How to skip execution of scenarios in an ODI package

Hello


I have a package ODI containing interfaces ODI, ODI procedures scenarios... I want to jump a particular scenario in the executing package. Is it possible to ignore a particular scenario.


Thank you

Karim

Hello

You can change next run after successful treatment.

Tags: Business Intelligence

Similar Questions

  • How to skip the Startup Repair...

    How to skip the Startup Repair... I started from the install disc and want to "restore full backup for PC. I selected the partition with the corrupt windows installation. The process is suspended, check disk for errors. This check can be ignored. I know it is corrupted and you want to restore completely. No need for this control.

    Hello

    What happens if you leave the disk check to run its course without interfering with it?

    And it is not a good idea to have a backup on the same hard drive, due to the possible failure of the Hard Drive altogether.

    I'm sorry, but nobody here knows why, your system is damaged. There may be problems with bad sectors on the hard disk.

    I suggest download you Diagnostic tools for your hard drive manufacturer, make a Bootable disc and run a diagnostic test to see what the problems are, if any, there is with this hard drive.

    http://pcsupport.about.com/od/toolsofthetrade/TP/tophddiag.htm

    See you soon.

  • How to migrate first cc Pro for the complete package?

    How to migrate first cc Pro for the complete package?

    I just checked that you have added creative cloud apps on your account membership. If all goes well it should work for you now.

    Please let us know if you need assistance.

  • How the configuration and implementation of security in ODI

    HI friends,

    I have a few question about the facilities of ODI. I use
    Oracle DB version is Oracle Database 11 g Enterprise Edition Release 11.2.0.3.0 - 64 bit Production
    ODI's ODI 11.1.1.5 version.

    During the installation we can go
    A master repository for Dev and UAT, mainly because we have a physical server for connecting to UAT DB and DB Dev UAT. And a separate master repository for Production?

    We have 2 groups of users. A developer and a tester.
    Tester donot have a permission to use or to check the development codes. They have only permission to run in operator.
    How to make this implementation of security in ODI during installation.



    Please confirm me on this.

    Thank you
    Lony

    Hi Lony,
    You can create a master repository, but the problem is that all developers have access to a physical connection. If a developer is going to change the details of connection to a card used in production can cause business problem. Although it is easy to maintain, but have some disadvantages.

    If you have a different master repository development and test, then avoid this kind of problem as I said earlier. If you ask me, I'll go to different master repository.

    Thank you.

  • How do test you a connection in a ODI 11 g?

    Hello

    How do test you a connection in a ODI 11 g? In 10g, you can do that on the definition tab.

    See you soon

    Hello

    It's still there... When you try to create a new database server / or open a data server, the "Test connection" button just below the name of the database server. You can test the connection of any tab definition i.e., jdbc, etc. properties.

    Thank you
    Fati

  • How tag member like two drop calc by ODI by planning?

    How tag member like two drop calc by ODI by planning?


    Thank you
    Dolar

    This isn't down to ODI, if try to log you in planning and try and it manually you will not be allowed.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • How to skip a step programmatically?

    Hi dear ALL,

    Could you suggest me a solution for my task? It is necessary to go through the program steps specified during the execution of the sequence. For example, I have a skipStep of type boolean parameter. And I want to connect this setting at certain stages. When the sequence is run with skipStep = True, execution Options of these steps will be Skip. Is it possible to implement?

    Thanks in advance,

    Max

    Max,

    This is possible. Evaluate your local variable true or false in the precondition of the step. Look in the computer.seq example to see how it's done.

    I hope this helps.

  • How to skip to the previous song, without using the iPod Nano touchscreen (7th generation)

    I want to understand, how can I go back and forth between songs in iPod nano 7th generation.  I thought that all iPods have this easy navigation through buttons system, but I don't think it's available in iPod Nano. After I search the Internet, I found that I can go directly through a double pressure on the middle part of the volume button band. But, is it possible to skip to the previous song?

    On the 7th gen iPod nano, there are three buttons on the side.  Increase volume / Play/Pause : turn down the VolumeNext song press Play/Pausetwice.  Previous song is triple - Play/Pause-press.

    NOTE: If you have headphones with control buttons on the cord, same three buttons are there, and they work the same way for the read command.

  • How to pause execution in a sequence file if a step fails

    Hello

    How teststand may suspend performance if any step fails in the movie file. I used parameters of breakpoint with RunState.Step.Result.Status is 'Impossible', but this breakpoint is not worked... Is there a way to do this?

    Thanks in advance.

    Concerning

    Ran

    Add a SequenceFilePostStepFailure and put a statement in there with RunState.Execution.Break ().

  • How to end execution programmatically?

    Hello

    I have a high level of sequence that bunch of calls of sequences in a new run one after the other (I chose to wait for execution to complete before running the next step ). I noticed that once an execution has been completed, it frees all memory acquired (I am observing it using performance monitor). This causes a memory leak large and finally Teststand hangs when it occupies 1300 MB of RAM. How can I force teststand to put an end to a writ of execution before starting a new run. I'll try to post an example as soon as I can. Thanks in advance.

    To do a few extra things to get rid of results after each run. Here is a list to make sure you get all the:

    (1) move your new execution sequence, call in its own Subsequence - this is necessary because a new reference is stored as a local hidden variable in which the appeal of the sequence order is in and you want to run go, to return from the sequence, making the call for you ensure that this happens.

    (2) you need to check the setting of "close the window when finished" on the Panel of appeal advanced sequence for the new call the sequence is run - once again, you want to run and go after it's done, then you must make sure that you're not he keep open anywhere.

    (3) make sure that you disable the definition stage of the results of recording on the new call of execution sequence - if you don't do this, then all execution results will be added to the call of the sequence and you will always use a lot of memory even if the execution goes.

    Hope this helps,

    -Doug

  • How to stop execution when modal Subvi open?

    Ladies and gentlemen,

    A very simple question: I sometimes modal dialog boxes, which can be closed (which can happen during programming, when logical not completed, or if one of the modal dialog boxes then opened, and then main VI is started). Then, when it happened, so the only way to stop execution is killing LabVIEW of Task Manager. I remember it was something simple how stop running without killing LabVIEW, but do not remember. Can you please give me a hint - how to stop the run in this situation? Yes, I know not Ctrl +. combination, but this does not work in this case.

    See the attachment for more details.

    Andrey.

    Try useful tool of Darren

  • How do the aggregation of scenarios/General Question (also of suggestions on useful beginner guide)

    Hello

    OK, so I was wondering if it is possible to aggregate the children of a scenario dimension in Hyperion Essbase (or whether it is even a good idea).

    Example:

    The scenario is my plan I have the following children:

    Scenario (~)

    Forecast (~)

    Actual (~)

    Actual_A (+)

    Actual_B (+)

    Actual_A and Actual_B are the actual data from two separate data sources. Their other dimensions will be overlap. It's like I have two machines to weld both with the same elements in them, and I want to be able to see their data on a machine-level and a level of aggregation (while they roll upward and actual expenditures).

    The Actual_A and Actual_B will have to do some calculations (as multiplying drink cost/income type, etc.), but they will make the same calculations. After that, I want that they aggregation on their level scenario (so I know how many cokes got sold, etc.) and then roll up to the real database.

    Although I don't know that I could create another dimension (for example, ' DataSource') which would be tag source the data, I really prefer to keep the division in this method.

    Is there something special I need to do this work? I tried to create a script that sets on Actual_A and then Actual_B, the calculations of mirror, and then I finished the script combining all my dimensions at the level of 'real '. Should I also pile so first of all, data bases (A and B)? I have to set levels to have some settings in my script? I have a minor programming experience, but not with Hyperion.

    In addition, suggestions for material good intro would be useful. We have a manual to my work, but it is very old and dry - for the version of Hyperion 5 years.

    Thanks a bunch!

    ~ Brian

    Try this and it should work

    Difficulty ("PriorYears", & Prioryr4, & Prioryr3, & Prioryr2, & Prioryr1, & Curryr & LagVersion)

    Difficulty (@Relative("Actual",0))

    AGG ('the company', 'Product', 'Market Segment', 'Cover', 'Paid periods', 'Segment of size');

    EndFix

    "Real";

    EndFix

    This way you are grouping only members actual and aggregation as real for the rest of the combinations provided your actual expenses is stored but not dynamic Calc

    HTH

    Amarnath

    http://Amarnath-Essbase-blog.blogspot.com

  • How to skip intro?

    Hello

    I have two projects in flash and I have the swf export

    1 - intro

    2 - homepage

    I would like to add the "skip intro" button to open the home page otherwise I want the intro jump to the home page when finished

    so I add button (skip intro) intro and write the following:

    this.createEmptyMovieClip ("man",1); by the way I don't understand what that means number
    homee.loadMovie ("home.swf");

    But what has happened is that the intro yet one loop in the homepage!

    I do not know how...

    Help, please

    One way would be to combine the two projects in a single swf and just use a gotoAndPlay (home) of the code type.

    Another solution would be to create a third-party swf file and have to do what you did in your intro, except that it have first loading of the intro in an empty movieclip, and then have it load the House in the same movieclip.  When you load the House into the movieclip which has the intro, it will automatically delete the intro.

  • How can I plan a scenario?

    Hello!

    I want to program a scenario that I created. How can I do? How can I create an Agent to do that?

    I hope someone can help me.

    Thank you
    Good bye

    Hello

    If you want step by step information, you have a reading [here | http://john-goodwin.blogspot.com/2008/09/odi-series-part-2-agent.html] to configure the Scheduler agent.

    And [here | http://john-goodwin.blogspot.com/2009/01/odi-series-final-installment.html] to plan for a scenario.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • How to skip the installation of SQL Express 2005 and using SQL Express 2008 instead?

    I have SQL Express 2008 is installed and you want to use instead of SQL Express 2005.

    How to configure the installation of Lookout as he ignores the installation of SQL Express 2005?

    Are there other measures that must be taken so that Lookout can work properly with SQL Express 2008?

    Thank you.

    OK - it worked.

    However, for 64-bit installations, I had to use the WOW of SQL Express 2008 versions, because, the Citadel is a 32-bit database and installation of 64-bit native versions would not allow an upgrade of the Citadel of Instance.

    Thank you.

Maybe you are looking for

  • Saudi flag

    Hello I just wonder why Skype changed the Saudi flag from previous version to this new? Why do you get a thick white line not blocking the "no God but allah" at the Saudi Arabia Pavilion?

  • Toshiba 32RV635D does not power off when the computer turns off

    Hello I inherited a Toshiba 32RV635D. I have a PVR based on linux (Mythtv) connected to the TV via HDMI, connected on a Nvidia GT610. With my previous TV, a Vistron LCD Panel at low prices, he would go to sleep when the put PC into hibernation and li

  • Satellite A300 - impossible to install the audio driver Conexant high definition

    I have a Toshiba Satellite A300 series with Conexant audio... my problem is the following... I can't install drivers for Conexant high definition audio in windows vista 64-bit because when I run the installer smartd 221... + Setup properly detects th

  • Concatenate the Images

    I'm doing a single image from a folder of multiple images. Images are jpgs, which is also I wish that the final image. The final product should be a grid square with all the images edge to edge. Currently, I have acquired regarding their reorganizati

  • 6520 loss of network after 2 min

    New 6520 all-in-one installed OK to test print, then do not print. After going through the power, available to print for 2 more minutes. drivers resettled, still same problem. Will work with USB OK connection. Change in Wi - Fi and same problem. 10 h