CSS's sudden lack of project manager (RH10)

Suddenly, my main css (named "Sol8.css) is not appear in the project... Manager it shows everywhere else, but it... See picture attached. I have no idea why this is suddenly the case.  I would like to be able to access them for editing in the HTML editor in RoboHelp 10... That's happened?

Help! and thank you...

missingcss1.png

In fact, you might find that the removal of PCD is originally the css file to disappear. (I've seen it affect some (but not all) of the images as well and has been a major cause of my last job passed to Madcap Flare.)

Try this:

(NOTE: If this is a very large project, you may go out for coffee or lunch.) Basically, this will refresh the HR list database file (my interpretation), which can take a long time for large projects. We had one that took an hour).

  1. Create a new folder. It can be anywhere and whatever it is called, and you can remove it in an instant.
  2. Check if your css file appears in the project again Manager.
  3. Delete the new folder that you just created.

If it works, you will need to create and delete a file when you want to change the style sheet, after deleting the cpd (or just use windows Explorer and an external editor).

Please also report as a bug to Adobe. I did a few times, but most of the people look at me like I'm crazy. Which reminds me, I should report it to new and link to this topic.

If this does not work, sorry, I'm ideas.

(Edit: Bug submitted with link to this thread and also https://forums.adobe.com/message/3478909)

Tags: Adobe

Similar Questions

  • 2015 CC: Project Manager does not work!

    Project Manager: copying files in a new (record low) works almost until the end, but then suddenly ""an unknown error has occurred during the operation of project manager. Please save your project and try the operation again. ""- and all the media that was already in the new folder disappear! " y at - it somewhere in a log file, I can look at what is wrong? fatal error is not enough to know what happened!

    Try excluding audio conform or preview files. It is usually the culprit.

  • There is no project manager how to remove image

    All, morning

    I managed to add a non-existent image for the project manager. Well, actually RH8 did for me. Now, I need to know how to remove it.

    I use a drop-down hotspot and wanted to use images other than what was available RH8. So, I added the hotspot and chose a random image to appear at the beginning of the text. Then I edited the default.css to (among other things) to change the name of the image file on the line:

    x open-image: url(image-name-goes-here.gif)

    I have badly spelled the name of the image, saved the default.css and went back to work in RH8, creating and previewing of content. When my image, I tracked down the misspelled name image and corrected.

    So now I have an image file that appears in the project with a misspelled name Manager, and this file never existed. There is a red X on the icon of the image and the command delete is not available.

    How can I get rid of this file of project manager?

    TIA,

    Patrick

    Hello

    Paste a picture with the same incorrect name in the directory and delete RoboHelp.

    Take a bow

    Willam

  • Custom development of modules CompactRIO - Embedded window of "missing" project manager

    Hello!

    The scenario:

    I am currently working on a custom CompactRIO Module. The material is made for the most part, I installed CompactRIO MDK 1.0 and I want to configure my CompactRIO system and develop the driver VI for my module.

    The steps required to configure the cRIO system before you start developing the pilot VI is the following (as mentioned in the documentation of MDK):

    1. launch LabView and select as an execution target FPGA devices. The Embedded project manager window will appear.

    2. Select the file-> New and create a project (LEP) LabView Embedded file.

    3. ...

    Used equipment:

    -LabView 2011, a Student Edition license

    -LabView FPGA and real-time modules

    -NIRIO 4.0

    OR-CRIO9024 controller with 8-slot chassis

    The problem:

    After the launch of LabView and selecting FPGA as a target (see figure), even by pressing the "Go" button next to the slide in the menu window of Embedded project manager will not appear.

    I also tried searching in other menus, without success.

    Issues related to the:

    1. where can I find the Embedded project manager?

    2 is it possible, that I can't find the window of Embedded project manager because I have a student licensed LabView?

    3. How can I create a LEP file in this case?

    4. can I use (and if so, how?) the option "create a pilot instrument? (see the attached figure)

    Waiting for answers,

    Levi

    Hello!

    After some research, I managed to create the link between my custom cRIO module and LabView.

    The complete solution (with LabView 2011):

    -Add the line "cRIO_FavoriteBrand = generic ' in the file LabView.INI"

    -Launch LabView

    -creation of a vacuum of the project and select FPGA execution target, click OK

    -Select 'CompactRIO Reconfigurable Embedded System' as the project type, click Next

    -the next step is the detection of the chassis / modules, followed by the creation of the new FPGA project

    -Add the custom module: click right on the target FPGA-> New-> C Series-> new target Modules or peripheral-> series C Module-> OK

    -Enter the name, select 'generic' module type, enter the location

    Hope it helps someone someday.

    Levi

  • Need to best Microsoft Project management tool

    Hello

    Please guide if Microsoft Project Professional 2016 have the following characteristics:

    1. define the meeting calendar
    2. define the project (Star Date, end Date, customer information, etc.)
    3 create resources
    4. create the WBS (task with attributes such as start date, date end, dependencies, resource, real, late start date, % completion etc..)
    5 assign resources
    6. Enter the actual data
    7. maintain the level of reference
    8. apply a level resources
    9. set on resources
    10. generate various view (Gantt chart, showing resources etc.)
    11 generate reports
    12. agile project management

    13 can be consulted online

    Please help me to get the trial version of the same.

    Concerning

    Gaurav Suryan

    Hello

    Your question is beyond the scope of this community.

    Please repost your question in the Forums of TechNet project.

    https://social.technet.Microsoft.com/forums/ProjectServer/en-us/home?category=project

    See you soon.

  • CRM integrated with MS Project Management

    Hi Expert,

    On the CRM integrated with MS Project Management, there any company always do this?

    In fact, there are only certain configurations or it's really complicated customization?

    The result of the integration is really effective and efficient?

    Can share with me the practice of MS Project to the planning of resources management?

    Thank you!

    Hello

    The question you posted would be bettersuited in the TechNet Forums. I would recommend posting your query in the TechNetForums for more assistance:

    http://social.technet.Microsoft.com/forums/da-DK/projectserver2010general/threads

  • Topic shows in the project manager, but not in Windows Explorer

    Hello

    I have an A project topic that I would like to import into the project B. When I work in project B and click import and watch the list of topics in project A, I don't see the topic I need. However, if I open A project, I can see in the project manager. The section opens and appears in the table of contents correctly.

    I don't know what is happening or how to fix this. I am reluctant to experiment because I myself got subject struggling outside the project before moving.

    Thank you

    MDawn

    I thought to it after I posted my question. I opened the Properties section and the name of the file is different than the title of the topic. Of course, in Windows Explorer, I saw the file name, not the name of the topic.

    Thank you

    MDawn

  • Copy the first Pro CC via the project manager

    Hello everyone"

    Because I am not able to get automatic registration to work.

    Are there problems with the help of project manager to copy the project to the CC folder?

    I would like to change my iMac and MBP my laptop when I'm on the road.

    In addition,

    Are there problems with the copy of the project of an iMac of Monitor 2 to a laptop monitor 1?

    Thanks a bunch,

    Bob

    Whichever one you want all workspaces by default are set to single monitors, so editing it is the norm, but I have 2 monitors at work, so I have a custom workspace, and then if I go home to my iMac with no external monitor I just spent on my custom workspace single monitor. So if you like what you have set up on your dual screen system and you did not save it, you should do that if you can get it at the time when you're not on the road.

  • In the project manager, records under HTML files are duplicated in the Images, multimedia, records of luggage and Style sheets. -What happened? Duplicate folders and subfolders are empty, but cannot be deleted.

    I am using HR 11.0.4.291. Everyone knows that before (see screen capture)? I want to solve this problem, if I leave it for the writers of the future tech. Any suggestions are appreciated.

    Oh, and it occurs to me that article I have driven you is old enough (but still relevant).

    The "fix" for it is click on the icon below to toggle the display of the project manager.

    See you soon... Rick

  • Project Manager hangs during fired fresh files and copy them to the new location

    Hello

    Any project I have which includes a .mts file captured with a Panasonic GH1 camera causes the project manager in Premiere Pro (CC 2015 edition) to hang (several minutes and ends by hangs) when I do a "collect files and copy them to a new location. It creates a "xxxx. MTSBDMV' with a 'STREAM' record fo RL first file, but that is it. I can even reproduce with a new project with a single sequence, single clip.

    I'm under Premiere Pro CC 2015 edition on a Windows 10 machine. (I tried before 2014 CC edition WIndows 7 as well, same result, but I have not created a test case).

    An example of project (1,3 Mo) can be found at: Test_GH1_footage_collect_files_crash.zip - Google Drive

    Any suggestion for a solution or workaround are much appreciated.

    Thanks in advance,

    Arjan Mels

    Hi Albion,

    Thanks for your message and anxiety. I downloaded your sample project and media and was able to replicate your issue.

    Any project I have which includes a .mts file captured with a Panasonic GH1 camera causes the project manager in Premiere Pro (CC 2015 edition) to hang (several minutes and ends by hangs) when I do a "collect files and copy them to a new location. It creates a "xxxx. MTSBDMV' with a 'STREAM' record fo RL first file, but that is it. I can even reproduce with a new project with a single sequence, single clip.

    I don't know why these images give you so much trouble, but there are a few things to check.

    1. Where is the folder for multimedia file structure? All I see is the raw. Clip of MTS.
    2. In general, you copy all the SD card to your computer HD, then ingest via the media browser
      1. This allows all the metadata to clips to be implemented with the clip.
      2. The clip needs this metadata so that it works normally.
      3. Many publishers of band on the metadata by choosing File > import and do not ingest correctly via the media browser

    I suspect that this could be at the heart of your problems. You could try a try and ingest the images correctly, so try and move the project with the project manager. If it still does not work, please file a bug herereport.

    Once I transcoded your footage to ProRes LT using Adobe prelude, I could ingest images, create a sequence, then moved the sequence and associated media without problem.

    Thank you

    Kevin

  • Error in project management

    Hi all the impossible project manage first cc 2015 without an error dialog box

    Hi Clarissa,.

    That would be my first suggestion:

    Create a new sequence with the same parameters as the sequence in question here (the one that does not). Copy the contents of the sequence shot and paste them into a new. Export a new using Project Manager and see if you still get the same error.

    Thank you

    Regalo

  • An unknown error has occurred to project manager

    So I tried to understand this point for quite a while now and I get this message. "An unknown error has occurred during the operation of project manager. Please save your project and try the operation again. »

    I have a feature film and I'm trying to consolidate a reader to send for coloring ( life-size contains16TB of film without consolidation project that is why I am trying to use the project manager). Initially, I tried to use the project manager on my master chronology that did not work so I was broke up segment by segment and still may not know which clip or file causing the error. I can get some deadlines at work while others give the error message every time. I can also see the differences between files that are contained in the various deadlines.


    -Mix of R3D and ProRes 4444 and ProRes (HQ)

    -Try to use it on a single sequence

    -Recover files and copy to the new location

    -Exclude unused items

    -Include Audio Conform files (also failed when it was unchecked)


    I'm 200% positive that my drive to target location has enough available space. The only thing I could possibly think is that on some images, I used the function "film" and has assumed a different framerate.


    ----

    Premiere Pro CC 2015 (newly updated this morning with bug fixes (July 30, 2015))

    iMac late 2013

    Intel Core i7 3.5GHz

    32 GB OF RAM

    NVIDIA GeForce 4GB

    OS X Yosemite (up to date)




    are there consistent images in your timeline?

    just discovered that my mistakes were caused by consistent images of 23 976 24.

  • Project manager not transcoding speed ramp Clips

    I have a sequence that contains about 27 shots, all from the same source. Im trying to project manage so that I can make shorter to send our colorist clips. There are 4 clips accelerated. Both of them have speed bumps and not two. 3 of them are not transcoding but. They have copied the original clip instead of transcoding to ProResHQ like all the others.

    IM on first Pro CC 2014.2 on a MacPro to 2013

    Any ideas?

    Time remapping is not currently supported to consolidate and Transcode, so it will fallback to copy the clip.

  • ProRes HQ in the Adobe project manager

    I edited a sequence in ProRes HQ based on a custom preset. When I try to use the project manager + click "consolidate + transcode" use preset as my source, all ProRes codecs rise except for HQ. He also says match source - apple prores 422, which is not correct.

    If you want to use the preset with Source: individual Clips, make sure that you select Source Match for the created preset (Source: individual Clips will accept only the presets to Match Source). And as Kevin already mentioned, you can create this preset in the SOUL or first.

  • Can I create a hierarchy of topic on the project manager pod or I must rely on the table of contents?

    Hello

    Can I create a hierarchy of topic on the project manager pod or I must rely on the table of contents? I use RoboHelp 9 (although I doubt that the version of the questions).

    Thank you

    Mary

    Hi Mary

    As you do this is by creating folders in the project manager, then create new topics in the files or move the existing entries in the records.

    If you work exclusively in the project manager, you are only able to move a single topic at a time. If you want to move a swarm of topics, open the pod of the list of topics and you can select as many as you want. Then drag the subjects selected to the folder on the project manager pod. Be a little careful when you drag. Often the mouse will pass over a tab at the bottom of the basket, and this can change their minds about you.

    See you soon... Rick

Maybe you are looking for

  • because I replaced my old browser, at your insistence that I run on 10.4.11 mac os, it will not open.

    New browser won't work... I'm stuck at 10.4.11 because of the need for the classic.All retro improved browsers? I've already replaced the old browser with in-an executable.You have faithful a warning, circumvent, alternative, something like that...is

  • iPhone 5 c water damage

    My son of 5 c stopped working all of a sudden he had in his backpack during a football match and it rained on.  The front of the phone was damp but not soggy.  In any case, it does.  We tried to put in a Bheestie bag 3 days to dry and has also replac

  • Password BIOS Equium A100-338

    Hi all First I want to say, that my problem is solved. I have the model A100 and I was very happy since February 2007 when I bought it. I'm obsessed with security, so I asked for passwords for everything: BIOS administrator BIOS, HARD drive, user and

  • printerspoolerservice

    Printer Spooler service does not not attended services to restart and I get error 1068 can no longer restart spooler service it says dependency service or group failed start checked CPP and its already on automatic and runs the other addiction is HTT

  • Insulting popup

    This site is the official site of Sony for updates to my very expensive camera that is still under warranty. I have never agreed to participate in an investigation when the appliance was purchased. I clicked the button 'No' on this popup of dozens of