New in planning

Hello

What is the record of a planning application? Why do I need to do. Is there any specific purpose.
Help me. I'm new to hyperion planning.

Thank you

Hello
You seems to be a beginner in planning. In short, save your application shared services so that you can control through a single interface of the user management console. So that the context you are looking for. Can not re open an app too. You can find info in the doc of admin planning.
If you work on the administration of the classic app, then Chapter 11 speaks of it.

Hope this info helps you

Sandeep Reddy, Enti
HCC
http://analytiks.blogspot.com

Tags: Business Intelligence

Similar Questions

  • How to create a new power plan that includes key backlit stop?

    I can't find any setting in the advanced power properties dialog box. Toshiba has provided a power eco plan. It's OK for me except the pilot. So I tried to create a power plan as eco with night light 1 hour not 5 minutes.
    However, this plan does not backlight key off.

    How can I create a new power plan that includes key backlit stop?

    Have you tried to change the power management Windows including power advanced for certain power plan options?
    For example, you can use balanced plan or standby power, change it and that s it.

  • Why do my work order plan getting all messed up when I try to add new work plans?

    Mac, HAVE CC

    If I create an icon for fine UX library. I have, say, 20 icons on 20 separate work plans. I have the following configuration: 4 lines and 5 columns. Create mu icons, name each work plan to export properly, and all is well.

    But when I come back to this document and try to add work plans, they add no way to 5 x 4.

    Very strangely, they are added in random places.

    Then I try again to "Reorganize the work plans", and they are willing, but once again, in a random order. My names are so disconnected from the previous relevant work plans.

    It's so frustrating. Is there something I'm missing, if it please or do not know, to add better control?

    Thank you very much!!!

    I think everyone goes through a similar confusion with work plans, but once to slow down and realize some items, they begin to work as

    1. Look at your work plan and that one is highlighted it's the artboard select
    2. You can easily unwittingly switch to another plan of work, by simply selecting another time with the selection tool. "Here, I've selected an item on the 4th game of darts and now the ' Live from the corners" artbaord is selected.
    3. When you use the new work plan command that adds a new after the selected work plan, some people waiting to be added as the last page.
    4. There are some bugs like when you run out of space on the right. I have the last elected artboard, but try to add a new work plan gives me an error because the top row is out of room who shovel have nothing to do with it.

    In summary

    • Name your work plans that you can easily get confused, that it is worth
    • Use reorganize artbaords often
    • Reorganize work plans does not care the physical position on the screen of the work plan, it transposes numbers (1 to 11 in my example above)
    • If you want to copy of artboard on the artboard 2 1. Copy the artboard 1 form, select any element of the artbord 2 and use the paste in front or to the rear. You can also use the work plans Panel to select your target artbaord.
  • move the selection to the new work plan

    Hi guys,.

    I'm new to Illustrator script but I have done some in InDesign.

    I want a script to move a selection to a new work plan and be able to name the work plan.

    I can't find something in the DOM as artboards.add ().

    Any help?

    Hi jakec88782761,

    are what version of picture you?

    Working with work plans is possible since CS4 +.

    Here's a simple example in [JS]

    var AB_1 = activeDocument.artboards.add([0,50,200,0]);
    AB_1.name = 'first quadrant';
    var AB_2 = activeDocument.artboards.add([-200,50,0,0]);
    AB_2.name = 'second quadrant';
    var AB_3 = activeDocument.artboards.add([-200,0,0,-50]);
    AB_3.name = 'third quadrant';
    var AB_4 = activeDocument.artboards.add([0,0,200,-50]);
    AB_4.name = 'fourth quadrant';
    

    Have fun

  • New action plan 2.3

    Hello

    I noticed on the new action plan missing some content. It seems not to have anything around gathering requirements, risk, assumptions, constraints, stakeholders, etc.. Surely, this is still part of the review, it is a reason this is deleted?

    But I do not see the link to download the points of the plan of action in terms of the DCA. Try this link for the correct of the blueprint DCD http://mylearn.vmware.com/register.cfm?course=134085

  • 4.0 EA1 - new explain Plan feature

    Hi I was trying simply the new explain Plan feature (I like the look of) mentioned by Jeff Smith on his blog but if I get an "ORA-00942: table or view does not exist.

    I get it doing the explain plan drop-down command selecting from V$ SQL_PLAN (synonym) and underlying base table V_$ SQL_PLAN. I am logged in as APPS, but that the user has select privileges on these objects sys to me. Don't know how you / he's got it to work (logged in as sys?) or if I give missing?

    Paul

    Grant select any dictionary apps privilege. Or, if your DBA prefers giving finer privileges on individual objects, you must also select on V$ SQL and V$ SQL_PLAN_STATISTICS.

  • How to simply create a new work plan? (java)

    What is the java script code to create a new work plan with a certain size and position?  I can't seem to find an example of anywhere.

    Thank you

    Check this link, I created another script that creates work plans

    http://forums.Adobe.com/thread/837709

  • WiFi Tethering and the new 'Verizon Plan'

    I recently changed in the new "The Verizon Plan" which is, in many cases, cheaper and more versatile than previous offers (thank you TMobile and project Fi). I was able to engage the service of "hot spot" WiFi on the Pure X even if I do not have a subscription for her (previously required for unlimited and others).

    Using registers "hot spot" against my assignment of data but I have seen no effect on my plan of billing (yet).

    I'm curious to know if any other X-purists 'Verizon Plan' Note This behavior also. YMMV, but it appears as always we have taken at least a temporary break.

    Since Verizon got rid of the unlimited, you're able to attach.

  • Complete individual - for new customers plan

    Is there any chance creativity plan cloud of "Comprehensive individual - for new customers" can be used on computer then one more? If this is not the case, is it possible that I can transfer the subscription to a regime of "all businesses", because it was not clarified when buying it was only eligible to a single computer and not active on behalf. Thank you and I look at prior to hearing all the world little

    Cloud license allows 2 activations http://www.adobe.com/legal/licenses-terms.html

    -Install on a 2nd computer http://forums.adobe.com/thread/1452292?tstart=0

    -Windows or Mac has no importance... 2 on the same operating system or 1 on each

    -Subscriptions CAN NOT be used at the same time (to be noted in the link above of the license)

  • Nothing appears when you create the new action plan published in the Director Application request

    I created a simple application in Application Director (with a single server) and published it to vCAC. vCAC shows a white screen when I try to make a new request for the request. I've not found errors or newspapers related to the error. No idea what could be the problem and how to solve? Thank you.

    I have seen this a fair bit - take a look at this:

    http://www.vmtocloud.com/white-screen-on-new-APPD-request/

    Oli

  • Working on a script that will add a new work plan and remove the old if it is not a specific size

    var app.activeDocument = docRef;

    app.coordinateSystem = CoordinateSystem.ARTBOARDCOORDINATESYSTEM;

    var ab = docRef.artboards [0];

    If (((ab.artboardRect[2]-ab.artboardRect[0])/72) == 17) & & (((ab.artboardRect[1]-ab.artboardRect[3])/72) == 20)) {}

    do nothing

    }

    else {}

    docRef.artboards.add ([575,1601.78,1799,161.78]);

    docRef.artboards.remove (0);

    var abIdx = docRef.artboards.getActiveArtboardIndex ();

    var actAbBds = docRef.artboards [abIdx] .artboardRect;

    }

    I mean it works about 90% of the time. I don't know why it does not always work, sometimes it will build the other work plan, even if it's the right size and I have no idea why. It's very frustrating haha. If anyone has an idea why it won't always work, please let me know. Thanks in advance!

    Hi djbgraphicdesign,

    Maybe this could be a rounding problem.

    Please try something like this instead

    if ((Math.round((ab.artboardRect[2] - ab.artboardRect[0]) / 72) == 17) && (Math.round((ab.artboardRect[1] - ab.artboardRect[3]) / 72) == 20)) {
    
  • New to planning, looking for some advice

    Hi all, I am 10 years old and more on Essbase development and administration working in finance, now, we decided to get to replace the budget process. I read the forum, the directors of HP guide and what I found on the web...
    I started to draw the types of application and plan on paper so that the box TI Gets and installs the software.

    I came across a few questions I'd like to share with you and maybe get some previews...

    1 - What are the differences between creating a Classic or EPMA/BPMA application?

    2 - my company has 2200 cost centers, should they be considered the entity Dimension? Or I simply give the entity dimension over a structure akin to the people / units who will work on the budget?
    For the profit and loss account and balance sheet, we do plan to profit center (20 +/-) and produced (300 + /), but the spending plan we do to the cost center and GL account (3000).

    Thanks in advance

    Hello
    You can consider a shared repository of objects of metadata that can be reused in multiple applications EPM of the same or different type EPMA. For example, if your organization has a hierarchy unique entity, you create this time in EPMA and reuse it in a database Essbase and HFM application. Thus, any change in the structure of the entity gets reflected to any application that she ensure integrity in habitat used total EMP. There are several other benefits, one of the most important of which is the ability to synchronize data between applications of the EMP. In contrast with the classical approach to create and maintain the application in a more isolated environment. At first glance, you may think that this approach cannot provide the same level of integrity and that it is somewhat limited with regard to the management of the database. However, many of the apparently weak aspects can be strengthened with the intelligent use of tools like ODI, contour utility load, etc. The main advantages of this approach are rapid development, easy maintenance and flexibility. Otherwise, with respect to the final product, it's the planning application, both approaches produce outputs the same.
    As to your question about the structure of the entity, I think that matters, it is the process of budeting. If the costing will be done for the cost centers and budget users are restricted to a single entity or a particular group of entities, it would be wiser to entity cost centers. You can think about segregation Department/unit user shared services through the creation of groups of users, assign users to these groups and set access rights using these grouos.

    See you soon,.
    Alp

  • [Filter plugin] Can we add a new transparency plan?

    Hello

    I created a filter plugin and I want to add to the transparency of the image. If the image is already a layer, it already has 4 aircraft (1 for transparency) and it works fine, but if the image is flatten, there are only 3 aircraft and I can't find a way to add a new aircraft to add transparency.

    I can't disable the plugin when there is no transparency (with the PSHOP_HasTransparencyMask property) but I think that this can be confusing for the user and add automatically the transparency would be better.

    Is it possible to do this that I missed? I tried to change FilterRecord but when I try to move to the new advanceState function outPlane returns an error.

    A filter cannot add transparency unless it already exists (ie: you are filtering on a layer).

    You can change the existing values of transparency.

    If the image is flat, you need an Automation plugin to change the background to a layer.

  • new planning of an urgent application-bit

    Hi experts,

    I installed and configured 11.1.2 planning. now, I try to create the new workspace planning application but I can't order associated with to create the new application under command of the administration.

    Can it please let me what going wrong... Thanks in advance.

    Thank you
    Ganesh

    It maybe the account has the appropriate permissions.
    Maybe the web server has not been configured last.
    If you're really struggling and need to quickly create an application you can go directly to planning http://: 8300/HyperionPlanning/AppWizard.jsp

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Handed over to new iPhone and AppleCare

    Hello

    I would buy an iPhone from a seller on Ebay. It is a refurbished device (exchanged by Apple), probably using the current owner AppleCare plan.

    My question is, if I wanted to buy this phone, can I buy a new AppleCare plan for it?

    Thank you!

    AppleCare can be purchased during the active period 1 year warranty.

    If it is, then no.

    If the seller received Applecare, it should be transferable.  Check with the guaranteed Apple Selfsolve check tool in getting the serial number of the phone.

    Make sure that the seller doesn't have money on the (contract) phone or carrier (Bill pending) otherwise you will end up with a non-active phone.

Maybe you are looking for