Compare the voltage

Hello.

I created a VI in order to compare the measure. I start with a simple button.

I want to replace the button with a myDAQ data. But read the data on sent myDAQ of data streams, and I need only one value? How to extract a value from the stream?

Pascal

Hi Pascal, see the attached VI (old version, but should open).

Place your daq assistant as shown and see the results.

Hope this is what you are looking for.

Best regards, W

P.S. I could not resist to show an alternative to the structure of your business

Tags: NI Software

Similar Questions

  • Qosmio X 500 - 11U - Eco Utility unable to check the voltage

    Hello

    I install the new version of the utility 1.2.11.64 eco (eco - 20100526090958.zip or TC00149401E.exe) and now, when the computer restarts, I have an error like this: impossible to check the voltage or a similar message.
    Works of utility but nothing seen on the graph, and the left button on the keyboard switch eco - standard mode!

    Any answer to this problem or am I alone with this?
    Thank you in advance for help

    Hey Buddy,

    I never saw such a message of error of Eco Utility even I use Eco Utility for months. I've never had a problem with this utility and it works very well, it saves a lot of energy, especially if you work in battery mode.

    In any case, maybe something went wrong during installation, so you must remove Eco Utility and restart your laptop. Then use CCleaner to clean and repair Windows registry and restart again. After that download and install Eco Utility again.

    I hope it works! :)

  • By comparing the numbers on MAC worksheet cell text

    How to compare the content of text in a cell in a column with the text content of each cell in another column to check for duplication. After checking the first cell, I won't move to the next and repeat the operation for each cell in the first column, ultimately comparing each cell in the first column with each in the second

    A simple way to do this would be something like this:

    The formula for C2, filled to the bottom of the column, is:

    = IF (COUNTIF (A, B) ", TRUE," "")

    The formula in D2, filled to the bottom is:

    = IF (COUNTIF(B,A), TRUE,"" ")

    This requires that you compare the contents of a cell in column B with all the contents of each cell in A and vice versa.

    If you want to see if the contents of a cell in column B is contained within the contents of the cells, etc., then a more complicated approach would be necessary.

    SG

  • Satellite L500 - what is the voltage on the USB ports?

    What is the voltage on the USB ports?

    I would like to connect Transcend StoreJet 25 with USB 3.0. It takes a 5 V DC on USB. How (and where) can I check the voltage in my computer?

    Thanks for help.

    Hi again,

    USB voltage is always the same on each laptop because it s according to the version of USB port. For example, all USB 2.0 ports has the same specifications, otherwise he n t be a standard USB port. ;)

    You can get more information about the USB ports on Wikipedia:
    http://en.Wikipedia.org/wiki/USB

  • What formula would I use to add all the other ranks in my spreadsheet. I want to compare the fees and expenses of 2015 since they are incurred for 2016

    On the same worksheet, I want a spreadsheet to compare spending 2015 totals by month in several categories to 2016 expenses when they occur. What is the best way to implement this worksheet? It is essentially a budget, but wants to see how the category spending increase or decrease all the months for 2016.

    Thanks for any help.

    Hi Bruddah,

    I would like to start by rearranging your table so that the amounts from here to 2015 and 2016 switch not in the column, as implied in your question.

    Vocabulary of the numbers:

    worksheet not sentence numbers

    Worksheet: A spreadsheet. Usually abbreviated to 'Document '.

    Leaf: a blank canvas on which are placed the tables and other objects. A Document has at least one and maybe more than one.

    Table: an object consisting of one or more cells, arranged in rows and columns.

    Take a look at the personal Budget template (file > new form model...), specifically the summary in the table of categories.

    It uses the formula: = SUMIF (Transactions::Category, A2, Amount)

    Since you want to compare the volumes in several CATEGORIES at the specific two-year MONTH, you will need SUMIFS, using three test values, pairs of condition.

    Syntax: = SUMIFS (sum of the values,test values,condition,test values,condition,test values,condition)

    I would like to know if it is enough information. If this isn't the case, I'll be later in the day to enter more specific details. In the meantime, a screenshot of your table and the lines of (at least) your transactions table header would be probably useful.

    Kind regards

    Barry

  • How to compare the 2 versions of the same document in Pages?

    How to compare the 2 versions of the same document on Pages?

    There is no OS X Visual tool which can open two Pages document and show the differences between them - other than the human eye.

    What information are you interested in identify as different between the two documents? What specific version of Pages?

  • How to find or change the voltage setting set in a series of HP TouchSmart IQ500

    How do I find or change the voltage setting set in a series of HP TouchSmart IQ500 (specifically an IQ524)

    It does not use an external power adapter? If so, all you need to use in another country is an adpater sheet to match the wall outlet.

  • Is it possible to read the voltage/current SMU after the closure of the original session?

    What is the method, or is it still possible reading the voltage and current of an SMU SMU-4138 measurements after the original configuration session has been closed?  I have a (relatively) long Teststand sequence that sets up the EMS to provide power to the ESA, then conducts tests and along the way I have to take the readings of SMU.  I was always under the impression, it is advisable to open and close the EMS quickly set up, but the 3-State programming model does not allow a way to jump into the running state of Init with channels VI, except through committed and engaged States and thus any stop in the process. The power measurement VI only works if you are in the Running State. Seems like a no-brainer, so what Miss me?

    bholsinger wrote:

    I was always under the impression, that it is recommended to open and close the EMS quickly set up

    It's BAD advice.  You open at the beginning of your program, you do whatever it takes with it inside your test (configure, read, etc.) program and you don't log off not until you stop your program.

  • Measure the voltage and the temperature simultaneously with PCI-6281

    Measure the voltage and the temperature at the same time at the same time. However, when I put the voltage and temperature in a loop, the acquisition of voltage is significantly delayed. When I put the voltage and temperature in two different loop, none of them works.  There is an example in aid of Labview as shown. This structure works fairly quickly? In addition, how a volgate get and temperature Analog DBL 1Chan 1Samp? I check the exported excel, the first column is 0, 1 the second column contains the value of the voltage, temperature value. I wonder how can I get these two values for each scan.

    ,

    Assuming that the DAQ cards can handle it, you can set an analog trigger for the channel of the tension.  Then you just X samples to get your 100us data value.  Keep the last sample.

  • Measure the voltage of strain gauge

    I have connected my 9237 to a 9945. I use a 350 ohm strain gauge. I have the voltage set to 2, 5V Max is there a way to measure physically to be sure that it is 2.5V? Also, in my vi I use a DAQmx create function of the channel. I want to add another channel for this but can't see how to do it.

    Thank you

    HS

    Hi, Harry, it's Paul with engineering Applications to the OR.

    My first question is why you are wanting to physically measure the voltage?

    If you are wondering how that tension may vary, it is limited by the maximum capacity of 150mW of your device, as explained here: http://digital.ni.com/public.nsf/allkb/7CBC67482CC9FB318625758C0048FF73?OpenDocument

    If you want to continue to measure externally, you have a few options.  You can use another DAQ hardware to measure the voltage, or you can use another external device, like a digital multimeter.

    If you want to see in the excitement that is actually supplied LabVIEW code, you can use the node property DAQmx 'Value of real excitement'.

    As far as playback of multiple channels, theres two ways you can go about it.  If your channels are sequential and all have the same settings, then you can change your name of the physical channel to something like 'Dev1/ai0' to ' Dev1 / ai0:3: to specify the first 4 channels.»  Alternatively, if you wanted to select non sequential channels, you can chain create channel set tasks, as long as they are of the same type of task (AI voltage, etc.) and the same device, as shown below.

    Let us know if you have any other questions.

    Kind regards

    Paul

  • Complete noob - would like to measure the voltage to manual start and stop

    Hello

    As the topic says I'm a complete noob when it comes to programming OR.

    I'm looking for someone to point me in the right direction

    Installation program:

    Windows8 office

    Visual Studio 2013

    NI 6255 PCI data acquisition card

    Block connection OR SCB-68

    What I want to do:

    I want to write a console application to measure the voltage on the signal ai16

    -I want to be able to start and stop the application manually

    -I want to be able to pressure measured in a CSV output.

    Where I am:

    I compiled and ran the example "NOR-DAQ\Examples\DAQmx ANSI C\Analog In\Measure voltage.

    It is said that I have "collected" samples but I don't know what that means, as I do not see an output file...

    What I don't understand:

    Samples - I do not understand cela or know even where to start

    How can output file - I get the file to save the collected data.

    Thanks in advance

    Chad

    Hi Arron

    Thanks for the link, unfortunately, it has not helped because the instructions were for Visual Basic and C++ not. It was my fault for not putting the language of prog that I need help in my original post.

    However, I started to find help on this link: http://www.ni.com/tutorial/5409/en/

    -With the help of NOR-DAQmx in text based programming environments

  • sweep the voltage keithley 2400

    Hi friends,

    I ve made a small program (reusing an I found in the web) to generate a curve using Keithley 2400. I want to sweep the voltage of 1V-1 using for example 10 points and get the current in a graph and a table.

    However, something is not because I have only (not yet correct) measure and no image in the chart and no data in the table.

    Could someone advise me here, please?

    Any help is welcome!

    Thank you

    Hi LabVIEWers,

    I ve you have a problem receiving data from Keithley 2400.

    I m using a distributed (attached) Keithley LabVIEW example and suddenly it does not work. When I run the program it sends the information to the Keithley and a scan is performed. The problem is when the scan is done, no data back to the program so I can't save all data or see any result in a chart or table.

    I ve tried to debbug program using the option to highlight and it is for me that the data are intended to the curve, but I have nothing (just #0 in the output of the Sub - VI last before the graph).

    The strange thing is that this program works so far, no idea what can be the problem?

    Thank you very much!!

  • In comparing the two last samples read in

    Hey guys,.

    before the start of my program to test a sample, to check whether its current temperature stable

    So, I read the information of my sample temperature very low frequency (once every 5 seconds) and basically I want to compare the last two samples I have read, and if they are the same allow the next part of the program to start.

    I thought that this could involve using the Labview collector function, but I can't see how I would implement it.

    Any help is very appreciated,

    Sam.

    use a registry node or shift of feedback.

    Write the value to the entry of feedback node and compare to the output

  • HPE - 580t: can not find the voltage selector

    I am moving to Asia with my office and would like to change the voltage of 220v.

    HP web troubleshooting says there is a red switch at the back of the computer, but mine doesn't have. I found the computer label indicates the input voltage: 110-240v so.

    How can I change the power supply for the computer then?

    Thank you for your help in advance.

    Hello

    This model do not have an option to change the voltage.

    You may need to use a universal power cable to the wall socket.

    Kind regards.
    Rajesh K G
    HP Tech
    ***
    * Click on the thumb BRAVO upwards on the left say "thank you."
    Make it easier for others to find solutions by checking a response "Accept as Solution" if it solves your problem.

  • How do you compare the data collected continuously?

    So, I'm stuck on the basic architecture, therefore, hoping that you can push took me.

    What I have is a VI that measures the tensions permanently, then, I have a flow of power from DAQ hardware data points.  What I WANT is to act on the data points of tension, only, which are larger than the previous points.  For example, I want to act on the first data point, since it will be the most important, since there is nothing to compare to, then I want to compare the points of data subsequent to the first, until there is a greater than the first data point.  Then, I want to compare tensions the NEW value more and so on, etc. and act only on the NEW larger value.

    Consider this list of data points and corresponding outcomes:

    2 LAW

    4 LAW

    3. DO NOTHING

    3. DO NOTHING

    4-DO NOTHING

    5 LAW

    4-DO NOTHING

    5-DO NOTHING

    4-DO NOTHING

    3. DO NOTHING

    6 LAW

    I've been watch combinations of them for WHILE loops and shift registers and the tables, but the table would get so huge so fast and the MIN/MAX value of the TABLE palette function would get pretty slow and I don't need to evaluate all previous data.  I just need to be able to identify the highest value and then compare it to the following values until there is a NEW larger value.  It's a bit like how the warriors would fight several opponents until they lost and then, there's a new champion, and all subsequent warriors are compared to the new champion and so on and so forth.

    You have any suggestions on how to achieve this?  I'm puzzled.

    Thank you

    Dave

    Yes, either case will work, I put it in the structure case just to show that you need to put in there if you want to use.

Maybe you are looking for