ACS high availability deployment: collector's journal can cause AAA functions?

Hello

I've been watching the ACS installation guide, section of deployment:

http://www.Cisco.com/c/en/us/TD/docs/net_mgmt/cisco_secure_access_contro...

Question:

Is it possible for one of the cases to be the journal ACS collector? Or need a dedicated server for the collection of journal only?

Thank you

Mario

It doesn't have to be a dedicated server. By default, the primary server will also be the collector of newspaper.

Tags: Cisco Security

Similar Questions

  • ACS high availability

    Hello

    I have ACS solution engine. Currently, it is connected to the switch using a single network adapter. For the

    high availability to change aside, I want to use the second card netwrok thus linking

    the second main switch as well as in the case of connectivity with a carrot switch break. ACS will be accessible via second switch.

    Network card Ip address is currently 192.168.200.14/24

    How to configure the second network adapter on the ACS in order to achieve high availability.

    Hello

    You cannot use the second NETWORK card on GBA.

    The following link mentions "ACS takes care operating an Ethernet connector, but not the two connectors"

    http://www.Cisco.com/en/us/docs/net_mgmt/cisco_secure_access_control_server_for_solution_engine/4.2/installation/guide/solution_engine/ovrvuap.html#wp1053900

    I hope this helps.

    Kind regards

    Anisha

    P.S.: Please mark this message as answered if you feel that your query is resolved. Note the useful messages.

  • High-availability software ACS 5.2

    Hello

    Can I configure main configuration / backup with the ACS 5.2 on Vmware software? Replication / high availability will happen just as if you use two devices? I need to install two ACS5.2 software on different machines to Vmware.

    concerning

    Joe

    Hey Joe,

    Yes it is possible. Make sure that you meet the requirements listed on this document:

    http://www.Cisco.com/en/us/docs/net_mgmt/cisco_secure_access_control_system/5.2/installation/guide/csacs_vmware.html

    Thank you

    Serge

  • The OAM Console in a deployment architecture high availability

    Hello

    I'm looking to implement a HA for OAM environment and read the various docs that the OAM console is deployed on the AdminServer. However, when I read the Oracle documentation on Oracle Fusion Middleware high availability Guide for Oracle Identity and Access Management

    It gives the URL in the console of the OAM as the link to test the server managed, which means that OAMConsole is accessible on the ManagedServer. Is there anywhere I can find a definitive answer on how OAMConsole is deployed and in the what server / cluster?

    Ideally, I'd like the OAMConsole app deployed to the cluster (instead of the AdminServer) in order to achieve for her AP.

    Thank you

    oamconsole is deployed on the AdminServer, and there may be only one admin server active per domain.

    The link that you are referring is on setting up a cluster OAM. Oracle encourages a cluster OAM of 2 instances that are deployed on 2 physical servers. The server administrator is recommended to set up an alias to separate host that they refer as a VIP that is linked to a separate IP as the OAM instance on the same host address. A clone of the Admin instance is then placed on the second physical server corresponding to the second instance OAM. In the case of the first instance OAM and the server administrator is not available, a reconfiguration of network must be made to move the VIP to the second instance. Once this is done, the server administrator can be started on the second server.

    This gives you a little HA/DR.

  • Deployment of high availability of the IPCC 4.5

    In a future HD architecture implementation, the voice service will provide CallManager 5.0, that will integrate with 4.5 of the IPCC. 4.5 (required with 5.0 CM) IPCC does implement a high availability. How can we ensure that technical support continues to operate if the IPCC goes down? One possibility might be to configure CM such that if the IPCC goes down, all the number of help desk calls are automatically and immediately headed to a group (which includes all extensions help desk). This redirection can be configured in CM? Is there a better option?

    Thanks in advance,

    SB

    This is your best bet. On the road Points for your call center just put the call before busy, no answer and failure to the fighter pilot. Thus, when the IPCC Express Server is down it will sent to your fighter pilot.

    Please evaluate the useful messages.

    adignan - berbee

  • High availability of components in the design of vWorkspace tips

    Hi all

    Would ask you some advice regarding the design of vWorkspace components highly available. Suppose that vWorkspace components will be deployed in vSphere or hypervisors managed SCVMM hence HA is in place, if the failure of a host. In this situation, if we still need components redundant (n + 1 VMS) vWorkspace?

    On the other note, I understand that we can add a couple of broker for vWorkspace in vWorkspace Management Console connections and based on KB 99163 it would just work. I'm not sure how the traffic would be when an application is web access? As in, I guess that the connection broker news would be 'defined' at the request of the web call to the broker for connections. Or this is done automatically? Access Web would choose randomly from the broker for connections to go?

    Thanks for any advice in advance

    Kind regards

    Cyril

    Hi Cyril,.

    Big questions. As with any IT architecture in layers, you must plan HA and redundancy at all points of failure required by your environment or level of Service (SLA) agreements. For vWorkspace, the center of his universe is SQL and you must plan accordingly the failure and recovery. In some environments, full backup can meet the requirement of HA. In others, full SQL Cluster, Mirroring, replication, or Always-On configurations may be required. With our broker, we recommend N + 1 deployment in most scenarios HA. When you move peripheral components or enabling, you must evaluate each component and needs its impact of failure as well as its valuation to determine the appropriate AP.

    Load balancing between several brokers is done automatically by logic in the client connectors. In the case of Web access, when you configure the site Web Access in the Management Console, it includes broker list in the Web access configuration xml file. As client connectors, Web Access includes balancing logic that distributes the client load on brokers available automatically.

    If you have any questions about specific components and requirements of HA or architecture, please add them in the discussions.

  • SNS with high availability option

    I need help to understand the requirements of network and connectivity to deployment Cisco show and share with the high availability option where the DC and DR are different geographical locations.

    As I understand it, to achieve high availability, the DMM and the SNS servers require a L2 connectivity between the primary and the secondary server. How can this be achieved in a scenario where two data centers are connected by WAN / MAN links?

    Thank you.

    Chaitanya Datar

    + 91 99225 83636

    Hi, Datar,

    I already asked this question to the TAC, and it is unfortunately clear today the HA mode with 2 servers connected mode "back to back" via Ethernet2, REQUIRES to be on the same network of L2.

    It is not yet based on the IP routing layer, and therefore it is did not in charge of the design when using remote data centers...

    :-(

    It's a shame, I know, and I pointed to the BU of the SnS.

    May be part of a next version of work will be based on network IP L3 routed...

    Wait and see.

    Hervé Collignon

    Converged Communications Manager

    Dimension Data Luxembourg.

  • High availability of Hyperion 11.1.2.3

    Hello

    We need to implement high availability.  The Oracle document shows compact deployment and horizontal scale (and may be this is the reason for which it does not deploy serve App on the second server).  But what happens if we want to affect a server run for each component of Hyperion individually.  Say, how to implement HA exclusively to a shared service with its own managed server?  In windows, I must have Domain IDs to ensure high availability?  Have no ad servers and used local id to install Hyperion successfully for the implementation of many.

    Thank you.

    If you have deployed an application of java web to its own server, you can change this possibility / on other servers in the cluster managed.

    Take a look at the Clustering Java Applications using EMP Web Configurator system

    See you soon

    John

  • Install the Cloud control 12 c high availability

    Nice day

    I install cloud control high availability, but when I install the third-party certificate services are not available when I check for HTTP.

    I followed the following guidelines:

    Deployment of a cloud of highly available 12 control Enterprise Manager:

    http://www.Oracle.com/technetwork/OEM/framework-infra/WP-em12c-building-HA-Level3-1631423.PDF

    And third-party certificate configuration, note:

    NOTE: 1399293.1 -EM 12 c Cloud control how to create a portfolio with certificate of third party trust that can be imported in the WHO of communication SSL?

    I have a few questions

    How can I change the CA in the OMS?

    How to export the certificate and key?

    Can someone help me, please

    Best regards

    Alexandra Granados

    Hello

    Please follow the steps below...

    EM11g / EM12c: utility ORAPKI to create a portfolio with third party to trust certificate and import into OMS [ID 1367988.1]

  • Must all weblogic application servers share storage to implement high availability?

    I would like to understand if it takes a shared storage for all application servers that will run weblogic + oracle Identity Manager.  I used the following guides to oracle: http://docs.oracle.com/cd/E40329_01/doc.1112/e28391/iam.htm#BABEJGID and http://www.oracle.com/technetwork/database/availability/maa-deployment-blueprint-1735105.pdf and my interpretation, both speak to configure all application servers with access to a shared storage.  From an architectural point of view, this means the entire application servers need access to an external hard drive?  If shared storage is necessary, what are the steps to implement?

    Thank you

    user12107187

    You can do it and it will work. But products of Fusion Middleware GDE to provide guidelines to help you implement high availability.

    Having a shared storage will help you recover from the failure of storage, otherwise this could be a point of failure.

    Enterprise Deployment Overview

    "An enterprise deployment Oracle Fusion Middleware:

    • Consider various business service level agreements (SLA to make best practices high availability there is as widely as possible)
    • Operates databases servers of grid and grid storage in low-cost storage to provide a very flexible, lower cost infrastructure
    • Uses the results of impact studies of performance for various configurations to ensure that the architecture of high availability is configured optimally to perform and that adapts to the needs of companies
    • Allows control over the length of time to recover from a failure and the amount of acceptable data loss of a natural disaster
    • Evolves with every version of Oracle and is completely independent of the hardware and operating system"

    Best regards

    Luz

  • ODI 11 g high availability features

    Hello

    Is there a link to all official documentation describing how ODI can be configured for high availability, and more specifically, which described how agents and repositories behave in case of failure.

    I saw the notes on how to configure the load balancing between two or more agents.

    However, I would like to know what happens if an agent fails:

    • Is there a process of follow-up that imprisons the failure and tries to restart the agent?
    • In this case, the ODI load balancer will be perfectly direct traffic only to available agents.
    • What happens if the agent fails in the middle of a stage of script performance?
    • Will of the database session, getting lost and rollback?
    • Stop the script or remaining available agents will manage the process of running success?

    Similar requests are the repository itself - if the master repository database or the work fails what is happening? Assuming, the repository is installed on a multiple-node cluster environment, if only one node fails, everything will run scenario fail (and need to reboot) or that there is a transparent failover to the remaining nodes in the cluster housing deposits ODI?

    I have a requirement where the ETL (ODI) system must be available 99.5% of the year and thus resilience is a key factor and I need to understand the capabilities.

    I need to know if high in ODI availability simply means that a process is restarted, if a node or agent fails, or if an existing process will continue until the end due to a transparent failover.

    see you soon,

    John

    Take a look at the link below:

    http://www.rittmanmead.com/2012/03/deploying-ODI-11g-agents-for-high-availability-and-load-balancing/

    I hope this has given a table on this topic clear about close.

    Apart from this we use EM to monitor the status of the Agent.

    See you soon!

    SH! going

  • vCO 5.5 high availability / load balancer configuration

    I do a planning for a new deployment of vCO 5.5 and I would like to take advantage of the new features for high availability, but documentation seems to be a little lacking in Department of load balancer. I hope someone knows the answers to the following questions using zero in on possible configurations for load balancing options:

    Calls to instances of vCO they state or can I use a setting of type stateless round robin for the configuration of lb or what do I need to support sessions?

    Is there a health control end point which I can query the load balancer to automatically remove service instances in a configuration active / active failure? If there isn't a specific is a good audit can be done to create a service to act as a health check?

    Did he already works with a configuration similar and willing to share their experiences?

    Hello

    You can read the following article which explains how to configure Nginx as the load balancer. I hope it's useful.

    VMware KB: Nginx Configuration load lalancing software VMware vCenter Orchestrator 5.5

    Kind regards

    Radostin

  • Infrastructure for high availability

    Hi all!

    Stage en currently, Lun project is to implement Davis high availability vmware to deploy it later.

    After a lot time on the tutorial, I realized to a high availability system, to 2 ESX servers, a minimum en SAN Bay.

    Normal after the Vmotion solution seems to me the best. So that Vmotion works must implement vCenter Server integrated into a field.

    My question is about how many card to pay the ESX servers? According to my research, I AI 3: 1 LAN, SAN 1 and 1, pour Vmotion if I don't me not mistaken.

    Then the question that arises is or place vCenter? Place it in a virtual machine or in physics?

    According to what I've read, the best would be to put it in a virtual machine. So in this case, is it possible to put the DC also in a VM or does is in physics by taking into account the possibility of "unavailability.

    Another question: should Hook the ESX version with a license or a version ESXi is sufficient?

    Thank you in advance if someone would have an opinion.

    Hi Tatuxp,

    Welcome to the VMware forums.

    Pour a DC Windows Virtualization, you can find a lot of info in this document:

    You can't start a band with the free version of vSphere. You'll have more info in the FAQ:

    Pour the network config, it depends on a lot of your physical infrastructure. If you have physical networks separated, it normal morphologies of ports need you two network for redundancy. If you only have one big switch output and you use a VLAN, you trunk ports and you can put your cards in redundancy to each other. You have a good document that presents the main principles of virtual networks here:

    Finally pour your VMs DC, the fact of having two and use rules qualifirons-affinity allows you to always have an available in even if one of the nodes in the cluster.

    Good luck!

    A +.

    Franck

  • Configuration of high availability.

    Hello

    Please help me to configure high availability for Foglight existing environment, please send me the steps and requirements of pre.

    How many servers can exist in a cluster?

    Capacity how do we need on the primary server and the other servers if there is a failure?

    We currently have 1 unifying and 3 child FMS.

    version: 5.6.10

    Thank you

    Vicky

    Vicky,

    There are 2 very useful field guides that go through the requirements and the Setup process.

    High Availability Guide - http://edocs.quest.com/foglight/5610/doc/wwhelp/wwhimpl/common/html/frameset.htm?context=field&file=HA-field/index.php&single=true

    Federation of field guide-

    http://eDOCS.quest.com/Foglight/5610/doc/wwhelp/wwhimpl/common/HTML/frameset.htm?context=field&file=Federation-field/index.php&single=true

    Note the following points, known issue

    http://eDOCS.quest.com/Foglight/5611/doc/wwhelp/wwhimpl/common/HTML/frameset.htm?context=field&file=HA-field/overview.1.php&single=true

    "A master of the Federation running in mode high availability is not supported. Only children Federated can be run by high availability. »

    Golan

  • WLC 5508 high availability

    Hello

    Today I have two WLC 5508 (with license for 100 AP each of them), on a single site.

    The WLC work availability (active-standby).

    However, we have a new scenario, with 02 sites: A and B (attachment).

    I would like to know if it is possible to work as follows:

    The WLC - A as the main controller of site A. WLC - B as a backup (BDC) of WLC.-a.

    The WLC - B that has the PDC site B. WLC - as a backup (BDC) to WLC - B.

    For example:

    If WLC - a falls, site access Points are managed by B WLC site - B and vice versa.

    Is this possible?

    How can I configure the new scenario? Don't forget, there is a site-to-site between Site A and Site b.

    Another point:

    If I add more than 50 APs on Site A. How does the license number?

    Should I buy a license for the two WLC?

    TKS,

    >....

    >.. .is it possible?

    No. , high availability in terms of controller is supposed to be what is said, the backup controller is not 'full' - stby and cannot play other roles.

    M.

Maybe you are looking for