The EBS 11i upgrade

Hi hussein.

Based on your experience, or even just your estimate.
Which is faster or easier to do?
* Upgrade/migration EBS 11i to EBS R12.1 (Application Tier)
* Update/migration (its database) 9i (9.2.0.4) to 11 GR 2 (11.2.0.1) (DB level)
thank you very much,.

Ms. K

Hello

Update the database from 9i to 11g would take less time as Oracle E-Business Suite 11i to R12 upgrade.

Again, it is a question of material resources and specifications.

Thank you
Hussein

Tags: Oracle Applications

Similar Questions

  • EBS 11i upgrade confusion

    Hi all

    EBS 11i (11.5.10.2)

    9i DB

    RHEL 4.6

    Fact: The 9iR2 database is certified Linux 3 and 4.


    Assuming that I migrate or upgrade 9iR2 to 11 GR 2, where install the GR 2 11? This is on linux 4 (current server) or Linux 6 or higher (different server).

    GR 11, 2 is based on 4 Linux?


    Thank you very much

    JC

    Why not the Server Windows 2008 or 2012 instead of Windows 7?

    It is a server and this means you better install a server operating system.

    Kind regards

    Bashar

  • Server Linux for EBS 11i upgrade

    Hi all

    EBS 11i
    RHEL 4.6


    Our EBS 11i is running on server HP with OS 4.6 RHEL and a single node only. This server was purchased 6 years ago and lately it is show the performance degradation. We want to migrate/upgrade to a model like high-end HP and make a knot of multiples. But the latest HP model doesn't support a minimum version of RHEL 5.
    My question is, is the support for EBS cloning 11i RHEL 4.6 to RHEL 5? How can I migrate EBS 11i with this kind of scenario?


    Thank you very much

    SIS Inday

    Hello

    It is supported on the database layer node, so there should be no problem in the migration of the database.

    Thank you
    Hussein

  • The EBS R12 upgrade and solaris to linux in a one-way migration?

    Hi all, first post on this forum so bear with me.

    I plan on spending 11.5.10.2 Solaris (sparc) 64-bit EBS EBS R12 on RHEL 5 x 86-64 a and would like to know if I can make in a shot that is the migration and upgrade in one step or I need to go to R12 first and then migrate first and then upgrade or migrate.

    I understand the stages of migration and upgrade, but have not seen any documentation to support on the combination of them, someone does that?

    Thanks in advance
    Jeremy

    Hello

    You can upgrade the application in the Solaris to R12 box then migrate the R12 to Linux application (since your target OS is 64-bit Linux, please note that you can not migrate the 11i application as 64-bit operating system is accredited as a layer of database for the Oracle 11i applications only).

    To install R12 11i, please see:

    The Oracle Applications upgrade guide: Version 11i release 12.1.1
    http://download.Oracle.com/docs/CD/B53825_03/current/HTML/docset.html

    Guidelines for preparation of database E-Business Suite Release 12.1.1 upgrade [ID 761570.1]

    Oracle E-Business Suite Release 12.1.3 now available
    http://blogs.Oracle.com/stevenChan/2010/08/ebs_1213_available.html

    E business Suite Release 12.1.2 now available
    http://blogs.Oracle.com/stevenChan/2009/12/ebs_1212_available.html

    To migrate the application R12 of Solaris to Linux, please refer to:

    Note: 438086.1 - Platform Migration Oracle Applications version 12
    Note: 756086.1 - Oracle Applications R12 Migration of Solaris for the Linux platform

    Migration of Application E-Business Suite for Linux-tier servers
    http://blogs.Oracle.com/stevenChan/2010/02/migrate_ebs_apptiers_linux.html

    Assortment of Oracle E-Business Suite platform
    http://blogs.Oracle.com/stevenChan/2010/02/oracle_e-business_suite_platform_smorgasbord.html

    To migrate the database, you can use export/import or transportable tablespaces - refer to these docs for more details:

    Note: 454616.1 - export/import process for Oracle E-Business Suite Release 12 using 10 gr 2
    Note: 741818.1 - process of Import/Export for Instances of database Oracle E-Business Suite Release 12 using Oracle Database 11 g Release 1

    Transportable Database 11 GR 2 certified with E-Business Suite
    http://blogs.Oracle.com/stevenChan/2010/04/tdb_11gr2_ebs.html

    Using Transportable Database 11 GR 1 material with E-Business Suite
    http://blogs.Oracle.com/stevenChan/2009/09/transportable_database_11gr1_ebs.html

    Thank you
    Hussein

  • Patch of the DST for the ebs DB Upgrade

    Hi all

    I'm upgrading ebs R12.1.3 database 11.2.0.4 11.2.0.3 on Sun (sparc) OS. The source DB contains the DST patch 14, do I have to apply the latest patch for the DST as part of the upgrade or I'm good with it?

    SQL > SELECT version FROM v$ timezone_file;

    Version

    ----------

    14

    Thank you!

    Yes, these patches are necessary for env EBS.

    https://blogs.Oracle.com/stevenChan/entry/dstv25_ebs

    Thank you

    Hussein

  • Change in the EBS 11i usernames

    Hello

    Is there an API that can be used to change just a username in Oracle 11i?

    Thank you
    Roald

    Hi Roald;

    Please see:
    How can I enter a username of the Suite e-Business Programatically [ID 761616.1]

    Respect of
    HELIOS

  • Concurrent managers not to go after an upgrade to the 12.1.3 ebs 11i

    Hello gurus,

    I'm in the process of ebs 11i upgrade to 12.1.3. I'm almost done the upgrade process, the application may start, but to my surprise there is no managers competitors when I tried to generate all Business Views.


    I just watched the competitor Manager journal:

    CD $APPLCSF / $APPLLOG

    tail-30 OFPROD_1012.mgr

    +---------------------------------------------------------------------------+

    Could not contact Service Manager FNDSM_OFINPROD_OFPROD. The TNS alias could not be located, the process of listening on OFIN

    PROD could not be contacted, or the listener cannot generate the process from the Service Manager.

    Deal monitor session started: 12 October 2013 12:56:49

    Could not contact Service Manager FNDSM_OFINPROD_OFPROD. The TNS alias could not be located, the process of listening on OFIN

    PROD could not be contacted, or the listener cannot generate the process from the Service Manager.

    End of session monitor process: 12 October 2013 12:56:49

    What Miss me.

    Thank you

    Mathias

    Mathias,

    Please see the following documents.

    Unable to raise concurrent managers after running Autoconfig (Doc ID 736024.1)

    Simultaneous treatment - internal Log Manager file contains messages "could not initialize the Service Manager FNDSM__"Non-simultaneous of the processing nodes (Doc ID 754698.1)

    Apps for listener starts but fails to reproduce the FNDSM from Service Manager (Doc ID 1073677.1)

    In addition, make sure that you have no errors in the database log file.

    Thank you

    Hussein

  • R12 11i upgradation

    Hello.. can someone suggest a document for the ebs 11i to r12 upgrade?


    Thankz in advance.


    Dembele.

    Please see these threads.

    reclassification of the ebs 11i to R12
    Re: reclassification ebs 11i to R12

    Release 11.5.10.2 R12
    Release 11.5.10.2 R12

    Thank you
    Hussein

  • How to enable auditing in EBS 11i?

    Hi, we use the EBS 11i with 10g R2 database in linux about Q1: how to enable Auditors on users of applications EBS 11i? Q2: How to enable auditing on EBS 1ii database users as SYS, SYSTEM, applications, etc. CUSTOM_SCHEMAS? Q3: How to write the trigger and fire and send an email to the Manager if any changes (such as object creation/deletion etc) will be produced in the database? Q4: How to set alerts email size of memory, IO, Tablespaces and thrashholds, etc., using 10 2 EM gr? Concerning

    Hello

    We use the EBS 11i with 10g R2 database in linux about Q1: how to enable Auditors on users of applications EBS 11i? Q2: How to enable auditing on EBS 1ii database users as SYS, SYSTEM, applications, etc. CUSTOM_SCHEMAS? Q3: How to write the trigger and fire and send an email to the Manager if any changes (such as object creation/deletion etc) will be produced in the database? Q4: How to set alerts email size of memory, IO, Tablespaces and thrashholds, etc., using 10 2 EM gr?

    There are a lot of hits on Metalink and let me point out some:

    How to audit user an Oracle Applications? (Doc ID 395849.1)

    How to enable the Audit Trail on the Table APPLSYS. FND_USER (Doc ID 420996.1)

    Note to master for Oracle Database audit (Doc ID 1299033.1)

    Understand the audit data in the Tables of the Oracle Applications using the (mandatory) Audit Trail (Doc ID 69660.1)

    FAQ (Audit trail) (Doc ID 107330.1)

    How to audit events of opening/closing session with triggers (Doc ID 70679.1)

    Audit of the operations of the user SYS (how audit SYSDBA) (Doc ID 174340.1)

    How to check the user login, logout Date and time (Doc ID 99786.1)

    In addition, also see the Forum search:

    Search Forum: audit

    Thank you &

    Best regards

  • the upgrade of EBS 11i database 9i (9.2.0.6) to 9.2.0.8

    Hi hussein.


    RHEL 4
    EBS 11i

    I'm upgrading of Database 9i (9.2.0.6) 9.2.0.8.
    I read the note:
    Oracle9i Patch Set Notes - version 2 (9.2.0.8) Patch Set 7 for Linux x 86
    I just don't understand the following:
    5.4.2 Recommended hangcheck-timer Configuration Defaults 
    The following are the recommended default configuration settings for the hangcheck-timer module. These are in addition to the recommendations for parameters in the Oracle RAC documentation. 
    I do hang check timer?


    Thank you very much

    I do hang check timer?

    It is a RAC instance? If this isn't the case, skip this step.

    Thank you
    Hussein

  • EBS 11i database upgrade of database 11g 2 9.2.0.8

    Hi expert,

    I demanded some suggestion. I m currently upgradation of ebs 11i to R12.

    I have these processes I update my default database 9.2.0.6 EBS 11i to 9.2.0.8. now, I'll update my 9.2.0.8 to 11g 2 database using the metalink doc

    Interoperability Notes Oracle EBS 11i with Oracle Database 11 g 2 (11.2.0.2) (Doc ID 1367654.1()


    in the document in step 3, it gives the point.


    Migrating to Oracle 10 g (conditional) Portal

    Oracle Portal 3.0.9 is not certified for Oracle Database 11 g. If you intend to continue using Oracle Portal with Oracle E-Business Suite 11I, then the existing Oracle Portal features should be transferred to Oracle Portal 10 g for compatibility with Oracle Database 11 g. read and follow the instructions to install Server Applications Oracle 10 g with Oracle E-Business Suite Release 11i on My Oracle Support.

    You can remove all dependencies for Oracle E-Business Suite and Oracle Portal 3.0.9 by performing the steps described in to Remove Oracle E-Business Suite Release 11i 3.0.9 Portal on My Oracle Support. Oracle Portal 3.0.9 should be removed that after the upgrade to portal Oracle 10 g, ensure that personalized data portal are migrated successfully.

    When I opened the link give this 3 step I found that the following content

    Installation of Oracle Application Server 10g with Oracle E-Business Suite Release 11i


    Oracle recommends customers to apply only the OracleAS 10g Enterprise Edition releases and patches that have been certified with E - Business Suite, as shown in the Metalink Notes following:

    I want to know all of the steps above is required to do for me in the process of upgrading EBS 11i to R12 with Database 11 g 2.

    currently I m does not help portal oracle discoverer, oracle web application cache, SSL.

    and also I want to know what is oracle Portal?

    my current EBS and database is

    EBS 11.5.10.2

    database 9.2.0.8

    OS - OEL 4

    It comes to my new installation of EBS 11i. for the free practice.

    Please please suggest me what stage is necessary for me that describe in step 3.

    Thanks and greetings

    pritesh Rodriguez

    Pritesh salvation,

    I want to know all of the steps above is required to do for me in the process of upgrading EBS 11i to R12 with Database 11 g 2.

    currently I m does not help portal oracle discoverer, oracle web application cache, SSL.

    No, it is not required that you follow all the steps described in the note... As you have not set up a portal, you can skip this step and move to another. This is the reason why "CONDITIONAL" was used in the respective step.

    I also want to know what is oracle Portal?

    Check out the link:

    What is Oracle Portal?

    What is Oracle Portal?

    I hope this helps!

    Thank you &

    Best regards

  • Role of PLSQL developer in the process of upgrading the EBS?

    Hello

    One client is currently in the process of upgrading of the EBS from V11 to V12. They are looking for a PL/SQL Developer, migrate their paintings of previous version again. What would be the role of a pl/sql developer in such situation? I want to ask that position and looking for documents related to the post but could not find one. If there is someone who had experience with this migration scenario please help me.

    Thank you

    Siva.

    PLSQL developer should be involved in the code changes between 11i and R12 - please see these links/docs.

    Changes to model data identification between 12.1.3 EBS and EBS prior releases

    https://blogs.Oracle.com/stevenChan/entry/ebs_data_model_1213

    Report of comparison data EBS model [ID 1290886.1]

    Comparison of EBS seed data reports now available

    https://blogs.Oracle.com/stevenChan/entry/ebs_seed_data_comparison_reports

    eTRM

    http://ETRM.Oracle.com

    Thank you

    Hussein

  • the ebs 11.5.10.2 to 12.1.3 on IBM AIX 64 upgrade

    Hi experts,

    We have ebs 11.5.10.2 currently, simple installation (db levels and applications on the same node) node
    We intend to upgrade to the latest version 12.1.3 on 11.2.0.3.0 RDBMS.

    I need your help for the following queries;
    -is it possible to configure the ebs (levels of db and apps) using RAC (only available to 2 nodes, each node must hold levels db and apps?)
    -What is the required minimum nodes if I deploy on my ebs environment rac?

    could you please help me with the docs needed to deploy a successful upgrade?

    Thank you.

    the current environment of EBS is IBM AIX 64 single node installation.
    the new topology must include 2 nodes with IBM AIX 64 > holding the DB as RAC level
    and the application layer should be migrated to Linux 64.

    In this case, you do not need to migrate the database and you just need to use a different OS for application-level nodes.

    the measures on the current node,
    1 - upgrade 9.2.6 to 9.2.8 DB layer
    9.2.8 to 11.2.0.3 DB layer 2 - upgrade
    3 - passage of the application layer, of 11.5.10.2 to 12.1.1
    4 - crossing the 12.1.1 to 12.1.3 App

    Sounds good.

    I will later propose the db for oracle RAC on a new nodes with the same IBM AIX 64 platform diffenet
    5 - Install the grid and the db on the new nodes
    6 - import the Pb of the old node upgraded to the cars db

    I still need to read good to find the best way to go through a successful upgrade.

    Once you upgrade 11i to 11.2.0.3 data base, lay the R12 software on new Linux machines and complete the 12.1.1 upgrade. Then upgrade to 12.1.3 release. Once you are finished with the upgrade of the application migrate the database of unique to the RAC node.

    Thank you
    Hussein

  • database upgrade 9.2.0.8 to 11g of EBS 11i (11.5.9)

    is it possible to upgrade directly 9.2.0.8 to 11g database in 11.5.9

    What is the upgrade for the same path.

    Kind regards
    Hafiz

    Hafiz says:
    is it possible to upgrade directly 9.2.0.8 to 11g database in 11.5.9

    What is the upgrade for the same path.

    Kind regards
    Hafiz

    Yes, it is possible - interoperability Notes Oracle EBS 11i with Oracle Database 11 g 2 (11.2.0).) [881505.1 ID]

    Thank you
    Hussein

  • Which is easier?  EBS 11i > 11g upgrade

    Hi hussein.

    I compared the following notes 4 (choice) in the upgrade of EBS 11i (9.2.0.6) to the 11g database.
    1 interoperability notes Oracle EBS 11i with Oracle Database 11 g Release 1 (11.1.0.6) version [ID 757593.1]
    2 interoperability notes Oracle EBS 11i with Oracle Database 11 g Release 1 (11.1.0.7) version [ID 452783.1]
    3 interoperability Notes Oracle EBS 11i with Oracle Database 11 g 2 (11.2.0.1) [ID 1265268.1]
    4 interoperability notes Oracle EBS 11i with Oracle Database 11 g 2 (11.2.0.2) [881505.1 ID]
    I guess that #1 is the most simple, right?
    Is ther other notes easier than the #1? as the upgrade to 10g maybe?


    Thank you

    Published by: Crystal on February 7, 2011 23:47

    I started reading ATG CUMULATIVE 6 and it made me crazy, a lot of fixes void mentioned, I gathered as 32 patches and each
    patches also have patches under another. And the docs also mentioned the ATG CUMULATIVE 6 is superseeded with 6241631 > Technology Applications 11i. ATG_PF. H.Delta.7. do I need this?

    No, because you can be on ATG RUP6.

    Thank you
    Hussein

Maybe you are looking for