Harvest of the bitmaps that overlap
Fireworks can cut/merge the way overlapping objects as shown here:
Is this also possible with * bitmaps *? SE not with Fireworks CS4, then in PS CS4?
This application is:
I have several bitmap to transparency reduction objects. But I don't want to let the underlying objects to shine through the overlying bitmap to the window. That is why I want to reframe the underlying windows with the overlying form of windows.
Your help would be very appreciated.
If the blue background is a solid color, just set the transparency of your bitmaps on the opaque rectangles, which look exactly like the background.
If the background is not a solid color, then the mask technique will work fine. Apply the mask completely opaque to the fully opaque bitmap, then set the transparency on the compound object that results. I can't insert my image for example today, so I downloaded on my drop.io:
http://drop.IO/FWpixlor/asset/maskfade-PNG
It is a document of fireworks .png, so you can see how it works.
If this is not the effect you are going for, then I'm afraid, that I do not understand your question.
Tags: Fireworks
Similar Questions
-
Separate the objects that overlap in a 1 bit image
I do a program that takes pictures of coins and transforms them into a 1-bit image, is it possible to treat the parts that may overlap to see them as separate rooms
Vision developmrnt monule contains methods for this - a solution involving either a watershead processing to separate the opjects.
-
Replace from the Clipboard, or "connect the wires that overlap?
I'll go by many of my first diagrams and clean code
with things I've learned since I started using Labview. A lot of this involves deleting
objects, then copy/paste of a conception of good reference in the old design. However,.
This often leaves a large number of broken wires to clean. For example, where I had individual
enumerations that are used in the design, I am replacing them with typedef enumerations.
(I couldn't typedef controls to appear in my palette of functions, but it is a question
for another post)
As it seems to be my only choice ' replace-> select a VI-> [file .llb]->-> [OK] typedef.
or remove the old one, paste a new, ctrl-B and rewire. This second option seems
to go faster than the first. But in both cases, there is a lot of click and drag to replace a
control, and there are dozens of them to do.
Therefore the routing of the wires is the same, but it takes time to connect them all back.
Is it possible to tell LV "re - connect the broken wires that overlap the pins."
overall or in a given area?
Or y at - it a way to simply "replace from the Clipboard?
Thank you and best regards,
-- J.
If you do a find > anyway, the dialog box that opens has a button replace. After selecting the replacement, one of the options is to replace all. This should save time if you have multiple copies of the original constants or controls made from the control.
Lynn
-
How to calculate the periods that overlap between two or more given the date range?
Hi all
If there are several durations then how we can calculate the period of time that overlap between these times.
For example: for 3 time periods. 03/12/2015-16/08/2015, 05/01/2015 to 31/07/2015 and the 06/09/2015 to 30/11/2015, how the overlap period can be calculated?
There are many potential unknowns in your question. For example, you want to count any overlap at all? If two dates overlap, what matters? Overlap - each of them?
In any case, here is a solution that counts how many periods are overlapping in any point in time... She, of course, using temporal logic. You can then use ValueAt(), WhenLast(), WhenNext(), etc. as appropriate.
Assume that your model has a child entity called 'the period' with name 'all time periods' relationship and basic attributes 'start date of the period of time' and 'date of end of period of time'.
In your example:
an entity should have the time period start date = 03/12/2015 and the date of end of period of time = 16/08/2015
another entity might have the time period start date = 01/05/2015 and the date of end of period of time = 31/07/2015
another entity might have the time period start date = 06/09/2015 and the date of end of period of time = 30/11/2015
To find the number of overlapping over time, we want to count or entities that have an active period, so the rule is perhaps the sum:
the number of overlapping = the number of all the periods for which it is true that the time period is active
How do we know a time is active? This is the time logic comes in. He is active on or after the start date or no later than the end date:
the time period is active if
TemporalOnOrAfter (the date of beginning of period of time) and
TemporalOnOrBefore (date of end of period of time)
That's all. Now, you can perform a temporal visualization of the 'number of overlapping' and you'll see it rise and fall over time. As a reference, he said that the number of overlapping = 3.0 from 06/09/2015 across 31/07/2015.
I hope this helps. You can use the same model to count periods of time functions, but you end up having to use the most logical date. You of course can count the total number of entities and compare this number of overlap over time to see if they overlap, but I digress...
-
Flattening of the ranges that overlap
I have data that looks like this:
I need to reduce it to the range for each category:(SKU, from_day, to_day) (1, 1, 3) (1, 2, 8) (1, 7, 9) (2, 2, 4) (2, 6, 8)
There may be many more records for each category, but this should be sufficient to illustrate the problem.(1, 1, 9) (2, 2, 4) (2, 6, 8)
I have three SKU 1 positions that were in place for a range of dates. The first element was there from day 1 to 3; the second days 2 to 8; the third days 7 to 9. These days this overlap, I would like to report on the maximum range of days that overlap - that is to say, that I had an element of SKU 1 present of the day 1 to day 9.
I have two SKU 2 elements that were present in the location for the date interval. The first element was there for days 2 to 4; the second from 6 to 8 days. Given that these days do not overlap, I need to report separately.
Can someone help me to write SQL that will accomplish this? It seems that I could use the syntax to CONNECT BY PRIOR, but I don't see how.Hello
Here's one way:
WITH got_grp_start AS ( SELECT sku, from_day, to_day , CASE WHEN from_day <= MAX (to_day) OVER ( PARTITION BY sku ORDER BY from_day RANGE BETWEEN UNBOUNDED PRECEDING AND 1 PRECEDING ) THEN 0 ELSE 1 END AS grp_start FROM table_x ) , got_grp AS ( SELECT sku, from_day, to_day , SUM (grp_start) OVER ( PARTITION BY sku ORDER BY from_day ) AS grp FROM got_grp_start ) SELECT sku , MIN (from_day) AS grp_from_day , MAX (to_day) AS grp_to_day FROM got_grp GROUP BY sku , grp ORDER BY sku , grp_from_day ;
This is an example of a problem of the English Channel , where consecutive lines (here, means consecutive in order of from_day) into groups, but there is nothing in any individual line which indicates which group belongs to this line; We must compare each row of other rows in the same score to determine if a new group (a ' handle') started this line or not. It's a little trickier than most other neck problems, because we had (I assume) data like this:
INSERT INTO table_x (sku, from_day, to_day) VALUES (9, 1, 5); INSERT INTO table_x (sku, from_day, to_day) VALUES (9, 2, 3); INSERT INTO table_x (sku, from_day, to_day) VALUES (9, 4, 6);
When deciding if a round begins with the 3rd rank, we cannot just look at the previous 1 row; To watch all the previous lines.
After that we have determined where each round begins, we use the analytical SUM function to see how many innings have already started, i.e. to which group each line belongs. Once we have the number of group, getting high and low group limits is just a matter of using MIN and MAX.
Published by: Frank Kulash, October 3, 2012 18:08
Additional explanation -
How can I adjust the shapes that overlap the page?
I'm working on a holiday brochure 270 page. I usually work with Photoshop, but I know that's not ideal for brochures, then worked along side another designer with InDesign. I picked up almost everything to get me going which is great. However, I am stuck on best practices for the bottom.
The idea is that each page with a hotel will have the same style of background, which consists of a few circle shapes that are slightly different shades. Circles leave the edges of the page, to just form a curve across the page. Each different destination will have these forms in different colors, so that the customer wants to be able to change the colors autour once I put the brochure their.
I work with what I have now, but it is a little ugly looking having huge circles leave the edges of the page in "Normal" mode.
Is it possible to cut the rest of the form that is not inside the purge?
draw a rectangle the size of the page + bleed area. Cut your background of the circle, and then paste in the rectangle. Ideally, it should be on a master page (a master page by destination).
-
HP 5200 - print all of the pages that overlap on the first page
I'm having a problem with one of my users while trying to print on our 5200 s HP.
This just started happening today and not affect any other users who also use printers.
When the user prints a document of several pages, it prints all the pages on a single page with all the text overlapping. Here is what I tried so far to fix it, nothing helps:
-Other models HP print very well
-Other profiles on the same PC with the same problem
-J' changed the processor to "Winprint" - no luck
-Update the driver does not
-Remove the checkbox for 'Enable advanced features' doesn't fix it.
-J' removed all traces of the printer in the registry and it still does the same thing.
Help, please!
It seems that if I use the 64-bit of Windows xp for the printer driver it solves the problem.
Thanks for nothing, everybody.
-
Improve the performance of the MCs that overlap?
I'll have some performance issues in some areas from Im flash game production.
Here's the situation:
I have a large movieclip containing a map that may be subject of a scrolling and scaling. There are panels with a bunch of MC buttons, controls, etc. on the right side of the scene. These are separate from the card and stay in the same place.
Everything works fine until the large map is zoomed or scrolls such as the right buttons and things are overlapping their card. Then the framerate jumps down to a nice smooth 30 frames per second for about 3 fps while the map moves. There is no problem with the card move when they do not overlap.
Now, the thing is, is that there is no real interaction between the buttons and the map. No transparency or whatever it is, in fact, I'm perfectly happy with the card to disappear behind a side panel. There are only about 3 panels that screen drawing routine would have to worry about, like all the buttons to rest on top of the panels, so why my performance takes such a success?
(Hmmm. I have actually a lot of transparency, but each is on a University background, and no interaction with the map.)
When no scaling (or discoloration or rotation etc), select your movieclips cacheAsBitmap property. Disable when scaling (etc.).
-
update of the end date on the dates that overlap
Hello
I have this situation
Status start_date end_date
OP 1 January 2007 31 - dec - 2099
W1 01-apr-2007 30-sep-2008
October 1, 2008 31 - dec - 2099 W2
W3 1 January 2009 31 - dec - 2010
January 1, 2011 31 - dec - 2099 W4
the December 31, 2099 end_date "is a conventional date and indicating the valid (current) state that should be the last"
I want to update the value of the end date to the same value as the date of the next valid record
result
Status start_date end_date
OP 1 January 2007 31 - mar - 2007
W1 01-apr-2007 30-sep-2008
October 1, 2008 31 - dec - 2008 W2
W3 1 January 2009 31 - dec - 2010
January 1, 2011 31 - dec - 2099 W4
Any help?
Thanks in advance
lukxHello
Here's a way to do it:
MERGE INTO table_x dst USING ( SELECT start_date -- or primary key , LEAD (start_date) OVER (ORDER BY start_date) - 1 AS end_date FROM table_x ) src ON (src.start_date = dst.start_date) -- or primary key WHEN MATCHED THEN UPDATE SET dst.end_date = src.end_date WHERE src.end_date IS NOT NULL AND end_date = DATE '2099-12-31' -- if wanted ;
If you would care to post CREATE TABLE and INSERT statements for your sample data, and then I could test this.
-
Traffic that overlap on the device with the power of fire
Hello world
How should I handle the traffic that overlap on the device of firepower?
I am inspection 2 VLANS using switches virtual, one VLAN is my edge of the internet and the other VLAN is my internal servers VLAN.
Sometimes my internal servers to THAT VLAN needs access to internet and that traffic is superimposed on the inspection of my internet edge VLAN.
Is there a configuration to avoid connections between connected/inspected twice?
Thank you
Hello
You can create rule of the trust with areas / vlan specific or IP source/destination if you want a specific traffic does not inspect.
-
Need to know the position of the bitmap wrt 0,0 on blackberry screen field
Hello
I have a form that contains a few text fields and a field of bitmap image. I use this bitmap field to capture the signature.
The problem is how whether the y of the bitmap field. I used the getContentTop and getTop methods but they give me the position of the bitmap field wherever I want to know where my bitmap field at that time regarding the point 0,0 of the screen while I scroll vertically.
SO if someone scrolls the screen so that the field of the bitmap image is moving upwards or downwards, and the area of the bitmap is always visible, I still know where my field bitmap regarding the point 0,0 of the screen.
If you see the atttached image, I want to know the position there of the bitmap that will be different in the two scenario illustrated in the image.
Kind regards
CharrierI created the following code to discover something I did some time ago, in fact I think that I have found this code on the forum somewhere and modified to fit my needs. Not sure it has never been used in a production application, so no warranty. But may be useful.
public static final XYRect getFieldExtent(Field fld) { int cy = fld.getContentTop(); int cx = fld.getContentLeft(); Manager m = fld.getManager(); while (m != null) { cy += m.getContentTop() - m.getVerticalScroll(); cx += m.getContentLeft() - m.getHorizontalScroll(); if (m instanceof Screen) break; m = m.getManager(); } return new XYRect(cx, cy, fld.getContentWidth(), fld.getContentHeight()); }
-
My setup is vSphere 5.5 with latest edition ESXi/Vcenter, and I use Google chrome 49.0 both 45.0 Firefox on my Windows 7 computer. Recently, some change has happened to Google chrome, making it extremely annoying. Please see the photo. Notice that eventually (it started to appear on April 5), every time I'm with the right button of the mouse, a window overlapping menu web client appears, preventing me from accessing some menu web client, I tried to solve this problem by selecting 'Settings' and disable flash related things (for example access flash to the camera privacy, etc.). How can you get rid of the menu circled in red?
Also Firefox's question, I use 4K monitor, the web client window is very small and cannot be changed even if I have the window zoom to 250-300%, no difference.
Here's how I solved the problems for these who can use Firefox, I suggest that you switch to Firefox and install Adobe flash, it's difficult for me because the last Flash on Firefox does not the web interface to scale correctly on my 4K monitor, everything seems tiny.
(1) uninstall Google chrome,
(2) download old version of Google chrome by visiting this site:
Download Google Chrome 46.0.2490.80 (Enterprise version for Windows - OldVersion.com
(3) after the installation, turn off the update of Google chrome auto, here's the info:
Disable updates of Chrome - Super user
It will be implicitly security once you disable Chrome/flash update, if someone else finds the best solution, do not hesitate to add your opinion here.
Update: this evening, the flash inside my google chrome (still in version 46.0.2490.80) is updated to the latest edition, automatically, I have no way to prevent this. Now, when I use Google chrome, the annoying menu disappeared, I tried the same thing on my laptop, which hosts the last Chrome and Flash, the menu that overlap also disappeared, I wonder why? This pi * s me off.
-
Hello
I need to prepare a request for the removal of the leaves that overlap to a denunciation of employee leave and return leaves without records with overlap. It works well in cases where leave overlapps leave immediately above or below the recording of leave sorting based from the date as below:
The above code returns a correct as result:with t as ( select 1 employee_num, to_date('01.09.2008','dd.mm.yyyy') gone_effdt, to_date('29.10.2008','dd.mm.yyyy') return_effdt from dual union all select 1 employee_num, to_date('29.10.2008','dd.mm.yyyy') gone_effdt, to_date('29.04.2009','dd.mm.yyyy') return_effdt from dual union all select 1 employee_num, to_date('29.04.2009','dd.mm.yyyy') gone_effdt, to_date('01.05.2009','dd.mm.yyyy') return_effdt from dual union all select 1 employee_num, to_date('01.06.2009','dd.mm.yyyy') gone_effdt, to_date('01.07.2009','dd.mm.yyyy') return_effdt from dual ) SELECT employee_num,MIN(gone_effdt) gone_effdt,MAX(return_effdt) return_effdt FROM (SELECT employee_num, gone_effdt, return_effdt,MAX(rn) OVER (PARTITION BY employee_num ORDER BY gone_effdt, return_effdt) max_rn FROM ( SELECT a.*, CASE WHEN lag(return_effdt) OVER (PARTITION BY employee_num ORDER BY gone_effdt, return_effdt) < gone_effdt OR lag(return_effdt) OVER (PARTITION BY employee_num ORDER BY gone_effdt, return_effdt) IS NULL THEN ROW_NUMBER() OVER (PARTITION BY employee_num ORDER BY gone_effdt, return_effdt) END rn FROM T a ) ) GROUP BY employee_num, max_rn ORDER BY gone_effdt;
However, the logic above does not work for the data below where the overlap follows a different as model below:EMPLOYEE_NUM GONE_EFFDT RETURN_EFFDT 1 01.09.2008 01.05.2009 1 01.06.2009 01.07.2009
This gives the output as:with t as ( select 1 employee_num, to_date('01.09.2008','dd.mm.yyyy') gone_effdt, to_date('29.10.2008','dd.mm.yyyy') return_effdt from dual union all select 1 employee_num, to_date('05.11.2008','dd.mm.yyyy') gone_effdt, to_date('11.02.2009','dd.mm.yyyy') return_effdt from dual union all select 1 employee_num, to_date('29.10.2008','dd.mm.yyyy') gone_effdt, to_date('29.04.2009','dd.mm.yyyy') return_effdt from dual union all select 1 employee_num, to_date('29.04.2009','dd.mm.yyyy') gone_effdt, to_date('01.05.2009','dd.mm.yyyy') return_effdt from dual ) SELECT employee_num,MIN(gone_effdt) gone_effdt,MAX(return_effdt) return_effdt FROM (SELECT employee_num, gone_effdt, return_effdt,MAX(rn) OVER (PARTITION BY employee_num ORDER BY gone_effdt, return_effdt) max_rn FROM ( SELECT a.*, CASE WHEN lag(return_effdt) OVER (PARTITION BY employee_num ORDER BY gone_effdt, return_effdt) < gone_effdt OR lag(return_effdt) OVER (PARTITION BY employee_num ORDER BY gone_effdt, return_effdt) IS NULL THEN ROW_NUMBER() OVER (PARTITION BY employee_num ORDER BY gone_effdt, return_effdt) END rn FROM T a ) ) GROUP BY employee_num, max_rn ORDER BY gone_effdt;
so in fact the result should be as below:EMPLOYEE_NUM GONE_EFFDT RETURN_EFFDT 1 01.09.2008 29.04.2009 1 29.04.2009 01.05.2009
Kindly help with pointers to the achievement of the above output.EMPLOYEE_NUM GONE_EFFDT RETURN_EFFDT 1 01.09.2008 01.05.2009
Thanks in advance.How about this?
with t as ( select 1 employee_num, to_date('01.09.2008','dd.mm.yyyy') gone_effdt, to_date('29.10.2008','dd.mm.yyyy') return_effdt from dual union all select 1 employee_num, to_date('05.11.2008','dd.mm.yyyy') gone_effdt, to_date('11.02.2009','dd.mm.yyyy') return_effdt from dual union all select 1 employee_num, to_date('29.10.2008','dd.mm.yyyy') gone_effdt, to_date('29.04.2009','dd.mm.yyyy') return_effdt from dual union all select 1 employee_num, to_date('29.04.2009','dd.mm.yyyy') gone_effdt, to_date('01.05.2009','dd.mm.yyyy') return_effdt from dual ) SELECT employee_num,MIN(gone_effdt) gone_effdt,MAX(return_effdt) return_effdt FROM (SELECT employee_num, gone_effdt, return_effdt,MAX(rn) OVER (PARTITION BY employee_num ORDER BY gone_effdt, return_effdt) max_rn FROM ( SELECT a.*, CASE WHEN lag(maxdt) OVER (PARTITION BY employee_num ORDER BY gone_effdt, maxdt) < gone_effdt OR lag(maxdt) OVER (PARTITION BY employee_num ORDER BY gone_effdt, maxdt) IS NULL THEN ROW_NUMBER() OVER (PARTITION BY employee_num ORDER BY gone_effdt, maxdt) END RN FROM (SELECT employee_num, gone_effdt, RETURN_EFFDT, MAX(RETURN_EFFDT) OVER (PARTITION BY employee_num ORDER BY GONE_EFFDT) maxdt FROM T) a ) ) GROUP BY EMPLOYEE_NUM, MAX_RN ORDER BY GONE_EFFDT;
But I suspect that there is a simpler solution (probably as suggested above marwin)
-
Hi, I need to calculate the exact overlap between two battered.
I first check if there is no present overlap:Main period = 2008-01-01 to 2008-01-15 Overlapping periods: 1 = 2007-12-28 to 2008-01-02 2 = 2008-01-03 to 2008-01-12 3 = 2008-01-14 to 2008-02-02
How can I get the timespan that overlap (in days) for the periods found and the main_period?SELECT * FROM periods WHERE periods.START > main_period.STOP AND periods.STOP < main_period.START;
If I have my right logic, something like that...
NB. table m = main period, table o = overlapping periods
SQL> ed Wrote file afiedt.buf 1 with m as (select to_date('2008-01-01','YYYY-MM-DD') as dt_from, to_date('2008-01-15','YYYY-MM-DD') as dt_to from dual) 2 ,o as (select to_date('2007-12-28','YYYY-MM-DD') as dt_from, to_date('2008-01-02','YYYY-MM-DD') as dt_to from dual 3 union select to_date('2008-01-03','YYYY-MM-DD') as dt_from, to_date('2008-01-12','YYYY-MM-DD') as dt_to from dual 4 union select to_date('2008-01-14','YYYY-MM-DD') as dt_from, to_date('2008-02-02','YYYY-MM-DD') as dt_to from dual) 5 -- End of Test Data 6 SELECT m.*, o.*, least(o.dt_to, m.dt_to) - greatest(o.dt_from, m.dt_from)+1 as overlap 7 FROM o, m 8* WHERE o.dt_from < m.dt_to AND o.dt_to > m.dt_from SQL> / DT_FROM DT_TO DT_FROM DT_TO OVERLAP --------- --------- --------- --------- ---------- 01-JAN-08 15-JAN-08 28-DEC-07 02-JAN-08 2 01-JAN-08 15-JAN-08 03-JAN-08 12-JAN-08 10 01-JAN-08 15-JAN-08 14-JAN-08 02-FEB-08 2 SQL>
If the first row overlaps the 1st and 2nd Jan that is 2 days
The second row overlaps on everything, that is days from 3rd to 12th jan for example 10 days
and the third row overlaps the 14 and 15 Jan that is 2 days. -
How to change the inner traits of two circles that overlap?
Hello
I have two circles that overlap with 2px solid feature. Now, I would change the two parts of the circles that are now in the circles of a dashed line. Something like this:
But it only creates parts mode dotted lines. Here, I used the Pathfinder "gap".
How can I do this correctly?
Thanks for the tips!
Luftikus,
You can:
(1) create two circles;
(2) copy the circles and the Pathfinder > intersect copies;
(3) select the original and unit of Pathfinder (or add to the box or whatever it is called in your version of form);
((4) select the path of the intersect 2) and apply the dashboard.
This will give you the paths intersect in front and United in the back.
The problem with the initial attempt to fracture that is filling the central aisle only leathers / covers half of the race of the external paths (because the fill extends to the center of the race). By having one United way in the background there is no line to hide cover. Pathfinder > unit or other after Parthfinder > fracture / can only provoke a group and fail to unite the two paths into one.
(You may need to keep Alt/Option 2) and 3) depending on the version.
Maybe you are looking for
-
How to disable the explicit songs in Apple's music?
I use Apple music for iPhone and Galaxy S7 Edge. I noticed that on Android Apple music there is an option to block explicit songs in a music Apple iPhone, there is no option to block explicit music. Unless it's there somewhere I don't know where. I'm
-
Problems caused by Service Pack 2
Last year, I got my HP Vista 32 bit twice because of problems with the mouse pointer, paste (especially to the "Awakening"), delays to scroll (then a movement of catch-up "jerky"), failure to stop on command (requiring the close button) and occasiona
-
Compaq V6000 closing right after button walk / stop is pressed.
The laptop turns on and turns off 2 seconds after you press the power button. Any ideas what is wrong. It was working fine the day before and the next morning is then when this started.
-
Windows or any other program can not find cd/dvd drive.
CD/dvd drive opens accepts the disc closes and nothing happens, if I select a program to read, he says no supported drive found. If I open my computer, the drive E is not indicated.
-
Update to Windows 8.1 after refresh
I've refreshed my pc recently, and it resets on windows 8. I went to my control panel, set it to install 150 updates or if necessary so that I could install 8.1 and my update is stuck at 0% and 0kb downloaded. I checked my internet speed, which is v