Synchronize two banners flash in AS2?

I was wondering of any method of synchronization of the two flash banners? What I mean is that when the page loads or banner starts until both are ready?

I will have two banners flash like this:

| Banner 1 |
(something between them, html css)
| Banner 2 |

Two banners will contain video, to be played in sync.

Any ideas? I would prefer AS2, because the site that I run these two banners prefer AS2.

I read something about LocalConnection in AS3, something similar in AS2?  And it works on all OS / browsers? Can it be done with Javascript?

LocalConnection works with as2.  There is only a small difference in its implementation in as3 vs as2.  Check the flash help files.

Tags: Adobe Animate

Similar Questions

  • synchronize two exits of meter 6071E map

    Well, that's usually how to synchronize two problem of counters.

    I use the 6071E with DAQmx .NET 4.0. I set a task and attach to two channels with implicit synchronization and zero initial delay of meter output. When executing the program

    I catch the first edge with a single trigger to scope. There is always a delay between the first edge of ctr0 and the first edge of 16.3 microsecs ctr1. Is it possible, not to mention that affecting the initial delay of ctr0 16.3 microsecs to make meter always start together? What is the source of the delay(software/hardware) and must always remain constant.

    any help is welcome

    The source of the delay is that while he is in the same tasks that the counters are always started sequentially by software.  I'm surprised that the delay you see is constant.

    If you want the counters to start together, you must configure a start trigger.  As soon as you begin the tasks of meter in the software, issue the trigger to start to generate your pulse output.  Relaxation of beginning must be a signal of material - for example, you can configure a digital outputs in software timing and the lead back to one of the PFI lines.

    If you want to avoid any additional wiring, you could split the counters in two separate tasks.  Trigger a counter with the internal performance of the other (start the task that will be triggered everything first).  In doing so, instead of using an external trigger, I expect a delay between the order of 100 ns counters as the initial delay is at least 2 timebase tick.

    Best regards

  • synchronize two number of cycles

    Hello world!

    I want to synchronize two number of cycles. I want two number of cycles to start the countdown together. I have two check County file VI, which was attached. I would like to ask if two ticks start at the same time counting.

    I thank in advance.

    In LV, you don't 'start' a number of cycles. The counter tick count functions interact with which is a 32-bit counter that starts when the fact of LV. You can compare the number in two places in your code, and can be assured that they are both reading from the same starting point.

    But I am totally confused by your code. What you trying to do?

    Mike...

  • How to synchronize two chassis

    Dear all,

    I want to synchronize two chassis, chassis first has RFSG 5673E (S) and other chassis a DAMA (S) 5663E, they are connected via MXI, is there anyone who has this experience and can support me to apply it. I know that he used NI-Tclk to synchronize in a single chassis and there is another kit of tools for mult chasis, but I have no idea on how to use it!  Thanks in advance

    Best regards

    Al-Rawachy

    So I did a little research and to allow you to synchronize the two chassis together you must use a map of timing and synchronization in each frame so that you can share Tclk. This is for several reasons: first of all, as well as terminals IN CLK and CLK OUT, several PFI lines are required for the export of various signals used by T - CLK (i.e. Start, Stop and Sync triggers). In addition, the map of timing and synchronization is also necessary to replace clock background basket of 10 MHz, on the chassis of the slave with the master clock. It is essential for the two hunts reference the same clock synchronization. In addition, using a more stable clock source, as provided for in the calendar and map of synchronization, improve synchronization significantly.

    From there, a chassis are sync'd up, TCLKing la 5665 and 5673E should be simple enough. It should be simply a matter of configuration tasks the DAA and RFSG, with a single trigger configured, before feeding the two tasks of the TCLK vi. Here is an example for you to study what explains this:

    http://www.NI.com/example/30254/en/

    I hope this helps.

  • I downloaded separately from all parties to a four-part harmony song, how can I synchronize. two or three playing together? Windows 7.Thanks.

    I downloaded separately from all parties to a four-part harmony song, how can I synchronize. two or three playing together?

    Hello

    Plenty of capable edition

    Audacity - free
    http://Audacity.sourceforge.NET/

    Audacity - Forums
    http://Forum.audacityteam.org/

    Free Audio Editor - free 2012
    http://www.free-audio-editor.com/

    Other sources of information:

    http://Forum.recordingreview.com/

    http://www.djforums.com/forums/

    http://Homerecording.com/BBS/

    http://www.pcmusicstuff.com/

    I hope this helps.

    Rob Brown - Microsoft MVP<- profile="" -="" windows="" expert="" -="" consumer="" :="" bicycle=""><- mark="" twain="" said="" it="">

  • Install Oracle GoldenGate Linux to synchronize two schemas from database on a single server

    Hi all

    I have to synchronize two schemas from database (Oracle 12 c) in a single host RedHat Linux to demonstrate and understand the use of OGG V12.1.2.1.0. I try to do. But it's complicated and confused me because I am new to Oracle and Linux. I followed this tutorial ( install Oracle GoldenGate for Oracle 12.1.2 on CentOS/6.x to 6.x/RHEL Linux 6.x EL ). But it is difficult to understand how I can match with two diagrams of database on a single server.


    And I found this tutorial (Oracle GoldenGate on Linux: two-way replication of Oracle 11 GR 2 to Oracle 11 g 2). He said: "" If you have that one host, it may be useful to change the /etc/hosts file to create aliases forhost01.example.com and host02.example.com.". What it really means?

    The other seems to be useful. But it's totally different from 1. Is that this will help my job since I use 12 c Oracle Server?

    Can I get some tips to continue my task?

    Here's another tutorial - http://www.oracle.com/webfolder/technetwork/tutorials/obe/fmw/goldengate/12c/OGG12c_Integrated_Replicat/index.html

    It has everything set up on a single Linux host.

  • Synchronize two schemas from database on a linux server using Oracle GoldenGate

    I followed this guide ( http://www.oracle.com/webfolder/technetwork/tutorials/obe/fmw/goldengate/12c/OGG12c_Installation/index.html?cid=9167 & ssid = 0 ) and for two different databases running on the same instance of database schemas.


    What I have now is a Linux server with two Oracle database schemas.
    I have access through my Linux virtual machine. I want to do the synchronization possible between them.

    I use Oracle GoldenGate to make this possible. What should I do now? Goldengate is must be installed in the server too? I'm totally new to this situation. Can someone give me at least the major steps before going to the more comprehensive study?

    Well understood. This helped.

    Install Oracle GoldenGate Linux to synchronize two schemas from database on a single server

  • This may seem like a strange question, but im trying to encode two buttons Flash Adobe, next and previous, however, when I put the thumb to the next scene and play on the next button and the previous scene and play on the previous button, it keeps switchi

    This may seem like a strange question, but im trying to encode two buttons Flash Adobe, next and previous, however, when I put the thumb to the next scene and play on the next button and the previous scene and play on the previous button, it keeps switching autour.

    If you have symbols of button on the stage to the next and previous, each of these symbols has an instance name with a listener event attached to it. The event listener is linked to a mandate. You can have a single event point to a function. So for example, if you have a next button and a click event that points to a function that says something like nextFrame(); and then you want to use the next button to point to a function that says something like nextScene(); you will need to use another instance of this next button and have this different instance to use a different event handler to point to a different function. Who help me?

  • synchronize two physical databases

    How can I synchronize two databases SQL Modeler, or SQL dev? Whatever one will work.

    Discover the characteristic of Different database in SQL Developer.

    You can also create a template of each database and to compare a model to generate an alter script.

  • video file from Flash cs3 as2 break

    Flash cs3, as2, win xp

    I want to import a file .wmv in flash. When you press "play" button, the video file must be played. but I want the video to be paused when you (preferably) the same game again.

    so:

    -How to pause an imported video file?

    -How to control play / pause the video with the same button?

    Click on your component and assign an instance name (in the properties panel, for example, flv_pb).  If you have a movieclip button (for example, btn), you can use:

    {btn.onRelease = function ()}

    {if(!this.) Toggle)}

    flv_pb.pause ();

    } else {}

    flv_pb. Play()

    }

    This.Toggle =! This.Toggle

    }

  • PE3 is possible to synchronize two sources video post edit AB Roll?

    In PE3, is it possible to synchronize two digital video files (AVI) to create an AB roller type post edit.  My two captured video files seem to have different speeds or od frame.  How do I align and frame corresponds to 2 video sources?  The situation is a 2 photo shoot.  How to best create a roll of AB edict of sources 2 videos with audio of a video file as a common element?

    Wes,

    Armed with Steve's article, you should be able to do what you want.

    I have a question and maybe a suggestion to fix the problem of pace from the start, to help solve this problem without a lot of fiddeling. What are the two frame rates? G-Spot will tell you exactly, if you can't find it in the properties. If the source files are DV - AVI, they must be of the exact same rate initially, but if you're a little off, I would like to convert it the DVD specifications do not support a correspondent. First place I would try this would be to simply interpret footage in the project Panel. If this does not work, then Windows Movie Maker can do for you, or you can use other conversion tools to match. I use DigitalMedia converter, but it's not freeware. Get the two sources in perfect sync at the beginning will go very far to the success.

    Good luck

    Hunt

    [Warning] I don't have PE3, PE4 only, but I think that applies to your version.

    [Edit] After reading the article by Steve, the only thing I would do (after the sync property) to help me in the multi-cam editing would be to set the video track display to show all the "frames" and the expansion of the height of each video track two (VT), so that they occupy the largest part of the vertical real estate in the timeline. Then, I would zoom in on the horizontal of the timeline display, so that I could see quite clearly, each image. Basically, this makes the timeline as a line of detailed scene, but you can stay in Timeline Mode. Because you do not have Mode multicamera PrPro, you won't get anything your video footage track higher in the program monitor. You will be viewing the images on the Timeline. This will require a lot of horizontal scrolling on the Timeline, but it is doable. Then, when you want to use the images of VT1, you will cut (scissors tool) VT2 overlay images. Personally, I work out my main sequence (such as the master in the article Steve Audio track) on VT1 and images from my camera "cutaway" on the VT2 console. Like prescedence VT1, VT2 you can leave VT1 footage almost alone and just cut the images on VT2. I would use the Cross-dissolves on the head and the tail of the "Cup" Clips to VT2. Remember that if you use these, you want to make sure that the cutting came where you want the scene on VT2 absolutely start or end. The duration of the cross-dissolves will determine when the stage becomes either visible at 100% (head), 100% invisible (tail). Also, don't forget that Dip - to-black on VT2 takes the image on VT1 to black, where my use of Cross-dissolves.

    Using this method, can also do some repositioning of the (cut from the original) Clips to VT2, to offset any loss of synchronization. But you can possibly use it to set the framerate differences, I'll try again to get the images as accurate, as it is possible to start - a lot less work in this way. Also, once the 'holes' were cut into the images on VT2, you can start using the program monitor much more.

    As Steve points out, PrPro facilitates locking securities and a double multiple camera monitor, multicamera mode.

    This is exactly how we did with film, except that we had to splice in black leader, where cuts were made and could not hold our intact VT1 sequences, we can with an NLE and video. Because we were dealing with sprocket holes, we had doped (sprocket) gears on a 'sync' block, and once we'd get right alignment, would physically renversible by a guide, who would 'lock' the film to these two rolls of film for the sync block. Although it may seem difficult, when you read it, it's really not and so very easy, as it was with the film.

  • Synchronization of a Flash with Captivate movie

    Hey,.

    Does anyone know how to connect, or synchronize, an animation to a CS5 Captivate editing such as each frame of the animation is related to a respective image on the slide of Cp? In other words, I want image 1 of my animation to start frame 1 of my blade Cp (which it currently doesn't, no matter where I put it on the timeline of Cp), and I would lilke the animation, take a break and play depending on what the slide of Cp.

    Here's what I did:

    I made a slideshow animation Flash CS5, I put on a slide of Cp at the top of the audio. The animation is 35.5 seconds, identical to the slide of Cp.

    I put the animation at the beginning of the timeline, said playing for the "rest of the slide" and checked "Synchronize with project" (which does nothing as far as I can tell).

    I put a stop (); command at the end of the animation, so it does not repeat itself (and it's literally the only code I have right here).

    The animation and the Cp are both at 30 frames per second.

    This is what happens when previewing the project (F4ing):

    When the project comes to this slide, the frame of the slide (click on audio/boxes/buttons/etc) works well, but when the slide starts, it starts in the middle of the animation. For example, at the start of the slide, frame 1 Cp slide plays during the framework (for example...) 75 on the animation sets.

    The animation begins at a different location each time.

    Also, when I stop the slide, the animation continues to play, which compounds the problem. I want the animation to pause when the slide of Cp is paused.

    I know that animations usually have a certain way, but I would like to know if there is a way to change its behavior to make everything work together. Best of cases, there is an option somewhere that I'm on, and worse, I imagine that there is a way to write some actionscript in the Flash animation which tells Framework 1 to always be attached to the frame the Cp 1 and frame 2 to always attached to the PC 2, etc, with each image frame. I'm new with Actionscript, so I don't know how to do this.

    Any help would be greatly appreciated.

    Thank you.

    Hi Brian,.

    After watching your .fla to the animation file and doing some research, I found the problem.  As Rod Ward correctly noted in this post:

    Captivate 5 was a total rewrite of the software architecture of Captivate 4 and it introduced a subtle, but a fundamental change in the way as animations Flash have been addressed in Captivate content published.

    Change means basically if your animation was built at a level or two inside a symbol rather than on the main timeline to the next level, then you will find that Captivate 5 or 5.5 loads and runs the animation on the first slide of the movie. This means that the moment where you arrive at the current slide where you WANTED the animation to make it is magic, it has already run and completed.

    Captivate 4 What did not.  The entertainment was not really busy until late in the chronology of the film to be ready for the slide where it was needed.  It didn't matter if the animation was buried inside a symbol or not.

    You have two choices:

    1. Improve your animation so that everything happens on the main timeline of the FLA Flash file it generates.
    2. Download your Flash programmer to add ActionScript code to the animation, so that it does NOT completely when loaded for the first time at the beginning of the project when running.

    Looking at your FLA file, I noticed you had a symbol MovieClip/called "Animations" containing the time line but the time of the main .fla movie line was virtually empty.  Following the logic of option 1, I moved all the layers of time line "Animations" to the root of movie .fla time line and that fixed it.  In Captivate, I also checked "Synchronize with project" for the properties of the animation and the animation actually pause and play when I put paused and played the film of Cp.

    So the key is to make sure you use the time line main for any animation you develop in Flash Professional.

    Hope that helps,

    Jim Leichliter

  • Why are there now TWO Adobe Flash Player required to view all of the Web sites: v11.9.900 and v12.0.0.43?

    I had Adobe Flash Player v.11.9.900.170 and upgraded to v.12.0.0.43. When I checked the Add-ons Manager, both versions of Flash were listed and active. I disabled the earlier version, and now indicate a few sites I don't have Flash. When I re-activated the old version, the video has played very well. So what's the problem with it is necessary to have TWO versions of Flash Player installed, the current one AND a previous one? Seems hinkey...

    @cor-el: the previous version seemed to disappear of itself, about 12 hours later. I checked the topic: plugins page (along with the Add/Remove Programs), and only the latest version of Flash is not installed. I have already refreshed the pluginreg.dat file.

    There always at least a web page that asks for the installation of Flash Player, but it works very well on almost all other Web sites.

  • How to synchronize two profiles in firefox, everything except localstore.rdf

    Yesterday, I asked about the binding cache between two profiles in firefox:

    https://support.Mozilla.org/en-us/questions/925836

    And I got to thinking. The only reason why I'm even a second profile is to have two 'places saved window' for purposes of multi-monitor. I want that these profiles to be EXACTLY the same except for the location in which they are open (which is registered in localstore.rdf). It occurred to me that with my current setup in the thread above, even if the caches are now linked... I still have to change twice bookmarks. Have two different stories, saved passwords, etc. A minor inconvenience at best, but it would still be nice to avoid.

    As I said, I want these identical profiles, except for the locations in which they are open. I know there are extensions for synchronization of profiles, but they all seem to be 1 star performance that hinder the mess. I prefer to do it manually, as I did with the cache. Possible?

    Found an answer myself, mklink. I delete the places.sqlite (the file where the bookmarks are saved) my 2nd monitor profile. I then go to CMD and create and MKLINK by running the following:

    MKLINK C:\Path\to\Mozilla\Firefox\Profiles\monitor2\places.sqlite C:\Path\to\Mozilla\Firefox\Profiles\default\places.sqlite

    This creates a shortcut in my profile monitor2, redirecting to the profile folder of the monitor of my first for the file places.sqlite. TADA, the bookmarks are sync'd and the changes are saved to both directions. I developed this and created mklinks for formhistory.sqlite, cookies.sqlite and permissions.sqlite. Works perfectly and synchronizes both ways, as did places.sqlite.

  • synchronize two usb 6289 with a meter

    Hi people!

    I'm trying to synchronize 2 boards of the series M USB-6289 using a counter.

    I searched the forum and that you've already seen the tutorials:

    'Synchronization of series M with LabVIEW and NOR-DAQmx - Developer Zone - National Instruments'

    'Synchronization of data acquisition USB - device to several systems - Developer Zone - National Instruments'

    "The time and the synchronization of the NOR-DAQmx - Developer Zone - National Instruments features."

    However, I still have some doubts (where the post with respect to the following:)

    -If I want to use the meter as trigger for both cards do I need to export to a PFI line and connect to the Member of the Board?

    -I do the same thing with the clock signal (export to the other panel using a PFI line) or using the same frequency for two meters is enough? Or both?

    -can I use the same value for the frequency in the meter and two clocks?

    Hope someone can help out me.

    If possible, underline some examples or detachment would be great.

    Thanks in advance for the help!

    See you soon!

    Hello

    All points depend on what you need to synchronize exactly.

    As you have probably already read in the links you provided, you have the option to share a trigger, or a clock, or both.

    Of course, the best solution is to share together.

    Then, you can choose to directly share the sample of one blade to the other clock (if the two sampling rates are the same), or to move the reference clock, then, both cards will synchronize their sample (with PLL) clock on the same reference clock, as shown in the synchronization M with LabVIEW and NOR-DAQmx series.

    Exactly how you want to use your meter?

    You want to generate a single trigger pulse?

    Then, for examples of synchronization, there are some zip files at the end of the links that you have read.

    Kind regards

Maybe you are looking for