Aggregation of links between poerconnect 5324 and poweredge with broadcom adapter

I am looking for information on how to build an aggregation of links between my powerconnect and three cards broadcom on my server. I want to create a bandwidth of 3 GB.

I created a team with suite ABEC 3.

My network have 2 VLANS.

At this stage, I could ping my server network, and I can ping the server in my network.

When I defined the three ports of the switch (where three cards are connect) as LASG and I defined in belonging to a VLAN these three ports whose status is F, I ping the server from the network, but I can't ping the server network.

Could someone tell me how I could build this bandwidth betwween my powerconnect, and poweredge?

Thanks a lot for your help.


Tags: Dell Switches

Similar Questions

  • break the link between the pix and sound

    Ugh I still don't know how to break the link between the pix and the sound in the timeline then of

    the sound and image are together. I know it of easy but have not yet found the way.

    Thank you everyone.

    Right-click on the clip and click 'Remove link' If you just want do temporarily, ALT click on the clip.

  • Wonder about the difference between the element and symbol with draggable drag

    I'm trying to understand the difference between a symbol and a with draggable element.

    She is the example I did: https://www.box.com/s/v2s8ueeqof9litu4zvwm

    • for the Rectangle element, drag works very well. The item dragged from where he is.
    • the symbol of the box which is initially 0 left and top 0, no problem
    • the symbol of the boxCopy which is placed on the left 100 and top 100, on the trail, he jumps to this amount.

    I guess drag Gets the original position of the symbol on the stage box and add these numbers to the position of the step. I have the symbol arround medication and it seems that the scene is translated left and top of the amount of the left and top of the symbol.

    This does not happen with the Rectangle element.

    Obviously there is something I don't understand.

    Ok. Joel gave me the solution.

    After you have placed your symbols on the stage, remove the left and top lines in the symbol. This will reset to (0,0).

    Here is the corrected file. In the left panel, you will see that there is no left and top except one to show the difference.

    https://www.box.com/s/v2s8ueeqof9litu4zvwm

  • How to create the database link between the production and the test server

    You will need to create a link between Test and prod DB access. We need only select access from user@prod to user1@test.

    Could someone please answer for example?




    Thank you
    sRII

    You will need to create a link between Test and prod DB access. We need only select access from user@prod to user1@test.

    Could someone please answer for example?

    If test for prod

    create public database link to_prod connect to the user identified by password using 'to_prod ';

    Check that to_prod is directed to your production database.

  • The use of laptop Dell Inspiron 6000 with D - Link DIR - 615 router and a Wireless N adapter, but showing the G signal

    I have a Dell Inspiron 6000 laptop and I use a router D - Link DIR-615 and a Wireless N adapter, but when I checked my settings, I received only a G signal. What can I do to get a N signal?

    * original title - how will I know if my cell phone is compatible? *

    The chipset WiFi the only information that I could source on the Inspiron 6000 ranked either the Dell Wireless 1390 802. 11b / g card mini or Intel Pro/Wireless 2100 802. 11 b / g mini card.

    None of them is compatible with N.

  • Aggregation of links between Powerconnect 7048 battery and battery S55 Force 10

    Hi all

    I'm trying to connect a battery 7048 with a stack of S55 (2 switches in each stack). I would use two ports (one on each switch) each battery to connect to each other. Can someone help me with the configuration of this please? I guess I'd go with LACP in this situation?

    If orders to fill what could be made, it would be much appreciated.

    Thank you, Carl.

    On the 7048, placing the ports in a SHIFT with LACP looks like this:

    Console (config) # interface gigabitethernet 0/1/2

    Console (config-if) active in mode channel-group 1 #.

    Console (config-if) output.

    Console (config) # interface gigabitethernet 0/2/2

    Console (config-if) active in mode channel-group 1 #.

    Console (config-if) output.

    Console (config) # interface port-channel 1

    Console (Config-if-PO1) #.

    And then configure the port channel but you need.

    On the S55, this tech tip article will guide you in the process of creating a GAP.

    http://bit.LY/1BO7tkS

    Let us know if you have any questions.

    See you soon

  • DB link between our client and the third party provider

    There is a third party provider that has its own db containing information on supporting documents.

    There is a link in db between db and db of third-party customer

    Now for our client we create vouchers through the UI in our database that must be verified in third-party provider db and created in our database

    How can achieve us

    Why don't you create a view in your DB which is ' select * from ".

  • Link between SCRM installation and verification PQM

    Hi all

    is it possible to directly connect a facility with an Audit PQM associated with this installation?

    Of the Audit PQM I can see the relationship with the installation, click on it and jump directly into the installation.

    I can't find the same link from the installation.

    Is it possible to get this direct link? (that is when I'm on the installation, I would like to see all the PQM Audits related to this facility)

    Thanks in advance

    Kind regards

    Matteo

    Hello Matteo,.

    have you tried our report package? We have a report entitled "Audits of suppliers (PQM)" that can perfectly solve your problem.all you need to do is install the pack of reports, configure a menu button/action for your company/institution that will lead the user to the report so they can review what checks are there who associated with the current company/plant. You can learn more about Oracle® Agile Product Lifecycle Management of the process of Reporting Guide, guide to the PQM report pack. I hope this helps.

    Thank you

    Jessie

  • Problems with dynamic links between Premiere Pro and After Effects

    Hello

    dynamic binding (insertion of After Effects compositions on a Premiere Pro schedule) rarely worked properly since it was introduced. Problems vary (for example "media disconnected" made plates, old versions of comps rendered).

    What's worse, is that you can never tell what will be ultimately made out of Premiere Pro. Thus, a typical professional workflow to several projects together to finish during the day and batch overnight rendering can cause a catastrophe.

    Of course, the option is to not use dynamic link. Which makes then less competitive whole adobe.

    This subject has been widely discussed for years has been a dynamic links. I'm not the only one having this problem, and the problem is far from new.

    My only question is:

    Adobe: have you ever fix dynamic links?

    I don't really understand how you focus on software development in your company. The vast majority of the features of CC is little or not useful. The most important thing in a professional environment is consistent and reliable - performance can you please focus on that?

    I'm inspired to write this post because I just arrived in my edit at 07:00 only to find that my night makes is the wrong versions. All bed very well in the body and AE, damage the final rendering off Media Encoder used an older version of one of my compositions, and that I have nothing to send to my client.

    Janne

    Title edited by Kevin Monahan.

    Management of files Adobe seems to rely on the names and the last path of known files. Body loses links Dynamics (and other files) with frightening regularity in a situation where nothing has changed in the hierarchy of files, the files.

    16, when a hard disk of 8 GB was a huge drive, Pro Tools has been littering files on several disks because, as was the creation of audio files in real time, she had to. Digidesign introduced into a system which incorporated a unique program generated number in each file. Since that day I have never had a problem with lost files or correlate. I can move them anywhere, on any system and any PT session concludes that they are with total reliability - and we are talking about a lot of projects with thousands of files, through several studios. If you are looking for files, you can choose to use the identification number, the name of the file, the length of the file, or any combination of these. Which allows for the substitution of file.

    Until Adobe address this problem with a solution similar to that of Pro Tools, we'll be constantly beset by problems.

  • Dynamic links between the first and truly dynamic hearing?

    I am familiar with the function of dynamic link Premiere and After Effects. If I send a clip to EI and edit it, it will update in my first order. But if I make a change of photo in the first edition, it will not update the corresponding hearing project? I'm currently tagging my short film and hoped multitrack recording in Audition, sending back to the Prime Minister and make changes to shot times according to the timing of the music. But he seems to have hearing see my changes in the first, I have to go to "Edit in Audition" again, replacing the original set and all work hearing project I've done so far? To go to the hearing is a sense unique street, until the final mix status?

    Or did I miss something in the hearing as a refresh option?

    For a little more information, see two posts from CharlesVW in this thread of 2015.2 hearing .  As Steve says, the full dynamic linking is a work in progress, but the feature improves with each version.  However, for things to work correctly, it is important to have corresponding versions of the hearing, first Pro and Adobe Media Encoder.  Unfortunately, it's not as simple as the numbers - the last hearing is 2015.2, last Premiere Pro is 2015.3 and I think later SOUL is also 2015.3.

  • OIM11g - remove the link between the user and the account

    We have configured a rule wrong Recon for a resource and then run the task of reconciliation on a limited number of users; the result is that these users are connected to the target system wrong accounts.
    Now, we have configured the right Recon rule, but we do not know how to clean/delete the 'link' created for users to reconcile, we want to run a new reconciliation from scratch.
    Is this possible?
    Can anyone provide a detailed guide of the how-to (step-by-step)?

    Thank you
    Gabriele

    Published by: user1175296 on June 29, 2012 07:50

    Published by: user1175296 on June 29, 2012 08:05

    user1175296 wrote:
    Hi madhatter.
    I agree with you and I will use the OIMDAO, but for more information and to make a test in the DEV env, can indicate you the name of the 11 tables that you mentioned?

    Sorry for a slight misunderstanding, I feel the ProcessInstance (ORC) table when talking about about 11 tables in detail. These 11 paintings is as follows:

    OLIVIER ObjectInstance
    BOA Organization2ObjectInstance2ProcessInstance
    Ouedraogo ResourceAccount lastAttestedResourceAccounts
    ORC ProcessInstance childProcessInstances
    OSI TaskInformation
    OTI TaskDetailMisc
    NCE ReconciliationManager
    REQ req. reqs
    RECON_ACCOUNT_MATCH ReconAccountMatch
    RECON_EVENTS ReconEvent
    RECON_CHILD_MATCH ReconChildMatch

    As for the ResourceAccount table (Ouedraogo), here's what I found in the file xell.sql of the distribution of the UCR:

    ALTER table OUD
    Add constraint FK_OUD_OIU foreign (OIU_KEY) keys
    references Ouedraogo (OIU_KEY)
    /
    ALTER table OUD
    Add constraint FK_OUD_OUD_PARENT_OIU foreign (OUD_PARENT_OIU_KEY) keys
    references Ouedraogo (OIU_KEY)
    /
    ALTER table RIU
    Add constraint FK_RIU_OIU foreign (OIU_KEY) keys
    references Ouedraogo (OIU_KEY)
    /

    CREATE TABLE ENT_ASSIGN)
    ENT_ASSIGN_KEY NUMBER (19) NOT NULL,
    OIU_KEY NUMBER (19).
    UNIQUE CONSTRAINT UK_ENT_ASSIGN (USR_KEY, ENT_LIST_KEY, OIU_KEY),
    CONSTRAINT ENT_ASSIGN_OIU_FK3 FOREIGN KEY (OIU_KEY) REFERENCES OUEDRAOGO (OIU_KEY)

    CREATE TABLE ENT_ASSIGN_DELTA)
    ENT_ASSIGN_DELTA_KEY NUMBER (19) NOT NULL,
    OIU_KEY NUMBER (19).
    CONSTRAINT ENT_ASSIGN_DEL_OIU_FK1 FOREIGN KEY (OIU_KEY) REFERENCES OUEDRAOGO (OIU_KEY)

    CREATE TABLE ENT_ASSIGN_HIST)
    ENT_ASSIGN_HIST_KEY NUMBER (19) NOT NULL,
    OIU_KEY NUMBER (19).

    As you can see, there are at least 6 references Ouedraogo in 5 tables.

    I myself prefer to delete process Instances (not ResourceAccount), eliminating all of the artifacts supply resource account, including the data of the form (records in the tables of UD_xxx).

  • Dynamic link between the Organization and AE

    Is it possible to edit a sequence in the body, use dynamic link to open in AE, add effects to the sequence in a model and then use dynamic link in the body to import the model with the modified sequence of body?

    When I tried this, there was no video in the model which has been linked to the organization.

    You need not the last step.

    1. cut the PrP sequence.

    2 send sequence AE via dynamic link

    3 create effects in AE.

    Now, if you check right back to PrP. You have a dynamic linked segment that has the same length as your original PrP sequence... You must make it more often to allow playback in PrP.

  • Dynamic links between Premiere Pro and AE (CS5.5)?

    Okay, then, here.

    I edit my main footage in Premiere Pro. I recently bought a denoising software which is only compatible with After Effects, so I've been using the denoiser plugin in After Effects. Once I changed my basic video cut in first, I select all clips (included audio) in the timeline panel and open in a new model of EI. Once it has been opened, I do all my video major alterations in AE (for example, noise reduction). Now, when I try to export the project as a project of first Pro (PP) and open it in the first, it does not load the project. It's just an empty sequence. This isn't a big deal, because I tried something else. I tried connecting the composition of EI EI to PP which works, but it is very slow and precomposes all individual clips in a video clip.

    So, just to go on it again, that's what I did: cut clips in PP > selected all the clips in the timeline of PP and them open in a new AE comp > published the individual clips inside the model AE w / effects that are not supported by PP (only AE supports the reductive effect) > open the AE comp edited pp > then the model came as a clip video précomposé instead of individual clips.

    So, my question is, how can I get the model of EI to stay as individual sequences when I open it in PP in case I need to adjust something? Is there a way to do this? Or should I just do the very last denoise effect?

    Two other things:

    (1) I noticed that it is extremely slow in PP to render a model of EI parts... is it just because of the added effects?

    (2) I transcode my videos to the ProRes 422 format before I put it in PP. Once I put the clips in AE and then again in PP (if I figure out how), the clips will always be the same ProRes codec? I need them to be the same codec due to the adjustment of colours and effects later in the post.

    Thank you if you can answer this! ANY help is appreciated! I have explained this about as good I can, so if you don't understand my question, just ask, and I'll try to give you more information. Thank you!!

    You use dynamic links, which consumes tons of RAM because it runs mainly AE and body at the same time. The temporal part of your denoising tool can slow things. Other questions are naswered easily

    In short: you make your living difficulat using the monstrosity that is the dynamic link. A more cautious approach based on files would most probably speed things up a lot.

    Mylenium

  • HP pavilion dv6-3031nr: no link between HP printer and computer laptop, even when they both show a connection

    How my printer can work one day and the other day it doesn't.

    I have a HP Pavilion laptop and an HP Photosmart printer.  Both show that they are connected, but the printer will not print. My dvd player want me to transfer pictures and will not read my cd for the printer.

    I have a Photosmart D110a.  The printer prints.  But would not scan.  I went to print and scan on my laptop and tried there.  I don't know what happened, but it is now printing and scanning, but only from my computer.  It seems to change with the times.

    Thank you for responding.

  • Dynamic links between After effects and Premiere Pro.

    For everything I want to do is to use the dynamic link to get my legacy project on my first pro project. However, every time I download the first composition it's an audio file when it is not.

    Any help would be much appreciated!

    Hi Daniel,.

    Make sure that the patch Source is enabled in first:

    Kind regards

    Navdeep Pandey

Maybe you are looking for