Change order of project folder
It is perhaps a silly question, but is there a way to rearrange the order in which the folders appear in a tree view of your project? It seems by default what CVI has them in order of "Files of User Interface", "Source Files", of"Include files", which is fine. However, I have an old project, where the "User Interface files" for some reason any comes after the "include files" that drives me crazy . How can I change the order in which they appear? It doesn't seem to be a way in the project tree and change it-> project... window does not appear to be a way to do it anymore. Thank you!
This isn't the most elegant solution, but the "brute force" approach is to open the project file in a text editor, find the [files] section and organize the folders listed to meet your needs. Once the records are willing, rename the keys to the digital file from 0 to n.
Tags: NI Software
Similar Questions
-
Hello
I created a puppet in Illustrator that doesn't have too many features (all forms of mouth, hands). The clip lasts less than a minute. The Web is about 1000 x 1000 px. The project folder is about 160 MB.
I wonder if this is the expected size, or if it is too large. And if it's too big, how can I reduce size? Y at - it an available order that compresses the file and it deletes unnecessary stuff?
I tried the file > delete history, but he is not having a significant effect on the size of my file.
Thank you.
In my view, that it is filled with temporary files help with runtime performance. I do not know 100%, but it was never a problem for me.
-
Hello!
under "Recommended workflow of InDesign documents" in the help section on indesign. He states:
'Create a project folder '.
Before you begin a project, determine which files you need, and how you are going to save them. If you have encountered problems with broken links, consider storing your files in the same folder as your document. InDesign maintains links to files that you place in a document, but if a link is broken, looks for the file in the folder of the InDesign document. Store a document and its files in the same folder makes it easy to move from one computer to the other. Storing files in a folder also ensures that InDesign finds the original graphics when you print a document. If InDesign cannot locate a linked graphic, it won't reflect changes that you make to the original image, and it can print the graphic poorly or not at all.
If your project consists of several documents (for example, chapters in a book), you may find it useful to create a project folder that contains a folder for each document and its linked files. »
I am wanting to create a project folder to scroll missing links and pixelation. I'm not sure how to proceed and how to create a project folder works. A project folder consists of a folder in my documents or a folder of files into an indesign document?
Can someone point me in the right direction
Thank you
Helen
Simply create a folder where you want and save the InDesign files and all the links in there.
Bob
-
I don't have permission to change the itunes media folder or a folder that it contains
I can't 'consolidate' the files trying to organize my library in iTunes. I get a message that I don't have permission to change the iTunes media folder or a folder it contains. I don't see anything wrong, but maybe I'm not good things. I am running the latest version of iTunes for Windows 64 bit with Windows 10.
Try to repair the security permissions for iTunes for Windows.
TT2
-
control array element changing order
I have observed several times where some of my paintings of controls have their items change order between debugging sessions.
It's unpredictable when it happens. But the symptoms amounted to my controls bad secondary control (for example, LED #2 gets turned on when the #0 SWITCH is pushed).
When I inspect control arrays, I can find that one or more items are now out of use. When I their difficulty in IUR again, then all is well again.
Any thoughts on how to lock them to the UIR?
ElectroLund,
One thing I noticed on your code, you call the GetCtrlArrayFromResourceID function at the top of each callback. Because the control panel should not change while the program is running, I might suggest you make all these function calls in the main function as soon as the program starts and just store it for use in the recalls. Which probably isn't helping the problem here, but it would make things a little more efficient.
Nothing is coming out for me right now as being a possible cause of the problem. I know you said you've been changing the code in an external IDE; to be clear, have edited the UIR file in any external editor?
One thing that was suggested by one of my colleagues was to create control arrays in source code, instead of using the GetCtrlArrayFromResourceID function. This would ensure that the controls are in the order that you want them to be, even if it would take a little more code to implement.
-
Open g vi in the project folder
If I used a few open g vi and I want to include these vi in my project folder, so that all my vi are under the same folder. What is the best way to achieve this? What I have to do a source distribution?
jyang72211 wrote:
If all screws are understand the same folder if the folder is moved to another location, it contains everything that a program was needed and no need to install anything. I saw this fact, and I probably won't "do this, but I wonder what is the best way.
The best way is to have OpenG installed on each machine of LabVIEW development worldwide... good well maybe a little high hopes.
I understand the desire to have easy transport and having only one folder with all that it makes it easy for you. But I have to recommend what others have suggested. If you have a Bachelor of VIPM it makes it easier because you can perform a check, have it analyzed what packages use a project and roll them all into a single file. Then when you want to move your project, you take your screws and record this file to a configuration (VIPC) and after installation the VIPC you can open your code and have it all to not be wiped out.
-
When I send an e-mail, the system automatically updates the message in my PROJECT folder. This happened last week. How to stop this annoying problem?
I use hotmail. (but is seriously considering moving to something else)
You need to ask the experts of Hotmail in their forum. I've never used the program.
Windows Live Solution Center Hotmail Forum
http://windowslivehelp.com/forums.aspx?ProductID=1 -
WINDOWS HOTMAIL
My Hotmail has recently begun to generate drafts and get into my project folder with the title 'unknown '? Someone knows why?
Any Hotmail questions belong to http://windowslivehelp.com/product.aspx?productid=1
-
This afternoon (September 12), I composed an e-mail message in my hotmail account - I didn't send the t receiver as I wasn't made that compose. So I save it to my project folder. Later that evening, I have re-opened this project to continue email to compose the email. Again, I didn't want to send it to the receiver, so I saved it in my folder of project again. A few minutes after that I hit Save draft, I have re-opned the new message - and my message all had disappeared. Can someone at Hotmail Live help dial me to recover this draft of email so that I'm not the top another?
HelloIn dealing with the problem with Hotmail, it would be better to post the same question on Hotmail portal for assistance.
Portal of Hotmail: http://windowslivehelp.com/product.aspx?ProductID=1Hope the information is useful. -
How can I change my BB10 project uses a makefile?
I recently created a new Blackberry Momentics project and it works fine from the IDE, but I need to be able to build the command-line with a Makefile. I ran 'make' in the Terminal, but encountered an error because the Makefile does not exist.
I checked the sample applications I have been watching, and they have all of the makefiles. I found a few sources that say you can choose whether you use a managed version or a makefile when you create the project, but I have not found any this option in the latest version of Momentics (2.1). I tried to change this setting in the properties for the project, but the constructor parameters of generation slot C/C++ are grayed out.
How can I change my BB10 project uses a makefile? If this is not possible, how can I require a new project to use a Makefile rather than a managed build?
I realized that my problem was a little more specific than I thought, as happens only in OSX while trying to use a Makefile for a native Core project.
I posted my solution on Stack Overflow, here: http://stackoverflow.com/questions/25192787/how-can-i-change-my-bb10-project-to-use-a-makefile/25333...
-
Is it possible to change icon of yellow folder by DEFAULT to something else?
I'm looking to change the default icon that windows screens (I use mostly list mode) I basically seeks to change to a darker color (blackish) more change then the true style of the icon. Is this possible? (via the registry perhaps?)
How to change the default icon for the folder of Windows 7:
http://www.SevenForums.com/tutorials/23825-folder-icon-change-Windows-7-default-folder-icon.html
-
I saved an email I have compiled and went in my project folder. Now, I want to send it. Should what steps I take? Thank you!
In most programs, you click or double-click the project to open it in its own window. You can then continue that compose or simply send it as it is.
If this does not help, please report back explaining what e-mail program or service you are using.
-
I changed the permissions of folder to % ProgramFiles%\WindowsApps, now all the startscreen apps do not work, I need to reinstall windows?
I managed to fix it by adding 'All the Packages of Application' to the list of permissions
-
In Photoshop, how can I change the background (Mount table) from black to white. I must have hit something because it changed suddenly mid-project and I cannot find anywhere in preferences to solve this problem.
Right-click on the pasteboard, and you should have a choice of colours from timeline menu.
I would add that you should have a file to open it or it won't work.
Gene
-
When I save a project edited with first Pro CC in the project folder I get a symbol for Premiere Pro CS4 rather ot getting the CC symbol. I can't open the CC project by clicking on the symbol of CS4. Why?
I discovered myself that you can choose in the project folder if you want to save the project in CS4 or CC. Sorry I took your time with my problem.
Maybe you are looking for
-
using the iMac 27 inch mid 2011 as an external monitor with a PC via mini DisplayPort
I find conflicting information via web search to be able to use my iMac 27 inches, mid-2011 as an external monitor with a PC. Is it possible to use the iMac as an external display via the Display Mode target between Thunderbolt port of the iMac with
-
Envy 15 t-ae100: each Envy 15 t has the same power supply to plug?
I try by a second adapter for my 15 t-ae100. I see some on sale, that give you in the compatibility section, "envy 15t." All laptops of 15 t want to use the same adapter? HP LaserJet p1102w
-
Overheating on HP Pavilion 1216ER G6
The temperature is 69 to 70 degrees Celsius when idle. And the temperature goes up to 90-98 degrees. Sometimes the laptop turns off because of this. What should I do? (The warranty is over)
-
Problem with "contactless control."
1. it's all fine until yesterday when I was watching a YouTube video on my phone - "Touch control" started appearing right in between every single video I watch assuming I used the expression of launch. I recycled the couple of words of launch times,
-
Support for WMI 1.5 tools on Server 2008 R2 and Server R2 2012
We currently plan to migrate tools WMI 1.50.1131.0001 on Server 2008 R2 and Server R2 2012. The application is compatible on the aforementioned platforms?