Hyperion planning and EAS console is unable to connect Server Essbase

Hyperion 11.1.2.3.502

We had essbaae in active/passive cluster and the environment was ssl is activated.

Recently, we removed the ssl configuration

Now, we are not able to connect to the planning and the Regional service console essbase Server

Have no problem connecting to essbase maxl or view smart server. We were also able to import into fdmee essbase.

Check the data source planning and validation of all the

I am getting following error when you use the Regional service console

Essbase Server: servername:1423 com.essbase.eas.essbase.defs.ServerCommands.Connect 16 December 2015 17:57:15 EST

Error: 103: unexpected error Essbase 1030818

Error: 1040142: NZERROR: nzos_Handshake failed (28864)

Error: 1042006: error network [0]: unable to connect to [cs2chypebp01:1423]

Error: 1030818: failed to connect. Please check if the server and port are correct. If you receive timeout or handshake failure, please check if you have tried to connect to secure the port without keyword secure or disable the port with the secure key word.

When you go to the planning, I get following errors in the log files

[2015 12-16 T 19: 20:10.616 - 05:00] [Planning0] [ERROR] [HSP-09012] [oracle. EPMHSP.olap] [tid: 4] [username: < anonymous >] [ecid: 000003wIIy ^ Bp2l5ovH7iY009W4a0000OQ, 0:1] [APP: PLANNING #11.1.2.0]]
[URI: / HyperionPlanning/faces/PlanningCentral] [SRC_CLASS: com.hyperion.planning.olap.HspEssbasePool] [SRC_METHOD: createObject] Impossible to establish the OLAP connection: {0}. []
com.hyperion.planning.olap.EssbaseException (1030818)


[2015 12-16 T 19: 20:10.618 - 05:00] [Planning0] [ERROR] [HSP-09012] [oracle. EPMHSP.olap] [tid: 4] [username: < anonymous >] [ecid: 000003wIIy ^ Bp2l5ovH7iY009W4a0000OQ, 0:1] [APP: PLANNING #11.1.2.0]]
[URI: / HyperionPlanning/faces/PlanningCentral] [SRC_CLASS: com.hyperion.planning.olap.HspEssbasePool] [SRC_METHOD: getConnectionInternal] could not establish the OLAP connection: {0}. []
java.lang.Exception: no object was created successfully. This may be caused by the following: the OLAP server is not running, the DBMS does not run, the DBMS is running on a different
Rental machine as specified, the name and the password provided was incorrect.


[2015 12-16 T 19: 20:10.192 - 05:00] [Planning0] [ERROR] [HSP-09012] [oracle. EPMHSP.olap] [tid: 4] [username: < anonymous >] [ecid: 000003wIIy ^ Bp2l5ovH7iY009W4a0000OQ, 0:1] [APP: PLANNING #11.1.2.0]]
[URI: / HyperionPlanning/faces/PlanningCentral] [SRC_CLASS: com.hyperion.planning.olap.HspEssbasePool] [SRC_METHOD: createObject] Impossible to establish the OLAP connection: {0}. []
com.hyperion.planning.olap.EssbaseException (1030818)

So far, we have made

We have removed the ssl configuration by running the Configurator

Reconfigure the web server

Reconfigure the web server to the logical address

Without success. Can someone help and advise you on what we should consider now

Hello

If you are able to connect to the server of Maxl Essbase.

1. I suggest you to take a look at the Source of data for planning application. Since it is an Active/Passive with SSL configuration URL would now

http://host: port/aps/Essbase? NOMCLUSTER = cluster_name

Note: ssl = true is removed at the end

2.

Change of the APS resolve URLS in the file essbase.cfg. Delete "https" and replace it with 'http' (Ref: https://docs.oracle.com/cd/E17236_01/epm.1112/esb_tech_ref/frameset.htm?apsresolver.html )

3. Regional service Console problem

You may need to cancel some things

a. download jnlp and change the URL, remove port 443 and https. Change it accordingly to http and the port of SST (def 19000). Save and open again.

b. in the Weblogic administration Console, you must disable "Enable the Plugin" some option like this that allow us once the SSL configuration for Regional service

Thank you

Anjum Ara

Tags: Business Intelligence

Similar Questions

  • performance problem - Hyperion Planning and Weblogic

    I don't know if Hyperion Planning has a limitation on no.. user connections. We tried a performance test and found that Hyperion Planning can support around 400 to 500 connections to user under the Weblogic application server platform. We understand that Weblogic can usually take care of thousands of user connections, so we assume that it is the problems of Hyperion.

    We have a server configured with 16 GB of memory. But since Hyperion Planning can support max 2 GB, the memory is not the bottleneck.

    Has anyone tried the maximum number of user of Hyperion Planning under one server connections?

    Thank you!

    You could easy find out by setting the max of the JVM to more than 2 GB, if the application server not dΘmarre, so I think it is 32-bit.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Problem of using IE 8 with Hyperion Planning and workspace

    Has anyone tried using IE 8 with Hyperion Planning and workspace? I found that sometimes it has the error message and cannot allow users to log out.

    Hello
    We tried IE8 with system 11. It simply doesn't get it. IE8 is not officially supported yet. And over the years, I have learned this lesson: never use a new browser, unless it is officially in charge.
    You can find a page very useful here in this link to see what is currently supported for your release.
    http://www.Oracle.com/technology/products/bi/Hyperion-supported-platforms.html

    Alp

  • My MacBook froze during the installation of the update at El Capitan and now I am unable to connect to any except the screen of the guest user. There was a message of panic, and somewhere in there, he said no set of OS. I tried to start without danger, it

    My MacBook froze during the installation of the update at El Capitan and now I am unable to connect to any except the screen of the guest user. There was a message of panic, and somewhere in there, he said no set of OS. I tried to start without danger, it does not work either.

    This general situation may be similar to what is mentioned in this sequel to thread of the CSA

    and if the remedy is to use instructions; detailed and I hope they are correct...

    Re: Restart fails after installation of El Capitan help!

    Or you can try and see on the repair of the system and then if your disk utility can

    See the Macintosh HD, as a boot volume, you could restart from OS X Recovery to

    the Mac system, to see if this solves the problem. There may be more than one cause.

    You could try and boot into OS X Recovery, utilities out there, and other options are available.

    • OS X: on OS X Recovery - Apple Support

    This example uses a special partition on the hard drive of recovery which is not in the

    same disc that the Mac OS X section; However if your hard drive is missing, these other

    items may also be at risk. You must have and maintain backups of your duplicate content

    on the external storage drives closed; In addition, a Time Machine backup helps to restore.

    • Apple OS X and Time Machine tips:

    http://pondini.org/OSX/home.html

    • Tips for OS X - using HD recovery:

    http://pondini.org/OSX/RecoveryHD.html

    {Using the utility disc and other tools can be done from the boot OS X Recovery volume

    Beware of the fact these tools can also delete or reformat your content; wiping.}

    Don't know what to say; you could see visiting an Apple store with genius if

    There is an official store. Usually for best time planning you would contact them for an appointment.

    Or if there is no official retail Apple Store with genius, the following suggestion would be to contact

    a service provider authorized Apple, an independent specialist who is qualified in the repair of Apple.

    In any case...

    Good luck & happy computing!

  • SSO through planning and EAS?

    Hello

    Is there a single sign on option Hyperion planning, smart display and EAS? or each of them requires a separate sign in?

    Only if you have configured SSO - SSO allowing security officers

    See you soon

    John

    http://John-Goodwin.blogspot.com/

  • Hyperion Planning and Essbase

    I have a question about how essbase is related to hyperion planning.  specifically, I would like to know if you can vectorize in essbase and then associate them with or have them cross to a hyperion planning an application.  I read that if you make a change to an essbase outline, and then refresh the hyperion application applications settings, including an outline, will be replaced.  It seems that master control is integrated with EPMA or hyperion planning because all the dimension and the main lines of work needs to be done here.  However, it seems to me that there may be times where you want everything works on and change the contour in essabase and have changes go through the application of EPMA, because it's maybe easier.  Is this true and if so, how do the changes so that they appear in the hyperion application that was created by EPMA.

    The flow is planning for Essbase, it cannot be reversed.

    If it's a planning request EPMA then the stream is EPMA > planning > Essbase

    See you soon

    John

    http://John-Goodwin.blogspot.com/

  • Hyperion Planning and Smartview: build the function Description HS

    Hi all

    I am currently using Hyperion planning 11.1.2.2, I want to display in excel of the ad-hoc reports description of some members of the dimension through smartview.
    To this end, I used the feature to "build the function:
    I selected an empty cell and call the feature, a window appears with two parameters:

    1-connection: this field is filled in automatically (WSFN |) HP | PC | Planning | Plane1)
    2 - members list: I want to wire it manually ex: '#100 account '.

    I click on validate: the following message appears: selected connection does not support this new function.select connection.

    I would like to know what is meant by connection? What is the syntax of the connection string? could you please give an example?

    Thank you
    Best regards.
    Toufik

    Published by: user11081975 on May 12, 2013 12:55

    Hsdescription is not supported by connection of planning.

    You can use it with Essbase connection.

    Read http://docs.oracle.com/cd/E17236_01/epm.1112/sv_user/ch17s01s08s15.html

    He talks about what are connections shared and private.

    Concerning

    Celvin
    http://www.orahyplabs.com

  • IOP 11.1.2.0 repel Hyperion Planning and Hyperion Essbase data?

    In the "Oracle-integrated-operational-planning - datasheet.pdf", it says in the section "Publish the Plans for execution,"
    "Once approved, revisions of the plan can be sent to other systems of planning to ensure.
    alignment or ERP systems for execution. Change the data are stored in Oracle
    Integrated operational planning root and review later cause analysis. »

    Can you please tell me how to send data from Plan of Hyperion Essbase or Hyperion Planning (which is always Essbase data) of IOP? I looked in the Administrator's guide, but I'm afraid I missed where you can do. Could you please direct me to the appropriate guide?

    Thank you.

    We don't support snapshot using MDX query command to export almost any segment of the IOP cube in a relational table. Once the export is complete, you can use Essbase loading rules for loading data in areas of interest. All these commands can be put inside a javascript or jacl command and then packaged as a script model. This script can be invoked from the IOP UI planning workshop.

  • Hyperion planning and Excel

    Can reproduce us the features of Hyperion planning of data forms using Excel with the locking function and Essbase sending?

    user4484703 wrote:
    Thanks John. But I've seen smart installed. Currently using Essbase 7 and Hyperion planning 3.5 versions.

    I just wanted to check if its possible to get rid of the planning and have the same functionality in Excel.

    Yes and no. You can replicate the main feature of the planning (re-recording of the numbers in a central database) with Essbase and the typical add-in. You can also duplicate the functionality of the forms created dynamically and the "point of view" or the selection of members with VBA coding. Other features of planning, such as to-do lists, supporting details and workflow are not as easily replicated in VBA.

    Tim Tow
    Applied OLAP, Inc.

  • Clone Hyperion planning and production to create the instance of development

    Hello

    We have recently upgraded to 11.1.1.1, and currently, we do not have a test instance. We want to create a test instance. To create an instance of the application of the oracle bs, clone us the app and create a new instance. However when we try to do the same with the planning application, our dev instance is always pointing to the instance of prod. How can we get the dev instance to point to the dev database. Our configuration is essbase on linux and other applications are based on windows.
    Pointers are greatly appreciated.

    Prasad

    Hello

    I did not fully understand what you have done, say you that you have installed v11 on test machines and copied on patterns?

    If you cloned just the planning system database, then all data sources will point to the location of origin and will need to reconfigure, it's that if it allows you to reconfigure the data sources, I don't know how you have configured.

    The best option with planning is to create an empty application on the target computer, and then migrate the schema.

    If you want to take this option while the migration was covered many times here, is such an example here:- Migration of Hyperion Planning Application

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Hyperion Planning and Varying attribute

    Hello

    Some can help me with the variable attribute in Hyperion Planning application.

    Hyperion planning support concept variable attribute?

    Concerning
    Evelyne

    Hello

    Varying attribute applies only to the essbase so far, it is also with the arrival of new versions.

    Sandeep Reddy, Enti
    HCC
    http://hyperionconsultancy.com/

  • Hyperion Planning and integration with MS share Point EPMA

    Hello

    Does anyone have information on how we can integrate Hyperion Planning / EPMA with Microsoft Sharepoint? Have we not a web parts etc.

    Kind regards

    Amol

    Hello

    There is a document of version 11:-http://download.oracle.com/docs/cd/E12825_01/epm.111/ra_setup.pdf

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Unable to connect to Essbase on Regional service Console server because of error 1042006

    Hello

    I installed the whole EPM 11.1.1.3 on Windows x 64 platform. When I try to connect the server essbase through the Regional service console, I get the following error:

    Essbase Server: localhost com.essbase.eas.essbase.defs.ServerCommands.Connect December 28, 2010 17:39:08 IST
    Error: 1042006: error network [10061]: unable to connect to [localhost:1423].
    The customer has expired waiting to connect to Essbase Agent using the TCP/IP protocol.
    Check your network connections.
    Also, make sure that the values for server and port are correct

    I checked the CFG file, which shows the correct port as well. I can connect to the Administration of Essbase server located on the same machine, but do not know why I get this error message. Below I have pasted the contents of the CFG file, in case where someone wants to cross check it out.


    CFG File indicates the following:

    ; The following entry specifies the full path to the JVM. DLL
    ; JvmModuleLocation D:\Hyperion\common\JRE\Sun\1.5.0\bin\client\jvm.dll
    BPM_Oracle_DriverDescriptor "MERANT 5.2 OEM 32-BIT Oracle Wire Protocol.
    BPM_DB2_DriverDescriptor "MERANT DB2 Wire Protocol BITS 32 5.2 OEM"
    BPM_SQLServer_DriverDescriptor "MERANT 5.2 OEM 32-BIT SQL Server Wire Protocol.
    BPM_SQLServer_DriverDescriptor "SQL Server."
    ; BPM_Netezza_DriverDescriptor "NetezzaSQL".
    BPM_Teradata_DriverDescriptor "Teradata.
    BPM_ORACLEBI_DriverDescriptor 'Oracle BI Server'
    ; AuthenticationModule CSS
    ; AGENTPORT 1423
    ; SERVERPORTBEGIN 32768
    ; SERVERPORTEND 33768
    ; AGENTDESC hypservice_1
    AGENTPORT 1424
    SERVERPORTBEGIN 32768
    SERVERPORTEND 33768
    AGENTDESC hypservice_1


    Ideas that would be really useful.

    Thank you
    AJ

    There is a clue in the error message and the CFG file you posted.

    The error message:
    ...
    Unable to connect to [localhost:1423].
    ...

    CFG file indicates:

    ...
    ; AGENTPORT 1423
    ...
    AGENTPORT 1424
    ...

    The port default (1423) is commented out and changed in 1424. Your EAS connection must use port 1424 and not default to 1423.

    Try to use "localhost:1424" (without the quotes) in the Essbase server field when you add the Essbase server to EAS.

    Published by: Robert Armstrong on December 29, 2010 13:25 - typo

  • Page BI Analytics and the Publisher is unable to connect

    Hi friends,

    I did OBIEE 11.1.1.7 the installation of windows server 2008 R2 Enterprise successfully, I can connect to the console, EM, analytic and BI publisher with the weblogic user.

    After that, I installed BIAPPS 7.9.6.4 with OBIEE upward and this OBIA also installed successfully. But after installation of OBIA if I tried to connect to the analytical page and BI publisher with the weblogic user, it is unable to connect and that is to say as im getting error while logging into the analytical page below

    Unable to sign in an invalid user name or password has been entered in the analytical page.

    If I tried to open BI publisher link im getting the error as

    Server not initialized. Please ensure that the repository is ready.

    Since then, I have all services in operational Bi, but I couldn't connect to the analytical page and the editor.

    But I can connect to the console with the weblogic user and page EM.

    Im not sure the problem behind all this, kindly help me with this friends.

    Thanks in advance.

    Kind regards

    Saro

    Hi guys,.

    The problem is solved and explained in the Note 1561846.1 MOS technique with a fix.

    Thank you

    Kind regards

    Saro

  • Error created another Console service, unable to connect to the host by vSphere vCenter

    After creating an another Service Console unable to connect to the host by vSphere vCenter. How can I remove the now Service Console or make the old one further work well?

    Thank you.

    George

    This KB will show you the steps to re-create the Service Console, but you'll need to console or ILO access to the ESX host.

    http://KB.VMware.com/kb/1000266

    If you have found this device or any other useful post please consider the use of buttons useful/correct to award points

    Twitter: http://twitter.com/mittim12

Maybe you are looking for