We are in the process of upgrading R12.1.3 with 11.2.0.4, R12.2.5 database with 12.1.0.2 Applications database. I'm a little confused about the process to upgrade the database as part of the upgrade to 12.2.

In accordance with the note "guidelines preparation of database for an E-Business Suite Release 12.2 Upgrade (Doc ID 1349240.1)", I'm reviewing step 2

Upgrading to the last group of patches (conditional) database
Customers currently on 11.2.0.3 or 12.1.0.1 must now move to the 11.2.0.4 or 12.1.0.2 within the upgrade 12.2 following the documented process in the appropriate Interoperability Notes (see the References section below). It is highly recommended clients on previous patchsets to the upgrade database to the last.

Complete all steps in interoperability Notes except the following:

  • Check the versions of the software
    • R12 to 12.1.0.2 upgrades (12 c) must apply the 16289505 patch and patch 8796558interoperability *.
    • 11i upgrades to 12.1.0.2 (12 c) must apply the patch of interoperability 16289505 as well as other pre-required patches listed in the 11i Interoperability Notes (My Oracle Support Knowledge Document 1524399.1in the References section below) *.
  • Step 'Run patch post-installation instructions' under 'Database Upgrade' in Section 1
  • Apply patch ECX post-implementation level (in the Notes of interoperability R12/11 GR 2)
  • Recreate the grants and synonyms
  • Restart the application server process
  • Apply the Oracle human resources (HRMS) patch 7721754 (11 I only)
  • Select the database Vault
  • Synchronize the views of Workflow
    • Note that this step must be completed after the 12.2.0 upgrade and application of the last ORS 12.2 when all services are up to such noted in last step be

This stage supposed to complete interoperability for 12.1.0.2 with R12.1.3? Am I wrong?

As I'm not going to bring up the applications before upgrade R12.2, that I have to perform interoperability for 12.1.3 or can I perform the steps of interoperability for 12.1,0.2 with 12.2?

Thank you

You must apply the patches immediately after installing 12.2.0 software.

This is mentioned in the section '1.5 request latest patches from application-level technology to perform file system', Oracle E-Business Suite Release Notes, version 12.2 (Doc ID 1320300.1)

Thank you

Hussein

Tags: Oracle Applications

Similar Questions

  • Upgrade patches for 10.1.2.3 during the R12.1.3 upgrade

    Hello

    Need a clarification about 10.1.2.3 fixes over R12.1.1 to R12.1.3 upgrade

    I'm following the Oracle E-Business Suite Release 12.1.3 note 1080973.1 Readme and applying patches "forms and reports Oracle E-Business Suite Release 12 . Document 437878.1 "

    I'm unclear if I apply the Patch 8919489 - R12. T2K. B.Delta.3 before applying other one-off patches, this patch seems to be included in R12.1.3 and I apply these patches to upgrade R12.1.13

    Thank you

    My question was out of the patches in the table, is 10.1.2.3 9593176 patch only which applies to the R12.1.3?

    Not only 12.1.3. It can be applied to any instance of R12 circulating 10.1.2.3

    Thank you
    Hussein

  • DB Upgrade during the R12 upgrade approach

    We have a 11.5.10.2 instance with 10.2.0.5 database and we have the intention to upgrade the database to 11.2.0.3 during our upgrade R12.1.1, as in the notes 761570.1 , we have the Patch C and D of path at our disposal. We decided to use the path C upgrade IE the database to 11.2.0.3 during the upgrade R12 itself and not two windows of downtime. According to this Note 761570.1, in the path c If the database upgrade is part of the R12 upgrade, perform all operations in the Interoperabity Notes except the following:

    Check the versions of the software
    Run adgrants.sql
    Implement and run the automatic configuration
    Recreate the grants and synonyms
    Restart the application server process
    Apply the Oracle human resources (HRMS) patch 7721754

    so that means that we do not have to apply all the patches mentioned under the versions of software to check like patch interoperability, ATG Patch 7456837 etc. on 11i?

    Thank you
    Murali

    You must run directly after the upgrade of database with the exception of the measures that require the application to be upward, then you can implement it after starting the application.

    Thank you
    Hussein

  • Questions on the R12 upgrade

    Hi Experts, I need you guys advice, we will begin the new update of R12, before I did, but this time we have huge environment 6-MT/2PCP/1DB no shared between MT/CFP applications don't multilayer and we custom on all nodes of the same levels of code, my question is can I upgrade to R12.1.1 then 12.1.3 in a node , then I can clone stay nodes this impressionable method of upgrade, my intension is that we can even time on the upgrade...?

    It is huge time necessary right to the upgrade process each node...?, please let me know the reasons why can't we go cloning other nodes.

    Because it only is not supported - this approach is not mentioned in any of the documentation for upgrade.

    Support by saying that's not :) suggested method.

    Have you reviewed the documents mentioned above?

    Thank you
    Hussein

  • Greetings fellow filmmakers! I use Premiere Pro vers.7 & have recently upgraded to CS3, however, I find this pre-existing vers.7 (project files) work even if they open do not fall within the timeline. They are unusable in CS3?

    Greetings fellow filmmakers! I use Premiere Pro vers.7 & have recently upgraded to CS3, however, I find this pre-existing vers.7 (project files) work even if they open do not fall within the timeline. They are unusable in CS3?

    Double click on the sequence imported into the location of the project.

  • Reinstall Windows 7 on hard drive again with only the Win 7 Upgrade disc?

    So I have an e9180t which, like clockwork, freezes after about an hour or two after the boot.  I thought it might be the curse of bad mothers, with what they came, but I hope that it is something else so test everything I can.  I noticed that it does not freeze upwards when it is started in safe mode with network.  The hard drive failed the test SMART so I wonder if it's time to replace it as if that has anything to do with the crash.   I can move the cursor, but no applications will be open and eventually everything becomes insensitive causing be tohit the power button to restart.   I already stopped unnecessary startup programs and it will still freeze in unsafe mode.

    The PC came with Vista and I think it's what's on backup hard disk partition.  I have the disk Win 7 Upgrade from HP.  My questons are-

    1. If I buy a new HD 7 upgrade disc will be enough to install the full version of Win 7?

    2. anything else I should do when I install the new HD and more to reactivate Windows?

    Thank you.

    Hi Mike,.

    Have you created a HP recovery disk to reinstall the factory image when replacing the HARD drive?

    It sounds like you have maybe a problem creating the recovery discs now.

    A Smart HARD drive test failure points to a HDD failure. The symptoms you are experiencing are likely caused by this fact. You can also have a card mother or any other hardware problem.

    You have the key to drive and Win 7 Upgrade product.

    I'm pretty sure that the upgrade to Windows 7 to be launched from Win Vista. The upgrade of Windows 7 is a full installation of Windows, so this isn't the problem. But he can't run the installation unless you start the upgrade in Win Vista. Normally, an upgrade to Windows 7 is launched within the current operating system, Win 7 valid existence of an eligible OS Setup and then request a restart to complete the installation of upgrade.

    You can replace the HARD drive and try to install Win 7 itself. If this fails and you do not have the Vista recovery discs, you can buy an HP recovery disc set here. There are three different versions. Select one that corresponds to the operating system that is installed at the factory.

    You may have another problem to replace the HDD with a Format HDD advanced most recent. Please see thisHP Supportdocument for more information.

    If you cannot install the upgrade Windows 7 itself or Win Vista because of the issue of the Advanced Format HARD drive, you may need to purchase a copy of Windows 7 OEM.

    Jaco

    I'm not an employee of ch *.

    "" "" Please give a "Bravo, Thumbs Up" If the notice is relevant or "accept as Solution" to help other users of the forum having a similar problem.

  • Is the price of upgrade available after the expiration of the 30 day trial?

    Hello

    I wanted to check the price of upgrade of the elements is available after the 30 day trial period, or must it be purchased before 30 days?

    See you soon

    You can buy at any time.

    30 days without fair trial limits your use of the software for 30 days.

    Most people decide yes or no within 30 days.

    When you purchase you can start the trial and click on serial number (sometimes called License this software) entry and enter your serial number.

    If you are in the United States, the price for the full version is currently the offer for US$ 55 cheaper than upgrading.

    Buying guide | Adobe Photoshop elements 14 vs. 13: 12

  • Role of PLSQL developer in the process of upgrading the EBS?

    Hello

    One client is currently in the process of upgrading of the EBS from V11 to V12. They are looking for a PL/SQL Developer, migrate their paintings of previous version again. What would be the role of a pl/sql developer in such situation? I want to ask that position and looking for documents related to the post but could not find one. If there is someone who had experience with this migration scenario please help me.

    Thank you

    Siva.

    PLSQL developer should be involved in the code changes between 11i and R12 - please see these links/docs.

    Changes to model data identification between 12.1.3 EBS and EBS prior releases

    https://blogs.Oracle.com/stevenChan/entry/ebs_data_model_1213

    Report of comparison data EBS model [ID 1290886.1]

    Comparison of EBS seed data reports now available

    https://blogs.Oracle.com/stevenChan/entry/ebs_seed_data_comparison_reports

    eTRM

    http://ETRM.Oracle.com

    Thank you

    Hussein

  • 11.5.9 to R12 - database upgrade path Direct11g

    Hello

    We are organizing our 11.5.9 to R12 upgrade CU2. The current version of RDBMS is 9.2.0.4.

    We were able to

    A.
    go directly to 11g of 9.2.0.4 before the upgrade, and then apply the R12 upgrade,

    or

    B
    do we not have to go to first, 10.2.0.2
    R12 upgrade
    then move the RDBMS to 11g?

    I am aware there is no interoperability between CU2 11.5.9 and 11g but we would not be using the / system access, we would continue directly with the R12 upgrade

    All the notes I've seen keep making reference to the need to be on, at least 10.2.0.2 If the RDBMS 9, nothing mentions going straight to 11g.

    Is there any control in the upgrade of the R12 which checks the version 11.5.9 CU2 then the RDBMS should be 10g?

    Thank you

    Salvation;

    Pelase check Hussein snoussi previous great post to your question

    11.5.9 to 12.1.1 upgrade
    Re: EBS 11.5.9 to 12.1.1 upgrade *.

    Respect of
    HELIOS

  • What happened to the flashlight after upgrade to ios10

    What happened to the flashlight after upgrading to IOS 10

    Flashlight is the control center? I swear that I saw on one of these demo phones in an Apple store.

  • white macbook 6.1 10.6.8 (4 GB SSD 512 RAM) which is the best os upgrade for me

    white macbook 6.1 10.6.8 (4 GB SSD 512 RAM) which is the best os upgrade for me

    Computer works wonders but new applications are not supported by 10.6.8

    Unless you have a specific reason to choose one plus one, El Capitan.

    (144668)

  • What is the procedure for upgrading Thunderbird ESR 17.0.7 at 31.6 on Mac OSX 10.10.2?

    What is the procedure for upgrading from Thunderbird ESR 17.0.7 at 31.6 (last public version) on Mac OSX 10.10.2?

    Is it as simple as install new version and then run to see all local folders and my email and its folders from IMAP to my company as before the upgrade?

    Thank you

    Create a full backup of your Thunderbird profiles folder.
    Uninstall the old version of ESR.
    Download the latest version from https://www.mozilla.org/en-US/thunderbird/all.html and install it.

  • Since the last system upgraded my menu bar top with wifi and time, date etc etc is hidden unless I have sulk my cursor on it. Same thing with apps from shingles. How can I restore it is always there?

    Since the last system upgraded my menu bar top with wifi and time, date etc etc is hidden unless I have sulk my cursor on it. Same thing with apps from shingles. How can I restore it is always there? bar menus hidden-how do I restore?

    SystemPreferences-> Dock: automatically hide / show Dock

    SystemPreferences-> general: automatically hide / show menu bar

  • HP will support the "Windows 7 Upgrade Program?

    For those not in the know, MS gives OEM (for example, HP) the ability to offer a free upgrade to Windows 7 for people who buy a Vista PC after July 1, 2009. I plan to do my next PC HP another and I would buy it sooner rather than later - but not if it means shelling out the extra cash for an iminent OS upgrade

    Yes, but the start date of the program Express Upgrade (standard on the OEM) is not officially released yet.

  • How can they take advantage of the Windows 7 upgrade option?

    The Windows 7 upgrade Option begins officially today that gives a free copy of W7 with Windows Vista PCs and laptops, and I wanted to know how I can take advantage of this offer when buying on the Toshiba site?

    Thanks in advance.

    Hello

    I searched on some pages of Toshiba for some details about this upgrade option and found the same pages published by Luke.

    It should be useful.

    Check it out.

Maybe you are looking for