Date / reminder

Hello:

I have a laptop HP under 32-bit Windows Home Premium.

Windows (or any other program that you can be aware of) has a "demand".

If the user can set a reminder when he or she needs to do something, for example,

Remember to do a specific chore, send someone, take the car to the shop...?

Basically, a date/calendar with pop-up, or another type, reminder. When you

Start the computer.

Thank you

DaleB

Uh, uh, uh, let me think, uh, Windows Calandar. Start - all programs - Windows Calandar.

Tags: Windows

Similar Questions

  • Windows calendar - reminder on the date of

    I have a monthly appointment that I put in place on the calendar for the first of each month. It was easy to make the recurring appointment. However, I want that it reminds me of the appointment to the date of the appointment, not x number of minutes. If I choose "to date" reminder, but it sets the date of the first occurrence of all occurrences. For example, the callback for 1 August is on August 1. However, the reminder for September 1 is set for August 1! The same is true for any other months that follow. Someone knows how to fix this?

    There is no option to fix this (I also).  I find it interesting that the default options for reminders do not include the date - maybe that has something to do with the problem.  I can't find any mention of this problem or proposed fixes (Microsoft or by carefully searching the Bing and Google).  I can even find another thread in another forum that addresses this problem.  Although there may be a registry fix for this problem, it does not appear in the registry and I could still find no reference to one.  I'm afraid, it is a bug in the program that we have to live with. I want to emphasize that I found MANY programs of reminder for Vista (some freeware) that should do it properly - but I could find none that directly linked in the Windows Calendar (and besides, reminder dates in Windows Calendar are wrong so the other program would probably use those incorrect dates as well).

    In the State, the only solution I can suggest is download a 3rd party program calendar to replace Windows Calendar and I hope it works correctly - or set the reminder of a day in advance and just leave it so that it shows two days of reminders (assuming that the those old remove automatically the day of the appointment, since they have been set for one day in advance).  Not really practical and not a very good workaround solution, but the only thing I can think of.

    Sorry, but I don't think there is a solution to this problem in Vista or Windows Calendar.

    I hope this helps.

    Good luck!

    Lorien - MCSA/MCSE/network + / has + - if this post solves your problem, please click the 'Mark as answer' or 'Useful' button at the top of this message. Marking a post as answer, or relatively useful, you help others find the answer more quickly.

  • InstallWinMsgCallback changes ATTR_CALLBACK_DATA of the Commission?

    Why the InstallWinMsgCallback call changes data reminder of my Panel?  This does not seem like good behavior?  Based on the documentation, I don't get the impression that my Panel ATTR_CALLBACK_DATA and callbackdata pointer passed to InstallWinMsgCallback must be the same... but they do.

    This problem can be reproduced easily.  Set the ATTR_CALLBACK_DATA to a Panel, call InstallWinMsgCallback with something different and they then look / try to use what you get in return for GetPanelAttribute (..., ATTR_CALLBACK_DATA...).

    If this is intended behavior makes limited InstallWinMsgCallback.  We currently have some libraries that add things like StatusBars, mooring, etc. to the user interface and these libraries use InstallWinMsgCallback.  I can't use them in applications that must use ATTR_CALLBACK_DATA of a Panel.

    (I'm with CVI 9.0.0)

    Greg

    Hi Greg,.

    Looks like you've got things to work, so I apologize all by dragging this point, but I wanted to make sure that I understand your mentioned minor annoyance.  You said that you had to create an empty callback to string function - you shouldn't have to do this.  If you are referring to the use of the GetChainedPanelCallbackData for the original recall data, you just pass an empty string for the parameter "type name.  It is another thing that is not documented very well - and one I will work specifically to address.  I probably muddied the waters by including SetChainedPanelCallbackData in the conversation.  Just use this function if you need to define the new data callback after the call to InstallWinMsgCallback, or a call to one of the other reminder of the functions of chaining.  If you are already running on this case (who need to change the original recall data after you're afraid that recall data may have been affected by a recall function of chaining), you call SetChainedPanelCallbackData with an empty string as the parameter 'type name '.

    I'll do my best to answer your question about why the behavior is the way it is as well.  The main problem is that the functions Get/SetPanelAttribute are part of our library of user interface and the InstallWinMsgCallback / chaining of callback functions are part of our code for the box tool.  Initially, the code of the Toolbox was developed more as an example of some of the things that you could do with CVI, but as he grew, more dependence on this issue has been implemented, and separating it from the code example (which was never necessarily intended to be as robust as our libraries) and the library code has been blurred.

    This means that chaining callbacks are integrated in any way with our library of user interface code.  In fact, if you open toolbox.c, you can find the implementation of these functions.  Basically, what happens is when these functions are called, we get the current recall data and callback works (with GetPanelAttribute), store these items in a list, and set the new callback function and data with the UI Library SetPanelAttribute function.  When events should be sent to your Panel, we go through this list, calling each reminder with the appropriate data.  It's your original recall data gets 'blapped', and why you must be careful to use some toolbox specific functions involved with the library of user interface features.  (it is this interaction that you noted is not documented as well as it should be and what we're going to work on treatment)

    NickB

    National Instruments

  • Why I can't change the dates of reminder in the calendar

    I was trying to extend a stay to add one day more to a reminder I had set up on my calendar, but couldn't stay.

    After changing the date it to show the dates of trip corrected for about 2 seconds and then return to the original date of travel.

    Any ideas as to why it is not working properly.

    Thank you

    Maybe this will help.

    Calendar may not enter the new event.

    Calendar may not enter the new event (2)

  • I lost Fox reminder... a lot of important dates etc... how I get it back

    Lost reminder Fox of Firefox. This has had a lot of important dates. Can I get it back. Something is displayed in the files when I search on the computer, but I can't understand how to try to add to the profile. It also doesn't let me read it because windows does not know how to open it. I tried the 'copying files between profile folders' but he won't let me not make right click in the profile to stick for some reason any

    Hi there... not the extension did not show anywhere in Firefox, although I could find a few mentions 'reminderfox' looking for windows.

    This was driving me crazy in the morning and half in the afternoon (I'm one of those who does not like to be beaten... especially by the computer). So now I have solved my problem.

    What I did to reinstall reminderfox, then, after further research, I've been just "reminderfox.ics.bak3" (assuming it was the backup) in the icon on the status bar and voila! It worked.

    Thanks a lot for picking up on my question

  • How to transfer data from a MainSequence to a reminder

    I'm just trying to learn TestStand so patient with me.

    I use the sequential model by default. I added a few steps and local variables to my MainSequence. I copied the reminder of the sequential model test report by default and which added to my list of sequences as a reminder. I have since added a few steps to customize the reminder of sequence of test report.

    My problem is to find how to move a my MainSequence LocalVariable to my reminder of test report. What is the best method? How can I use an Expression statement in my test report reminder to recover data from the local MainSequence? What is the best method?

    I spent 8 years to do with threads of data flow programming. This passage disconnected data is very frustrating.

    Not sure know how you are with the RunState variable?  RunState essentially information describing the State of enforcement.  At this point in your reminder in MainSequence executing State is not known (even if you have a pretty good idea).  In your case, you are probably safe, but there are cases where it could cause problems.  It is simply not sure make a habit to access data via RunState.  And it complicates maintenance because now you have stronger coupling (not in your case).

    In my opinion, FileGlobals seems to be more stable.

    There are moments where the RunState access is needed but I would like to use it with moderation.

  • Why doesent runstate.sequencefile.data.seq.mysequence.mystep.result.numeric contains a measure value when I use it in a reminder of the UUT post?

    Hello

    I want to write that a witch of the csv file contains all the measured values and the limits of my machine. So I try to give the values in post use reminder to a vi. The limits work and the csv file contains all my limits, but the measured values are all 0. I used runstate.sequencefile.data.seq.mysequence.mystep.result.numeric

    I do not want to do with FileGlobals because they are values much.

    Thanks for any advice for this problem.

    There is probably a better way to accomplish what you want.  But to make your life easier, I'll give you the hacky solution:

    Use: Runstate.ProcessModelClient.Data.Seq.MyStep.Result.Numeric

    The funny is that the report must contain all the information you want. Just, I would create an engine to convert your csv look.  If you use 2012 then this seems to be an ideal candidate for a plugin.

    Hope this helps,

  • How to activate a reminder for when a shared review has reached its end date?

    I thought that Acrobat will send the initiator of a shared review a reminder prior to the date of "end of revision" is reached. This will allow his or her check with commentators how.

    It seems that we don't receive this reminder.

    When I place the process of shared initially review I saw that a reminder the review ends in a day or two.

    Lately, looks who ceased to...

    We use Acrobat X Pro & Std, SharePoint and Outlook 2010

    Appreciate your help

    Acrobat doesn't send regular emails and never did. You have the option of manually ' e-mail all reviewers ' via the Tracker dialog box, and of course when someone opens the PDF you will tell them deadline.

  • Return data of an event Reg to appellant VI reminder

    Hello

    I'm new to LabVIEW and approach it from a c# programming background. I have a DLL written in c#, connected library and a reminder of event Reg .NET listen to an event in the DLL. That part works. I can receive an integer of my DLL when the event fires - well.

    However, having this available only in VI integer that is referenced by the event Reg reminder doesn't help - I need to this integer passed back to appellant VI so that I can work with it. I tried a digital indicator to an exit in the Subvi of wiring, but it generates a conflict of function on the wire that connects the strictly typed event with Ref VI reminder. Please see the attached illustration.

    Help, please!

    These "yellow blocks" are all the range of events under "Dialogue and User Interface. They create the user event, generating the user event, destroy the event user and Unregister for events.

    EDIT: see also this thread for example code, you can download: http://forums.ni.com/t5/LabVIEW/How-to-interaction-with-Main-VI-from-Net-event-callback/m-p/2954265#...

  • Send a reminder using the Dates of the form

    Hi all.

    I don't know what is the best way to send reminders (email), verification of the dates of the form.

    For example:

    There is a task assignment when the user enters 5 dates (day 1, day 2, day 2... etc)

    Then I need to send emails to 'Xpath user' when the date system is: "day 1" - 24 hours (for example). "."  The same date 2, day 3... etc.

    How can I do?

    I write the dates in the database need?

    Some ideas?

    Thank you very much.

    Maria

    You can use a gateway with a branch for each email that will be sent. Put a holding Point before sending email. Set days to wait as an XPath expression using get-days-from-dateTime-difference(current-date (), Date of the form). Subtract 1 for your less 24 hours.

  • Why when reminding us to keep everything up-to-date, he recommends Firefox for Android 'Beta '?

    Why is--update beta is recommended rather than Firefox for Android? (I should change?)

    Beta are intended for developers about what buggy

  • Impossible to update Firefox, even when installing from scratch, it reminds me always up to date, I have already done, to the version that I have already installed

    I struggle with this for some time. When I open help > about Mozilla Firefox, it shows the current version at the top but at the bottom it says 3.0.5. So I guess it's updated, but not completely.

    Your string UserAgent in Firefox is marred by another program you have installed - MEGAUPLOAD.

    http://en.Wikipedia.org/wiki/USER_AGENT

    type of topic: config in the URL bar and press ENTER.

    If you see the warning, you can confirm that you want to access this page.

    Filter = general.useragent.extra.firefox

    Right-click the preference and select reset

    Then restart Firefox

  • Is there a way to set a follow-up reminder of an e-mail message?

    I want to set a reminder on an e-mail message, so that on a date and time the reminder will activate and tell me about the message on which I put the reminder. I found the tags in Thunderbird, but I'd rather have a reminder pop up. Thank you!

    I would define it as a calendar event. You can convert a message to an event and all you have to do is set the time and date for the reminder. If you synchronize a remotely shared calendar then you will also get reminders on your phone, tablets or other computers, if you wish.

  • Reminder and calendar is not remember things

    My reminder and calendar are not remember things even if I set the time and date if event 5,10 minutes before.

    the stimulus passes time and no alert comes. When I recall his due. same thing in the calendar. No alerts...

    the sounds are put right. Even made with siri also, but no alert anyway... what else could be the problem of this alert no? Please help and guide

    Hello naveenvnair,

    Welcome to Apple Support communities. It is my understanding, you receive notification of your reminders and calendar events. I know how it is important to be informed of the specific information. I'm happy to help you to get this resolved with you.

    There are a couple of settings that may affect your alerts. Please make sure that your notifications are enabled for reminders and calendar. Go to settings > Notifications. Also, make sure you do not disturb is turned off by going to settings > do not disturb. Here is some additional information on notifications:

    Use the Notifications on your iPhone, iPad and iPod touch

    Have a wonderful day!

  • iPhone FaceTime always using data

    My friend and I discovered that FaceTime uses always the same when connected to wifi data. If you go to settings > cell phones and walk to FaceTime, you will see the number accumilating even when connected to wifi. None of us had been given using FaceTime, but that he had used 130 MB while I used 260 MB. I disabled the cell data and reminded him and it would be not connected at all. However, I have facetime my iPod with a cell phone off the coast. I don't really know how to make so that he could stop using the data, but at the moment, we use other alternative video chat applications until we have find what is happening.

    iPhone 5 s. iOS 8.4.1

    iPhone 6 s more. iOS 9.3.1

    Hi there logic227,

    Welcome to the communities of Apple Support with your question about FaceTime using cellular data.  I use FaceTime to keep in touch with friends and family a lot and I have the pleasure of helping you avoid using your cell data with it.

    First, you'll want to update all devices to the latest version of iOS.

    Update the software on your iPhone, iPad or iPod touch iOS

    You can do this by Wi - Fi:

    1. Connect your device to the power and connect to Internet with Wi-Fi connection.
    2. Tap Settings > general > software update.
    3. Click Download and install. If a message asks you to temporarily remove the apps because iOS requires more space for the update, click on continue or cancel. Later, iOS reinstall apps that he deleted. If you press Cancel, learn what to do next.
    4. To upgrade now, tap on install. Or you can type later and choose install tonight or remind Me later. If you type install tonight, just plug your device iOS to power before going to sleep. From one day to the next, your device will update automatically.
    5. If requested, enter your access code.

    To avoid using cellular data, go to settings > cellular > USE OF CELLULAR DATA for: and then you place on FaceTime and turn the switch from green to off.  This will prevent FaceTime to use all cell data.

    Best wishes

Maybe you are looking for