Two monitors... two jobs?
With two monitors, it seems that I can't get the same desktop on each monitor. Is a great way to have a different office on each monitor?
Not natively in Windows. You can do it with third party software. UltraMon is excellent but fresh. DisplayFusion is very nice and it's free. Some video cards include advanced multiple monitors manipulation in their drivers so look in your control panel. NVIDIA's nView and ATI probably has something like this in their Catalyst Control Panel. MS - MVP - Elephant Boy computers - don't panic!
Tags: Windows
Similar Questions
-
Hello!
How can I get two jobs when using two monitors, instead of stretching a desktop on both screens? I n ' want to clone my office, and I don't want to stretch it. I want two desktop computers, where I can "send/give" to the other desktop programs.
I need a third party program? It is very good. If you know one please tell me about it.
Hi OskarKvist,
This feature is not supported by Windows XP.
However, you can use your favorite search engine to download any third-party software that could serve the purpose.
Note: Using third-party software, including hardware drivers can cause serious problems that may prevent your computer from starting properly. Microsoft cannot guarantee that problems resulting from the use of third-party software can be solved. Software using third party is at your own risk.
Hope the helps of information.
-
I followed the suggestion to use start > Control Panel > administration tool > services > print spooler > properties.
System in automatic mode but State of the said service stopped.
I get error 1075: the dependency service does not exist or has been marked for deletion.
Printer worked this AM, but stopped working between two print jobs.
I used Mr. Fixit to diagnose and fix the problem. Mr. Fixit indicates the print spooler service is not running, but cannot fix it.
Is there a source code for Windows XP service pack 3 which can be downloaded to replace the corrupted code?
Thanks for your help
Curry:
I have followed your suggestion after that someone else provided the steps for me to do the program accept net start spooler.
The error message was THAT SYSTEM ERROR 1075 has occurred.
The dependency service does not exist or has been marked for deletion.
If I need to reload the operating system, I have a back up saved on a hard drive.
Do you know what file (s?) needs to be recharged?
Thanks for your help.
-
A single button; Two jobs. Submission of data and e-mail at the same time.
I have a FORM on which the current action validates the form and submit the text to a MYSQL database:
< form action = "<?" PHP echo $editFormAction;? ">" method = "post" name = "form1" id = "form1" onSubmit = "MM_validateForm ('ck_firstname',", "R',"ck_lastname', ", 'R', 'ck_email3',", "come from mail"); " return document. MM_returnValue">
I wish that submitting to warn me, by email, that the entry on the database was created. I can do it from the same page or is happening from the page, as a result. If it is necessary to move to another page to send email I would like this page to automatically redirect to the page of the FORM, so that the page emailling is invisible. Possible?
Also, I should move the current action of PHP to the next page, so that the button on the FORM simply publishes on the other page that realizes both the presentation of the database and the emailling?
Advice or code received with gratitude.
I wish that submitting to warn me, by email, that the entry on the database was created. I can do it from the same page
Yes. It is to modify the code generated by Dreamweaver, so the server behavior insert record ceases to be editable through the Dreamweaver dialog box. All that is necessary is to add the e-mail script after the record has been inserted in the database. You can add the script physically in the same page or use include a PHP. Remember that PHP scripts are processed from top down. Keep everything in the right order, and it's a piece of cake.
-
The regular job in IOM 11gr2ps3
Hi all
We have a requirement where we need the planned-dependent tasks... As the result of planned Job1 we run Job2.
Please let me know if any implementation of this type of scenario and how to achieve the IOM. Can achieve us by using quartz Scheduler? Please share your entries on this ASAP...
Thanks in advance.
You can write a custom trigger planning work two jobs dependent on the other. You can trigger both OOB or Custom Job with this approach. Use the SchedulerService API for this.
SchedulerService.getStatusOfJob (java.lang.String jobName): to get the current status of a task 1.
SchedulerService.triggerNow (jobName): to run specified job 2.
In addition, providing below blog post for reference:
IOM IDM blog: SchedulerService API example
__
When closing a thread like a response please do not forget to mark the messages correct and useful to make it easier for others to find their
-
Disable the planning for the users of the report jobs
Hi all
Is it possible to disable the ability to schedule the job for some users report? (Two jobs, historical option of work for reports)
Thank you
Yes, it is possible.
By default, users are assigned to the role BIConsumer and here are the permissions associated
oracle.bi.publisher.runReportOnline
oracle.bi.publisher.scheduleReport
oracle.bi.publisher.accessReportOutput
oracle.bi.publisher.accessExcelReportAnalyzer
oracle.bi.publisher.accessOnlineReportAnalyzer
Authorities highlighted ones provides the advance access.
Please create a new custom group and add the users to the new group. When providing permissions for the new group, ignore the above permissions Planner said.
-
How to start a job using DBMS_SCHEDULER depending on the result of other JOBS
How to start a job using DBMS_SCHEDULER depending on the result of other JOBS
For example I have two jobs A and B of EMPLOYMENT, I would like to start JOB B only when a JOB is complete, is an option like that?
Hello
Yes, you can create a channel with the Scheduler, see the documentation:
Creation and management of channels of employment
http://docs.Oracle.com/CD/E11882_01/server.112/e25494/scheduse.htm#ADMIN10021
-
window of artboard to job instead of having to resize every time
How to achieve them. Everytime I open a job I have to draw in the lower right so that I can put two jobs side by side. One is the main version, I am copying from and the new for a change. How I can this automatic action. After twenty years of resizing I really, really want to know.
Thank you
You can do that in the "The Document range" button, turn the split screen to two documents
-
Formerly CC installation backup job displays "download error".
I just swapped my two jobs, moving to a more powerful in my home office and put my most older and less powerful in a remote studio. The two had a working entirely installation CC/2014.
The old system is fine even after a system cleanup and changes, but the new system is now show a "Download error" message in the CC Apps Panel. It doesn't seem to be one of the mistakes numbered; He said just two words and try to contact new customers.
What is the problem and how to restore the Apps and updating facility for this system?
This alone does not work, but all three steps in combination - quit CC, make sure that the process is complete, rename the folder, delete the database file and restart - which it cleared up.
-
request on inactivating a job dbms_refresh
Hi all
We have a 11.2.0.2 base of windows that is running on a Win 2008R2. I feel bad how to kill two jobs in double that is activated in auto & is created automatically, even after using dbms_refresh.destroy. These red refresh the MView jobs every time.
. Need your expert advice how to permanently kill these jobs. Please notify.
Kind regards
Work, WHICH
-------- ------------------------------------------------------------
4418 dbms_refresh.refresh ('"NSG71".) "SUCCESSFUL_SUB20121108" ');
4419 dbms_refresh.refresh ('"NSG71".) "SUCCESSFUL_SUBMISSIONS" ');
SQL > SELECT refname, refowner, ref_child FROM sys.ku$ _refgroup_view;
REFNAME REFOWNER REF_CHILD (REFGROUP, REF_ADD_USER, REF_ADD_DBA)
------------------------------ --------------------------------------------------------------------------------------------------------------
SUCCESSFUL_SUBMISSIONS NSG71 KU$ _ADD_SNAP_LIST_T (KU$ _ADD_SNAP_T (3944, ' dbms_refresh.add (name = > "'NSG71'.))) «"SUCCESSFUL_SUBMISSIONS" ", list = >" ' NSG71 '.»» (SUCCESSFUL_SUBMISSIONS"" siteid = > 0, export_db = > "DEVNSG"); ',' sys.dbms_irefresh.add (name = > "'NSG71'.) «"SUCCESSFUL_SUBMISSIONS" ", item = >" ' NSG71 '.»» SUCCESSFUL_SUBMISSIONS"" siteid = > 0, export_db = > 'DEVNSG'
');'))Normally you would when you create your mview as part of the CREATE MATERIALIZED VIEW of [url http://docs.oracle.com/cd/E11882_01/server.112/e26088/statements_6002.htm#i2116443] statement.
When you want a mview which refreshes periodically, you use the UPDATE... START BY... NEXT... a part of the statement.
When you want a mview who don't not refresh unless you tell her, you use the UPDATE... WE ASK... the part of the statement.When you need to change this after the fact, you have the statement ALTER MATERIALIZED VIEW [url http://docs.oracle.com/cd/E11882_01/server.112/e26088/statements_2002.htm#i2233205].
With that statement, you can change the mview to REFRESH on DEMAND.Do not forget that when the value of ON DEMAND, the mview refreshes never by itself, only when do you explicitly by calling the dbms_refresh.refresh or dbms_mview.refresh.
If you want a periodically refreshed mview but simply not hourly, you might also consider changing the formula NEXT to your mview get updated only once every night, rather than once per hour.(I mean, someone has created your mview to update every hour - then perhaps that someone is waiting for it to refresh periodically ;-)))
Read the examples in the links above. [Url http://docs.oracle.com/cd/E11882_01/server.112/e10706/repmview.htm#i31171] Advanced Replication guide explains also on different types of discount mviews.
-
default 10g Auto Gather Stats Job running NECESSARY or NOT?
Hello
our database is 10 gr 2
Operating system is windows
in my 10g database, I already have a regular job of running statistics which collects level schema statistics. There is only 1 schema of the application.
Is it necessary to permanently keep the Oracle default 10g Auto collect Stats Job?
If two jobs are running (default 10 g auto gather stats job running in the window management 22:00 to 06:00) and our stats of manual diagram gathering job (market every day at 7 to 11) then that statistical jobs would be examined by CBO. ?
should I deactivate default job statistics?
Thank you...Probably the Oracle supplied job is "smarter" that no matter what mechanism you provided.
I will disable your own job.
The Oracle supplied job only collects outdated statistics, outside office hours.
Your business brings together (all? / stale?) statistics during office hours. Your job may fail due to the ora-0054.
Collection of statistics of segment during office hours is not desirable. Collection of statistics of system during office hours may be desirable.----------
Sybrand Bakker
Senior Oracle DBA -
Add the date and time in DBMS_SCHEDULER. Name of the job CREATE_JOB
Hello
I have a JDeveloper application that needs to create
'DBMS_SCHEDULER. CREATE_JOB ().
The problem which I am facing is that I might need to create two jobs that may be waiting at the same time. When this happens, I get an error saying that the name of this work already exists.
So I tried to create the name of the task so that it has the data and the time that the job was created, which will give it a unique identifier. But when I tried the following I have an invalid name for the database object error.
Start
DBMS_SCHEDULER. () CREATE_JOB
"EmailJobDefinition" | TO_CHAR (SYSDATE, "DD-MM-YY HH24:MI:SS) |".
"PLSQL_BLOCK,"
"BEGIN EMAIL. SEND_LONG_MAIL('','','','') END '.
0,
TO_DATE (March 12, 2009 09:30 ',' MM/DD/YYYY HH24:MI:SS'),
NULL,
NULL,
"DEFAULT_JOB_CLASS,"
FAKE-WHAT IS TRUE?
TRUE,
'Comments');
end;
Is it possible to integrate the name of employment, the date and time?
Thank you
SteveTry this way:
"EmailJobDefinition" | TO_CHAR (sysdate, 'YYYYMMDDHH24MISS') | ".
Max
-
Hello
I start two jobs in crontab for the same full backup twice by accident.
Could someone tell me please how to stop one of the jobs?
Thank you
GodThere is no way you can stop the current rman work. The alternate would be to kill the SID that started the work.
Hare krishna
Alok -
HP CP1215: Impasse of documents in the print queue of the printer
I am running Windows 7. My printer is a HP CP1215.
I have a CP1215 and it shows in devices and printers. There are two documents lean back in his queue that will not delete.
How can I clear all these jobs on queue? The status of these two jobs is 'delete... '. »
I turned the printer and turn off many times.
Hello
Try after printing HP and Scan Utility below by selecting difficulty printing, it must automatically clear any element from the queue:
http://h20180.www2.HP.com/apps/NAV?h_pagetype=s-926&h_lang=en&h_client=s-h-E016-1&h_keyword=DG-PDU
Kind regards
Shlomi
-
I am considering buying an Envy 15 T. I am also considering the backlit keyboard, but I want to * details * on how it turns on. Through several questions and a lot of waiting, all I can down the support chat is the f5 key operates the backlight. I want to know what I do when I want to have the f5 to send its code to an application, such as Excel or Eclipse.
Hello
F5 has normally two 'jobs': normal F5 works for many software programs, including Excel, or Eclipse, and toggle the backlit keyboard. To use normal F5, you must use the Fn key (hold down the Fn key, and then press F5). You can reassign the keys F * from the BIOS.
Kind regards.
Maybe you are looking for
-
Satellite P300D - problem with reboot after update the HARD drive
Hello I have laptop Satellite P300D - 12 c and recently, I put a new hard drive, the Seagate momentus 7200 RPM 2.5 "500 GB. It works well, but I have a strange problem; normally when I reboot the laptop when it will close something sounds, in the fig
-
create a MNU file in instrument pilot project
I created an instrument to aid driver Tools--> Instrumentation--> create an Instrument pilot project. The problem is that none of the new VI in the instrument driver. I tried to add the screws following the instructions on the other posts in Tools-->
-
CANNOT RETRIEVE OR FIND FILES BACKUP REPORTEDLY MADE BEFORE FAILURE OF VISTA.
My files that I backed up before my Vista failed seem to have vanshied. Even though I received a msg that it is successful. I am tech challenged. Help, please. SW
-
Speaker Bluetooth paired but can not play
Hi, I am user of Windows 7. I recently bought a bluetooth speaker. My laptop can pair the device, but it does not recognize the device as one of the speakers. I can't select the bluetooth speaker to listen to my music. Here is some information that m
-
I have a new computer and I need help, download of lightroom to my new computer. I also want to upgrade to the latest version.