MS Project - issue of completed tasks Earned Value Management
Hi - I'm looking for a way for ms project display a column of information showing my current work for tasks are completed and the work planned for the tasks to come.
Currently if I mark my complete tasks it automatically updates my topic = the estimated original work even work when the actual entered hours are different. Is there a way to ensure that when I score my complete tasks, they can reflect the actual work is entered from the estimated original work?
KO
This issue is beyond the scope of this site and must be placed on Technet or MSDN
Tags: Windows
Similar Questions
-
I can not view my complete Task Manager
I can't view my complete Task Manager. My task manager only show process, that other manues are missing him, how to solve the problem of race?
Using an Internet search engine:
http://www.Google.com/search?q=missing+tabs+in+Task+Manager+in+Windows+XPExample of success:
http://www.winxptutor.com/Taskmgr.htmMicrosoft article:
http://support.Microsoft.com/kb/314227 -
List reading assignments - reading not completed tasks
Hi @all,
I try to read tasks in the BB todo list.
with the following code, I can check the "completed": tasks
if(match.countValues(ToDo.COMPLETED) > 0){ if (match.getBoolean(ToDo.COMPLETED,0) == true){ // processing of code here... } }
But how can I check for stains "unfinished":
'not started', 'in progress', "waiting", "deferred"?
In "ToDo". I don't see another type of States.
How can I do?
Any ideas are much appreciated.
Thanks in advance
CUA
Michael
Well,.
I found it by myself:
I used the bad casting (ToDoList instead of BlackBerryToDoList), so I wasn't able to see the State of a ToDo entry.
All things are working fine now.
Thank you for all.
CUA
Michael
-
The operation did not complete because the disk management console view is not updated.
Disk title management error: Windows 7 original by adding a drive letter
Well, I don't know why this is happening, but if I try to add a disk to my windows system, it will not automatically add a drive letter, but it will add a drive letter to my USB and USB external drives without problem. It's just when I plug it in sata he's going all wobbly. I see the HARD internal disk in disk as a disk, but windows disk management Refuses anyway shape to add a drive letter, even with diskpart automount enabled. This is the error I get when I try:"The operation failed to complete because the disk management console view is not updated. Refresh the view by using the refresh task. If the problem persists close the disk management console, then restart disk management or restart the computer. »
Absolutely nothing works. I tried Diskpart, acronis, AOMEI, EausUS, chkdsk, sfc/scannow, Microsoft fixit. Nothing works to get the drive Manager to add a drive letter to an internal HARD disk. Like I said, sticks and USB drives are no problem. I looked all over Google and I have not seen one solution to this problem short of a total erase and start again, and at this point, I'm not be done with everything I installed and might have to reinstall.
I have other systems that do not have this problem. Just this one windows 7 install x 64. Can anyone shed some light on why this happens and how to fix it or if there is even a fix for it.
Thank you
Methadras
Just to follow and finish this, the old MAIN drive has had some problems and was
continues to worsen, it ends up by crashed. scannow revealed some Windows system
Files were corrupted and could not be repaired. After the crash, I used the blank hard disc 500 gig
and did a restore of the system since the disks created with the purchase and restored the system to
"DAY 1". Yes all the data and installed programs are missing, but I reinstalled my software.
Adding external or internal disks worked without any problem now.
I created a Windows 7/64 system repair disc.
I created an Image of the system.
I have a backup plan.
I do the scheduled backup.
I learned a lesson...
Joe_T45
-
After the installation of the preview of media manager on my Mac, I read the fine print that Missing Sync and PocketMac will no longer work (which must be in bold).
What are the steps to completely remove the Media Manager?
Thank you
LD
I do not understand the reasoning/logic either. Media Sync preview works well enough, but what's the point if we disable the other piece of software that can sync anything other than media? (?!). Maybe this will be mitigated as the Software develops (although, once more, he would kill RIM to give us a roadmap?).
In any case, to completely uninstall Media Sync, you must double-click the file you first downloaded to install it. Within the limits are two applications - one to install and uninstall. The latter should do the job.
-
Need help to completely remove Adobe Application Manager.
I just tried to update my Adobe Application Manager, but he told me that the installation has been broken, I went and uninstalled hoping that I could just download the installer again and reinstall.
It did not work, and now the package install for Adobe Application Manager tried again to update and not to do a fresh install. It gives me the error that it could not initialize when I try.
I guess the only thing now is to root parts of the registry for this there is no other trace left MAO on my PC.
Running Windows 8.1 with Photoshop CC, CC Bridge and Lightroom 5.7 installed. As well as the Air and Flash Player.
HO, Kevin,.
You can follow the article: use of the cleaning tool CC to resolve installation problems. CC, CS3 - CS6 which helps you completely remove Adobe Application manager on your computer.
Let us know if you still face problems with this.
Thank you
Yann Arora
-
The issue of RTOS task duration
Hi, I am a novice in programming on RTOS.
I have a question about the design of special function. For example, the system scale is 10ms,
If a task cannot complete a loop to within 10 ms (a function in a loop), then how I can guanrantee time of execution of the function?
I mean, start and the time it stops?
I got it. preemption
-
Completed tasks remain in the queue, subsequent job does not print.
Queue says 100%, but it never goes away. If I put the computer to sleep, it prints a second copy of the work "completed" (even if only one has been specified. If I have a second job in the queue, it does not print until I have manually delete one (a troublesome task with several jobs to print).
I tried a few suggestions that I found these boards of Directors, including the removal and re-adding the printer, printing (Option-click) system reset, unplug the power cord and plug and unplug the USB cable and reconnect. None of these things has eliminated the problem.
I can impose by the experts here to suggest something that I might have missed?
Photosmart Premium C310
Driver version 4.1.2
Mac OS 10.9.4
I recommend you only uninstall the HP software using the "scrubber":
Go to Applications/Hewlett Packard / click Uninstall HP
Click on continue
Highlight your device in the left pane
Press on and press and hold Ctrl + Alt + Cmd keys on the keyboard at the same time as you click on uninstall, it IS the Option of the scrubber, no button is labeled "washer".
There will be a pop up that asks if you are sure you want to uninstall all hp software. (At this point, if you continue, all HP printers you have installed will need to be reinstalled)
Click on continue and let it finishDownload and install this: http://support.apple.com/kb/DL907
Restart your Mac.
Now reset the printing system:
-Sys Prefs, Print & Fax
-Right (control) click inside the box that lists your printers and select Reset Printing System.
WARNING - This will remove ALL your printers!
-Select the sign + to add again. Search for the printer, select it, and wait until the button 'Add' becomes available. Until it clicks. -
Creation of blu - ray and DVD standard of same video project - issue of menus
Hello
I have a video project, I intend to distribute on blu - ray and standard DVD. I plan create all menus and buttons for the blu - ray disc first. Can I just reduce the menus and buttons in again when I go to create the DVD standard? Or better, I'll recreate the standard DVD menus in Photoshop? Someone else to create the menus same br and standard DVDs? Any tips? I'm using CS5. Thank you.
Cheers, Steve
I would certainly agree with Jim's response above too.
The problem with trying to use the same image is not massively different resolution (1920 x 1080 from 720 x 480), but also the size of the pixels.
BD uses square pixels and what you design is what you get in the disc - DVD on the other hand uses non-square pixels and it can be a nightmare to design if you try at the scale of the images of high Resolutiom down to SD
The SPHL button are also different - BD requires a separate layer for each State of the button to coloiurs up to 256 while DVD gives you the complete package on 2 bits of an image indexed with a total of 3 corridors.
I would definitely say to create separate menus for each project.
-
OIM11G: Issue authorization BPEL task assignment.
Hi all
I have a question about approval BPEL task assignment. Hope someone can help out me. I followed the OBE
My requirement is that the task should be assigned to a particular group of IOM. So the steps I did:
1. creates a new variable called "groupName".
2. a java bpel activity before the task assignment and there the "groupName" assigned the value as inserted: "OIMGroupName" (this group exists in IOM)
3. Add the attribute 'groupName' payload.
4 copied this variable "groupName" to the attribute of the payload.
5. modification of the assignment in the ApprovalTask to assign it to the group by expression, as defined by the variable payload.
6. deployed on SOA.
7 seat with IOM.
6. created appropriate model ask, ask political level and strategy at the level of the operation. Basically model application level request both are auto approved and operating level has the attached approval.
I created the application and it works as expected with the task for the Group and etc.
Now the question,
Place the task of java to step: 2 above, I want that this "groupName" to be configurable from outside of the deployed code composite SOA. Something that we should be able to set up on the fly without changing the component and redeployment and registration, etc.
A way that I could think of is to use in the same way in which oimurl is used in the examples of OBE, create the variable in the composite.xml and then set in the SOA of this composite property once when he he deployed. This way I can change it to any value I want and will not redeploy all and etc.
I tried to do it, so I deleted the activity of java and made an additional variable and mapped to bpel.preference.groupName and redeployed all and then gave the value of SOA Composite property to the console.
The fun part? It did not work and the value is always null. So, anyone with knowledge of soa and bpel help me here?
Your question more but that is for another day... and thanks to go through my long story... is the examples were more better!
Cheers...
Published by: bbagaria on March 31, 2011 09:10Implement the RequestPayloadFieldGenerator interface and add additional fields in the populateAdditionalPayloadField method
Reference: http://bbagaria.blogspot.com/2011/08/how-to-extend-payload-from-oim-to-soa.html
HTH,
BBPublished by: Bikash Bagaria on December 6, 2011 15:39
-
Someone has any idea how to remove rejected in the new update to i-movie clips? Very difficult now to create new projects and name them. Never wearing a name for the project. Project tab does not. Go to the projects through the tab of the window, and then go from there to the area of projects. There is that an i-movie update just gets worse every time, and for the worse. I don't think that people never updates actually use the product.
See if that helps. (1) to remove the clip selection rejected rejected in the context menu above the media window. Right-click and choose Remove. (2) to create a new project click on project button on the top left of the window. In the projects list that appears click on create new and pick the movie. When the editing window opens it will say my default movie. Click the projects button again and you will be asked to name the film. You can also go ahead and edit your film add clips, etc. and if you share, you will also get an option to rename. At any time, you can go to the project and in this window button rename a project. I don't know what you mean by project tab does not. If you want to say, it does not appear or is not functional then launch iMovie, hold down the command and option and choose to delete the preferences. See if that fixes the project tab.
-
Impossible to build the project on a Linux (task CAP)
Hello
I want to run my script compilation (with tag Cap ant script) on a linux machine. I have included the file tools.jar - ant - bb in the classpath, but there are also the JDE installation directory.
Help me please if someone knows how to solve this problem. I cannot use the machine windows for my building project, is it possible to copy JDE dir from windows machine to linux for running the script?
Kind regards
Pulkit
Finally solved the problem...
Cap running under linux is pretty easy. We need rapc.jar and net_rim_api.jar in the bin and lib folders respectively alongwith correct path for Java, ANT & WTK (FNIHB predetermination).
-
Completed task - adding device to MSC
Hello world
I was able to add to the asa at the WSC, 4.3 Add a device on the network.
ASA is in production
Https connection was successful after he asked me to create tickets for this step
I created tickets need to know why this ticket is necessary?
also, after that, I started to discover the device and he added the device with warnings.
And here's the tab which shows
generate the report
Need to know should I click on generate report?
Last small window I is completed.
It is said to the security contexts appear in the device Chooser you must submit the current activity.
You do not want to submit the current activity now.
There the option Yes or no
Should I click Yes?
Need to know if I do all the steps above it will cause any change config ASA?
Thank you
Ticketing is used mainly in multiuser environments to allow different users to follow the work of the other. It may possibly interface with a system of external ticket as a remedy or Service now.
For example, if a user has started working on a configuration of ASA and plans to implement at a later date, the ticket will display following users that the configuration is, indeed, 'recovered '.
For single user or very small shops, ticket sales (and workflow) are not usually required.
-
The project will be completed once all images finishes loading
I'm unable to close or to share a project created in Adobe Comp CC on my iPad Pro.
When I try to close the project I get an alert indicating that "the project close once all images finishes loading."
I left for more than 10 minutes and nothing has changed. I tried to delete every image and he still has the same message.
Any suggestions?
Hi André,.
I know that you posted Saturday; still having problems?
When adding an asset she draws CC (depending on the file size and network speed) there may be a delay. Click the button close three times should cancel the current download (so you can start over), but sometimes, the application can get hung in this State.
Have you tried force - leaving the app (double - press the home button, a list off apps; pass to the app and the blow up on this subject), restart your device, then relaunch the app?
Let me know what happens.
Sue.
-
Hi guys,.
I have a few scheduled tasks that works well. I tried to create a new scheduled task today. It is a Powercli script that is compression and encryption of output with the public key and send by Mail.
So, for some reason, a scheduled task that runs through without error > but did not have encryption.
-the PS file works manually without problem
-manually tested a bat file with the full path to powershell.exe and PS = works as well
Just once, I try to plan its > it does not Code. simply paste the Code problem
do I need special Arguments in the scheduled task? It has not set up for others.
# #Encrypt #.
$gpgpath = "C:\Program Files (x86)\GNU\GnuPG\pub\gpg.exe.
$recipient1 = "xxxxxx".
$recipient2 = "xxxxxx".
$encrypt = "recipient $recipient1 - recipient $recipient2 F:\Report\vCenter\Finance\9-6-2016\Finance.zip--encrypt--.
$Process = start-Process $gpgpath $encrypt - WindowStyle hidden
If I make a New point between lines > it creating folders as test > just to see if script is running or not.
I have some ideas right now, why the scripts - but does not not the encryption Code. As manually PS is doing well.
I even made with 7-zip. and that works well.
Perhaps some clues?
Best regards
Max
You specify an account under which the scheduled task to run?
By default, this is the system account if I remember correctly.
Maybe you are looking for
-
UPDATE FROM 10.4.11
HI, I have a 10.4.11 iMac 2 Ghz Intel Core 2 Duo with 2 GB and I wanted to upgrade to a more recent software. The truth is this computer was not used but I started using it again and I want to upgrade. I think that I bought in 2008/2009, not so sure.
-
Why do I only half of my IE favorites when they are imported into Firefox?
I tried to import my favorites IE8 twice in Firefox. On these two occasions only on the first half of them appear in Firefox. There is as a limit of size on the Favorites, or some other problem here?
-
After the recovery with CD Satellite C660-1FE keyboard does NOT work
Hello A month ago I bought a Toshiba C660-1FE. After three weeks my HD broke down. I bought a new HD from Western Digital and I replaced the broken HD. I did a recovery of my HD image, so I had to order the recovery disks of the product on the Toshib
-
C5180 all in one: photosmartessential
Try to sue HP Photosmart Essential - used to work. Now it says cannot find the HPPhotosmartessential.msi. I can't find my original installation disk, if anyone can help?
-
Dv6-1101so' cannot start. "
Hi there... I m from Sweden so I hope the spelling is correct... I have a Dv6-1101so who can not start? I turn on and all I get is... press esc to the start menu? I can press but nothing happens. F2... F11 all buttons are enabled but nothings happene