Log items on different canvases

Hello

I'll have an "existing" database datablock multi-record (tell records no. = 5) in the form that consists of elements and a checkbox.

It has an order by clause. For some records in the box is updatable.

Now, I want all of these (box + other items) to replicate to another canvas that will appear in a pop-up window. But this time. records displayed are that say 10.

To do this, I did a copy and paste of datablock existing and renamed it (say popup block). It copied all existing triggers on the block and in the elements.

I changed the canvas for this popup for new canvas popup block elements.

I changed the name of the block in the triggers too.

Reason behind another popup block:

If not. recovered files (say 7) > "existing" block no. records to display (i.e. 5), then controle control moves to the popup block (which displays 15 records) else control passes to the block "existing".

This painting of popup appears when I run the screen or click on a specific button.

Now my problem is:

If I click on the check box in the Web of popup, checkbox in the 'existing' block must be synchronized to the same record.

If I click on the checkbox in the "existing" block, the checkbox in the popup block must be synchronized to the same record.

This is necessary because some controls / treatment are performed on the checkbox block 'existing '.

Note: There is a button on the popup block to return to the main canvas.

In my view, using the record group can solve the problem.

Can someone help me with this.

Thank you

I would only use a single block. Duplicate all items for each element set the property 'sync with the point"accordingly. Set the number of records displayed for the month of may of two paintings (for example 15), set the number of records displayed for items on the canvas with less records to the lower number. Fact. Now, everything is synchronized automatically.

Tags: Oracle Development

Similar Questions

  • my computer shuts down by itself idle, see event log the many different mistakes some cry

    Windows 7-64, HPe 130F, COMPUTER SHUTS DOWN WHIE IDLE No. REASON APPARENTE has critical errors and mistakes of warning in the event log.

    Hello

    Just to confirm if the problem lies in the operating system or not. Please go ahead and enter the BIOS. The link provided below shows how to enter the BIOS.

    http://support.HP.com/us-en/document/bph07110

    If please enter the BIOS and press F5, it asks if you want to set the default setting, press YES. Press F10, then enter it will re-start the comp. Be in the BIOS and see if the computer stops.

    Guess you didn't do all the hw of the stock changes.

  • Adding items at different times to your animation

    I placed a few items that appear every 3 seconds along my calendar successfully. However, no matter what I do, the latter keeps appearing at the beginning of the timeline. I want it to appear about 9 seconds, but I can't make them disappear or invisible before the second 9. Someone at - it suggestions?

    Thanks in advance!

    You must add the display on and off your items.

    Choose an item and let view on where you want to start. It turns off the display before this point.

    Another example:

  • Peformance Gain for a different drive for the SQL Server data and log (VM) file?

    Hello

    It is suggested to separate SQL Server 2012 data and log files in different drive for VM.  Is there a performance gain if two of them resided in the same logical (Partition VMDK) unit number?  OR should they (different dives) in different LUNS (Partition VMDK)?

    Thank you

    The General mantra in the physical world goes as follows:

    For optimal performance, you need to separate logs and database of transactions on different physical disks (e.g. disks) stacks.


    This general concept applies naturally agnostically to virtual workloads as well. It essentially translates to:

    For performance, you should put the files of database transactions on various resident on different LUNS VMDK or use separate RDM. You should also use a separate vSCSI controller to each VMDK/RDM as the controller has its own IO queue.

    There is a point more important which is often neglected in the physical and virtual world in particular:

    Ideally, you should make sure that your physical LUN for logs and DB are not a group of common disk same stacks of physical disks. This violates the general concept above.

  • Of a complete log of Information can I find myself with several graphs of selected information

    I received a great response here before, here's something that I'm not sure is possible... but maybe you know.

    Current version of numbers (3.6.1)

    So, I create a log of the different courses.  Here is a simplified version of what I do:

    The idea is so that I will have separate sheets for each of the classes, where I will have the analysis of numbers.  For example:

    What I would like to have on this page is a graph being each class, day by day, showing the presence so that I can follow increases or decreases trends, from the newspaper on the first sheet.

    I thought I'd try to find a way to have a referenced version (Alias) of the main newspaper on this sheet, which I can then do a filter before you apply a graphic, or perhaps a function which will only list info in a new table which matches certain information (such as the title of "Workshop").

    I can be looking for a function that does not exist, but if there is anywhere I could get a clear answer on this subject, I figure that it would be here.  Thanks for any advice you can give.

    Kevin Cunningham wrote:

    I can be looking for a function that does not exist, but if there is anywhere I could get a clear answer about it,

    Numbers (and other spreadsheets) are good to extract summaries of data and plot summary.  Here's a way, using SUMIFS.

    The formula in B2, filled to the bottom of the column:

    = SUMIFS(log::E,log::$B,$a2,log::$C,$A$1)

    The formula in C2, filled to the bottom of the column:

    = IFERROR (SUMIFS(log::F,log::$B,$a2,log::$C,$A$1) "/ B2," "")

    The SIERREUR function tells number of leave the empty cell if there is an error because attendance is 0.

    The graph is 2D 2 axes in the case where you want to do something similar.

    Once you have the summary table and table of work, then you can 'clone' them by copy - paste other sheets and put another name of the workshop in cell A1.

    SG

  • cannot log on to a particular Web site by using the Satellite L series

    I can't connect to a particular Web site all of a sudden with my computer Toshiba satellite phone. I was able to before, but now I can't?

    Check the settings of the antivirus and firewall. In many cases, these security tools prevents log in to different pages.
    In addition, you should check your settings of browser like filtering settings etc.
    Try different internet browsers like firefox or IE.

    Sorry, but that's all I can suggest at the moment

  • Missed, received, cache placed call logs

    Hi all

    I'm having a time difficult trying to find the documentation that describes the limitations/parameters for the call connects IP phones themselves.  I think missed calls for example are stored locally on the device, and if you have configured the extension mobility you can clear the logs on logout.  In addition, if the DN is a shared line, then the calls will not record.  I see also of the side CUCM where you can configure on line or via the options of the user the option to disable logging of the calls.  But what I really want and need to know how many missed calls will be in the log by default (or placed and received).  He is 100, then he begins to replace?  What motivates the time-out, a numerical limit or a time limit?  These parameters are adjustable in all?  The settings or parameters differ by type of device?  I'm looking like crazy to find answers to these questions and I can not find them.

    Hi Jeremiah,.

    Call logs are hard-coded depending on the model of phone in question

    Cisco IP Phone 7960 G and 7940 G featured

    Maximum supported entries 32 each for the calls missed, received,
    and call lists.

    Cisco 7961G IP phone / 7961G - GE and 7941G / 7941G - GE

    100 each for the calls missed, received,

    and call lists.

    http://www.Cisco.com/en/us/docs/voice_ip_comm/cuipph/7961g_7961g-ge_7941g_7941g-GE/4_1_3/English/usr_adm/enhancements_guide/6141ftrs.PDF

    This information is included in the phone specific IP "User's Guide" for each model. Here is the example for the 7942/7962

    Missed calls, received calls or calls placed. Each stores up to 100 records.

    http://www.Cisco.com/en/us/docs/voice_ip_comm/cuipph/7962g_7942g/7_1_2/English/user/guide/62enu712.PDF

    And 7945/7965;

    Missed calls, received calls or calls placed. Each stores up to 100 records.

    http://www.Cisco.com/en/us/docs/voice_ip_comm/cuipph/7965g_7945g/7_0/English/user/guide/65enug70.PDF

    This can be mitigated to "Missed calls" on the lines of sharing IE; You can enable/disable;

    Logging of the calls for shared lines

    --------------------------------------------------------------------------------

    Edge of the information contained in this section does not exist in the online help for Cisco Unified Communications Manager Administration or in any other document 6.1 (x) Cisco Unified Communications Manager, in addition to the release notes.

    --------------------------------------------------------------------------------

    Description

    With the missed call logging for the feature of party lines, the administrator can configure Cisco Unified Communications Manager Administration, or the phone user can configure Cisco Unified CM User Options, so Cisco Unified Communications Manager saves the missed calls in the call history list to one aspect of shared specified on a phone line.

    Missed calls

    The missed calls feature allows the administrator to phone specify if missed calls will be get saved to the directory of missed calls for an appearance of the given line. The following properties apply to the function of missed calls:

    The line can represent a shared row or a number from the phonebook. The default behavior records all calls missed on all lines.

    Missed calls log operates on a basis of the line. The line can represent a number from the phonebook or a shared row.

    If the phone administrator configures a line appearance (share or not shared), therefore not missed calls get connected, calls to this line never get connected in the directory of journal of missed calls, even if the calls end get forwarded due to no response.

    If more than one line key is configured on a phone, logging of missed calls is based on missed for each row call log.

    Logging of missed calls is controlled by a configuration switch parameter sent to the phone in the configuration file.

    The missed call log configuration does not affect the existing or previous call log items.

    Calls on lines that are not registered do not affect the Missed Call new status message.

    If phone administrator disables the functionality of missed calls on the appearance of the configured line, missed calls get not appear in the call history missed on this aspect of the line.

    In addition to these properties, the following properties continue to apply to all calls:

    All phone calls appear in the log of calls received, regardless of the line on which they were received.

    All calls made from a phone appear in the log of the calls, regardless of whether they have been placed from a primary or shared line.

    The function of missed calls gets supported on the following phones running SCCP and SIP:

    Cisco Unified IP Phone 7906G

    Cisco Unified IP Phone 7911G

    Cisco Unified IP Phone 7931 G (SCCP only)

    Cisco Unified IP Phone 7941 G/GE

    Cisco Unified IP Phone 7942G

    Cisco Unified IP Phone 7945G

    Cisco Unified IP Phone 7961 G/GE

    Cisco Unified IP Phone 7962G

    Cisco Unified IP Phone 7965G

    Cisco Unified IP Phone 7970G - GE

    Cisco Unified IP Phone 7971G - GE

    Cisco Unified IP Phone 7975G

    http://www.Cisco.com/en/us/docs/voice_ip_comm/CUCM/rel_notes/6_1_3/CUCM-rel_note-613.html#wp475040

    See you soon!
    Rob

    "Everything is broken" - Bob Dylan

  • How to monitor the IPS event logs!

    Hello

    We have a few Cisco IPS and also sensors juniper IDP in our networks, Juniper, I use NSM to analyze the network logs, attacks, generate different types of charts and stuff like that, its so easy to work with and also its informative, but with cisco IPS devices I do not know what are the online newspapers network monitoring tools , attacks and also the generation of graphics for my boss. I see IDM, but it doesn't have the features we need, we know anything else for the analysis and monitoring of newspapers?

    Best regards,

    Omid

    IME (IPS Manager Express) provides more information and reporting that IDM tool and it can support up to 10 IPS devices/modules.

    Here's the URL for the IME for your reference:

    http://www.Cisco.com/en/us/products/ps9610/index.html

    Please check the system requirements for EMI on the following notes:

    http://www.Cisco.com/en/us/prod/collateral/vpndevc/ps5729/ps5715/ps9610/data_sheet_c78-459033.html

    Hope that helps.

  • syslogging to 2 host with different levels of severity?

    I have a PIX that sends the logs to a host with Cisco syslog installed. It is configured to send messages of level 3 (as required by the internal standards) of gravity.

    I have another host which collects the theses papers too, but I want some info - level 5 or 6.

    ? is it possible to config the PIX to send logs on 2 different hosts with different levels of severity?

    you configure the pix to send to 7 on a syslog server. configure you this server to send events to the level 3 to another server. I think that it should be possible

  • in how many ways could connect a different company of telepresence?

    Hi all

    I am new in the field of video conferencing and telepresence.

    I would like to know how many ways there are to log to a different company to do a telepresence session.

    Currently I am an infrastructure management of telepresence in which all the other location are 30 Km away and are all part of the same intranet.
    Obviously, we have a VCSC and VCSe and a MCU.

    If I do not have an intranet, and I want to connect to a different location, how can I do? VPN? Is it possible to use only the public internet?

    for example, if I have 3 location (200 km) and each location offers free SSDL (declining from 4 Mbps to 4 Mbps), can I connect them?
    I thought to use for example a VCS Espress starter pack in one place and 3 codec SX20.
    Is it possible to have a 720 p call given the distances?

    Just to add to the comment of the juriss; be sure to include 20% overhead for each call, when you calculate the bandwidth you can use. I.e. for a 768 Kbps call, you will need a minimum of 922 kbps available b & w.

    I would create a separate subfield on the VCS E existing for these systems to register, allowing you to specify the b/w max available within the area, as well as max eligible b & w by appeal. This way you won't have to worry about potential problems caused by a connection at a higher rate.

    /Jens

    Please note the answers and score the questions as "answered" as appropriate.

  • How to create Redo Log as a good way to avoid the problem of performance

    Hi Experts,

    I work in the following environment.

    OS - Windows server 2012

    version - 11.2.0.1.0

    Server: production server

    1 to 10 of each month, we have huge process. Like many DML and ddl involve.

    I've implemented the RMAN also.

    My Alerts log entry is as below,

    Kills Sep 08 17:05:34 2015

    Thread 1 cannot allot of new newspapers, 88278 sequence

    Private stream flush is not complete

    Currently journal # 1, seq # 88277 mem # 0: D:\APP\ADMINISTRATOR\ORADATA\AWSPROCESS\REDO01. JOURNAL

    Thread 1 Advanced to record the sequence 88278 (switch LGWR)

    Currently Journal # 2 seq # 88278 mem # 0: D:\APP\ADMINISTRATOR\ORADATA\AWSPROCESS\REDO02. JOURNAL

    Kills Sep 08 17:05:38 2015

    Archived journal 81073 extra for each sequence 1 88277 0x38b3fdf6 dest ID thread entry 1:

    Kills Sep 08 17:05:52 2015

    Thread 1 cannot allot of new newspapers, sequence 88279

    Checkpoint is not complete

    Currently Journal # 2 seq # 88278 mem # 0: D:\APP\ADMINISTRATOR\ORADATA\AWSPROCESS\REDO02. JOURNAL

    Thread 1 Advanced to record the sequence 88279 (switch LGWR)

    Currently Journal # 3 seq # 88279 mem # 0: D:\APP\ADMINISTRATOR\ORADATA\AWSPROCESS\REDO03. JOURNAL

    Kills Sep 08 17:05:58 2015

    Archived journal 81074 extra for each sequence 1 88278 0x38b3fdf6 dest ID thread entry 1:

    Kills Sep 08 17:06:16 2015

    Thread 1 cannot allot of new newspapers, sequence 88280

    Checkpoint is not complete

    When I check in the internet I found a few points and need clarity also by the following.

    -It is recommended that this switch Redo log 5 times maximum per hour, but I have this time of maximum peak about 100 redo log changes occur.

    -It is recommended to have the large size of the Redo log. But I have 3 Group of redo and each size is 50 MB by default.

    -My group of Redo log not multiplexed and it by default with each group have only a single Member

    Group 1 - D:\APP\ADMINISTRATOR\ORADATA\AWSPROCESS\REDO01. JOURNAL

    Group 2 - D:\APP\ADMINISTRATOR\ORADATA\AWSPROCESS\REDO02. JOURNAL

    Group 3 - D:\APP\ADMINISTRATOR\ORADATA\AWSPROCESS\REDO03. JOURNAL

    And advised by experts with add that again group will give more performance in the other location. Is it mean that I need to add the Redo log as a different group, player or Redo Log itself I need to replace the other location.

    Say in the end, My Live server works with the location and size of restore default. I'm trying to create a better way and get all confused

    How to do it perfectly.

    Experts, please share your comments to my environment to log redo instance as better through your comment or recommended weblink based on my above needs, or a document.

    Thanks in advance, if you need more information to help me, then ask me, I'll share you.

    Hello

    You can't resize an existing redo log group.

    You will need to create 3 new redo log groups and drop old log redo (with 200 MB size) groups.

    Here you can find a good explanation: DBA for Oracle tips Archives

  • Returning from universal theme item values - form Page (modal dialog box)-

    Hello

    I use the universal theme - modal dialog (the form page, page 7) and intend to return several values of the item to the page back 2 when the dialog box is closed.

    I'm back from the point values P7_DNAME & P7_DEPTNO of page 7 of the elements P2_DNAME & P2_DEPTNO on page 2 but does not work.

    Form Page - Page 7 (modal dialog box)

    Process - close dialogue

    Items to return - P7_DNAME, P7_DEPTNO (put several points of values here to go back to page 2)

    Report Page - Page 2 (that calls the page 7 of the modal dialog box)

    Here we have a dynamic Action. I use the event ""closed dialogue ' and 'Set value' action "

    Event (closed dialog box) -

    Action - set

    -Define (return goods of dialogue) - P7_DNAME, P7_DEPTNO Type

    -Selection Type (items) - P2_DNAME, P2_DEPTNO [here I am back to several items.]

    If I go back more than one Page values element, it doesn't any idea WHY?

    BUT if I'm back only a single value of point, there works perfectly well.

    Thank you

    Deepak

    You can return multiple items at once and their values are sent along, but you cannot set multiple items with different values by the action of a set value.

    You must create an action of the value set for each element you want to set the value with the value of the element to return.

  • How can I move a single menu item? Whatever i, when I try to move a menu item, the entire menu will follow after.

    I kind of need quick help, is possible to do or what I need to do each button manually? I've looked everywhere but I can't find a way to do it.

    You can use the text panel and adjust the spacing, indent, etc.. As an alternative, you can create menu manual or go to the State of the links buttons where the design model requires menu items at different locations on the page.

    Thank you

    Sanjit

  • Why my projects Premiere Pro that contain SWF items is no longer do not recognize the format?

    Is it true that CC Pro first 7.1 no longer recognizes one of the prominent releases another element of the Adobe Creative cloud to Adobe Flash SWF format?

    What is the point of having a range of products, if you're going to fall suddenly cross-platform support for a key element of the suite? Not only that - this happens in a dot release charged automatically? WTF?


    Imagine my frustration that I had put to schedule time on my weekend to finish your work on a project only to find that I now need to overhaul an important part of the book. I mean really, who draws from this kind of * on their customers?

    My friends often ask me why I agree with too expensive and more complex software Adobe. My answer was the convenience of being able to mix and match items from different parts of the suite. I said that everything in overlooking the many kludged of workarounds I had to invent to make a difference. Well this rationalization just flew out the window in a big way.

    Flash support is no longer offered in CC.

    However, the update 7.1 since always user initiated, not automatic.

  • RMAN backup with log archiving

    Hello

    I'm using oracle 11G (11.2.0.1). My open database and I'm using the RMAN command to perform a backup hot below. My doubt is the reason we have the backup of the database to archivelog more? What is the use of the archivelog backup because the archivelogs will keep generation while the database is open.

    RMAN > backup the database archivelog;

    Kind regards

    007

    I agree with Oviwan. You must archivelogs in the recovery database to the last second. If you have the base of mission critical data, then you must also add redo log members on different disks.

    And I also suggest to run command before backup below.

    RMAN > sql 'ALTER SYSTEM SWITCH LOGFILE;

    You can remove the logs to archive that are saved.

    RMAN > delete any backup archivelog entry;

    Also, I suggest to backup database and Archives journal separately.

Maybe you are looking for

  • How can I put it to delete messages on my server after download?

    How can I put it to delete messages on my server after download?

  • Integration with SCCM (desktop and portable computers)

    Hi, I need your help with SCCM, in a project, we offer the landesk software, but customer wants to integrate with SCCM (customer we this software) We use: HP ProDesks 600 G1 EliteBook 820 Probooks 640 Please give me some advice how to do this, should

  • Trim by dragging multiple clips?

    Is there a way to select multiple clips, then extend/reduce size all together? I tried this with clicking and dragging the end of the clip, but it only extends / retracts the clip alone, I clicked on the spot all the selected items.

  • Rename the first alias

    Rename my primary alias attempts fail. Here is the response I get when using your tool:"You cannot use your secondary e-mail as Microsoft account. Please enter another Microsoft account. » I even earlier, tried to add and then remove the e-mail (* ad

  • ALL HOTMAIL FOLDERS ARE MISSING!

    Was it only a new version of Hotmail recently charged without my permission?  ALL my records, which was a TON of information, are missing.  Help, please!