Question: How do the Disqualification Trigger ODI?

Hi all

I know to ODI with trigger Disqualification job but are threre any wat do Disqualification to trigger ODI Job?

Kind regards

Nathan Srisaksakul

Assuming that the ODI jobs can be called from the command line, you can use an external task and invoke a shell script of the for.

Tags: Fusion Middleware

Similar Questions

  • Yet another question: How do the update of Windows (Windows 7)

    My Dell laptop running Win7 fine until recently when the WU stop working, which seems to be a very common problem.   After many, many hours to try dozens of fixes, I gave him room and upgraded to Win10.  After discovering that Cortana (surprisingly) cannot be uninstalled and uses massive memory resources, I have reinstalled Win7 from the original dvd.    Window update still doesn't work, but I downloaded a 'stand-alone' Windows Update version and it worked.  Downloaded and installed updates 225, but subsequently of course, Win Update does still not work.   It just displays a message that updates are downloaded, but nothing else happens (several hours).   I tried Fixit kb971058, and it is also just here for hours.

    I used Windows since 3.0 and with each major release, maintainability got progressively more difficult.

    I don't know how Win Update might have gotten this done but has hundreds of discussions on the issue on the forums, etc, I think maybe that Win7 is now a lost cause and it's time to switch to Linux?

    Download KB3145739 from the Microsoft web site and install it.32 bit version: 64-bit version of https://www.microsoft.com/en-us/download/details.aspx?id=51857 : https://www.microsoft.com/en-us/download/details.aspx?id=51853

    You must include KB3153199 in this guide. There is no update of windows running performing normally without KB3153199 and a few others installed. Links and info provided here:

    http://Wu.krelay.de/en/

    KB3153199 and KB3145739 are still necessary, after installing the rollup of convenience.

    https://blogs.technet.Microsoft.com/windowsitpro/2016/05/17/simplifying-updates-for-Windows-7-and-8-1/

    Best regards, VZ

  • syntax Select question, how does the V.*

    Hi all
    I am new to ORacle and resembles the code example, as below, I couldn't find any reference to this V.* which refers to all columns and defined in Oralce docs after the ORDER, and also I can not reproduce this in my site. If confused, maybe it's just for the code sample and not legimate. Can someone point to the right place, how to read how it works. This code is valid?

    TX
    T
    SELECT PKID
          ,NAME, PRODUCT_NUMBER, PROD_TYPE, TO_DATE
    --      */
    FROM   (SELECT ROWNUM RNUM     ,V.*
              FROM (SELECT   PKID
                            ,NAME
                            ,PRODUCT_NUMBER
                            ,PROD_TYPE
                            ,TO_DATE
                        FROM PRODUCT PRD
                       WHERE 1 = 1 AND PROD_TYPE = 'Sell'
                    ORDER BY UPPER (NAME) DESC) V
             WHERE ROWNUM <= :V_CNT2)
     WHERE RNUM >= :V_CNT;

    This subquery in your code was given an alias name 'V' which is used in the actual query as V.*
    If you want to you can provide a different alias name namely "qry" and its reference as qry.* columns

    (SELECT   PKID
                            ,NAME
                            ,PRODUCT_NUMBER
                            ,PROD_TYPE
                            ,TO_DATE
                        FROM PRODUCT PRD
                       WHERE 1 = 1 AND PROD_TYPE = 'Sell'
                    ORDER BY UPPER (NAME) DESC)
    

    Hope that's clear.

  • I figured out how to create a contact group and add contacts to the group, but here's a stupid question: how in the heck actually send an email to the Group?

    I go to "create mail", then "Tools", then "windows contacts" where I see the name of the group that is listed.

    Then what?

    Hello

    Read article 2:

    http://www.Vistax64.com/tutorials/69738-contact-groups-Windows-mail.html

  • Siebel &amp; Disqualification - what happens in case of failure of the Disqualification?

    Hello

    We think about how monitor the Disqualification and its communication with Siebel, to be notified in case of problems.

    The best possibility would be monitoring web services Disqualification, just to see the availability of http, or even with sample data. However, this would not cover communication between the Disqualification and Siebel. Are there best practices on how to monitor this part? Perhaps with something like logcheck?

    Or, as a more general question: how exactly Siebel reacting if Disqualification is not accessible or if there are problems in the communication of the Disqualification, the generation of keys, either for verification of duplicates? The Siebel Data Quality provider running several web service against Disqualification request, so I see potentially several points of failure - even if caused by a misconfiguration.

    Best regards

    Daniel

    Hello

    Customers generally adopt one of the following strategies here:

    1 set up so that they should still be running if the application server is running, and let's assume they are if it's jobs in real time. This leaves a window of risk as specific web services are not monitored and it is possible that he could have not detected the time if the job fails, but the application server is not.

    2 ping the web services with dummy data that are not consumed to verify that they are available. Gives good control, even if it may pollute the logs a bit.

    3 monitor web services by using a script that checks via JMX of Disqualification interface - the path to check is disqualification/Runtime/data/buckets/realtime/projects / [project name] /readers/ [name of web service] and opening check = 1 (for the race) not 0 (no not running).

    The behavior in Siebel web service Disqualification is not reachable is configurable in the dnd.properties file that controls the connector. By default, each service call "integrated security" that is set to true, which means an error is generated in the newspapers if the service cannot be called but the end users see no error. Change the failsafe to false indicates the user will see an error if the service is not available.

    Kind regards

    Mike

  • How to strengthen the failure on jobs of the Disqualification

    We execute the Disqualification autosys scheduler jobs (ksh shell script called CLI command) and have the following conditions:

    1. do not the autosys job each time that there is a problem in the execution of the task of the Disqualification (i.e. the Disqualification job failed because of blocking problem)

    2. do not work autosys whenever at least a save fails in the processor business rules

    Currently, the shell script returns a 0 return code (success) on both scenarios.

    Can you advice how Disqualification jobs can be configured to trigger failure to the caller?

    Yes the bug has been checked on 12.2.1. It is the version, and not specific o/s. The bug does not exist in previous versions. We are working on a fix for the fix.

  • Hello.. I've forgotten the answers to my security questions... I do not have the chance to remember the... What can I do now? No idea how delet old questions and put the new ones? PLEASEEE help me

    Hello.. I've forgotten the answers to my security questions... I do not have the chance to remember the... What can I do now? No idea how delet old questions and put the new ones? PLEASEEE help me

    Hello

    If you set an alternate e-mail address, you can reset your security questions. Follow the instructions here to check if this option is available:

    If you forgot the answers to your questions of security of Apple ID - Apple Support

    Otherwise, you will need to contact the Apple Support. The information is available here:

    Contact Apple for assistance with the security of the Apple ID - Apple Support accounts

  • TestStand 2012 Newbee question: How do I pass a string to a VI to TestStand to control the flow of sequence?

    I want to use a drop-down list box (or a similar control) in a VI to select from a list of strings to direct execution in TestStand.

    • How connect the channel selected in the combo box at the output of the VI Terminal so I can see it in TestStand?

    • What should I use as 'value' in the parameter module TestStand to retrieve the result of that VI?

    I tried "wiring" the result of the drop-down list box directly to a terminal of output without success.

    I tried "wiring" the exit from the drop-down list box to a wire string variable then this variable to an output without success Terminal.

    (see attached files)

    Can someone give me an example of a VI that allows you to select from a list of strings: {'Bob', 'Mary', 'Bill', 'Jennifer',...} using a

    (or similar) drop-down list box control and routing of the string selected to the output terminal?

    Also, how to reference this (result) setting within TestStand?

    It is a simple task and there can be only one solution TestStand, I'm looking for a simple direct execution sequence by the operator to select a string in a list.

    I studied this problem, but could not find instances of the digital comparisons or string canned and did not find a generic model that would return a string to a VI to TestStand result.

    Thank you for suffering through this fundamental question.

    David

    Melbourne, Florida

    Marco beat me but here is my interpretation. TS 2010, LV 2011

    Also, look at the example of demo which comes with TestStand: C:\Documents and Settings\All Users\Documents\National Instruments\TestStand 2010 SP1\Examples\Demo\LabVIEW\Computer Test of the motherboard

    Demonstration should be a version of what you want.

    See you soon,.

  • How to understand the reference trigger as a trigger to stop?

    Hello

    I tried to use an external signal how the trigger works / stop for analog data entry. I had looked for solutions and above all that they suggest to use a reference trigger. But I don't really understand how it is applied. For example, why it should be set to the number of samples before release? For me, the number of samples that are taken are those between the market trigger / stop... I don't really have it.

    Migne

    Hello master,

    As see you, there is no trigger stop easily available with DAQmx. Indeed, you will need to use the reference if you want to trigger the end of the acquisition. What actually a c of reference trigger on a task must begin a kind of continuous acquisition until the trigger occurs. Then by default you will get a certain number of samples before (before) and after (after release) edge relaxation when you read the buffer after the triggering event.

    To read data continuously during the acquisition, you must change a property to change the access mode during playback. You will also need to manage properly reading the buffer has you will certainly get the same amount of samples during the last reading.

    Detailed explanation again as long as there are for example--> http://digital.ni.com/public.nsf/allkb/BA775B0E445BFA79482571FE0032CCEB?OpenDocument

  • The question came on the resettlement of the original operating system on the computer. How do we go to this matter legally?

    Re-installation of the operating system on a computer

    I volunteer for a nonprofit that takes computers donated by the community and cleans them and provides them with under ideal children and homes for humanity in our local community.

    The question came on the resettlement of the original operating system on the computer.  How do we go to this matter legally?

    Start here: http://www.microsoft.com/refurbishedpcs/programs.htm

  • I'm 'in the Community' (or I couldn't ask a question) how can I get the PW I put here?

    I'm 'in the Community' (or I couldn't ask a question) how can I get the PW I put here?

    I know it may seem silly for a computer "geek" to not write it down but... @ 81 Alheimers rules!

    Cescokid

    Hello

    Use the links below to reset your Windows Live ID password:

    http://windowslivehelp.com/solution.aspx?SolutionID=6ea0c7b3-1473-4176-b03f-145b951dcb41

    https://windowslivehelp.com/PasswordReset.aspx

    If you need assistance, you will need to create a post on www.windowslivehelp.com

  • How is the Score calculated to the Disqualification/OWS priority

    How is the Score calculated to the Disqualification/OWS priority?

    I tried to ask support and they directed me in the direction of this forum?

    The implementation guide did not help http://www.oracle.com/technetwork/middleware/ows/documentation/ows-impl-guide-2235293.pdf

    Thank you

    Karen

    Pretty simple (and support should have been able to say, sorry).

    An alert can have several connections. Normally because registration of a given client (name) matches a number of names of different aliases of the same person or entity.

    Each of these relationships has a priority score that is configured in the matching to the Disqualification rules. Whatever the rule of correspondence formed this relationship has a priority associated with score that indicates the power of this game.

    (Default), the score of the priority of the alert is set to be the highest score of any relationship in the alert priority; in other words, the score of the game stronger.

    Mike

  • I create an account, the user receives the email to activate the account, but a message shows the account activate has been exceeded my question how to achieve responsive account id

    I create an account, but the user receives email to activate account, but a message account activate has been exceeded my question how reactive to this account id

    Contact adobe during the time pst support by clicking here and, when available, click on "still need help," http://helpx.adobe.com/x-productkb/global/service-ccm.html

  • Question: How to make data Disqualification Purge project after completing a work?

    Hi all

    I know how manually purge the data of the project by clicking on

    but I wonder if there is a way to Purge project data of the Disqualification after completing a work in itself.

    Thanks in advance for any response.

    Note that Disqualification 11 g, just released, includes the ability to create policy rules for the purge of the data where the jobs are executed with labels of execution.

    This does not include the data produced during the execution of the works interactively to the Director (i.e. development and test jobs).

  • How can I start the BI and ODI Managed Servers?

    Well,.

    I read at step 4 of Doc-ID 1589540.1 the following:

    "BI applications requires the BI and the ODI Managed Servers (bi_server1 and odi_server1) should be started via the node Manager. This setting is required for settings, memory, and jvm arguments are correctly defined.

    Starting not not the BI and managed servers of ODI can lead to memory problems and the loss of functionality BI Applications Configuration Manager, the Manager of functional installation and ODI.

    To ensure that the BI and ODI Managed Servers are started through the node Manager, start using the Console of Administration WebLogic user interface.  Do not start the BI and servers managed by ODI by using the managed server start script. »

    Well, as I'm new Weblogic management, then, what are the steps to start all of the services?  (I have OBIEE, ODI and Bi Apps on the same server).

    I mean, was that you should not start their script. What is the proper sequence and how should I do this?

    Could someone help me on this?

    Thanks in advance...

    the appearance of the home screen for environment-> servers-> here you will see the admin and managed servers-> click the tab control and then check off the boxes related to managed servers, and then click start that's all

Maybe you are looking for