Formula node - text do not cover wrap in LabVIEW 2011

I recently updated a usage control system general vi from LabVIEW LabVIEW 2011 8.0.  In the previous version, the text of the node form (real expressions) encapsulated automatically reaching the edge of the box.  It does not in LabVIEW 2011.

Although I can turn on the scroll bars, my boss would prefer to see the text on several lines, as before.

Is it possible to force wrapping?

Otherwise, carriage returns can enter arbitrarily without affecting the analysis of expressions?

Shift + enter will put you on a new line just as if line took place.

As far as just using the Enter key and if it effects a formula, why not give it a try? I don't think that CR can be placed.

Tags: NI Software

Similar Questions

  • Formula node, Dungeon errors

    I'm trying to integrate a node form in a table, I get errors and don't know why. Any ideas?

    Thank you!

    It is an attempt to better.

    The problem is that you only set your output array y to be a 1 d array.  And your calculations on the input array is also as if it were a table 1 d.

    See the amendment attached.

    But your formula is simple enough that in true LabVIEW code is easier and you don't have to deal with problems of syntax of the formula node.

    (Note, because I don't have data, I couldn't run this, it is so possible errors there.)

  • It seems that wrapped text will not host photo resizing without cutting and pasting the image resized, is - what the Muse way is suppose to work?

    It seems that wrapped text will not host photo resizing without cutting and pasting the image resized, is - what the Muse way is suppose to work?

    It would be the default path to wrap the text with the image when you work in Design view.

    This document explains more:

    https://helpx.Adobe.com/Muse/using/wrapping-text-image.html

    Thank you

    Sanjit

  • A text will not wrap around the object. Some does. Anyone?

    I worked in InDesgin (currently the CS6 for Mac) for many years. I'm not an expert, but fairly well-versed and comfortable with the program. I think I know almost everything about the wrapping of text and its options and how it works. But it drives me crazy.

    I have an imported MSWord part of the text. I have an item I want to insert in the text. Normal procedure. Easy. But this text will NOT wrap around the object. What about other texts? Yes. Other text in the document wrap around that object even very well.

    I rebooted the computer and the program. Check the settings as much as I can think and even spruced up the document from scratch as a MS Word document. Yet, no film.

    This happened to someone? What is going on? Help.

    Check the options of text block for the text that will not wrap. Ignore text dresses it is checked?

  • Text InDesign CS6 increments wrapping is not accurate.

    My job went from CS4 to CS6, so I don't know if the CS5 had the same problem. Anyway. Wrapping of text (in the bounding box) now seem to be very limited. For example, if I have, say a texte.25 wrap on the underside of an object, but I need to change a little pour.245 the text does not move. The box shows the change, but the text below is not just do the same. CS4, I was able to make small incremental changes to the scarf, but it does not work for me now to the CS6. All ideas, answers?

    Suggest post you specific questions about the product in the forum of products in question.

    Try to post to http://forums.adobe.com/community/indesign/indesign_general

  • Text InDesign 5.5 wrapping does not

    I am currently working on a 4-page newsletter which was previously designed by another designer. I got a bundled file and everything works fine so far. I began to fall in the new copy and am inserting images. i've got 2 stories that I put in column 2 and when I insert a picture on them and click the wrap text button, nothing happens. I checked the area text envelope and ai.0625 as the amount of envelope options, but the text always flows behind my images. If I move the image on another existing copy (not all), it ends very well. any suggestions?

    You have the image before the text (Arrange > bring to front)?

    Made the text block, in object > text frame Options, you ignore the text dressed not checked?

  • The collage of AI. image in InDesign and applying the wrap text does not!

    Hello!  I was wondering if someone can help me please.  Currently, I learn how to use InDesign and have encountered a problem.  Basically, I made some sketches/illustrations with Illustrator and to stick in a book about InDesign.  When I do this it works fine, but then the text will not wrap around the sketch.  I found how to solve this problem - I have created a form (white) solid block of the draft sketch to go under the original sketch and can now wrap the text around it, isn't ideal if - however, I can not select the drop-down menu wrap text options in the dialog text wrap, as it is gray and unclickable.

    Help is not help!

    Thank you

    First, unless there is a reason for it, you are better to place the work Illy.

    With this selected work, open the text layout Panel and set the appropriate text wrapping.

    Bob

  • Outputs not used in the formula node

    Hello

    To clean up my code and avoid repeated calculations, I want to use intermediate variables in my code formula node. To create those variables, the only way I know is to create an output variable of the node, which of course eventually unused. Y at - it no problem/inneficiency created by doing this?

    Thank you

    Define a variable inside the node form. Use the syntax of C

    Mike...

  • Pass the array to the formula node Eval (any chance to avoid this?)

    Hello

    I have not installed on my PC of MATLAB.

    I need to be able to say from the entry Panel custom formula "y = sin(Fm*2*pi*t[i]) + 2 * sin(3*Fm*2*pi*t[i]) + 3 * sin(4*Fm*2*pi*t[i])..."

    This form may contain a variable of harmonics (sine or cosine functions), but strict number of input parameters: Fm, t [i].

    FM - is a frequency.

    [i] t - is a time (ramp model) which is a table

    Can I pass array as a parameter of t [i] entry in formula node? How to do what other parameters, which are constants?

    Is there another method how to implement this - using the variable functions count?

    You are still far too complicated and it's still not scalable for a variable number of terms. You must be able to get out of math based text and think in terms of real LabVIEW.

    Here's a quick example using the terms in your first post (I show only a picture, because I have more LabVIEW 7.1).

    Modify if needed.

    NOTE:

    If you have more than a couple of terms generally, I tenacious feel that it would be simpler to configure a table complex stick (with the desired amplitude and frequency positions) and do an inverse FFT on this.

  • Sorting table 2D using the formula node

    Hello

    • What l am trying to do is kind of numbers in groups.
    • A group consists of the numbers that are equal, or step upwards or downwards by a single value. Each group must be assigned to a column. E.g. O column of the table of entry test would consist of 5, 4 and 3, but not the 9 and 10. These values belong to column 1. However if the adjacent cell in the column was not empty then 9 and 10 would stay in column 0
    1. To better understand the programming formula node went to 1 d. I found that each cell is not treated individually with my code.
    • The final table of the orange entry test is that the data type l want to sort a 2D picture that ends up the same size chart.
    • In the code l provided my goal to compare each cell of each column line to determine if a cell is equal for example a = b, a + 1 = b or a-1 = b If Yes, then these values are in the right column. If this is not the case, a sort must be made to put a value in the right column it is.

    This is my first shot with node formula and l must admit others examples l found a bit confusing how a result has been obtained. I prefer to do any programming in labview instead of going to another program for results l am after. I tried to picture of programming just for this problem and found to grow big and very complicated then stopped l. For me the road to node formula should be simpler and more compact. My last resort is to use Excel but l still hope to do all the programming in Labview l you end up with a more dynamic program.

    Concerning

    Michael

    Hello

    You are brilliant... bloody!

    I just couldn't she would repeatedly using tables, l have been on it for weeks. I never thought about how you solved this problem.

    I hate excel and text. I am graphically spirit therefore l such as labview.

    I had a solution in Excel yesterday, but your solution is much better than what l came with

    I'm very grateful

    Thank you

    Michael

  • calculation using the formula node needs two clicks

    Hello

    I want to use this piece of code for a larger program. My goal is to take 10 values and calculate two values using a formula. I used the formula node as the calculation functions digital ordinary would be too heavy. If I click on save, it saves two values to a file.

    The problem that I am facing is that when I start the program, it works very well for the first time. The second time however, if I change the values, and then click on save, it still displays the previous values, or some altered values. I have to click on save twice to get the correct values. I don't understand the reason why this happens. Can anyone help?

    File attachment: Capture screen and VI.

    P.S. If the solution can help with the problem, I'm ready to change any part, but please, not irrelevant to suggestions on how to * improve my code *, because I've worked hard to make it work with another major project.

    I don't completely understand the description of your problem.  But I see two problems.

    1. the "Save" button actually belongs to the event that handles the record button.  And the case of the event should really be Jean-Claude Value Change of mouse down?

    2. your STOP at the bad mechanical action.  Since it happened so this just released, it is only true while you're pressing it.  It stops the upper loop, but can't stop low loop because your loop will also be waiting to save button to press.  Stop will always be false because you cannot press two buttons at the same time.

    Try to make your action to stop button to be changed when released.  You must return the button to false programmatically born of two loops.  In fact, it would be better to have a case of events for the stop button to stop the lower loop.

    I don't understand what you're trying to do in the upper loop.  You read a file as soon as possible, and it seems to be the same file that you create in the lower loop.  Why?

  • Problem with formula node

    Hello

    I'm using LabVIEW 2012 and there seems to be a problem with the node of the formula. The output of a simple no operation is not correct.

    I have an input U8, whose value is 255. I apply a no operation (a = ~ a and the value returned by the formula node is also 255.)

    Is this a bug in the node or there at - it another way to calculate the bit DO NOT level?

    Thank you

    Ritesh

    You must use the function or exclusive.  So what you really need, is:

    a = a ^ 0xFF

    EDIT: Dig even more, it is called a 'top-up bit.  I consider cela a bug.  I see the same thing with 2011.

  • whites in the data in the table using the formula node

    I have 2 tables 1 d of data go into a loop. Inside the loop, there is a formula node that combines the 2 sets numbers and did a little math for them. If the result of the calculation is 0, it means that the value is not valid. Nothing other than 0 is good value. The result of the calculation comes out the knot of the formula and leaves the loop becomes a table 1 d. Then my table is saved in a spreadsheet. 0 really screw up my graphics, and I want them to just be white instead. I tried to use NaN instead of 0, but who also live up to my graphics. How can I place white on the output instead of 0 array?

    It seems that your real problem is to define what will make Excel leave gaps.  For LV NaNs graphics to do what you want.

    You can also consider getting the output array an array of strings. There may be string values (NO?) that cause Excel jump.

    Lynn

  • Formula node problem

    Community salvation OR

    I am currently working on a VI where I run primarily calculations. I use the structure of noda formula I have some experience with. I insert some quiet easy formulas, but when I run the VI there are something that I don't understand. Here is the crux of the formula:

    Here's the problem:

    consider the first iteration and don't spend attention to H1, H3, and H4.

    In the first iteration, my input values are V201 = 0 and pw = 4. Then H2 must be calculated = 0 (this also happens when I run the VI in the execution of climax).

    If H2 = 0 also Q1 should be = 0 (this also happens when I run the VI in the execution of hightlight).

    In the next step produces the problem when I want to calculate VRw2. It should be VRw1 (which is 0, the first iteration) then add with 0.25 times Q1. Because Q1 = 0 this should give VRw2 = 0. Instead, it calculates somehow VRw2 = 25. For some reason any he sees Q1 100 instead of 0. In the next iterations, it always adds + 25 to VRw2.

    Anyone has an explanation of how this can happen and how do I fix?

    I'll add the VI (LV13) as an attachment so you can try some things if you want.

    When in doubt, read the help... Formula node.  There is a special note in there.

    Note  Formula node accepts only the period (.) as the decimal separator. The node does not recognize decimal separators located.

  • Formula node cannot use 'fabs '? Can someone help me?

    I want to use 'fabs' of the formula node, but it appears the "undefined variable" information, showed in the following image. Anyone know how to solve? Thank you very much!

    Xiaoquan wrote:

    Yes, I tried.  It may be accurate to six decimal places.  I might tink this is the limit of the DBL. You know another way to increase accuracy? Thank you very much!

    This is not true! Make sure that you change the display format of the indicator to show enough digits.

    (right-click... display...)

    (If you still have problems, please include your code with some typical data).

Maybe you are looking for