How to calculate the cpu in the resource pool

How to calculate the cpu in the resource pool

and don't forget that shares in pools of resources are not inherited by the virtual machines in the pools. the action is related to the pool itself.

Tags: VMware

Similar Questions

  • calculate the resources

    Hello world

    I have a main site and a recovery site.

    On the main site, I have 10 esxi hosts and I use a third party application and I am reproducing a few virtual machines on the site of DR.

    Replicated VMS are shutdown in the DR site.

    Now I need to calculate the resources on my site of recovery so that I can reproduce a few more virtual machines,

    How to calculate the resources left on my site of DR assuming that all virtual machines of closing are started.

    Please guide me

    As VMs on DR are online on the main site, you can use the use of the resources required by virtual machines on the main site and calculate how much will be needed at the Dr site and how much will be left.

  • How to calculate the CPU Ready on Cluster DRS via Powercli?

    Hi all!

    I have a DRS Vsphere cluster. I want to know what is the value of the loan of CPU I have in my group.

    For example, I get 20% of powercli value, it is normal for the cluster, but if I have 100% or more, I have a problem.

    How to achieve via Powercli? And how to calculate the percentage values correctly?

    I know, I can get all values of CPU Ready of VMs cluster, but IT is not the same thing, I need overall value of CPU Ready.

    Thanks in advance!

    As far as I know you can get the cpu.ready.summation for ESXi nodes or VMs.

    For a cluster, you will need to get the value of each node in the cluster ESXi and then take the average.

    The metric cpu.radey.summation is expressed in milliseconds.

    To get a percentage, you need to calculate the percentage of loan period during the interval during which it was measured.

    Something like this (this will give the loan current %)

    $clusterName = "mycluster.

    $stat = "cpu.ready.summation".

    $esx = get-Cluster-name $clusterName | Get-VMHost

    $stats = get-Stat-entity $esx - Stat $stat - Realtime - MaxSamples 1 - forum «»

    $readyAvg = $stats | Measure-object-property - average value. Select - ExpandProperty average

    $readyPerc = $readyAvg / ($stats [0].) IntervalSecs * 1000)

    Write-Output "Cluster $($clusterName) - CPU % loan $(' {0:p}'-f $readyPerc).

  • How to calculate the total memory used by oracle under Linux?

    Hi all

    In one of my server have 148 GB of total physical memory and 12 databases are running. For capacity planning, I need to know how the Oracle server use.

    How to calculate the use oracle database? I was perplexed because Yop out his show off 148 gb 128 GB are used.

    Below for your reference:
    ++++++++++++++++++++
    == > back to top
    top - 09:52:32 up to 151 days, 15:20, 3 users, load average: 6.11, 6.00 6.05
    Tasks: 7 running, 1314, 1321 total sleep, stopped 0, 0 zombie
    CPU: 37.8%us, 1.4%sy, 0.0%ni, 55.0%id, 5.6%wa, 0.1%hi, 0.2%si, 0.0%st
    MEM: 148290444 k total, 129368792 k used, 18921652 k free, 1450292 k buffers
    Swap: 50331632 k total, 1296188 k used, 49035444 k free, 114733336 k cached


    The memory allocated to each instance is: sga total == > 34 pga = > 48 GB gb
    +++++++++++++++++++++++++++++

    SGA PGA
    4 GB 4 gb
    4 GB 4 gb
    2 GB, 4 GB
    2 GB, 4 GB
    2 GB, 4 GB
    2 GB, 4 GB
    2 GB, 4 GB
    3 gb 4 gb
    3 gb 4 gb
    4 GB 4 gb
    3 gb 4 gb
    3 gb 4 gb

    Thank you

    Try this - http://www.pythian.com/news/29703/oracle-instance-memory-usage/ for each of your instances.

    As far as I know, different instances may share only the binary code oracle and using libraries, so you should be able to easily understand the amount of memory of all instances of 12.

    Lordane Iotzov
    http://iiotzov.WordPress.com/

  • How to calculate the execution time of a SCTL in FPGA VI?

    Hello

    Can someone guide me that how to calculate the execution time of a SCTL for an iteration in the FPGA VI?

    Thank you and best regards,

    Rashid

    Hello r,.

    A SCTL will always run in a beat the clock it has been linked to.  So, if you use a 40 MHz clock, this loop will run in 25 ns.  If the code cannot complete in that, or if it requires two graduations of the watch to do the calculation, your code does not compile, then you have the guarantee that this will always be how long it takes this piece of code to run.

  • To build the waveform.vi function how to calculate the value of dt

    Dear all

    Please guide me How to calculate the value of dt according to waveform.vi of construction

    My sampling rate is 25000 and I take 200000 samples.

    Kind regards

    Muhammad Irfan

    It's all simple arithmetic. The inverse of the sampling frequency power of samples is then the dt or the time between samples the number of samples is not relevant.

  • How to calculate the execution time of a loop?

    Hello

    Can someone guide me that how to calculate the execution time of a loop to iterate?

    Thank you and best regards,

    Rashid

    I hope I have your question! See attached screenshot

  • How to calculate the polynomial graphic adjustment of waveform

    Hi all

    I am new to lab - view so would need a little assistance in one of the problem I have right now.

    My problem is: how to calculate the polynomial graph of waveform data adjustment? I need to convert the waveform to XY graph data, and then use the polynomial vi made integrated to calculate the fitting?

    Detail: My problem is that I have waveform graph, I calculate the vertices and the Valley, but because of the noise, my peaks and Valley detection is sometimes not exact, so to smooth the chart that I must apply the polynomial fit.

    If anyone can help me in this, I'll be very grateful.

    Thanks in advance

    Hi Omar,.

    have you seen the suggestion of Lynn above?

    You already have the values of Y (your table). Now, you need build the table of X as indicated, only to replace the value of dt with your spacing from point to point. Somewhere in your code, you know that the value that you have an x-axis indicated in milliseconds...

  • How to calculate the sum of two digital form fields based on the selection of the checkbox.

    I have a form in Acrobat Pro who needs a custom calculation. How to calculate the sum of two digital form fields based on a selection of the checkbox. I have three number fields. Field-A and B are simple one or two digits. Field-C is the sum, or the total field. I want to field-C have a control box which, when turned on and off, just gives a. gives the sum of A + B

    _ Field - 2

    _ Field - A 4

    [check] _ _ field - 6 C

    [disabled] _ _ field - 2 C

    Thank you

    The custom field C calculation script could be:

    (function () {
    
        // Get the values of the text fields, as numbers
        var v1 = +getField("A").value;
        var v2 = +getField("B").value;
    
        // Set this field's value based on the state of the check box named "CB"
        if (getField("CB").value !== "Off") {
            event.value = v1 + v2;
        } else {
            event.value = v1;
        }
    
    })();
    

    Replace 'A', 'B', and 'CB' with the real names of the fields.

  • How Illustrator calculates the height of box Em?

    I am trying to determine how Illustrator calculates the basic position of the top of the a Point text object bounding box.  She seems to be the same distance as an object of text box with the game setting of first base to box Em height line.  I just do not know what assets within the scope of the police which matches.  Help of the Illustrator defines it as:

    "The top of the box em in Asian fonts touches the top of the type object. This option is available regardless of the preference show Asian Options. »

    For some fonts, this distance seems to be near the pole of the police, but this is not true for each font.  The clues how Illustrator calculates it?

    metric-example.png

    Here you go

    var idoc = app.activeDocument;
    var itext = idoc.selection[0];
    
    var top = itext.position[1];
    var base = itext.anchor[1];
    
    alert('Em? size: ' + (top-base));
    
  • 'Custom actions' of the CPU in the Resource Pools: should I also set the VMs child on "custom"?

    Hello world

    Imagine a VMware vSphere 4.1 cluster managed, of course, by vCenter Server, with some 4.1 ESXi hosts.

    This cluster has 3 Pools of resources: development, Production, quality

    Now consider that the Resource Pools have been initially implemented in the following way, about the 'actions' for 'CPU resources':

    -Development: Shared low =

    -Quality: Sharing = Medium

    -Production: Sharing high =

    Several virtual machines were placed in the Resource Pools. Some virtual machines are single vCPU, but others are vSMP ones: some have 2 vCPU and some of them have 4 vCPU.

    Now, I read the following articles of the (large) put at disposal by Duncan Epping, VMware, in his blog "Yellow brick", on "Resource Pools" and actions:

    The Resource Pool priority-Pie Paradox - yellow bricks [written by Craig Risinger]

    Actions on Resource Pools

    http://www.yellow-bricks.com/2010/12/14/shares-set-on-resource-pools/

    Actions on a Resource Pool, custom scripted

    http://www.yellow-bricks.com/2010/02/24/custom-shares-on-a-resource-pools-scripted/

    Now, imagine that I have manually changed several Pools of resources from low/normal/high "Custom" and gave them the following values:

    -Development: 3000

    -Quality: 6000

    -Production: 9000

    The virtual machines inside each Resource Pool appear to be all set up to 'Actions' = 'Normal '.

    I want to know is this:

    1 - since I changed Resource Pool shares 'Low' / 'Normal' / 'High' to 'Custom', I should / need to change the 'actions' in each individual VM from "Normal" to "Custom"?

    2 - I'm guessing that the sum of the actions of all virtual machines in a Resource Pool must be equal to the actions that I gave to this Pool of resources. Am I wrong?

    3 - I also guess that the only practical way to make this change to Virtual PCs, if necessary, is to generate scripts, preferably using PowerCLI. Friend, I have right?

    Thanks in advance!

    See you soon,.

    Ricardo

    Whatever resources the resource pool level are applicable to this pool of resources and will get the part accordingly. So that resources will be divided between the virtual machines according to the shares they hold.

    Example:-two pool of resources A and B.

    Total cycles CPU = 10000 Cycles CPU

    A part (custom set) = 6000 CPU Cycle.

    Part B (custom set) = Cycle CPU 4000.

    Now a resource pool has three virtual machines powered with shares.so high normal and low on this desire to cycles CPU 6000 cases divided among them in 4:2:1

    VM1 have = 4 * 6000/7 = 3428 cycles cpu.

    VM2 will get = 2 * 6000/7 = 1714 cycles cpu.

    Vm3 will get = 1 * 6000/7 = 857 cycles cpu.

    so according to your requirement, you can change your actions at the level of the virtual machine.

    PS:shares come into picture when there is a conflict.

    HTH

  • How to calculate the size of a VMFS volume?

    Creating a new partitiontable after ESXi 4 wiped empty was pretty easy with fdisk.
    These days with partedUtil and ESXi 5 is not so trivial.

    Consider that we have a disk/Lun, which looks like this

    ~ # partedUtil get /vmfs/devices/disks/mpx.vmhba1:C0:T4:L0
    93990 255 63 1509949440

    and suggests that the original - now messed the Volume was created with ESXi 5.
    How to calculate the value of the end in the sector so that I can recreate the VMFS partition like this:

    partedUtil setptbl ' / vmfs/devices/disks/mpx.vmhba1:C0:T4:L0 ' TPG '1-2048 ? '. AA31E02A400F11DB9590000C2911D1B8 0 "


    In this case, the correct value is 1509949349, but how do I calculate if I don't know the correct value?

    Hello

    the output of the command "partedUtil get /vmfs/devices/disks/mpx.vmhba1:C0:T4:L0" will be useful in your case, it's "93990 255 63 1509949440".

    gives us the values for C/H/S (cylinder/head/sector).

    A VMFS volume partition must end on the limit of a cylinder, so selecting the last sector of the partition table should be done using the formula endSector = (C * H * S - 1).

    who is '1509949440-1' = 1509949349.

    Concerning

    (Ref: http://www.virtuallyghetto.com/2011/07/how-to-format-and-create-vmfs-volume.html)

  • How to calculate the number of days/weeks/months between 2 dates?

    Hello

    I would like to know how to calculate the number of days/weeks/months between 2 dates in OBIEE 11 g, for example, I have 26/05/2013 and 19/05/2013, then I want to get 7 days.

    Thank you!
    Jamie

    Hi Jamie,

    Through this links...

    http://www.bravesoft.com/blog/?p=682
    http://twobiee.blogspot.in/2012/01/working-with-date-differences.html

    Mark as correct it allows u...
    Thank you...

  • How to calculate the size of HFM Cube in SQL Server 2005

    Hello

    How to calculate the size of the HFM Cube in SQL Server2005

    Under application used to Oracle. So what's application to SQL Server?

    ***********************************************************************************************************
    SQL > select sum(bytes/1024/1024) from dba_segments where nom_segment like 'FINANCIAL_ %' and owner = 'HFM;
    SUM(BYTES/1024/1024)

    SQL > select sum(bytes/1024/1024) from dba_segments where nom_segment like FINANCIAL% HSV' and owner = 'HFM;

    SUM(BYTES/1024/1024)
    **********************************************************************************************************

    Concerning
    Smilee

    What is your goal? The subcube in HFM is a concept that applies to application layer - not so much to the database layer. The size of the subcube is the unique number of sheets (data values for January - December inclusive, for example) for the given entity, a triplet of currency or node Parent.Child. Should be considered for accounts of parent and customs that do not exist in the database, but are calculated in the RAM of the application layer.

    So if your goal is to find the largest subcubes, you could do this by querying the database and by counting the number of records per entity value (tables DCE) or combination of entity parent.child (tables of the DCN). I am not versed in SQL, but I think the script below you would just the size of the pattern and not the sizes of subcube.

    See Accelatis.com for a third party software product that can do it for you. The function is called the subcube Analyzer and was written by the same team that wrote HFM, then they should know how :-)

    -chris

  • How to calculate the month on month growth rates in an OBIEE application?

    Hi all

    I would like to ask for your help on how to calculate the months on growth rate previous/[(last month-previous month) month * 100%] in a query OBIEE. This report should always be calculated for the last 2 months available.

    I have the following query:
    Month0 | Months1. Month2
    Produces a 500 | 100. 200
    Product B 600 | 300. 150

    I would like to add month on month column as follows:
    Month0 | Months1. Month2. Month on Month (%)
    Produces a 500 | 100. 200 | + 100.00%
    Product B 600 | 300. 150. -50.00%

    I tried to add a calculated item, but it failed because I couldn't find a way to not show the column calculated in percent with 2 decimal places. In addition, I would ideally prefer to have an automatic update but as far as I understand it can be done in the automatically calculated item

    I also tried to add a new column to the column area and to filter the results for the last month, then for the previous month and then based on that to calculate the necessary ratio but unfortunately it does not work.

    Thank you in advance your advice

    Hello

    The best way to solve this problem is by using the function Ago. With this, you can create a logical column for the previous month. Then you will have 2 columns available with which you can do your calculations.

    If you want to do this with a calculated item (don't know if formatting will work for you), but you can do the more general calculation using $1 for the $2 for the 2 column and 1 column in your calculation. If ($x) columns will change with the columns in your report.

    Concerning

Maybe you are looking for

  • Missing many browser settings (cookies, etc.) in Firefox OS

    Hello I know that the mobile browser to firefox for android and firefox on linux. today I activated my new phone os of firefox. now I can not find the browser settings for cookies, offline data, passwords etc. in the configuration section, there are

  • Order of song playlists is not transferred to iPod classic

    Hi there: I'm on Yosemite 10.10.5, with iTunes version 12.3.2.35. I want my playlists to play in the order of songs per album, but no matter how configure iTunes to sort, playlists always end in a different way on the iPod. The iTunes menu drop-down

  • I want to use google browser

    I want to use google image as my browser, I used ie but don't like her, then how do I change browsers?

  • SIGMATEL STAC 92XX C-Major HD Audio Driver for Windows 7?

    Computer: Dell XPS 420 OS: Windows 7 64-bit Sound card: SIGMATEL STAC 92XX C - Major HD Audio I upgraded my machine to Windows 7 64-bit a few weeks; However, the sound card is malfunctioning. I have the Logitech Z-5500 Digital 5.1 Speaker and is nece

  • installing not silverlight from Microsoft and some other updates.

    one of the errors are: WindowsUpdate_00000643""WindowsUpdate_dt000 and 64 c WindowsUpdate_00000""WindowsUpdate_dt000" He also says in some occations that my windows installer does not work. It's happeninig for about 6-8 months now. Done everything I