Table of graphs

I created a table 1 d of XY graphs and to make friendly Viewer, I would break it up into two columns (if I have 6 slots, I want to see them as an array of 3 x 2 instead of 6 x 1). The algorithm works very well, I tried with other types of data, but does not want to LabVIEW initialize and full of table grapes. Is there a way around this? Other ideas to a large number of plots more readable?

Andrew

I hope this helps. One thing to keep in mind when using tables, graphs in cluster is that each chart must maintain the same exact properties - including the same scales! In other words, it is often necessary to normalize all the plots, say from-1 to 1, or 0 to 1, even though they are all in line. If you're lucky, all the graphs will use the same units on the same range, so no worries!

Tags: NI Software

Similar Questions

  • Number of points and the number of plots for table and graph

    Hi guys,.

    Can someone explain to me why I get when I run the number Vi 1 2 plots for each table and graph with 6 points, but when I run vi 2 I get 4 locations with 1 point each run assuming that the same logic applies to two screws

    Thank you.

    When wiring of the paintings in the graphics, it is assumed that each line are several points of land.

    You must convert the 2D table or right-click on the graphic and select "convert table.

  • Dynamic linking of tables and graphs in excel

    Hello

    We use excel to generate reports of som that got the tables and graphs. This excel file is updated every week.

    My question is:

    -Is it possible dynamic graphs of linking excel in indesign?

    I know its possible with tables / cells, but don't themselves are no more information about this.

    If not, it would be possible will be illustrator?

    If I save the chart in PDF format, it is possible to link to a situation of PDF in indesign, then I can just export a new PDF to Excel every week, crush the old PDF and indesign displays the new content?

    The PDF method you describe above will certainly work, but as with any link, you specify ID to do the update.

  • How to convert a table to graph XY?

    Hello

    I'm new to LabVIEW. For my course, I have to create a graph of load on a beam against the measured voltage to a rosette strain gage.

    I managed to create the required table and I can export to Microsoft Excel to create the chart, and that works fine. However, ideally, I would just use LabVIEW to create the chart.

    Attached is an example of the table after the test is run. [table 1]

    in this table, I need to draw 3 lines (A, B, C) on a single graph of voltage(y-axis) against load(x-axis), with a line of regression for each of them.

    Also attached, it is an example of the chart created in excel, to give an idea of what I'm trying to create. [Chart1]

    Any help would be appreciated, as I am new on using Labview.

    Thank you

    I managed to understand what I had done wrong. I was just posting this when you posted your reply Ian.

    Ian and Bjorn thanks for both of your help. It is much appreciated

    Luke

  • How to upgrade a 1 d table multiple graph/diagram of dispersion

    Hi, I am trying to add data to the chart single parcel you see below.  It is a 1 d array.  When I build another table to add to that, he becomes a 2d array and am not sure how to handle this data in another graph/chart.  I have a set x-scale-10 a-100 and at each iteration, about 100 values are inserted there to say-10 and - 20 (x scale) and so on until-100.  The chart will be of type point cloud.

    Any suggestions?

    Hey Grant,

    as I said: table of construction is required to create a 2D of your shift register. Change the default constant to a 1 d array!

  • Plot data from several sources in table of graphs

    Hello! I get 1250 pixel data and I want to plot the data for each pixel in a different chart. Each time, I get a data word and one word for the address of the pixel just, how do I trace these in an array of graphics? (Or the other table 1 d of 1250 graphics or table 2D 50 25 columns x lines).

    When there was less that I used a case structure and graphics I would wire the address pixel in the selector of the case, now what can I do?

    Any suggestions would be helpful, thanks.

    Practically speaking it is not not possible to see 1250 chart 1 shot so its no need to have a lot of graphics. What we do in this situation is usually to initialize an array of elements of 1250 and replace these items when you receive data in a particular order. At the same time have a ring to control and update the name of items in the same order as you update the table. Now pass the array of values in the index table and connect control of the ring to the terminal index and connect the output to the curve. So when you select an item, you will be able to see the value of this element in particular.

  • TO RESET THE GRAPH AND TABLE SEQUENCE EVEN STRUCTURE IS NOT EXECUTED.

    Hello everyone, I made this vi which runs automatically at the beginning and I can't use my power butoon to control this vi. Now, I want to clear the table and graph vi even when the structure of sequence is not executed as the start/stop button. And I want also when I run the program both the graph and the table should be cleared. I tried a lot of things, but as I'm new to labview I can't do. Thanks in advance.


  • XY graph with matrix Boolean

    Hello

    IAM facing a little problem here... what iam trying to do is basically convert a xy chart in a table of Boolean (no matter if it is in a table or graph)

    I did a sketch in photoshop is easier to understand.

    xy graph:                                                                                     boolean array:

    any idea on how to do this?

    Kind regards

    Oli

    Initializ a Boolean array of the desired size and put it in a registry to offset. iterate over the xy pair, map coordinates on the array indices and use replaces the subset of the array to light the LED at this level. Repeat for all points.

    (If the points are relatively remote and you need create lines of interpolation, you would add a little more code)

  • OBIEE 11g - lock dimensions tiles so that users cannot modify a table / pivot

    Hi, in OBIEE 11 g, is it possible to "lock" the tiles so that users cannot re - arrange the dimensions of a table / pivot / graph? In general, we would like to have this feature, users, but for a couple of key reports, we might want to "lock it" so end users can not change.

    Thanks in advance!
    Scott

    Hi Scott,.

    Answer is no. It's still a bug with no workaround.

    Rgds,
    DpKa

  • First Page is Table and forest of footnotes is graphic

    Hi all
    In my dash I should display only the table. In the table, if I select a drill of the values. It should show only graph not table formate.
    How to set this option.

    First page it ability be table
    Forest of footnotes should be graphic

    How to do this.

    Thank you

    Hi Govind,

    First page of table and graph (diagram will hide) while zooming table will hide

    No this is not possible, without creating the second report

    Thank you
    Saichand.v

  • How to make a magnifying glass link to a look up table?

    Dear friends,

    Hello. I develop the application of accounting journal entry. Journal line, I use the image "magnifying glass" next to each field in the table. When you click on the magnifying glass, it is supposed to come a look up table (a graph and a table of name mapping), and we choose the appropriate chart to enter the field of the table.

    I understand to create another page for the look up table and record. But I do not understand how to make a magnifying glass link to a look up table. Can someone tell me how to do this? Thank you.


    Lucy

    This is how it works,
    Table A (which stores the fields of graph). You used A table fields on a page so that users can enter data.
    You do not need to put a magnifying glass image or create a new page to achieve the look to the top of the page.

    all you need to do is create another table say table B, which should have the graphic field and the description to display on the search page. Then open folder field property field chart table A and table B as quick picture to mention.

  • Problem with adf tables dynamyc region

    Hello.

    I have a problem when use ADF tables in dynamic regions. Happens if the table is inside the first task flow that is loaded (by default) in the dynamic region, recovers the data perfectly, but if the table is in a second, third and so on. flow, the task does not retrieve the data. This only happens with adf tables and graphs, if I use a form of component, for example, there is no problem.

    Any idea which can happen?

    I use Jdveloper 11.1.1.1.0

    Appreciate any ideas or help with this problem

    In iexplorer 8 gives the following error:

    Band details of page errors

    User agent: Mozilla/4.0 (compatible; MSIE 8.0; Windows NT 5.1; Trident/4.0)
    Date: Wednesday, December 2, 2009 16:17:48 UTC


    Message: 'null' is null or not an object
    Line: 1105
    Character: 2
    Code: 0
    URI::7001/SGLadf-ViewController-context-root/afr/partition/ie/default/opt/collection-11-r1.js http://seisbd101.dgac.cl

    Hello

    Define the scope of the bean managed for the bean that switches between the regions to more far-reaching than demand: for example, set it to viewScope or pageFlowScope. This fixes the problem

    Frank

  • Graphics output using graphics data

    Hi all

    I have a signal in the range of 0 to 1000 mV that I am aquring using my device to acquisition of data usb or over a period of time.

    Let's say I'll connect the DAQ Assistant for the waveform table and display the signal on the chart.

    The graph will plot v vs time and after about 60 seconds of acquisition (for example), now I want to analyze the data on the chart "visually", using my eyes, then choose a few points (x, y) graph so to use for calculations in my vi.

    Is it possible in labview to click on points on the graph using my mouse and then take the value 'x' (because I'm only interested in the information of the x-axis) which represents the relative time in my case and then undergo calculations using this value?

    I'm new to labview so forgive me if this function is already there, but I don't know how to use it.

    Thanks in advance

    Concerning

    Shady

    LV 2010 version attached.

    I suggest to read the help on graphics and check out a few examples (help > find examples and search for table or graph).

    Graphics will store only a finite amount of data (defined by the length of history, default = 1024) but require very little work on your part. You give it just a scalar (or a table if you want to display the serveral tracks) and it will be updated to the x axis, scroll, etc. Because it loses data, I guess that's why NOR did not bother with the sliders, but I don't know.

    With a Simple graphic, you will need to feed the WHOLE track, so if do you it point by point, you should have to add each value in a table, feed this table updated the graph. A bit more complicated for a novice like you, but not that hard. Yet once, check the examples. But you could show the sliders (the visible elements > cursor legend) and read the mouse XY coordinates without programming.

    Good luck!

  • Is there a way to select an area of some of the elements of a csv file and read in LabVIEW?

    Hello everyone, I was wondering if there was a way to select only a certain "box" of the elements of a .csv file in LabVIEW? I have LabVIEW 2011 and my main goal is to take two tables and graphs against each other. I can import the .csv perfectly and separate each line and each column to be his own, but I have a 8 X 8 but want graphic in the middle of 4 X 5 or something like that. Is it possible to extract a table without starting at the beginning and end in the end? Thank you in advance.

    Hi Szklanam,

    as a CSV file is a TXT file with a different suffix, you can read a number of lines in this file. For example, you can limit the number of rows in your table of resultung. To limit the number of columns, you must always use an ArraySubset, so maybe it is much easier to read the complete CSV file and select interesting places with ArraySubset...

  • Save the data to the excel file

    Hello

    I make a program reads the value of the probe via serial port... but I don't know how I can record this data in excel file... I open the example in the labview example, but I don't want to like this... becaue I use a while loop in my program that cause opened "multi" excel file... . How can I solve this problem?

    You need to think about what you want to do, not how you want to do.  I'll make a few assumptions here - adopt to your notebook loads "real."

    I guess you want to take a series of readings from a device (sensor, serial port).  I suppose you take multiple readings, perhaps their display on a table or chart, for a certain period of time.  Once you have a set of data, you want to save all the data in an Excel file.

    If this scenario is correct, there are three distinct phases to this task - implemented the data collection (open the serial port, manage the interactions of the user according to the needs), data collection (and potentially produce tables or graphs) and save the data.  Note that only step 2, collect data, involves a repetitive action appropriate for a while loop.  Once you have all the data, you can then open an Excel report, use something like Excel table easy to put the Table in the report or chart Excel easy to put a chart in the report and save the report in evidence, save the report.

    If you are using a relatively recent version of LabVIEW (2010 or later), the new generation Excel report screws are pretty easy to use.

Maybe you are looking for

  • Apple Watch automatic unlocking on MacOS Sierra

    I use an iMac of 2014 with MacOS Sierra, a 5 iPhone with iOS 10.0.1 and a Apple Watch with watch 3 installed OS. I also have a password on my watch, authentication both active and running as well surrender. I don't know why, but the icon to activate

  • 5s iPhone charger

    It will be his my iphone 5s if I charge it with the charger of my mini ipad?

  • IPhone 5 s volume changing randomly was last updated

    IPhone 5 s volume changing randomly was last updated

  • 5540: Instant ink

    I got my new printer yesterday, and only 31 pages a4, its now say its out of ink. I am a member of ink instant on the 300 pages per month But as I've only had my printer yesterday (Friday) not much so good already missed How long I'm going to get my

  • BlackBerry 8900 smartphones and BMW?

    Has anyone tried to match the 8900 with a BMW?  BMW does not recognize it as a compatible phone with AT & T service, but he agreed with T-mobile service.  What is the difference?