How to add DaqMX task to an existing project

I use Measurment Studio 2010 with Visual Basic. I created a NI Daq Windows application with an element of task Daq to analog input.

Now, I have to add additional DaqMX tasks (tasks in digital and Digital Out) to the existing Visual Basiic project.

How can I do this?

Thank you

Mike

Hello

Here is a link that shows how to add a task to a .NET project

http://digital.NI.com/public.nsf/allkb/290D84D10809D4C086256FF20076F8B8

Curt

Tags: NI Software

Similar Questions

  • How to add an item to an existing project in the timeline?

    How can I add a new item in the middle of my timeline of an existing project? It should be easy, but I can't figure it out... but I'm a newbee stupid

    Hold down the CTRL

    or

    or

    https://helpx.Adobe.com/Premiere-Pro.html

  • How to add the new column in existing table to our desired location?

    How to add the new column in existing table to our desired location?

    For example, I have to add the new column 'course' before the salary column in the emp table.

    I think the best way is to add the column at the end of the table and create a new view with the order of the columns...

    Another option...

    places the data into a temporary table and recreate the table with the correct order of the columns, and then insert data to the table from the temporary table

    Refer

    Add column (from table) in the desired position

    Example:

    CREATE TABLE temp_my_user LIKE)

    SELECT * FROM password);

    DROP TABLE password;

    (Password) CREATE TABLE

    userID NUMBER

    , first name VARCAHR2 (25)

    , middleInitial VARCHAR2 (1)

    (, name VARCHAR2 (25));

    INSERT INTO password (userID, firstName, lastName)

    (SELECT username

    first name

    lastName

    OF temp_my_user);

    DROP TABLE temp_user;

  • How to add the file to the existing catalog

    Hello:

    How to add a new file already existing catalogue? If I using the regular method "-> import library", the old files will disappear.

    Thank you

    Images to be imported into Lightroom. When you go through the import process, when it has finished, it will seek you images of the previous import (import you just made). It's normal. If you look at the different sections on the left side of the library module, you'll see that "Previous import" is one of the sections. You will also notice that there is another section called "files". If you choose this section, you will be able to see the other folders that you have imported.

  • How to add the blank page to existing Document in Adobe Dc

    How to add the blank page to existing Document in Adobe Dc Pro

    Hi thashrifs16749461,

    You can add a blank page using Adobe Acrobat DC by following the instructions below:-

    (1) open your PDF in Acrobat DC.

    (2) choose the form of option "Organize the Page" of the tool pane on the right as shown below in the screen shoot.

    (3) now, at the top, you will see all the tools to organize the page, click "Insert" & select 'White Page' in the drop down menu to insert blank pages.

    * Shortcut: If you are using a windows computer you can use the key "Shift + Ctrl + T" to insert blank pages.

    In case if you have any problem or have any questions please let us know. We will be happy to help you.

    Kind regards

    Nicos

  • HOW to add an attribute to the existing node?

    Hello

    I have a question - is possible to add a NEW attribute to existing xml node registered in xmltype?

    I found no such a possibility.

    I need to use the update! :)

    I have: < tag > < tag2 / > < tag / >

    I want to have < tag value = 1 > < tag2 / > < tag / >

    THANKS IN ADVANCE! :)

    With insertChildXML:

    SQL> with t as (
      2    select xmltype('') doc
      3    from dual
      4  )
      5  select insertChildXML(doc, '/tag', '@value', 1)
      6  from t
      7  ;
    
    INSERTCHILDXML(DOC,'/TAG','@VA
    --------------------------------------------------------------------------------
    
     
    

    Alternatively, in 11.2.0.3, updated XQuery:

    select xmlquery(
    'copy $d := $doc/tag
     modify ( insert node attribute value {$val} into $d )
     return $d'
     passing t.doc as "doc"
           , 1 as "val"
     returning content
    )
    from t
    ;
    
  • How to add a topic 'About' in a project empty

    Edition

    RoboHelp HTML


    Version
    RH8

    Output

    .chm (Microsoft HTML Help)

    How can I add a topic 'About' (About.htm)? I guess that the subject of what is present in the default templates, but I can't seem to find a way to add a when I create a project empty. Is it possible to add a section about an empty project?

    Thanks for your help!

    Hello

    Normally I will just create a topic and name it 'about '. I'll also usually add it as one of the toolbar buttons.

    You configure the toolbar buttons in the properties of the window.

    See you soon... Rick

    Useful and practical links

    Wish to RoboHelp form/Bug report form

    Begin to learn RoboHelp HTML 7, 8 or 9 in the day!

    Adobe Certified RoboHelp HTML Training

    SorcerStone blog

    RoboHelp EBooks

  • How to copy DAQmx task without the help of MAX?

    Howdy-

    I hit a bit of trouble here I think points to a fundamental misunderstanding I can have on DAQmx channels and tasks.  I can hack together a workaround, but I would like to know how to do these things, common sense.

    In a Word, I prefer to do everything in the code and not use MAX.  For my application, I would like to create a single channel/task initialized with all the scaling, the physical channel parameters and units (it is what is, in my case, a 'channel').  I would then like to create copies of this channel/task and configure each with parameters of specific task of sampling... corresponding to what I would call the "tasks" to use "Channel".

    I'll have no chance, so of course, I do not understand what I do.  Any reading/posts I've met use MAX.  Here's what I've tried so far:

    Even when you try to use MAX, I am the breath.  Any help straightening on my confusion here is very appreciated.

    Thanks in advance and have a nice day.

    -Brad

    In fact, you're not confused.  In this instance of National Instruments is perhaps...

    See the links ofthese ideas in the link.

    But a 'task' is really just a section in an XML file.  If this file is named *.lvproj the project has access to tasks.  If this file is *.nce any labview application has access to tasks.  If this file is created by the RTE that vi has access to the task.  In short, the "tasks" are never really defined by 'Code' but by the XML code to the file than declairs them and teir properties.  Tasks need to be defined a time-preference during design - project

    Yes, it's a bit simplistic but a good analogy!

    Go ahead and kiss MAX to set your tasks... use DAQmx property nodes if you need to programmatically determine a task property.   "do everything in code" as you say is just not really the way it is... the way I think you hear it...  'S really not 'made it in the code"but rather how LabVIEW is inherintly multithreaded.  The IDE just handles it for you "So easy that could encode a cave man!  Relax and let it work the way it does work for you.

  • How to add Premiere Pro to my existing photography Plan? [was: Adobe first]

    I have a plan of creative photography of Cloud for LR and PS, how do I add Adobe Premier to this plan and what might be the extra cost?

    Add a simple plan App for Premiere Pro under the same Adobe ID for 19.99 $par month to your existing plan.

    Pricing plans and creative Cloud membership | Adobe Creative Cloud

    So, you will then have two plans and two amounts debited from your account each month.

    If you need any other apps after that a plan of all applications would be the way to go.

  • How to add a foreigner to an existing arc

    I use the Data Modeler Version 3.3.0.734.  I face relational models and creates a template for generating the DDL as a point.  Currently I have a table that is connected by a CRA to two other existing tables. I tells you that a table has a foreign key exclusively to one or the other table.  Well I can create an arc if necessary.  However, now I need to add another more recent table to this existing arc, I'm defeated so far in this addition.

    No matter what I click on, tables, relations, or both, I can not simply enable ' Add foreign key to the CRA ", and it remains greyed out.  I apparently, obviously not, tried the combinations as much as possible and yet nothing active as the icon.  A similar problem exists when I try to activate "remove foreign key of Arc.

    Aid seems insensitive to the however I make my request for help, so I need help in this case.  Exactly, perhaps a sequence of steps, which must be clicked to activate this icon?  Thanks for any help in this matter.

    Hello

    You must select arc and FK you want to add. Even if you want to remove CF of arc.

    Philippe

  • How to add a host to an existing cluster of ESX?

    Good evening


    I was responsible for adding a new HP Server as an additional host to an existing cluster of ESX4.1.

    Now, please excuse my ignorance if this seems to be a simple task to some of you. I don't have experience in this field and want to make sure I have all my bases covered. Please someone would be kind enough to please guide me through this step by step.

    I have an idea of basic, do not want to miss something.

    Concerning

    Hi Bryan777,

    Welcoem to the community.

    Please follow link below, if you need anything else please let us know.

    http://www.youtube.com/watch?v=W78shNXw5h8.

    If you don't succeed the first time. call it version 1.0. "
  • [AI - CS4] How to add an art Council to existing document?

    Hi all

    can anyone suggest me the addition of a new work plan for existing document? I found no Palette of the artboard in CS4. But in CS5 it is given.

    Thank you

    D.A.

    The Panel to the artboard is new to AiCS5. In CS4, a new work plan can be added by doing one of the two:

    1. choose the work plan tool and click-and - drag in the area of canvas of the Illustrator document.

    2. choose the work plan tool, click on the button "New work plan" in the control panel. Then select the size you want in the list of presets of the artboard in the Control Panel, then in the area of the canvas that you want to add a new work plan.

    I hope this helps.

    Neeraj

  • How to add a bookmark to an existing (or add new) folder in my favorites Office synchronized?

    Firefox does not seem to give me this option.

    Currently, this is not a feature of Firefox for Android. The only way to manage bookmarks in Firefox for Android is currently using a desktop installation that is synchronized between Firefox for Android and Firefox for desktop PC. How can I set up Sync on my computer?

  • How to add a Mac to an existing network of Wrt160N

    I have a work network, set in place using a XP computer. I added the devices successfully wireless in the past. I am trying to add a Mac, but it asks a passwork. There is no password that I know in the wireless setup and didn't have to do it on an XP.

    I use WPA2_Personal security. I can connect correctly using a wired connection.

    Any ideas? I was told that it should be easy.

    Update: I found the password that I was telling him typing was not well done. As soon as I touched him "show password" I could see that it wasn't the right plugs.

    Problem solved.

  • How to add a column to an existing unique index?

    Hello

    I have a unique index defined on 5 columns in a table. I want to add a column more to the unique index. Is there one solution other than to drop and create the index?

    Also please let me know which is the ideal way to do it. The table has about 80 million documents.


    Thanks in advance,
    Noble.

    None...

    but creating the new index before your previous fall, the previous will be helping to create the new index faster.

    Abhishek Gera

Maybe you are looking for