VI locked at the end of the sequence

Hello

I'm pretty new to LabVIEW and very new to TestStand, so I hope it's just a case of me being a bit thick.

I have a sequence calling a few screws it is a mixture of purely based on windows screws and a host of Windows VI for an FPGA on VI.

If I test a scenario with the file in a sequence, then all is well. If, however, I try to run it again, it seems that the VI is not running at the end of the sequence (in spite of fill a TestStand get its test result data). I get the following error information:

Details:

Close the file to Test Controller.vi-> Test Controller.vi.ProxyCaller
LabVIEW: An input parameter is not valid. For example if the input is a path, the path can contain a character not allowed by the operating system such as? or @.
=========================
NOR-488: Command requires GPIB controller charge controller.

Error code:

1; User-defined error code.

Any help would be greatly appreciated. I've been hunting around for help, manuals, forums and the internet in general for much of the day without success.

See you soon,.

Simon

It must unload the VI if all measures that use the VI have a similar setting. If the VI is used nowhere else, charge time is actually the longest of all the places where it is used. Also if an another VI which is always loaded as references that VI will effectively keep the vi loaded. Since all unload unloads all the modules, it is possible that somehow made VI refers to VI another you always load.

Hope this helps,

-Doug

Tags: NI Software

Similar Questions

  • Is there a way to find out programmatically if the sequence ends?

    I can determine if a sequence has failed (RunState.SequenceFailed), Errored (RunState.SequenceError.Occurred) and is on go to cleaning (RunState.GotoCleanup), but I don't know how to determine if the sequence ends. Is there a Boolean value or another way to determine this?

    Objective: I believe that cleaning MainSequence work again even if a sequence ends. I wish I had a step in cleaning that works only for a dismissal (must be in "MainSequence"). Is this possible?

    Thank you!

    I may have been able to get Execution.GetStates () to work, however, after reviewing the methods of execution, I found an alternative. I was looking for to use this as a precondition, so I don't know how to use GetStates() in the prerequisite (because it returns the State to another variable) without calling it in another statement before the one that interests me. I'm güssing there is a way (maybe I'm overthinking that), but what follows, worked for me:

    Solution:

    RunState.Execution.GetTerminationMonitorStatus (Locals.TerminationMonitor)

    where Locals.TerminationMonitor is an object reference variable initialized to RunState.Execution.InitTerminationMonitor () beginning of the test (I did it in the configuration of MainSequence steps).

    Thanks again!

  • Can I need separate videos to allow a user to 'Play All' (from the beginning to the end) and select certain sequences (ceremony, reception which the sequence chosen start and end at the rest of the video and not the sequence, speech etc.)?

    Hi - I'm obviously new to yet, but that's what I want to do.

    In a wedding video, I want them to be able to:

    1 play the movie from start to finish.

    2. Select a sequence (say speech) who plays since the beginning of the sequence to the END of the whole video.

    So do I need 1 video for the room, as well as 4 sequences - reception, cake, speech, dance?

    Colin

    You can use separate videos or a single video. The only video is easier for your desired navigation. You will find more people asking how to get the 'chapter' or the video scene at the rear to a menu when it ends and also have a game all. So ignore the advice on those.

    Simple video:

    Your single video goes on a timeline. 'Play all' is a button in the timeline, and the timeline has an end action of "last menu."

    Menu of chapter has 4 buttons (plus a fifth to return to the main menu), going to each respective chapter marker. There is no action to end on chapter markers, so when a new chapter is reached, he continues to play as the piece all the.

    Several videos:

    Each video goes on his own script. The end of video action a timeline is timeline two video etc. Play all is a button that goes to the timeline one. The chapter menu also has a button go to chapter one, and it works identical to the play all. Each of the chapter buttons go to their respective chapter deadlines.

    Still may have some problems with a certain time lag, but I do not think that they affect either of these workflows. Don't rely on the preview again; burn a test disc and play on a DVD player.

  • End of the sequence of jumps back to the beginning

    I have 2 simple questions:

    When I'm playing a sequence, at the end of the sequence, he climbs back in the beginning. How to stop right at the end? (I can't find the setting of the loop!)

    What is the keyboard shortcut to 'play out '.

    Thank you

    R

    Edit > Preferences > General...

    Edit > keyboard military...

  • White vertical line at the end of the sequence?

    Saw a similar question on a black vertical line to end of sequence. Response was that it was an indicator of the end of the video, and don't show in the final. Is it the same or are there other issues? Newbie here!

    Yes, the 'last framework indicator' is a relatively new (which causes confusion and various discussions) in first CC. It shows as a black, vertical bars with a white line if you have reached the end of your sequence or the element in the source monitor. In the past, it was just 'black' you've seen in this case, so consider an automatic rearview mirror he won't be exported from acualy there is no content to export more in this context.

  • Send me an E-mail to export and/or make the end of the sequence?

    I'm not finding any means for PP to send me an Email at the end of a sequence of rendering and/or export to the media?  Is there such a feature?

    Thank you, Rob.

    I like the idea, robains. Please make a feature request: http://adobe.ly/feature_request.

    Thank you

    Kevin

  • Reading and the end of the sequence

    Hello! I have a sequence that is 1 second then the clip in it. But when I hit the space bar or play button in the monitor program, playback stops at the end of the clip, but not at the end of the sequence. How to play where is the playhead at the end of the sequence? Thank you!

    You're memory is in error.  PP will not play past the last element in a sequence.  If it appeared to do, it was only because he does something he was in order, maybe that one frame long, that you simply do not see.

    You cannot specify a length of the sequence anywhere within Premiere Pro, as this term is defined only by the last element in the sequence.  No clips, no 'duration' and of course, no reading.

  • Button "Exit", used in several images of the sequence

    I hope that there is a more elegant way to do...

    See the VI attached for a much simplified program that is typical of what I am trying to accomplish.  Basically I have a button that I want available in several images in the sequence.  In this case, I used a button "quit".  When you press on, the program passes by remaining sequence frames until it ends.  The last image "unclicks" the button "Exit".  This last image is necessary because I had to put the mechanical action of the Exit button for "switch when released" because I used local variables in all the images in the sequence after the first.

    Is there a way I can accomplish the same functionality of this program without using local variables and/or during the definition of the mechanical action of the 'exit' switch to ' lock releasing?  Specifically, I'm looking for solutions that will work in several images of a structure of stacked sequence (I realized there are ways for the three lights without using a structure of stacked sequence, but I'm not interested in doing).

    Any help would be greatly appreciated!  Thank you!

    Something where you're looking at a sequence of steps, you really recommended using a state machine architecture.  (Search the forums for examples).

    Having several structures event with cases duplicated in different settings of a structure of stacked sequence (it would be a little better if you used a structure rather flat sequence), only to request trouble on the road.

  • Length of the sequence in hearing CC

    When I send a sequence of CC of the Organization, the extent of the sequence displayed in the sequence reflects the greater length of the sequence in the body at any time during the installation. For example: at one point the movie is 60 minutes long, but I cut down for 5 minutes, photo locked and now I have "Edit in Audition." The timeline in hearing is now 60 minutes long, with a small patch of bitty 5-minute clips on the left.

    Is it possible to do the Audition to cut out the empty space at the end? As the end of the sequence of setting the force?

    The fastest method of "reset" of the notice of hearing would be to click on the button 'Zoom Out full both Axes', located at the upper right of the Editor window:

  • How to let axSequenceView view the sequence file, after the opening before the race.

    How to let axSequenceView view the sequence file, after the opening before the race.

    I would do it differently, you do not see when running because your sequence control is connected to the requeteexecution Manager. I have two controls of the same size that sits on top of the other, one connected to requeteexecution as it is by default and the other to SequenceFileView Manager.

    You can then use reminders to start execution and execution of end events in the user interface to make the control visible. It is very easy to achieve.

  • Get the context of the sequence of other connectors (active) in the batch processing model

    TestStand 2014 - model updated the batch

    LV2014

    System controls an environmental Chamber and doing trials on 4 of the UUT.  Room Enviromental is the shared resource and is controlled by the synchronization of thread only lot.  A UI TempMonitor of Labview (also synchronized lot) pops up, until you reach the target temperature and soaking time is over (so you can monitor returns to the House and see the amount of time remaining.  It all works fine in the system of warnings in.

    Now, there is a new requirement to take permanently UUT s to ensure that they remain in the State during the temperature ramp and soak period.  The simple answer is to integrate this track in TempMonitor UI because it has access to all relevant data pads.  However, I would need to do an end run around traditional return since it is only run by one of the four (up to).

    My thought is that if I had access to all active sockets sequence contexts, I could ask them their index and State, follow up and write the results to réécrirait a local variable before leaving the user interface.  The only thing that prevents me from going forward, it's that I don't know how to get the engine to give me the sequence for each Active socket contexts (0-3 which may be disabled via the setting ContinueTesting false instead of disable flag, it is a product of use pass 3rd batch of party model, so the executions of people with disabilities are marked as completed when running rather than wait).

    Or, Alternatively, how inspect all executions and to determine what decision he belongs (if necessary, because my data acquisition engine runs in its own, hidden, execution).

    Thanks for any help,

    Mike Webster

    Actually, I was looking for a way to get the SequenceContext for the other active sockets that launched the TempMonitor GUI, so I could put results in the other sockets directly.

    However, I gave it, and instead I am launch the GUI TempMonitor in its own thread and have each socket to monitor the status of USE on its own with a separate VI until what the ramp / soak temperature is how the GUI will highlight Boolean StationGlobal that triggers the individual to continue.  More complicated, but also in the spirit of TestStand to things, I think.

    MKE

  • Detect "arrested" call of the sequence status

    Hello

    I use TestStand 2012 and one of my sequences is a bunch of sequence calls to other sequences.

    Each call is made using the "use new run" and wait for execution ends before the next step.

    I use this option because I like having different reports for each sequence.

    However, I still would like to capture what call has succeeded or failed in my main sequence.

    To do this, after each call, I have a statement whose status expression is:

    (Find (RunState.PreviousStep.ResultStatus, «Passé», 0, True, False) > = 0)) ? 'Past': 'failed '.

    The problem I find is that when one of the sequences I call ends in the middle because of an error in the object to measure which does not allow me to continue his tests, the main sequence gets the status of "success."

    So, when I see the 'success' in my report of main sequence, I still open the various reports to ensure that it was passed.

    If anyone knows a way around this?

    I tried to change the expression of the State of the call sequence step, but it is a read-only field.

    Thank you in advance,

    Leandro

    OK, that makes sense.  Yes, when you call a sequence in a new run you can store an object reference.  Store everything in a local variable.  Then you can look at the State of this object reference.  Even if you have to play with it because if execution is gone I don't know what state you will get.

    Let me know if you have any questions on this subject.

  • When the sequence of process template client file is loaded for execution?

    As part of a custom process template I've created, I would like to make a few changes in the sequence of the client before file called by the process template. These changes will be then be restored after the loop finishes USE (I'm changing the sequential model).

    Another thread, I discovered that TestStand sequences cannot be edited structurally once they have been loaded for execution. My question is: what is client sequence template process ' for execution "?

    After some research, I discovered that the sequence of the client file is not locked to prevent changes to the sequence editor until the "Reminder of the main sequence" sequence step call runs in the model process entry point. At this stage, the sequence of the client file is loaded dynamically as the module at this stage.

    However, before this point, there are two places that the file of the client's sequence is used, and I want to assure you that they don't 'load the customer file for execution.  The Runstate.ProcessModelClient property is a reference to the object the client file SequenceFile and exist as soon as the entry point is called. In addition, the engine must know about the sequence of the client file to correctly call reminders of process model. Do any of these things make the movie of 'responsible for performance customer file?

    It boils down to this: can I do safely from the structural changes to my file of sequence of the client during the ProcessSetup and ProcessCleanup?

    According to the information I found in another post (see the comments of Eric_Crank on page 2), it is allowed. However, in this case customers were only make changes to the property Data of the RunState.ProcessModelClient. I want to assure you that I can use the TestStand API on the reference too.

    Also, just FYI, I got this works. I can add steps to the sequence MainSequence customer sequence file of the group stage of installation of the point of entry of the process model via the API TestStand. I ask here if make sure that it is a safe thing to do, and that there is nothing I plan not to.

    Thank you.

    Josh,

    If your sequence allows the option "optimize no concave calls this sequence", the first time the sequence run TestStand stores a copy of the execution of the sequence in a cache associated with running. As long as the sequence is in this cache you can not change, and TestStand considers that the sequence for 'run' file (see the SequenceFile.IsExecuting property). You cannot unload 'enforcement' sequence files (see SequenceFile.CanUnload). Sequences remain in the cache until it is closed. There is no way for you to remove the sequences of this cache, but you can prevent them to be added to the cache by turning off the option "optimize... ». Disabling this option should have no impact on the performance that you call the sequence only once.

    -Erik

  • is it safe to use a view control of sequence to display the sequence file both for execution

    I have a Teststand UI written in Labview 2012.  It has a single control of sequence, and I use the ConnectSequenceView method to switch between the display just the loading sequence file and the running.  Allow me to reiterate.  When a file sequence is running, the control is connected to the execution Manager.  Otherwise, it is connected to sequenceFileView Manager.

    I begin to suspect that I have questions related to this control, when I do the following.

    1. load a movie file

    2 run Single Pass

    3. the execution ends

    4. unloading and Release sequence file

    5 load a different sequence file

    6. run single-pass

    7 Labview crashes

    Am I missing a step?

    Thank you

    Kevin

    So it seems the crash of Labview, I mentioned in the original post is unrelated to the joint use of display of the sequence control.  However during my troubleshooting, I noticed that I was missing cut from a point of view of control stage before connecting the other view.

    And for the record, I think that there are many things wrong with the architecture used in the complete example, but there also many too many features for what to.  Just need a simple "press a button" and "run a test" for operators.  Everyone uses the sequence editor.

    All right.  Thanks for the comments.

    Kevin

  • Locking of the WRT54G2

    I have just updated the firmware on my WRT54G2 to worm. 1.0.02 and now I'm having issues where the router will lock on the occasion. I have my PC statically IP'ed. and when I can't go to the internet, I can't ping the local gateway (the IP address of the router) or the other. No connectivity at all with or without wire. Didn't have this problem before the upgrade to the new firmware.

    After an update of the firmware, you must reset the default router, the router again from scratch.  If you have not done this since your last update of the firmware, please do it now and see if it solves your problem.  If you have saved a router configuration file, DO NOT use it.

    (1) Please list addresses LAN a static IP you use.

    (2) If you do not the default DHCP server 192.168.1.100 through 192.168.1.149 range, then specify your range of the DHCP server.

    Note that any static LAN IP address must be outside the range of the DHCP server, and it cannot end with 0, 1 and 255.

Maybe you are looking for

  • My imessage and facetime will not work correctly

    A few days ago my iMessage suddenly wasn't working properly on my mac. I could not receive messages, and when I tried to sent messages, he says not delivered. Then I reinstalled the OS X IS captain. Then when I type a contact to send an iMessage from

  • iPhone 4S only rings on the second call

    If someone calls me, iPhone doesn't ring or buzz, but registers a missed call. People get the 'busy' tone when they call me. BUT! They remember immediately after the connection cut my phone works normally and it sounds. Installed a new SIM card, same

  • EliteBook 8460p: lack of SM bus controller

    After installing some updates and restarted my computer, I got a notice saying that my card SM Bus driver was not installed.  the hardware ID are below.  is there anyone who can tell me the right driver?  This appeared after getting the base system d

  • How to get the center of solutions for photosmart 2355

    My OS windows 7 Printer/scanner HP PSC 2355 I have the disk but does not install I have need administrative access that I am. bound to turn off any firewall restrictions. Need an alternative way of installation works Center and imaging solution

  • How can I reset administrator password in Windows CE?

    Urgent RPL