Update DB Manager best practices?

It is advisable to give VUM it's own DB instance separated from the VC DB instance?   The best practice is documented somewhere?

Thanks in advance,

-geob

That's probably what you are looking for: VMware Update Manager Performance and best practices

Tags: VMware

Similar Questions

  • C++ Cache manages best practices

    Hello

    Extend the initial connection to the coherence via C++ client proxy is an expensive operation. To this end could someone offer me some clarity on the best practices in the following situations.

    1. currently I call CacheFactory::getCache (cache_name); and save this handle, I then use the handle for the duration of the application for gets later. I use a range of different caches and I keep all handles 'alive '. By doing this, I found only the cost of the socket connection once.

    2. given situation 1. What happens if multiple threads call 'get' on a mixer? Are queue operation? It is thread-safe?

    3. situation 2. Will there be a performance gain to have a cache to manage per-thread?


    Thank you
    Rich

    Hi rich,

    The CacheFactory puts cached internally NamedCache returned references, multiple calls to CacheFactory::getCache ("name") will return the same reference every time. When the application is done using the cache it can ask the factory to drop the reference and invalidating local stubs by calling CacheFactory::releaseCache, passing in the reference cache. The NamedCaches returned are also thread-safe, so that you can share them safely between threads in your application. Finally, given that the factory will return the same reference every time, you have not really a way to distribute the different references in different threads, if you really wanted to do that you would need to instantiate DefaultConfigurableCacheFactories separate for each thread, rather then making them share the CacheFactory singleton. Note these feature exist in the same form in our Java and .NET clients.

    Thank you

    Mark
    The Oracle coherence

  • Best practices for the firmware update 40 + switches

    Hello.

    I need for firmware (and boot code) updated over 40 switches PowerConnect (mainly 5324).

    What is the best practice on that?

    I tried to download and install Dell OpenManage Network Manager, but it seems like an application of 'disorder' for someone who doesn't know. I threw a look at the demo of Dell for the application, but the quality is very bad and it is a version different than the one I downloaded (V3.0.1.15) you cannot use the guides directly.

    Are there other options that manual session opening, then TFTP the new firmware and boot code? Or can someone a link to a valid demo or documentation that can help me with the work?

    Thanks in advance.


  • I'm looking for help to share best practices to upgrade the Site Recovery Manager (SRM), if someone can summarize the preparatory tasks?

    I'm looking for help to share best practices to upgrade the Site Recovery Manager (SRM), if someone can summarize the preparatory tasks?

    Hello

    Please check the content below, you may find useful.

    Please refer to the URL: Documentation VMware Site Recovery Manager for more detailed instructions.

    Important

    Check that there is no cleanup operation pending on recovery plans and there is no problem of configuration for the virtual machines that protects the Site Recovery Manager.

    1 all the recovery plans are in ready state.

    2 the protection status of all protection groups is OK.

    3 the status of the protection of all the individual virtual machines in the protection groups is OK.

    4 the recovery of all groups of protection status is ready.

    5. If you have configured the advanced settings in the existing installation, note settings you configured before the upgrade.

    6 the vCenter local and remote server instances must be running when you upgrade the Site Recovery Manager.

    7 upgrade all components Server vCenter Site Recovery Manager on a site until you upgrade vCenter Server and Site Recovery Manager on the other site.

    8 download the setup of Site Recovery Manager file in a folder on the machines to be upgraded the Site Recovery Manager.

    9 make sure no other facilities-\no updates windows restarts done shoud

    Procedure:

    1. connect to the machine on the protected site on which you have installed the Site Recovery Manager.

    2. backup the database of Site Recovery Manager by using the tools that offers the database software.

    3. (optional) If you upgrade of Site Recovery Manager 5.0.x, create a 64-bit DSN.

    4 upgrade the instance of vCenter Site Recovery Manager server that connects to vCenter Server 5.5.

    If you upgrade a vCenter Server and Site Recovery Manager 4.1.x, you upgrade the instances of vCenter Server and Site Recovery Manager server in the correct sequence until you can upgrade to Site Recovery Manager 5.5.

    a upgrade vCenter Server 4.1.x to 5.0.x server.

    b Update Site Recovery Manager of 4.1.x to 5.0.x.

    c upgrade server vCenter Server 5.0.x to 5.5.

    Please let me know if it helped you or not.

    Thank you.

  • update of best practices of folios

    Hello

    I have a couple of folios that must be updated every month.  Could someone please help me with best practices for planning the release of the new folio and you ensure that it replaces the old one in the Viewer?

    To begin with, in the folio builder Panel, can I create a new folio every month or can I remove items from folio of last month, change its name and keep reusing that?

    I'm also a little confused about how to plan a new available for producers of folio.

    I would really appreciate hearing how the whole process must be managed, Panel builder folio to folio digitalpublishing.acrobat.com producer

    Thank you!

    You're doing a completely new folio for January so that publish in Folio Producer when you want to live for your readers. It replaces the previous edition, he lives next to her. Your readers will be able to see these two questions in your viewer and can choose who they want to download and read.

    You can leave the new folio not published in Folio Producer until the day you are interested in to go live and then click on publish. You can also use our new feature of advanced publication date to schedule a date up to 7 days in advance for the folio automatically go live. You will see this option when you click on the button publish on the folio.

    Neil

  • I would like to know the "best practices" for unplugging my computer permanently to the internet and other updates.

    Thank you for taking the time to read this. I would like to know the "best practices" for unplugging my computer permanently to the internet and other updates. I thought I would do a clean install of Windows XP, install my Microsoft Works again and nothing else. I would like to effectively transforming my computer into a word processor. He continues more and more slow. I get blue screen errors, once again. I received excellent Microsoft Support when it happened before, but since my computer is around 13 years, I think it is not worth the headache to try to remedy. I ran the Windows 7 Upgrade Advisor, and my computer would not be able to upgrade. Please, can someone tell me how to make it only a word processor without updates or internet connection? (I already have a new computer with Microsoft Windows 7 Home Premium, it's the computer that I use. The old computer is just sitting there and once a week or so I updates.) I appreciate your time, thank you!

    original title: old computer unstable

    http://Windows.Microsoft.com/en-us/Windows-XP/help/Setup/install-Windows-XP

    http://www.WindowsXPHome.WindowsReinstall.com/sp2installxpcdoldhdd/indexfullpage.htm

    http://aumha.NET/viewtopic.php?f=62&t=44636

    Clean install XP sites
    You can choose which site to reinstall XP.

    Once it is installed, then you do not have to connect what anyone, however, some updates may be required to perform the work, test this by installing work and see if you get an error msg. Except that you should be fine.

  • Request for advice: generally speaking, what is the best practice for managing a paid and a free application?

    Hi all

    I recently finished my first app of cascades, and now I want to inspire of having a more feature rich application that I can then sell for a reasonable price. However, my question is how to manage the code base for both applications. Any have any "best practices", I would like to know your opinion.

    You use a revision control system? This should be a prerequisite...

    How the different versions of the application will be?

    Generally if you have two versions that differ only in terms of having a handful of features disabled in the free version, you must use exactly the same code base. You could even just it for packaging (build command) was the only difference, for example by adding an environment variable in one of them that would be checked at startup to turn paid options.

  • Best practices for the Manager of the Ucs to the smooth running of our environment

    Hi team

    We are remaining with data center with Cisco Ucs blades. I want the best practices guide Ucs Manager Manager of Ucs check all things configured correctly in accordance with the recommendation of Cisco and standard to the smooth running of the environment.
    A certain provide suggestions. Thank you

    Hey Mohan,.

    Take a look at the following links. They should provide an overview of the information you are looking for:

    http://www.Cisco.com/c/en/us/products/collateral/servers-unified-computi...

    http://www.Cisco.com/c/en/us/support/servers-unified-computing/UCS-manag...

    HTH,

    Wes

  • Best practices for managing exceptions and success messages.

    Hey people,

    These days I've been shooting packages to clean my application. And question came to my mind, ' should I treat my exceptions the right way?


    So I want to ask you met guys, what is the best practice for this? (I want to learn it until it's too late )

    Currently I have a function that returns "OK" if all goes well.


    return('OK');  

    Can I manage my exceptions like this

      EXCEPTION
        WHEN OTHERS THEN
          ROLLBACK;
          RETURN (SQLERRM);
    
    

    At THE SUMMIT, I have a process that calls the function and then checks if the function returned "OK".

         IF cRet not LIKE 'OK%' THEN
          RAISE_APPLICATION_ERROR(-20000,cRet);
         END IF;
    
    

    And in 'process Error Message' I put "#SQLERRM_TEXT #" so that I can see what error occurred.

    Question aside, how do you manage your messages of success?

    Currently in 'process success Message' put something along the lines "Action completed successfully". What to do about all the processes.

    Do you want to do differently?

    I really want to hear what you have to say since I'm tired of feeling like this is a terrible way to manage these things.

    Hi Para,

    Para wrote:

    I don't know of situations where my service throw exceptions like no_data_found.

    and I need to know that the process is not so I can get to see my # #SQLERRM_TEXT.

    I got this by increasing the error in the application (which I think is a bad way to go) if the return is anything other than 'OK '. I get my application error in the process of the apex, and not in my service.
    And I want to show the inline error in the notification. (Which I am currently with my approach).

    You can use APEX_ERROR. ADD_ERROR in your PL/SQL process to throw exceptions in Oracle APEX.

    Reference: Re: Re: error in the processing of the page management

    Kind regards

    Kiran

  • Best practices for the integration of the Master Data Management (MDM)

    I work on the integration of MDM with Eloqua and are looking for the best approach to sync data lead/Contact changes of Eloqua in our internal MDM Hub (output only). Ideally, we would like that integration practically in real time but my findings to date suggest that there is no option. Any integration will result in a kind of calendar.

    Here are the options that we had:

    1. "Exotic" CRM integration: using internal events to capture and queue in the queue changes internal (QIP) and allows access to the queue from outside Eloqua SOAP/REST API
    2. Data export: set up a Data Export that is "expected" to run on request and exteernally annex survey via the API SOAP/REST/in bulk
    3. API in bulk: changes in voting that has happened since the previous survey through the API in bulk from Eloqua outside (not sure how this is different from the previous option)

    Two other options which may not work at all and who are potentially antimodel:

    • Cloud connector: create a campaign questioning changes to schedule and configure a connector of cloud (if possible at all) to notify MDM endpoint to query contact/lead "record" of Eloqua.
    • "Native" integration CRM (crazy): fake of a native CRM endpoint (for example, Salesforce) and use internal events and external calls to Eloqua push data into our MDM

    Issues related to the:

    1. What is the best practice for this integration?
    2. Give us an option that would give us the close integration in real-time (technically asynchronous but always / event-based reminder)? (something like the outgoing in Salesforce e-mail)
    3. What limits should consider these options? (for example API daily call, size response SOAP/REST)

    If you can, I would try to talk to Informatica...

    To imitate the integrations of native type, you use the QIP and control what activities it validated by internal events as you would with a native integration.

    You will also use the cloud api connector to allow you to set up an integration CRM (or MDM) program.

    You have fields of identification is added objects contact and account in Eloqua for their respective IDs in the MDM system and keep track of the last update of MDM with a date field.

    A task scheduled outside of Eloqua would go to a certain interval and extract the QAP changes send to MDM and pull the contacts waiting to be sent in place of the cloud connector.

    It isn't really much of anything as outgoing unfortunately use Messaging.  You can send form data shall immediately submit data to Server (it would be a bit like from collections of rule of integration running of the steps in processing of forms).

    See you soon,.

    Ben

  • What is the best practice for the double management interfaces?

    Hello community!

    I'm upgrading to a few host ESX to ESXi 4.1U1 4.0 in the coming weeks. My question is about how to configure the management networks. Obviously in ESX 4.0 Classic I have a Service Console port (on vSwitch0) group and a group of ports VMkernel (also on vSwitch0) which provides my host with SC and vmotion capabilities, as we all know. Note: my vSwitch0 has two vmnic attached to it, is pending and is active. That's just how we have our double installation of switches, so it must be active / standby.

    I got to thinking (book the great from HA and DRS deepdive Duncap Epping and Frank Denneman), that I should consider carefully when my network mangement I improve these hosts to ESXi 4.1 - which of course done away with the Service Console and use the vmkernel instead.

    The question is, in which best practices and account with my setup: I have two vmkernel ports? If so, how should I configure each for traffic management and vmotion vmkernel?

    I think it will be a good discussion to have.

    Thank you all,

    Matt

    The NIC vSwitch0 value active/active, the vswif (and future vmkernel management) team of NIC Active vmnic6 and vmnic1 ensures and leaves the vMotion vmkernel NIC team as is.

    This will allow you to use two physical network interface cards at the same time while having a failover plan and keep your physically separate management and vMotion traffic.

    In the end:

    vSwitch: vmnic1 vmnic6 active, active.

    VMK (Mgt): active eve of vmnic1 vmnic6.

    VMK (vMotion): active standby, vmnic6 vmnic1.

  • Separate management / VMotion Best Practice?

    We're heading to 4.0 ESX ESXi 4.1.  Our servers have 4 physical Gigabit NIC.

    On ESX 4.0, we lack 2 vSwitches:

    vSwitch0

    Service Console - Active vmnic0 - vmnic3 watch

    VMkernel - Active vmnic3 - vmnic0 eve

    (Unique network interface cards / IPs by function)

    vSwitch1

    Port VM - vmnic1 and vmnic2 active groups

    (Several VLANS to resources shared)

    With the changes in ESXi, is recommended to separate the management of VMotion as we did with ESX?  Notice that we use the same subnet for these two functions.

    Personally, I would prefer combining Management and VMotion.  VMotion will not only benefit an additional NIC usage, especially with the multiple simultaneous VMotions?  At the same time, it seems not that management traffic would be impeded to the point of needing to separation, as we use the same subnet.  In addition, security should not be a problem, since the new, we use the same subnet for management and VMotion.

    Your configuration is consistent with "best practices". I prefer separate management taffic VMkernel myself, even if it will cost me some performances of vMotion.

    ---

    MCITP: SA + WILL, VMware vExpert, VCP 3/4

    http://blog.vadmin.ru

  • Best practices for managing strategies of path

    Hello

    I get conflicting advice on best practices for managed paths.

    We are on version 4.0 of ESXi connection to a HP EVA8000. Best practices guide HP recommends setting the strategy of railways handle on Round Robin.

    This seems to give two active paths to the optimized controller. See: http://h20195.www2.hp.com/v2/GetPDF.aspx/4AA1-2185ENW.pdf

    We used certain consultants and they say that the best practices of Vmware for this solution is to use the MRU policy which translates a single path to the optimized controller.

    So, any idea what good practice is best practice? Does make a difference?

    TIA

    Rob.

    Always go with the recommendation of the storage provider.  VMware recommendation is based on the characteristics of the generic array (controller, capable ALUA failover methods, etc.).  The storage provider's recommendation is based on their performance and compatibility testing.  You may want to review their recommendations carefully, however, to ensure that each point is what you want.

    With the 8000, I ran with Round-Robin.  This is the option of creating more robust paths available to you from a failover and performance point of view and can provide performance more even through the ports on the storage controller.

    While I did of the specific tests/validation, the last time that I looked at the docs, the configuration of HP recommends that you configure each IO to the ports in the switch configuration.  This adds the charge to the ESX host, the switch to other ports, but HP claims that their tests showed that it is the optimal configuration.  It was the only parameter I wondered in their recommendation.

    If you haven't done so already, be sure to download the HP doc on configuring ESX and EVA bays.  There are several parameters that you must configure the policy path, as well as a few scripts to help make the changes.

    Virtualization of happy!

    JP

    Please consider awarding points to useful or appropriate responses.

  • Registration type of best practices for updating the mapping of cascading for account drop-down list

    1. most bearing the name of choice in parent list values and related lookup has been changed in the main list of the external application, so the same should be updated in CRMOD.

    2 to update the value of the list of choices, do we need to DISABLE the existing value and CREATE a new list of selection.

    3. are there best practices to avoid the manual pick list Cascading draw for the record type account? because we have about 500 values in list dropdown to map with parent and related list of choice.

    Thank you!

    Mahesh, I recommend disabling the existing values and create new ones. This means that the remap manually cascading dropdown lists.

  • Just updated to CC, 2014. Interested in best practices for conversion INDD high-resolution print layout of files .jpeg for use on a preview of portfolio site

    Looking for recommendations on best practices to Convert docs INDD Hi-res to .jpgs for web portfolio magazines

    Export to a PDF file in high resolution, then do your conversion in Photoshop where you have more control.

Maybe you are looking for

  • I need a second Apple ID/e-mail address.  How?

    I need a second Apple e-mail address.  How?

  • Config-software Bluetooth is frozen

    I have a Tecra A9 with Vista and the latest Bluetooth Stack 6.30.01. When I right click on the bluetooth icon in the lower right corner of the pop-up menu appears.But I can't click any menu item, the program is not responding. I started working when

  • How to automatically run an order of series

    Hello I'm brand new on Labiew. I did a vi as attaché to the reader one shoot-syringe and rotary valve, and it worked fine. what it does is send command whenever I click on the button "pump" or "valve". But now I want to run a series of commands autom

  • Cannot run chkdsk because of insufficient privileges

    Windows do not allow to run check disk utility.  Message says I have enough privleges even though I am the administrator and the only user of my laptop.

  • Reference Dell T5600 PERC H310 led connector

    Hello Where is the map system of precision T5600 for Perc H310 LED connector cable please. I watched http://www.dell.com/support/article/us/en/19/SLN132460/en and especially No. 5. "Connect the AUX_LED cable to the connector marked H310 SAS_ACT_LED_C