How to get operational Task Scheduler?

In the event viewer, I can see the next event, which appears after every start.

Service Task Scheduler doesn't have to launch tasks triggered by starting the computer. Additional data: error value: 2147942402. User action: restart the Task Scheduler service.  (Event ID 412)

The advice given appear to be invalid, since the Scheduler service has all it's controls in gray.  The service does not appear to be active.

I'm not abe to say from the message that it is.  This means a particular scheduled task failed?
Enjoy troubleshooting tips.

Dave

Download Process Monitor of
 
 
Start the program as an administrator (right click and choose Run as administrator).
 
Set the filter (gout 4 boxes along the top to the bottom)
 
ProcessName Contains svchost.exe Include
 
and then click Add. Then set a second filter
 
Event class is system file include
 
then click Add then Ok.
 
Then Options menu - enable Boot Logging will record it at the next startup, until you rerun ProcMon. Try to restart and read the log for file operations failed.
 
Svchost hosts most of the services, there will be a lot of waste.
 
After the reboot, tab of the task of Service Manager Appendix a right-click and click go to process. Note the PID. Then add a filter to ProcMon existing filters.
 
The nest is to include
 
then click Add then Ok.
 
Which will limit the display to a few services.
 
Still a lot of waste but. You cannot sort in ProcMon, but you can file - export to Excel, where you can sort by the column of result. If no excel use the menu Filter - Highlite.
.
--

Tags: Windows

Similar Questions

  • How to configure a task scheduler in apex?

    How to configure a task scheduler in the apex without code

    2740883 wrote:

    Sorry to be is not clear.

    I need to create a task that runs every 15 minutes. This work updates a certain painting of my DB. I need to do this in the Apex, so that users of my application can configure the frequency of employment

    Oracle database includes Oracle's Scheduler, which is a sophisticated job scheduler. You can set up a job scheduler to update your table and create an interface user of APEX, allowing users to change the work using the methods in the DBMS_SCHEDULER package.

    Other issues related to the creation of the APEX user interface can be requested here, but there is a forum of Planner where you refer questions about aspects of the Scheduler.

  • How to use the Task Scheduler to send an email

    I have Windows Live Mail + Windows 7

    I want my computer to send an email to someone on his own. I opened the Task Scheduler and creates a new task using the Task Scheduler 'send and send '. The problem is that the program asks only me who he is, which comes from the e-mail and how to use smtp server... He doesn't ask for my mail server login and user name, so in theory it would be rejected... and when it comes to send the message, now it does nothing without any error message.

    I have 2 settings of e-mail in Windows Live Mail accounts but how do I know the Task Scheduler program which includes use of e-mail and how to connect to the account to send it?

    best,

    Charlie

    This task seems to be used only in limited circumstances where a local Windows based SMTP server is available and security credentials are already established.  There is an interesting discussion about this in
    http://social.technet.Microsoft.com/forums/en-us/winservergen/thread/f087c57c-57b8-4c7f-ba2a-feb04c51f5ba

    One of the links posted http://www.microsoft.com/technet/prodtechnol/WindowsServer2003/Library/IIS/e4cf06f5-9a36-474b-ba78-3f287a2b88f2.mspx?mfr=true indicate a possible way to do so by implementing a service SMTP with IIS, but many (I think that most) ISPS block Port 25 and who would probably be a problem.

    It looks like using a 3rd party to contact the external mail server might be the best bet.

    'Charlie Cooper' wrote in the new message: * e-mail address is removed from the privacy... *

    Thanks for your reply, but I'm looking to make use of the 'send an Email' task which included in Task Scheduler... is something that has been there for a while and I've never understood how it would work... I open the Task Scheduler, create a "fundamental task" and click 'send', but I is not even asking me my user name or password? only the smtp server and the email I want to use!

  • How configure you the Task Scheduler to send emails with user names when they are locked on their w/s

    I configured Task Scheduler to send alerts by e-mail. My problem is this, when a user is locked out of their jobs, we get the alert message, but it does not show that. Only that 'someone' has been locked. What adjustments or changes should I make to see who is the alert message for. We try to simplify "tickets" for simple lockout.

    Windows Server 2008. As before it works it will send alerts by e-mail, but it does not show me who it was from.

    Any help or advice is welcome.

    Thank you

    Hello

    As you work on Windows 2008 Server, please post the question in the following link for assistance.
    http://social.technet.Microsoft.com/forums/en/category/WindowsServer/

    It will be useful.

  • OIM 11 g - how to run a task scheduled by using APIs

    Hi all

    Can I know how can I run a job schedule in OIM 11 g via API. I mentioned the link below but it is for version 9.x. I need the same functionality in 11g?

    Schedule tasks

    Thanks in advance.

    Check this box:

    SchedulerService schService = oimClient.getService (SchedulerService.class);
    schService.triggerNow round demo Scheduled Task");

    QAnywhere:

    Sub triggerNow (java.lang.String jobName)
    get SchedulerException,
    SchedulerAccessDeniedException

    Runs the specified job
    Parameters:
    jobName - the work that needs to be triggered
    Throws:
    SchedulerException - when an error occurs in the Quartz engine or Scheduler is not running.
    SchedulerAccessDeniedException - this exception will be thrown if the access permission for the operation is not available for the user

  • How to get the Task Manager recognize image after upgrade to dual-core

    I have improved the fron of processor Intel Pentium G3240T (Haswell) 2.7 GHz Dual - Core of Intel Core i5 - 4570T (Haswell) 2.9 GHz Quad Core. HP Pavilion 23-g120t CTO of all-in-One desktop PC is running windows 8.1.

    Devic Manager shows 4 core, but the Task Manager does not work.

    There need a configuration file updated to benefit for the quad core?

    How can I get the Manager tasks recognize four hearts?

    I restored the system with recovery CD and tried the msconfig by selecting 4 processors with no luck.

    Here is the link to the card mother deatiling all taken CPU model supported.

    HP Pavilion 23-g120t CTO all-in-One desktop PC

    http://support.HP.com/us-en/document/c04014873

    Thank you!

    Looks like that the plateau of the ony processor version supports two hearts. Thank you!

  • How to get out of scheduled using web service api report

    Hello

    By using the api service report I can run the report query and get the result and save it in a file. But as I'm under the report directly I don't see report running history in BIP UI. (Or there is a way to do what I don't know.)

    So I create a task report and the request for a change it and then call using the api planning service and it works properly gives me a return identification work and I see the history for a job at the BIP UI.

    But I can't find a api that gives me the result of this work.

    All of the suggestions.

    I use eclipse, cfx to generate stubs, and it's a simple java program with access to the web service

    Obtained, he works as below.

    1. Call scheduleReport on SchedulerService to schedule a report and get the scheduled_job_id.
    2. Call getAllScheduledReportHistory on SchedulerService using scheduled_job_id to get the work history that includes the work of the child created by the Scheduler for above child_job_id scheduled_job_id.
    3. Call getScheduledJobInfo on SchedulerService using child_job_id to check whether the job has finished if it is wait for a while, then try again until the work is either successful or failed. The api returns object JobDetails
    4. If the job is successful then check if xmlDataIsAviable for the above job details. If Yes, then call getXMLData on SchedulerService using child_job_id which gives a byte array, write this array of bytes on the disk using the java.io library
    5. Call getScheduledReportOutputInfo on SchedulerService using child_job_id for the information of reportOutput, which is a list of cases
      more than one output format is specified in the report definition to the bi pub. Scan the list for the output_id for the data to the desired output format.
    6. Call getDocumentData on SchedulerService using the output_id above, which gives an array of bytes of report data, and save it using the java.io library

    If you want to avoid voting in step 3 you can configure a httpserver in bi publiher, which is basically a servlet url of a Web application deployed on a server

    Select Server Name URL Default Delete
    BiPubReportsWebApp http://hostname:PortName/webappnameWebApp/servleturi

    and when planning the report in step 1, you can specify these options in the ScheduleRequest element

    scheduleRequest.setNotificationServer (notificationHttpServerName) / /notificationHttpServerName = BiPubReportsWebApp

    scheduleRequest.setNotifyHttpWhenFailed (true);

    scheduleRequest.setNotifyHttpWhenSkipped (true);

    scheduleRequest.setNotifyHttpWhenSuccess (true);

    scheduleRequest.setNotifyHttpWhenWarning (true);

    So when the work is done bi publisher will make a post to you request httpservlet with jobid, reporturl, jobstatus, so you can use this jobid (which corresponds to the id of child labour) to perform steps 4 and following

    Another thing to note is step 6 gives the byte array return which may be huge in big reports and you can go outofmemeory in this case

    (1) request to the server to save the xml data and output on the server and returns the path where these files have been saved by using downloadXMLData and downloadDocumentData to the SchedulerService, and then tokensize the string to get the last piece

    (2) call downloadReportDataChunk of the report (in a loop) service to get the data for the xml data and the document into segments giving him the name of the file in step 1, a start index and chunksize

    While (offset! = - 1) {}

    LOG.debug ("Getting chunck number :->" + counter + "index :->" + beginIdx);

    ReportDataChunk reportDataChunk = getReportDataChunks (tmpFileNameOnServer, beginIdx, util.chunkSize);

    data = reportDataChunk.getReportDataChunk ();

    output. Write (Data);

    beginIdx = beginIdx + util.chunkSize;

    offset = reportDataChunk.getReportDataOffset ();

    counter ++;

    }

    public ReportDataChunk (String starts, int beginIdx, int size) getReportDataChunks survey com.oracle.xmlns.oxp.service.v2.reportservice.OperationFailedException_Exception,

    {com Oracle.xmlns.OXP.service.v2.ReportService.AccessDeniedException_Exception}

    ReportDataChunk reportDataChunk is getReportServicePort () .downloadReportDataChunk (starts, beginIdx, size, getUsername(), getPassword());.

    Return reportDataChunk;

    }

    Note: when you schedule a report using schedulereport pub bi api back you a job id but matching so that it creates a Collard work with a different id that does the job and this childjobid is given when using the method of notification httpserver.

  • How to configure the task scheduled by powercli?

    Hello

    I'll evaluate the VAAI feature to my storage. To assess the "hardware assisted locking", I'll do that 300 VMs starts at the same time. but I don't know how is the best way of.

    I'd like to set the schedule of the task of the indivisual by vCenter GUI virtual computer. Can I put in the annex by powercli? Is there some sort of useful tools? or I have to write a program using VMware SDK?

    Thank you

    mashoj

    Alan, called to run a scheduled task PowerCLI, post explains how to set a scheduled task.

    Or do you want to use the Planner vCenter?

  • How to get the Task Manager back?

    Recently I could not use my task manager, I keep ending up with "task manager has been disabled by your administration."

    This happened after my computer has been attacked by a keylogger. I got out of my computer.

    Your computer is probably still not clean. Make sure that it is:

    http://www.elephantboycomputers.com/page2.html#Removing_Malware MS - MVP - Elephant Boy computers - don't panic!

  • How to automate ScanDisk using Task Scheduler tool?

    There is no file c:\windows\scandskw.exe on my XP, does anyone have any suggestions on how to automate using Task Scheduler tool in XP ScanDisk?

    Thanks for all the suggestions

    Saturday, August 14, 2010, 02:18:45 + 0000, SC Tom wrote:

    There is no program Scandisk in Windows XP.

    In order to specify that the person you are you answer to the. There is no program
    called the Scandisk, but there is a program with this feature; There
    Called Chkdsk.

    Ken Blake

  • Error "task BackgroundConfigSurveyor: the task image is damaged or has been tampered with." When I click on Task Scheduler

    Original title:

    When I clicked on Task Scheduler I got the following error message: "BackgroundConfigSurveyor of the task: the task image is damaged or has been tampered with."

    When I click on the OK button and try to go I had error messages and I need to get out the Task Scheduler.  I tried to fix by restarting my computer once again by clicking Task Scheduler - result error messages persist.  Help!  How can I 'corrupt' Task Scheduler?  Please give me detailed instructions.

    Hello

    You did changes to the computer, before the show?

    Method 1:

    Run System File Checker analysis and check.

    How to use the System File Checker tool to fix the system files missing or corrupted on Windows Vista or Windows 7

    Method 2:

    Important: This section, method, or task contains steps that tell you how to modify the registry. However, serious problems can occur if you modify the registry incorrectly. Therefore, make sure that you proceed with caution. For added protection, back up the registry before you edit it. Then you can restore the registry if a problem occurs. For more information about how to back up and restore the registry, click on the number below to view the article in the Microsoft Knowledge Base:

    How to back up and restore the registry in Windows

    Check out the following link.

    MS10-092: vulnerability in Task Scheduler could allow elevation of privileges

  • How to move the task bar

    original title: work toolbar

    I would like to know how to get the task of tool bar back on the upper right side of my screen.  It was off my mistabke.  How do I turn it back on?

    In addition, I would like to know how to get my taskbar to the normal position, all the way down my screen. (Blue section dark with START on the left side)  The symbols went on the far right and shape are scarce.  I would like that they to the left side, in long form.  How to restore this normal?

    Thanks for your help.  Waiting for your response.

    The game, October 11, 2012 22:33:25 + 0000, Jacqueline Stankiewicz wrote:

    I would like to know how to get the task of tool bar back on the upper right side of my screen.  It was off my mistabke.  How do I turn it back on?

    Sorry, I don't know what you mean by "the task of the tool bar." Please
    clarify what it is.

    In addition, I would like to know how to get my taskbar to the normal position, all the way down my screen. (Blue section dark with START on the left side)  The symbols went on the far right and shape are scarce.  I would like that they to the left side, in long form.  How to restore it normal?

    Although by default, the taskbar is displayed on the bottom of the screen,
    It can be on any of the sides on what you prefer. To move any
    side to side, simply click an unused portion and drag
    where you want it. Don't forget to click inside it, not on the edge.
    by clicking on the edge and dragging will resize not move.

    If it does not move, it can be locked. In this case, right click on it
    and uncheck "Lock the taskbar", then try again.

    Moreover, with the screen monitors wide today, I prefer the taskbar
    on the left or the right of the screen. I think that allows a better
    use of real estate than have it at the bottom of screen.

    Ken Blake, Microsoft MVP

  • When I try to get my task manager on the screen I get the consignment "task manager disabled by administrator".

    When I try to get my task manageron screen I get the consignment "Manager tasks disabled by administrator - can anyone help with a solution on how to get the Task Manager.

    The following links may be worth a visit:
    (A Google search will produce more information on this topic)

    FWIW... it is possible that this problem was caused by a virus.

    (555480) "Manager tasks has been."
    disabled by your administrator"error message
    http://support.Microsoft.com/kb/555480

    The task manager has been disabled by your administrator
    http://WindowsXP.MVPs.org/Taskmanager_error.htm

  • Why all of a sudden I get an error message saying that the Task Scheduler engine stopped working and was closed? How can I fix the problem?

    I don't know what has been done to cause the TASK SCHEDULER ENGINE TO STOP WORKING. What should I do to correct this?

    Hello

    Apologize for the delay in response. I suggest that you mention 'Sidi Y' suggestions in the following link and check if it helps:

    http://answers.Microsoft.com/en-us/Windows/Forum/windows_vista-performance/getting-error-on-startup-Task-Scheduler-engine-has/883004c6-C06D-E011-8dfc-68b599b31bf5

    Hope this information helps. Back to us for assistance.

  • How can I prevent the shutdown task scheduler engine, get the new display detected to work and avoid receiving the message "Internet Explorer has encountered a problem and stop"? __

    My laptop is a Dell Inspiron 1520, running Windows Vista Home Edition Premium and Internet Explorer 9.  My extra monitor is a Sharp Aquos LED HD - TV, the model LC-46LE700UN.  I've been using a VGA cable to me onnecter the laptop and TV.

    The laptop seems to operate normally when not connect to the TV.

    As soon as the VGA cable is connected to the laptop (without being connected to the TV), the following message appears:

    'Microsoft Windows - Task Scheduler engine has stopped working.  A problem caused the blocking of the program works correctly.  Windows will close the program and notify you if a solution is found. »

    When initially, I connected the laptop to TV, "new display detected" was automatically acti EV.  Soon, it was activated is no longer automatically.  I was able to activate manually using Windows Mobility Center during automatic activation failed initially but now Windows Mobility Center no longer detects the new view.

    Using Fn + F8, I can view the image on the laptop or TV, but not both simultaneously.

    The message "Internet Explorer has encountered a problem and stop" appears intermittently, but I can still make internet sites and show the content after the message.

    I have download software, myp2p.eu, a site for watching TV programs "streaming", including PPStream, Sopcast, Live, Stream Torrent Sina, a Swarm, TVAnts, UUSee, VGO and Veetle player and canceled downloads for PPL (who failed an integrity check), PPMate (corrupted) and (blocked) TVKoo.

    Norton Security quarantined the installer of UUSee, indicating that it was a high risk of program with many users.

    To a computer repair shop and using a different additional display flat screen, I could not duplicate the problems yesterday (4 October 2010), when the "new detected display" has been activated automatically, and I could see the photo or the other and both screens.

    I tried to restore the system to a date (on the list) before when the problems occurred first - failure of the restoration of the system.  I tried to use scandisk, but received no indication that he had performed and corrected all errors found after restarting Windows.  I looked at responses from forum, the display setting and the new display detected support literature.

    How can I avoid these problems?  Help!

    Hello

    Restoring the system end up with any error message?

    This could also happen if one of the substantive programmes is in conflict with the proper functioning of your computer. To troubleshoot error messages and other issues,
    You can start Windows Vista by using a minimal set of drivers and startup programs. This type of boot is known as a "clean boot". A clean boot helps eliminate software conflicts.

    Steps-
    1 log on to the computer using an account with administrator rights
    2. click on start, type msconfig.exe in the start search box and press ENTER to start the System Configuration utility.
    If you are prompted for an administrator password or for confirmation, type your password, or click on continue
    3. on the general tab, click Selective startup, and then clear the check box load startup items. (The check box use the file Boot is not available.)
    4. on the Services tab, click to select the skin all the Microsoft services check box, and then click Disable all

    Note: Following this step lets services Microsoft continue to run. These services include networking, Plug-and-Play, record of events, error reporting, and other services.
    If you disable these services, you can permanently delete all restore points. Do not do this if you want to use with existing restore points system restore utility

    See this article-
    http://support.Microsoft.com/kb/929135

    This should solve your problem.

    -Robert

Maybe you are looking for