management of the migration of 11.1.1.6.0 to 11.1.2.4.0

Hello

Some versions are not currently mentioned on the 'matrix of Support of Migration '
at http://www.oracle.com/technetwork/developer-tools/jdev/documentation/jdev11gr2-cert-405181.html

As ' of' '11.1.1.6' and '11.1.1.7' versions seem to be missing.
UNDER 'for' version "11.1.2.4" seems to be missing.

Where would be the best place to get information on the migration of 11.1.1.6.0 to 11.1.2.4.0 support?

Experiences (pointers to) with migration (supported?) 11.1.1.6.0 to 11.1.2.4.0 are welcome.

Thank you very much
Jan Vervecken

FYI

In the RS, I got this feedback:
"... We have now updated the matrix of migration for the 11.1.2.x version. "Please check http://www.oracle.com/technetwork/developer-tools/jdev/documentation/jdev11gr2-cert-405181.html#Migration....

Currently, he said "Certified" for the combination of 11.1.1.6 to 11.1.2.4.

concerning
Jan

Tags: Java

Similar Questions

  • How to change the models of Calc Manager after the migration of HBR

    Hi all

    at the moment I'm trying to migrate a planning application classic migration incl. EPMA to CM business rules. Migration worked well, but I'm a model with CM and I don't like the graphic mode... Is there a way to change (HBR Macros) models in script mode? I can switch mode script for business rules, but I don't see the option if I open a Template (custom template set and after the migration of HBR).

    Thank you very much!
    Kind regards
    André

    P.S.: We are on 11.1.2.1.0

    Currently in 11.1.2.1, it is impossible to set the mode graph script. In the last 11.1.2.2 calc and patch, the default rules of planning will be migrated in order to script. In addition, the model contains a script component that will contain the macro text HBR which you should be able to change. Since the HBR was not deleted in 11.1.2.1, we will not be porting this functionality to 11.1.2.1.

    One thing you can do is to modify the model, remove all graphics components, add a script component, and paste your macro script here. If your model has parameters, you must reference them with []. For example, if the parameter has been param1, then you référenceriez it as [param1] in your macro script.

    Sree - mougel

  • I just bought a new iMac and used the Migration Assistant to transfer my files. At first everything worked, but now a week later, I get the message that the application manager is missing, and I can't Photoshop and InDesign to start. I don't want t

    I just bought a new iMac and used the Migration Assistant to transfer my files. At first everything worked, but now a week later, I get the message that the application manager is missing, and I can't Photoshop and InDesign to start. For my personal use, I don't have a need to reach creative Cloud. You have any suggestions for a workaround?

    Try installing Adobe application Manager down the link and check

    Adobe - Adobe Application Manager: for Macintosh: Adobe Application Manager: thank you

  • TMS directory failed in the endpoints of series C after the migration of the device to the virtual computer

    Hi all

    We have migrated the 12.8 TMS from the device to the TMS 13.0 on the VM platform. There is no matching TMSPE and mainly used for management and directory service.

    Once the migration is complete on the platform of the VM, we found that endpoint C-series could not receive phonebook of TMS (while 95 MXP endpoints works very well with the TMS directory).

    The end point of series C, we check the Configuration-> directory server 1: URL. The link is converted from http:// /tms/public/external/phonebook/phonebookservice.asmx http:// tms/public/external/phonebook/phonebookservice.asmx.

    (In addition, we check the authorization of the two phone book page, and there is no IIS issue).

    In the 95 MXP endpoint, it can receive the telephone directory unit VM MSD and MSD.

    Best regards

    Ben

    Hi Ben,

    As confirmed by the curl command - you don't have access to the web page as an anonymous user.  You have to fix your permissions.  One of the fastest ways to do would be to try to reinstall the MSDS on the server again - this should reconfigure the IIS settings required for TMS.

    Wayne
    --
    Remember the frequency responses and mark your question as answered as appropriate.

  • The OID of the Migration of OUD, hitting the problem with the attribute pwdhistory OUD

    The OID of the Migration of OUD, hitting the problem with the attribute pwdhistory OUD

    I use sync DIP at the end of migration of data from OID for target OUD. Everything seems great so far, I have found that pwdhistory being migrated is not being validated by OUD password policy

    I do import ldif for OUD and find this pwdhistory field is populated with the same OID value. When I reset password in OUD-DOHAD with the word in the history of password,.

    Expected Behavior: Error Message from the OUD "" LDAP: error code 20 - already the value of specified password exists in the user input " "

    Course Behavior: OUD is what allows to reset the password in the password history

    Also found that when I try again with the same password, then it throws the error 20 code. OUD replaces the old values in pwdhistory after the password resets and written new values with stamp of password.

    It is a Blocker for us for migration in the history of password, I would like to join the forum and check if someone had the same problem and how they managed it?

    Thank you

    Satya

    Support of Oracle confirmed that DIO history for the OUD password migration is not supported. The OID and OUD records and validates the pwdhistory differently

  • BUGS: Pre calendar treats Saturday 1st title of 2nd Saturday, brings also 3rd Saturday as BYMONTHDAY = 21 (but the migration is apparently not)

    After having closed the thread of questions related to migration of DTA, I discovered a new failure in the Pre calendar application.  It's using DTA 1.1 and WebOS 1.1, only syncing my Palm profile.  The next of VCALENDAR record is in my migration.mig file (I changed the incorrect initial INTERVAL 1 interval = 12 =):

    BEGIN:VCALENDARVERSION:2.0PRODID:Nova-MigrationBEGIN:VEVENTUID:818CATEGORIES:UnfiledCLASS:PUBLICSUMMARY:Woodward Dream CruiseDTSTART:20040821BEGIN:VALARMACTION:DISPLAYTRIGGER:-PT7200MDESCRIPTION:Woodward Dream CruiseEND:VALARMRRULE:FREQ=MONTHLY;INTERVAL=12;BYDAY=3SAEND:VEVENTEND:VCALENDAR
    

    In this case, the initial event occurs on 21/08/2004, which is the 3rd Saturday in August.  Note that August 2004 starts on a Sunday, which I think is German for this particular failure.  This means that Saturday, August 7 is the 1st Saturday in August, not the 2nd.

    The migration process initially placed the repetitive event on the thing to the day in 2009, namely, Saturday, August 15, which is the 3rd Saturday.

    However, I don't have a five-day-advance alarm today (Monday, 10 August 2009) on my pre (but I had one on my Treo 700 p, which has all my old data calendar loaded on him), so I went to the event on Saturday, 15 August 2009 (where the migration process had placed) and opened it to inspect it.

    First of all, I noticed that there are a set of alarm for five days in advance, so I opened the property repeat monthly custom and found that it was set to 'Every month on the 21st [sic]', 'Every 12 months', ' repeat until that Forever. "  It was clearly wrong and does not match the date at which the migration process had placed the event for 2009 (Saturday, August 15, the 3rd Saturday in August 2009).

    Even stranger, when I slipped back monthly custom property page repeat (why is there not a Cancel option to get out of these pages without modification?) he must have accepted the 'change' of ' monthly on 21st [translation] "because the event disappeared from where the migration process had placed (August 15, 2009), and it showed on August 21, 2009 , instead.

    At this point, I thought that I could access the event initial (21 August 2004) and change the 'monthly on 21st [sic]""monthly on the 3rd Saturday.  That's when I discovered the 2nd (probably related) bug: were the only options available in the event of 'head ':

    "Daily".

    "Weekly".

    "Every month on the 21st [sic]" (enabled)

    'Every month on the 4th Saturday' (!)

    "Each year the [translation] 21 August [sic]" (geez, it would be really hard to be grammatically correct, you think?)

    So, I reached a dead end.  Saturday, August 21, 2004 is clearly not the 4th Saturday, but apparently the Pre calendar program does not know that (again)!

    In summary, I documented two bugs:

    (1) the "RRULE:FREQ = MONTHLY; RANGE = 12; BYDAY = 3SA"clause contained in the migration.mig file has been munged (it's a term of scientific programming)"every month on the 21st [sic]. "  I don't know if this has been done by the migration process, but it seems unlikely, because the migration process apparently placed the original recurring events on the appropriate dates.  Only after opening one of these events and inspect the property to repeat monthly custom (and getting caught by the Pre Calenar 'feature' of not being able to leave inspecting the property without modifications) made the event move to 21 of every August, as indicated by the property of repeat incorrect on the monthly of custom.

    (2) for an event that starts on Saturday, where the month starts on a Sunday, the timing of the front (but apparently not the migration process) is a 'one stop' error and suppose Saturday, March 1st (7) is the 2nd Saturday, and so on.  In the particular case of August 2004, Saturday will eventually be numbered 2 to 5.  I don't know if this is repeated with other days of the week, or what might happen if a particular month ends with the 2nd to 6th (!) a few days of the week to manage.

    Anachronistic, PDAGuy, can we bring this to the attention of the Palm development team, please?

    Thank you.

    After the upgrade to WebOS 1.20, these issues seem to be resolved.  I could go to the entrance of the 'head' and correctly choose the 3rd Saturday in August, every 12 months, and it now appears the correct days in the following years.

  • My computer crashed and after the purchase of another, I used the Migration Wizard to copy all the files to the new computer.  Everything was going well until I tried to launch LR6.  It was two weeks ago and a search for many pages of the Adobe Web site. 

    My computer crashed and after the purchase of another, I used the Migration Wizard to copy all the files to the new computer.  Everything was going well until I tried to launch LR6.  It was two weeks ago and a search for many pages of the Adobe Web site.  I think I've exhausted all the remedies listed without success codes error A12E5 to questions cloud creative, Manager of Application and error 1: Configuration problems.  I'm ready to reformat my computer and try again with Time Machine.  Help would be greatly appreciated before I waste more time on this task. Any further suggestions?

    Migration of Mac with Time Machine WILL NOT WORK with the Adobe program activations due to hidden registration files

    Sign out of your account... Uninstall... to run vacuuming...

    -non-Cloud programs, to disable the service before uninstalling

    -http://helpx.adobe.com/creative-cloud/help/install-apps.html (and uninstall)

    -using the vacuuming after uninstalling and before reinstalling is often necessary

    -https://helpx.adobe.com/creative-suite/kb/cs5-cleaner-tool-installation-problems.html

    -Restart your computer... Sign in to your account... Reinstall

  • Re: Creative cloud problem on new Mac after you use the Migration Wizard.

    It is a terrible response.  I've migrated three days ago and am still stuck in a never-ending cycle of errors trying to get CC to function on my brand new MacBook pro.

    Thanks for your follow-up.  I found myself on an online chat that guided me through a process to solve my problems.  The most common error was on the CC Apps page, where I have been informed a download error, with instructions to contact technical support or to download Creative Cloud.  It seemed that I needed a clean uninstall of CC, but whenever I tried to do, I received the message "CC uninstalled with some errors.  It's frustrating, because I was in need of a clean uninstall to reinstall, but I couldn't get a clean uninstall successfully.

    I would add that some best solution from Adobe seems to be necessary for users who migrate between Macs.  I was quite careful to follow the instructions from Apple, including the update of apps installed before the migration.  I was expecting some problems during this migration, but honestly, the only problem I had was with Adobe CC.

    In case this is useful with future users, here are the instructions of Nirvan in Adobe support that finally solved my problems:

    Mudassir: Close the creative Cloud Desktop application.

    Mudassir: Please open a Finder window, click go > go to folder.

    Mudassir:, and then type as ~/Library/Application Support / and press ENTER.

    Mudassir:, Please rename the folder Adobe as Adobe_old

    Mudassir: Now open the folder search to spend once again, in this type/library/application support / this time and then click OK.

    Mudassir: Notice that this time it's just/library and the ~ symbol is not included.

    Mudassir: Now, rename new folder Adobe in Adobe_old

    Mudassir: Now open the finder window and press it command + shift + U key.

    Mudassir: It will open the Utilities folder, then remove the Adobe Application Manager and cloud file Adobe Creative.

    Mudassir: Please now open utilities activity monitor.

    Mudassir: Then find below process and end them one by one, if they are present:

    Mudassir: 1 cloud creative

    Mudassir: 2 CoreSync

    Mudassir: 3 CCLibrary

    Mudassir: 4 Office Adobe services

    Mudassir: 5 broker IPC Adobe

    Mudassir: 6 demon Adobe Crash

    Mudassir: You can complete the AdobeUpdateDeamon as well.

    John McGrann: Is not smoking. I should try to force quit?

    Mudassir: Yes, you can try to force quit.

    Mudassir: If it does not, please ignore it. After awhile, it will automatically timeout.

    Mudassir: After that, please download and install Creative Cloud Desktop application using the link below:

    Mudassir: http://creative.adobe.com/products/creative-cloud/

    Mudassir: Please click on applications.

    Mudassir: Also, you can remove the folders that we have renamed as Adobe_old under the places below:

    Mudassir: 1. ~/Library/Application Support /.

    Mudassir: 2 / Library/Application Support /.

    Thanks for your follow-up, if - I appreciate it.

  • Attempt to determine the space required for the migration of the opening...

    Hello:

    I'll put together a plan to migrate from Aperture to Lightroom.  My research is coming short on a particular issue... If I use Adobe plug-in to convert, if it changes the file system existing opening, thus converting the Lightroom folder structure?  Or, is, in essence, "duplicate" files by creating a new set for Lightroom and leaving the intact existing opening?

    If it gives all existing files, I'm fine.  If it is redundant with, I have to approach differently - since my opening set is about 400 GB, and I have about 100GB left on my drive.

    I've almost worn out G for Google tries to find an answer.  Your help is appreciated.

    Thank you!

    PS I posted this on the General discussion of Lightroom, but I have received no feedback.

    The migration tool calculates the space required before continuing. It really depends on if your Aperture library is managed or referenced. In the case of a managed library, your images will be get duplicated in order to protect the opening of corruption. See this link for more information:

    http://www.lightroomqueen.com/ready-move-aperture-iPhoto/

  • Help the migration of virtual machines

    My company is changing the data center in a co-location facility.  How the migration is performed, there are ESXi hosts and storage shared at Camp already.  Data warehouses are replicated to the storage to the camp of data stores with the same name.  The plan was to stop the virtual machines in the data center, removal of the inventory, browse the data store of one of the colo ESXi servers and add the virtual machine to inventory... Rinse and repeat.

    The problem we encountered had to do with the fact that each virtual machine has VMDK on several data stores.  This process only acknowledged the change of the primary VMDK, VMX file was always looking for 2 other volumes on the old warehouses of data, which could not be accessed camp.

    I have to think that there is a way to generate scripts to avoid this problem to occur.  If we know the identifier for the new storage volume, we should be able to generate scripts, Yes?

    I would like the script to read the VM names from a txt file, remove the virtual machine from the inventory on host1, browse the host2 data store (which is at Camp) and add the machine virtual inventory and then remove and re-add the other volumes, based on the name of the data store (if hard disk 2 is on datastore2 then use 9d0fac87...)

    Any help would be grately appreciated!

    Thanks in advance!

    -Ben

    Hello, BenLiebowitz-

    I looked through your script.  You were just on a good amount of it.  There are a couple of things to tweak and a number of things to correct.  Here is the script of update from what I've seen would / should change (and here is the explanation of the things that I've changed the code).

    # export list of Staging VMsGet-Folder -Name "Staging" | Get-VM | select Name | Sort Name | Export-CSV "c:\staging.csv" -NoTypeInformation
    
    # Get Staging VMs$stg = Get-Folder -Name "Staging"
    
     # Shutdown VMs (cleanly)$stg | Get-VM | Shutdown-VMGuest -Confirm:$false
    
    # Remove Hard Disk 2 and 3$stg = $null$stg = Get-Folder -Name "Staging"    ## getting Staging folder again$hdName2 = "Hard disk 2"$hdName3 = "Hard disk 3"$stg | Get-VM | Get-HardDisk -Name $hdName2,$hdName3 | Remove-HardDisk -Confirm:$false
    
    # Remove VMs from InventoryGet-Folder -Name "Staging" | Get-Inventory | Remove-Inventory -Confirm:$false
    
    ## then, disconnect from the vCenter to which you were connected
    
    ## then, when connected to the vCenter server in the co-location facility:# Add VMs to Inventory$esxhost = "prpp6-vmwhst23.i3global.net"$datastore1 = "someDatastoreName" ## need to set this value!
    
    ## and, add hard disks back to VMsforeach ($row in (Import-Csv c:\staging.csv)) {    $vmName = $row.Name    $vmxfile = "[$datastore1] $vmName/$vmName.vmx"    $vmNewVM = New-VM -VMFilePath $vmxfile -VMhost $esxhost
    
        # Add hard Disks 2 and 3    New-HardDisk -VM $vmNewVM -DiskPath "[transient_deviceid] $vm/$vm.vmdk"    New-HardDisk -VM $vmNewVM -DiskPath "[data_deviceid] $vm/$vm.vmdk"} ## end foreach
    

    Comments about what I've updated / changed:

    • To stop the virtual machines, you should be able to all channel the results of Get - VM directly to Shutdown-VMGuest (I rewrote which)
    • to remove the hard drive, 2 and 3, you can use the cmdlet Remove-hard drive and do it in the pipeline (I rewrote which)
      • the ' $vm = Get - VM $stg | Get-show"line in the foreach loop was going to be problematic, as you had: '$vm' contains managed objects views for all the virtual machines in the folder of staging, not only of the virtual machine currently being acted on this iteration, so things have been broken
    • the remove inventory line, you might want to add "-confirm: $false", as the default behavior may be at the request of confirmation
    • the "$esxhost = prpp6 - vmwhst23.i3global .net' line needed quotes the host name
    • you do not use the $fields variable anywhere, which can be removed
    • I've renamed the variable '$add' to '$row' for a little more clarity
    • in the part that adds the virtual machines to the inventory in the co - lo vCenter:
      • the part that tries to set the value of "$vm" is not quite right; I've updated that (and changed the name of the variable "$vmName" for clarity)
      • you did not initialize the variable "$datastore1" - you must set a value for it (and how you use it assumes that all of the virtual machines in the co - lo facility are on the same data store - is this the case?)
      • you need square brackets around the name of store data and quotes around the value for $vmxfile
      • for the call of New - VM, you might consider providing a folder with - location (if you want the VMs newly saved to a particular folder)
      • for calls of New-hard drive, you need quotes around the value - DiskPath

    I would give that a shot with just a single machine and see how things are going.  Let us know the result.

  • After the migration of the catalog security issues

    Hello

    We installed a new environment of Sys (11.1.1.7.0) and now need to migrate the OBI of Dev (11.1.1.7.0) objects. Everything works as expected in Dev with connection and view dashboards appropriate according to the permissions of the users. Now, after the migration to Sys when we try to connect to hostname:9704 / analytic all users cannot see the table edge and catalog of objects. WebLogic even does not see everything. I can see items in catalog offline through the Manager of catalog or Windows Explorer. If I look at the catalog using the Catalog Manager my permissions do not allow me to see all items in folders. However, Dev, I am able to do. It seems that some thing is out of sync btwn the catalogue and policy store even if users have the relevant groups assigned in the weblogic LDAP. Any ideas on what might be happening or how to fix?

    Migration process:
    (1) store the migrated policies and identity sys Dev store. Confirmed objects have been migrated.
    (2) migrated RPD and sys Dev catalog. Confirmed objects have been migrated.
    (3) refreshed GUID in Sys
    (4) services start successfully

    Kind regards
    Mike

    Hi André.

    I worked with Mike on this permissions problem and can provide feedback.

    I compare the "Shared folders" privileges between the two environments, DEV (works) and TEST (does not work).

    The DEV environment has:

    Name - Type of permission - details-
    ------------------------------------------------------------------------------
    -Authentication user - Application role - total control - control total
    -Presentation Server Admins - role of catalog - full control - full control

    The TEST environment has:

    Name - Type of permission - details-
    ------------------------------------------------------------------------------
    -Admin BI role - Application role - full control - full control
    -Role of consumer BI - custom...-read, through, etc. - the Application role

    I'm changing the TEST environment to reflect our operation DEV permissions:

    Name - Type of permission - details-
    ------------------------------------------------------------------------------
    -Authentication user - Application role - total control - control total
    -Presentation Server Admins - Application role - full control - full control

    I am now able to log in as my administrator user and have access to the appropriate objects.

    I have a few questions, I hope you can clear up however.

    (1) something in our process of migration to our TEST about. must have updated the privileges of shared folders not to include roles authenticated the user & Presentation Server Admins/groups. It's weird, because we migrated all our DEV operating environment around. No indication of what we have fact/lack would be useful.

    (2) authorities 'Shared Folders' REP on my DEV TEST Server vs server, the type of role is 'Catalogue', and 'Application' on the other. How we do conversion as a catalogue to an application from DEV to TEST role?

    DEV:

    Name - Type
    ------------------------------------------------------------------------------
    -Presentation Server Admins - role catalog

    TEST:

    Name - Type
    ------------------------------------------------------------------------------
    -Presentation Server Admins - Application role

    Much obliged.

    Ben

  • a few questions about the migration of content/web content

    Hi all


    I have a few questions about the migration of the website and content (from development to test) which are not specified after reading the oracle documentation.

    -> When we make the site replication will be migrated content (data files).

    -> when we move will contained all the ED and RD etc (any object type web site migrated).

    --> are the two the necessary step for migration when we migrate web site.


    Thank you

    -Yves

    --> When we make the site replication of the content will be migrated (data files).

    It depends on how you do it. The tool 'Site Studio Replicator' won't move any content, only the structure of the site. The 'Manage replication Site' page can be used to migrate content with the structure of the site but I do not recommend for large sites, I use separate tasks to archive to move the content. "Backup and restore" page stores the entire site in a ZIP file, not advisable for large sites.

    --> When migrate us content will be all ED and RD etc (any object type web site migrated).

    Yes. It uses the metadata xWebsites field to identify the elements that belong to the site.

    --> are the two the necessary step for migration when we migrate web site.

    Depends on how you do it, but yes, all bits are needed.

  • displacement of the configurations of lab manager between the ESX server host computers / data warehouses

    Hello

    Is it possible to move configurations of lab manager between the ESX server host computers / data warehouses? I don't see an option in the library & gt; Clone library. Thank you!

    Recently, I used SSMove to migrate our datastore LM set a new LUN.  It's really simple to use.  This KB gives complete instructions on SSMove http://kb.vmware.com/selfservice/microsites/search.do?cmd=displayKC&docType=kc&externalId=1006694&sliceId=1&docTypeID=DT_KB_1_1&dialogID=8456583&stateId=0%200%209407965

    See you soon

    Paul

  • 101202 BPEL process (Oracle AS) of the migration to SOA Suite 11 g (WLS)

    Hi all

    I am looking for more information on the migration processes BPEL developed using 101202 BPEL Process Manager struggle to run on AS Oracle 10 g, Oracle SOA Suite 11 g running on Weblogic Server.

    Pointers is very appreciated.

    Thank you
    Anish.

    Looking for info on integration OSR 10 g and SOA Suite 11 g I found this link (http://docs.oracle.com/cd/E12839_01/upgrade.1111/e10127/upgrade_soa_apps.htm) that might help you.

    Published by: alfredozn on November 15, 2011 11:26

  • Steps to install and configure Node Manager on the local machine and remote

    Hello

    I'm using WLS 10.3 on Windows.
    I did the following till now.

    (1) installed WebLogic 10.3 on one machine (local computer, on which I created the field and my Server Admin is under execution. 1 managed server is also created on this machine).
    (2) installed WebLogic 10.3 on computer B (remote computer, which Managed Server 2 will be created).
    (3) on the machine, I used the Setup Wizard and create a domain. When creating the domain, I did the following:
    (i) created two managed servers.
    (II) create a cluster
    (III) the servers assigned to regroup.
    (IV) created two machines.
    (v) the servers assigned to machines (Admin Server and MS_1 to the machine and MS_2 machine B).

    (4) start Admin Server.
    (5) on the administration Console, I made some configurations for the node Manager on Machines-> Machine A-> Node Manager. The assigned values:
    (i) type (SSL)
    (II) Address (ip_address machine A) listen
    (III) listening port (5556)
    (6) in the same way it did for Machine B.

    So far, phsically the managed server (MS_2) directory and configuration is not there on the Machine B (its only configured on A computer because I created the field on computer A).

    I went through the documents on the Node Manager and found what to configure. But I have not found what is the sequence of configuration.

    Please let me know the sequence of steps I must follow to install and configure the Manager of nodes on the local and remote machine. I want to use Java Node Manager (not the Script node Manager).

    Thank you

    Sanjay

    Hello Sanjay

    Basically if I understand your question, you have A machine where you had installed ""(permet de supposer admin serveur) and "VAS_MS1_A VAS_ADM_A" (lets assume the managed server.» And on the second machine B you want to create a managed server 'VAS_MS2_B' which must be controlled by node manager, so that you can start console, auto restart the managed server and perform other activities such as the migration of servers using nodemanager. If this is correct, this is the sequence of steps.

    Since you say you are on windows, I start from the principle

    WebLogic version 10'3
    BEA_HOME:-c:\bea
    WL_HOME:-C:\bea\wlserver_10.3
    DOMAIN_DIR:-c:\VASDomains

    Machine has

    (1) install the BEA.
    Using 2 Setup Wizard) create the domain under "c:\VASDomains".
    (3) to start the Admin Server and connect to the console and create two machines "Machine_A" and "Machine_B". Select the types of machines as 'other '.
    (4) once machines are created go to each machine and go to the tab 'NodeManager' and enter the details nodemanager.
    (5) create server 'VAS_MS1_A' and 'VAS_MS2_B '. Enter the respective details. To "VAS_MS1_A", enter a machine name of host or ip and machine "Machine_A" and "VAS_MS2_B", enter the hostname of the machine B or ip and machine 'Machine_B '.

    Machine B

    (1) on this machine install BEA
    (2) then you have to register the machine with the Manager of nodes. So for this first set the environment go to "C:\bea\wlserver_10.3\server\bin" and run "setWLSEnv.cmd". Then type 'java weblogic. Enter the WLST", once you run this command at the next prompt Details ' connect ('', 'adminserverpassword','t3: / / adminserver:port" ")
    (3) then run this command.
    nmEnroll('c:/VASDomains','C:\bea\wlserver_10.3\common\nodemanager')

    Orders above fits machine with nodemanager. The first parameter is "domestic field", now if you see "c:\". ' directory 'VASDomains' will be created. Second parameter is nodemanager House, now if you go into nodemanager houses that some properties will be updated.
    (4) If this node Manager runs on this computer, kill that one and restart the node Manager again.
    (5) now if you go to "Adminconsole--> Machines--> Machine_B--> Monitoring" you can see the status as accessible.
    (6) now you can go "Servers--> VAS_MS2_B--> Control" and start the server. Newspapers to see how the server gets up the tail.

    If you want more details on "nodemanager", dedicated to my 'vasweblogic.blogspot.com' blog, not a lot of messages but post nodemanager can help you.

    I hope that's what you're looking for, have a nice day.

    Naour Vijay.

Maybe you are looking for