best way to migrate project teststand

Hi all. I am new to teststand

I have to work again on a former ramp driven by a core of teststand. to do this, I first need to copy all the data with another computer, just to see the source codes and .seq file, since I can't not work directly from the ramp

After copying the workspace, a lot of things don't work / are not more recognized in the source code. the main one is the globals station. is it stored somewhere else in the project directory? You can specify all the things outside the project that I have to copy with my project and with what?

Thanks for your help

It is not trivial to simply copy like this.  There is so much that goes into automation TestStand.  Consider the following, which form a TestStand system:

  • Code model/s process and support
  • File of the client's sequence and dependencies (screws, DLLs, assemblies, etc...)
  • Cfg files (settings of the station, stationglobals, search directories, report options, etc...)
  • User interface
  • Engines
  • Drivers
  • And much more

Station globals are stored in the config directory.  Usually stored here: C:\ProgramData\National Instruments\TestStand 2010 SP1\Cfg on Windows 7.

In addition to the configuration settings, the most important copy thing on would be the .seq file and all of its dependencies.  You will have to go through it, step by step to understand what all of those who are.  And then to top that off, you need to make sure that when you should I copy on they are accessible by the search directories (of if using absolute paths that they are exactly the same task).

The best way to move from a system of TestStand is to deploy.  http://digital.NI.com/public.nsf/allkb/EE3382373D209449862570A5006572F0

Hope this helps,

Tags: NI Software

Similar Questions

  • Best way to migrate virtual machines to new ESXi hosts with a different configuration of networking.

    We currently have a cluster of 6 Dell machines that move VM 120 or so on ESXi 5.5. Networking consists of a dVswitch with 6 uplinks that map to 6 x 1gig physical NETWORK adapters on each host ESXi... These are grouped into 3 trunks / gal, so we have 2 GB by SHIFTING of the bandwidth and failover. The LAGS are configured as follows:

    LAG1

    Traffic to our (NFS) shared data store and management of ESXi. (vmk0)

    LAG2

    Access to the network of the VM - groups of different ports on different VLANS

    LAG3

    vMotion (vmk1)

    We just bought 6 new Dell machines that have connections fiber 2 x 10gig each. The idea is to bring together in a 20Ggig LAG by machine that will handle all of the traffic, so traffic NFS data store, network traffic from the VM, vMotion and traffic management ESXi.


    What is the best way to migrate the virtual machine in the cluster existing to the new machines? Many of the virtual machine are essential, so we cannot stop time.


    Can I create the new DELAY on existing dVswitch and put it as an auxiliary card? I'll be able to do it for all 3 of the above both above LAGS?


    Thanks for the info Alistar, it's almost here. The bit that was me stumping was that after establishing a new dVswitch I received messages that the new dvSwitch was not reachable on the old host, when I tried to migrate the virtual computer.

    The solution (with the permission of VMware Support) was that I need to add the two dVswitches to one of the old hosts, then assign a physical alternative on this host uplink to a temporary 3 uplink on the new dVswitch. I then tag all the relevant VLAN that uplink.

    This way I can first migrate the virtual machine to the new dVswitch networking so I can move the computer to the new cluster.

    Obviously I can only migrate from old to new cluster with a single host. each virtual machine must be a double for the host with 2 switches, and then to the new cluster. I also had to have the two dVswitches to the same version.

    Fortunately, I had a physical rising spare on the hosts of the old, otherwise I would have had to break one of the trunks and re-use of one of these uplinks.

    Oh and be aware, impossible to use the same names for groups of ports 2 DV switches, they must be unique!

    Nick

  • What is the best way to migrate PSE6 catalogue (Wxp) to new computer W7, PSE11?

    What is the best way to migrate PSE6 catalogue (Wxp) to new computer W7, PSE11?  Recovery of previous PSE6 (Wxp) after a HD failure gave rise to images showing, but not not opening due to connection problems.  Had to restore backup images and rebuild the catalog and albums.  Found a fix to third later that has no support spent PSE8.  Try to make this migration to painless PSE11.

    William47 wrote:

    What is the best way to migrate PSE6 catalogue (Wxp) to new computer W7, PSE11?  Recovery of previous PSE6 (Wxp) after a HD failure gave rise to images showing, but not not opening due to connection problems.  Had to restore backup images and rebuild the catalog and albums.  Found a fix to third later that has no support spent PSE8.  Try to make this migration to painless PSE11.

    This is a very common and classic situation:

    http://helpx.Adobe.com/Photoshop-elements/KB/backup-restore-move-catalog-Photoshop.html

    Just make sure that your backup on the external drive is ok: you should find a "backup.tly" file in the folder.

    Use the organizer of PSE11 to restore the backup of the PSE7: the first step restores all your multimedia files, the second automatically performs a conversion of catalogue in format PSE11.

    Read the note in the link above on the restoration of XP to the ulterior Win operating system. You can also restore to a location 'custom '. For example in a "C:\My new library" folder. Make sure the main folder is accessible to all users, and if you wish, you can move the catalog (database), itself from this location to the default location: Catalog Manager, ability to move catalogs in location that is accessible to all users.

  • What is the best way to migrate your Adobe software on another computer?

    What is the best way to migrate your Adobe software on another computer?

    Install the software, does not migrate/transfer it.  If you need to download links for the software and see you not in your Adobe account online, just determine what applications or Suites is necessary and it might be possible to provide links.

  • Best way to migrate without Vmotion virtual computer

    Hi all

    I was wondering if you have ESX vmotion but have HA which is the best way to migrate the virtual computer on to the oringal in a cluster host when HA moves a virtual machine because of a failure of the host.

    I know that you can export the VM over the other host when he returns to the top and you can add it to the inventory if it is a hardware failure and the original host will not return upward anytime soon.  What is the best way to achieve this?  is there maybe a console command to grow HA a virtual machine over another host or export is still the best way?

    Welcome to the forums - with vmotion output, there is no way to do it with out the time - the easiest way is to turn off the virtual machine - unsubscribe form the host is on - don't use the browser to store data on the second andreadd from host to host and turn on the virtual machine - you should be able to do this in less than 5 minutes.

    If you find this or any other answer useful please consider awarding points marking the answer correct or useful

  • Best ways of Migration in the 9.3

    Hi I'm on Hyperion 9.3,

    Please can anyone suggest the best way to migrate my application of PLANNING from one environment to another. (If possible so other docs)

    Thanks in advance

    Well the native SID of a user a user changes between environments unless you have used the CSSImportExport utility during the creation of the user to force the same native SID.

    What you need to do is create an empty application on your target environment or go to the one that was created with the same owner of the application.
    Search in the table HSP_USERS and store SID for the UserID 50001, 50001 if no changes have been made to the application since the application owner.
    Now go to the HSP_USERS in the application, you have just migrated and replace the SID that you have stored, and then restart planning.

    You should always check the logging as I suggested, because it may be a different problem.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Best way to migrate (RDBMS and Essbase) planning data between systems

    Hello. I need to migrate data from planning (fact data relationship of Planning (time and text comments) and Essbase). Migration of Essbase is relatively simple (migration of Essbase dimension data and then export and reload fact Essbase data) but I'm not sure on the best way to migrate relational data 100% done. Should I do a dump of the schema and then migrating the other system of planning? Thank you.

    It comes to 11.1.1.3.

    Like you're on 11.1.1.3 I suggest to use LCM to migrate the planning elements.
    An example on how is available at:-http://www.oracle.com/technology/obe/hyp_ss/SS11.1.1_PLNLCM/PLN_LCM_OBE.htm

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Best way to migrate the Apex in Production applications - how users are affected?


    Hello

    We have been migrating our apex in production applications after the opening hours to try to minimize the impact on users. Can the affected users if they use the application while migration is taken?

    It's how we migrate:

    -We export enforcement apex of the development environment. This creates a SQL file.

    -Then the SQL file is imported into the Production by using the option 'reuse application ID export file XX'

    Please let me know if there is a better way to move the application in production, and if the user isn't be affected if we during opening hours.

    Thank you

    Violeta

    Hi Violeta,

    Violeta wrote:

    We have been migrating our apex in production applications after the opening hours to try to minimize the impact on users. Can the affected users if they use the application while migration is taken?

    It's how we migrate:

    -We export enforcement apex of the development environment. This creates a SQL file.

    -Then the SQL file is imported into the Production by using the option 'reuse application ID export file XX'

    Please let me know if there is a better way to move the application in production, and if the user isn't be affected if we during opening hours.

    Yes for sure users will be get affected when you replace the current with a new app, if they use it at the same time.

    Another best way to move the application to the production (keeping the same URL of deployment) is to use the Application Alias for your URL of the App Production.

    In this way, you can import the application while users are using the old application. And then after opening hours all you have to do is delete the alias from the application of the old app and assign this alias to your new application.

    Refer to the following response: Re: versioning in Apex (the thread is on version control, but, in this reply, I have explained the deployment of Application Alias method).

    I hope this helps!

    Kind regards

    Kiran

  • What is the best way to migrate from forms to ADF?

    We are in a big mess. Our company has been developing Oracle Forms for more than 15 years. We have applications developed in Forms 6i and 10 g. We have about 5 products and these 5 products have different versions of 25 to 30. that is, we maintain about 30 different versions of our applications. Each version of the application has about 100 forms and 100 States.

    Now, given that the forms came at the end of life of 11 g we want to pass to the ADF. We tried forms of ADF migration tools but failed. So now, we decided to manually to rewrite applications in the ADF.

    Our forms / PL/SQL developers, designers and analysts (about 40 in total) are all people of Oracle Forms. They have no experience in Java.

    What I want to know is:
    (1) what is the BEST way to do this?
    (2) need to learn Java, JSF, and ADF? (i.e. every 3)?
    (3) it is mandatory to learn JSF?
    (4) assuming that may benefit from a full training, how much time will it take for people of forms learn the ADF?
    (5) what kind of training will be necessary? (Java, JSF, ADF and JDeveloper etc..)
    (6) how LONG will take? that is to train all 40, then to rewrite an application forms 100 + 100 + reports? (Ballpark is OK).
    (7) any other technology we should learn?

    Published by: user12240205 on July 18, 2012 05:48

    Obvoiusly liked you training the better, but I think the minimum would

    (1) Java skills - I think to start, 1 or two days read some thing like head first Java http://www.amazon.com/Head-First-Java-Kathy-Sierra/dp/0596009208
    (2) I would then get the http://www.amazon.com/Quick-Start-Oracle-Fusion-Development/dp/0071744282/ref=sr_1_1?s=books&ie=UTF8&qid=1343201618&sr=1-1&keywords=jdeveloper+quick of "The Quick Start Guide to Fusion Development" (declaration: I am the author so have an interest, but I still think it's a good point of departure - this should be about 2-3 days to read and also to try things.)
    (3) in parallel I would observe these http://www.oracle.com/technetwork/developer-tools/adf/learnmore/adfinsider-093342.html#a1 ADF Insider Basics - a few hours
    (4) I'd so try this tutorial http://www.oracle.com/webfolder/technetwork/tutorials/obe/jdev/obe11jdev/ps1/ria_application/developriaapplication_long.htm - 3 hours.
    (5) if necessary, if you come from a background of forms I would also read http://download.oracle.com/otn_hosted_doc/jdeveloper/11gdemos/SummitADF/SummitADF_Redevelopment.pdf and watch http://download.oracle.com/otn_hosted_doc/jdeveloper/11gdemos/Forms_Redevelopment_ADF/Forms_Redevelopment_ADF.html - which is about 2 hours of work.

    I think it would be the absolute MINIMUM at least be able to build basic applications and begin to feel your way all also described in the http://download.oracle.com/otn_hosted_doc/jdeveloper/11gdemos/ADFTour/ADFTour.html 'ADF COLLATERAL TOUR' could be shot as you start to build a proof of concept. However, I would say don't you try to build a real application with a single exposure of weeks (in the same way, I don't expect you to design a database of product with the formation of a week only). I would probably expect your developers to have at least the above training, then spend a month or so evidence of (minimum) building of the concepts (or test themselves with the ADF Insider Essentials tasks). In addition, I would probably expect to have at least a senior developer/architect, with much more experience that may be decisions on things like reuse, partitioning, architecture, etc..

    Of course, it's all subjective, but I hope it helps.
    concerning
    Grant

    PS
    Of course, we also have lectures for university training Oracle which you could attend (or they can be bought to watch online).

  • The best way to migrate data... Opinion please...

    Guys,

    I'm working on a solution for a customer who needs to move in a new SAN SAN data.

    Existing SAN is attached to the ESX server farm and is very close to the location of a new SAN. In your opinion, what is the best way to move data without interruption to VM ESX farm?

    I know we can do SAN replication, but right now, I don't know if the SAN is still the same provider.

    I know we can do Storage VMotion. In this case, he should present the new SAN somehow for the existing ESX servers.

    I know that we can probably use the converter to migrate virtual machines. This can take some time because we would go over WAN.

    What are your thoughts?

    Thanks in advance for your comments!

    With 4 TB of data, I wouldn't pass on the replication SAN or WAN solution of optimization of the property, and it can fly quickly with 4 TB of data that you use storage vmotion which basically depends on how your WAN links are, if if its quick to go for it.  There is not another free solution then this but if you can manage somehow to make backup of system state of all virtual machines, and then you can ship these backup data to remote locations and import, save back to clusters.  You have to do the actual calculation how fast you can Transfer data from the siteA-> siteB Mbps?  This will give you a clearer picture of how long it will take and picture plan here.  I could do that during maintenance or weekend windows that are the least impact to users and systems.

    If you found this information useful, please consider awarding points to 'Correct' or 'useful '. Thank you!!!

    Kind regards

    Stefan Nguyen

    VMware vExpert 2009

    iGeek Systems Inc.

    VMware, Citrix, Microsoft Consultant

  • Best way to archive projects for future use

    I use Adobe Premiere Pro CS4, but this is a more generic question.  I shoot the videos that people want to save for a long time.  I burn my DVD projects (or if the client does not mind the cost of Blue-ray discs).  DVD can be destroyed, lost, will wear out.  What is the best way to keep these memories?  I know that some people charge the customer and use an external hard drive dedicated for each project.  Which technique is not too expensive, but it will last the longest?

    Thank you

    Lisa

    I think most use the method of the hard disk or tape.  The stuff (dvd, Blue ray) 'See only' cant really be used for editing "again" without loss of quality because of the compression... so the HD or the band allows you to save the project and less compressed (perhaps "Lossless" codec)... that can be edited later.

    If you just want to record the DVD "for life" just make copies of the DVD and keep them nicely...

  • Best way to migrate from Vista to Windows 8

    You want to migrate my old laptop to new notebook (Win8) with most precision and less hassle, by ensuring that all my files, cross.

    Have a very recent Vista backup on external drive (via MS backup) and am on my own WiFi at home. In the many and varied experiences there, what is the best options? EFT via Wifi, using external drive EFT, EFT using the connection cable, external backup restore? In addition,
    Vista's Windows Mail that suited me. What I now have to use outlook to send? Moreover, 1 day in Windows 8... yuk! Thank you

    You want to migrate my old laptop to new notebook (Win8) with most precision and less hassle, by ensuring that all my files, cross.

    Have a very recent Vista backup on external drive (via MS backup) and am on my own WiFi at home. In the many and varied experiences there, what is the best options? EFT via Wifi, using external drive EFT, EFT using the connection cable, external backup restore? In addition,
    Vista's Windows Mail that suited me. What I now have to use outlook to send? Moreover, 1 day in Windows 8... yuk! Thank you

    Windows 8 does not include a desktop e-mail program, you will need to download and install a. You can also use the start screen Mail application.

    If you want continuity in your messaging experience, you can download the Windows Mail successor, called Windows Live Mail:

    Download Windows Essentials 2012 (Web installer)
    Download Windows Essentials 2012 (Offline Installer)

    See also:

    How to upgrade Windows Vista to Windows 8

  • Best way to move project files

    Hello

    I'm in the middle of editing a film with multiple video and audio clips and still images. Some of the files are from a network drive, and some of the files come from an external hard drive. I'm getting nervous about the reliability of the external drive and wishes to consolidate everything on the drive network and go forward with my editing from there.

    What is the smartest way to do this?

    Thank you.

    Hi Jodi,

    The project manager can help you collect a project to a new location. Collecting files copies the current project and all of its files in media associated with a single storage location. There is no conversion of files when the files are copied.

    You may need to check this: using Adobe Premiere Pro | Consolidate, transcode and projects archives

    Kind regards

    Navdeep Pandey

  • Best way to migrate data from a store of data to a ROW

    Hi all

    I have a maybe simple question.

    I have some SQL clusters to customers that are not configured by the best practices of VMware.

    They are running ESX 4.0 with vCenter 5.0 u2 u2

    Some of them are running two nodes on the same ESX, some of them have mixtures of RDM and data warehouses and LUNS are connected by mixtures of policies of multiple paths.

    I can make changes to the MPP and the separation of the knots without problem, but I was wondering if anyone has recommendations for the data transfer of any store of data that exists in a ROW?

    Obviously if it is possible I would disconnect the data store, add as a RDM again but is it ok to do?

    Are there catches hidden here?

    If this possible isn´t would I need to create a new drive as a vMotion RDM and the storage of the data between the 2?

    I Don t need to migrate data for the operating system, the data on disks, so I can use storage vMotion for this or it would be better to run VMware converter?

    Someone at - it advice or recommendations?

    Thanks in advance

    Mark

    Obviously if it is possible I would disconnect the data store, add as a RDM again but is it ok to do?

    Are there catches hidden here?

    If this possible isn´t would I need to create a new drive as a vMotion RDM and the storage of the data between the 2?

    I Don t need to migrate data for the operating system, the data on disks, so I can use storage vMotion for this or it would be better to run VMware converter?

    Someone at - it advice or recommendations?

    Thanks in advance

    Mark

    You can't add the data store to a server asa RDM because the data store is in VMFS format.

    you could use vmware converter or restore backups to place the data on the rdm.

  • Use the old C3 SWF in Captivate 5 - the best way to convert project?

    I'm updating some old e-Learning content created in Captivate 3 in Captivate 5.

    This includes some animations that are small 1 or 2 slides C3 SWF.

    These don't work in C5 as they are implemented in ActionScript 2.

    I tried to open their original .cp files in Captivate 5 and then republishing to AS3.

    This translates into animation (sometimes) play when I play the slide in the edition, but in the preview window or

    Edition I get a white grey that does nothing.

    Strangely the C3 project containing sovereign wealth funds comes through relatively spared apart from that (well a few invisible buttons and some changes of fonts).

    The only solution I have at the moment is to open the file in C3, copy the background, then use the bottom in a new project of C5 and tinkering with positioning etc of mouse, which is far from ideal.

    Is there a better way to do this?

    (BTW I also access to C4 if it helps)

    Thank you

    Lynn

    I would try the upgrade of my Cp3 project files that generate these SWFs to Cp4 format and then first to Cp5 Cp4.

    Once you have your problems to the Cp5 format should be minimal, as far as compatibility goes.

Maybe you are looking for

  • Mode full screen

    I have installed an extension of full screen on my Asus laptop convertible and he (mode full screen) is now locked without options toolbar, bookmarks or browsing tools.I've uninstalled and reinstalled without success.Help!

  • have selected item in combobox

    Hi all I need to get the item selected from a ComboBox, there are features that I see. But no one seems to meet the need. Best regards

  • Turning off WebClient in disk cleanup

    Hi I use Win XP Prof and IE8. I followed the steps required to disable Webclient and I noticed that the default settings are "Startup Type: automatic 'and' the service status: started.'" When the "Startup Type" to "Disable", why doesn't the "Service

  • print spooler error 1068

    Click Start, run, and in the box type (including important space after the "equal" sign): dependent on the spooler of sc config = RPCSS When I do the above step, he said.  access denied My addictions are HTTP, LexBce server, Remote Procedure Call (rp

  • M250 rev 2 fast forward is not

    I have an another m250 that pressing and holding the causes fast forward fast before going faster and faster through the file. A podcast of the hour can be fast, passed through in a few minutes. The m250 in question has a steady, slow speed, fast-for