future after this year _ reset

    Vista alone, advancing the date for the coming years (example 2073). After reset date it's OK for a while, then he returned to a far later date.

    Hello

    How to fix synchronization of time Internet - add your own time server
    http://www.edbott.com/weblog/?p=1779

    Dealing with Windows Vista time sync problems
    http://www.howtogeek.com/HOWTO/Windows-Vista/dealing-with-Windows-Vista-time-sync-problems/

    Synchronize your clock with time servers Internet from the Vista command prompt
    http://www.howtogeek.com/HOWTO/Windows-Vista/sync-your-clock-with-Internet-time-servers-from-the-Vista-command-prompt/

    Time synchronization on Windows XP and Vista with Internet
    http://www.techexams.NET/blogs/jdmurray/synchronizing-the-time-on-Windows-XP-and-Vista-with-the-Internet/

    I hope this helps.
    Rob - bicycle - Mark Twain said it is good.

  • PowerCLI does not calculate the Date year statement

    Hello

    I have a custom to attribute Date (JJ/MM/AAAA) in vCenter and I attempt to bring together WHAT VM before that date but does not my statement appear to account for the year.  So if I put a date in the future for example 15/01/2012 the script lists than before the current date is incorrect and everything goes back beyond the date of the day but still in 2011 is not displayed is correct.  Any ideas would be greatly appreciated.

    $currentdate = get-Date
    $currentdate = $currentdate. ToShortDateString()

    Get - VM | Get-Annotation - CustomAttribute "Expires"? {$_. Value - the "$currentdate"} ' "

    Version:

    vCenter - 4.1.0.12319

    PowerCLI - 4.1.1.2816

    See you soon!

    Have you thought about converting the date you get the attribute.  Try this

    $currentdate = get-Date

    Get - VM | Get-Annotation - CustomAttribute "Expires"? {(Get-Date $_.)} The value) - $currentdate}

  • Copy of retained earnings in the current year to the future year

    Hi all

    I want every month of year (2013) the future of a group of entities to the exemplary gains kept of current (December 2012).

    My dimension structure is

    Retained_Earnings_Total
    -1000_Retained_Earnings
    -1100_Retained_Earnings_Acquired
    -Retained_Earnings_Current_Activity

    I want the value of 2012-> Dec-> Retained_Earnings_Total to copy to 2013-> 1000_Retained_Earnings (for each month). The code I used is


    DIFFICULTY ('Jan': 'Dec', @LevMbrs("Product",0), @LevMbrs("Location",0), @LevMbrs("Cost Center",0), @LevMbrs ('Channel', 0))

    FIX (& FutureYr, @Relative("Desired_Entity_List",0))

    Fix ("1000_Retained_Earnings")

    'Local' = FcstBS-> & CurrYr-> 'Dec'-> 'Retained_Earnings_Total'-> 'Local ';
    & RateCurrFcst = RateCurrFcst-> & CurrYr-> 'Dec'-> 'Retained_Earnings_Total',-> & FcstBS;
    ENDFIX

    ENDFIX

    ENDFIX

    Sub Variables: & FcstBS = Balancesheet7 + 5 & RateCurrFcst = USDForecast7 + 5Rates & CurrYr = 2012 & 2013 = FutureYr.

    Data for the FutureYr are not getting copied from Dec, current year. Can someone help me please?

    Using Essbase v11.1.1.3.

    Thank you

    Published by: Ministry of Foreign Affairs on August 19, 2012 19:41

    Published by: Ministry of Foreign Affairs on August 19, 2012 21:10

    Hello

    This seems a problem of creation of block as indicated by Ringo.

    I would use DATACOPY to copy the data from the current year-> dec to the future-> jan/begbalance. And then I copy data from jan/begbalance for the remaining months of the coming year.

    Something as follows (assuming the dimension that contains the members Retained_Earnings_Total as spare and as dense period);

    DATACOPY & CurrYr-> 'Dec'-> 'Retained_Earnings_Total' to & FutureYr-> "Jan"-> "1000_Retained_Earnings";

    And then copy data from January of the coming year in the last months of the coming year.

    DIFFICULTY (Feb:Dec and any combination of the years to come)
    "Local" = "Local"-> "Jan";
    & RateCurrFcst = & RateCurrFcst-> Jan;
    ENDFIX

    That you'd be using DATACOPY, block would be created when it is required for fastest way.

    Ministry of Foreign Affairs wrote:
    Lol data may not have filled in the destination. I tried to use CREATENONMISSINGBLK the ON VALUE, the script took a little longer but the filling of another value.

    I think that for creation of block, in this scenario, using the VALUE CREATENONMISSINGBLK ON you will be asked to create a member of spare member block. (However, this creation of block might take longer than datacopy)

    I hope this helps.

    Concerning
    -SM

  • I have a Mac Book (2006), all my emails since two and a half years have the same date. How to bring back the original dates?

    Of 'date and time' I tried to drag the month and year of my menu bar. He did not stay, I did several times, but nothing helped. I closed the window and went back to my Thunderbird email to see the date, I tried to use became the date in the column "date of receipt" of all of my emails back for 2011. I changed the date a few days later, and then the date is changed on all my emails. I want to cancel everything I done the dates so that the emails show when they were initially received. I managed to get "the order received" which helps a little, but I don't see the original dates.

    I checked "set date and time automatically", but it does not change the dates on my saved emails.

    Of 'date and time' I tried to drag the month and year of my menu bar.

    Is this something Mac?

Maybe you are looking for