Change order in Muse?
Hello everyone, I just downloaded Muse with an idea to try for a one page Web site. Is it possible to change the order in the Muse? I would like for my main navigation bar to be at the front and stay in place on all content, while my animation of the anchor link goes behind the navigation bar. Example: www.joelwilcoxson.com/muse , any help is greatly appreciated.
If you put your menu on a master page, it will always be "behind" elements on a page based on the mask. If you want your menu to appear on top of any other content, you will need to copy and paste in place on all pages instead of having it on the master.
Releasing the master page elements to appear above elements in other pages has been requested here:
I wish I could pin my head to the top of the browser and have the scrolling of content BEHIND it.
http://forums.Adobe.com/ideas/1546
Please add your vote.
Best regards
Corey
Tags: Adobe Muse
Similar Questions
-
control array element changing order
I have observed several times where some of my paintings of controls have their items change order between debugging sessions.
It's unpredictable when it happens. But the symptoms amounted to my controls bad secondary control (for example, LED #2 gets turned on when the #0 SWITCH is pushed).
When I inspect control arrays, I can find that one or more items are now out of use. When I their difficulty in IUR again, then all is well again.
Any thoughts on how to lock them to the UIR?
ElectroLund,
One thing I noticed on your code, you call the GetCtrlArrayFromResourceID function at the top of each callback. Because the control panel should not change while the program is running, I might suggest you make all these function calls in the main function as soon as the program starts and just store it for use in the recalls. Which probably isn't helping the problem here, but it would make things a little more efficient.
Nothing is coming out for me right now as being a possible cause of the problem. I know you said you've been changing the code in an external IDE; to be clear, have edited the UIR file in any external editor?
One thing that was suggested by one of my colleagues was to create control arrays in source code, instead of using the GetCtrlArrayFromResourceID function. This would ensure that the controls are in the order that you want them to be, even if it would take a little more code to implement.
-
I ordered Adobe Muse on 27/07/2014, I paid £133,28 for a year of subscription... all very well until Adobe Muse took another £133,28 from my account on 10/08/2015 does anyone know why they would do? I have more use of Adobe Muse. I talked to people on the Chat, they say they have no record of the transaction and still, he stated on the bank statement that MU Adobe Creative took £133,28 out of the account.
Please call the customer service and provide details as well as the receipt of payment, they would surely help you:
United Kingdom: 0207 365 0735
https://helpx.Adobe.com/UK/contact.html
Thank you
Sanjit
-
Change order number/special character artists
I would like to know if there is a way to change the order of all the artists that begin with a number or a special character order. Currently, they are all sitting at the bottom of the list of the artist on the ipod (and iTunes) but I would like to have all displays at the top of this list.
This is the sort order... I think you would need to change the names of the artists so that they start with something that gets sorted at the top of the list in alphanumeric order. For example, replace 10,000 Maniacs a_10, 000 Maniacs.
-
Portege R700 - change order of remote start
Hi all
Is it possible to change a Toshiba Portege R700 BIOS remotely? -Specifically to change the boot order to a PXE boot (instead of HARD drive).
I intend to deploy images on our laptops using SCCM 2007 but it takes a utility to change the BIOS settings. HP and Dell, both allow you to do so, as Toshiba?
Thanks in advance
Hey,.
As I know that it is not possible to change the BIOS settings remotley s but what you can do is to use a Windows remote connection or another remote control based on Windows of the program and then use the preinstalled Toshiba HWsetup tool. Tool for configuring the BIOS, where you can change the boot order and other options based on this Windows s BIOS.
It should work! :)
-
Change order of project folder
It is perhaps a silly question, but is there a way to rearrange the order in which the folders appear in a tree view of your project? It seems by default what CVI has them in order of "Files of User Interface", "Source Files", of"Include files", which is fine. However, I have an old project, where the "User Interface files" for some reason any comes after the "include files" that drives me crazy . How can I change the order in which they appear? It doesn't seem to be a way in the project tree and change it-> project... window does not appear to be a way to do it anymore. Thank you!
This isn't the most elegant solution, but the "brute force" approach is to open the project file in a text editor, find the [files] section and organize the folders listed to meet your needs. Once the records are willing, rename the keys to the digital file from 0 to n.
-
ThinkPad T430 cannot change order of Bios Boot
last day, I just bought new thinkpad T430 machine, when I try to change the boot order priority by default in the BIOS, the menu is disable, I can't change anything. Is - this thinkpad T430 came with default supervisor password? Did anyone here knows the default value of the supervisor password?
FYI, when I try to enter the BIos, it asks for the password, and I just press ENTER to access the bios.
Thank you
Hey Ferrym and welcome to the forums.
If you check in the BIOS under boot, what does say beside the command lock Boot? If it is enabled, you can change this for are disabled? Thanks Ferrym.
-
Muse of merger Mode change / difference between Muse &; Xd
Hello, I just started to use the Muse, and I have a few questions.
1. I have difficulties to find a way to change the mode of fusion in Muse. As in Photoshop and Illustrator, I thought that I could set to multiply, overlay, etc., but I couldn't find the opacity setting, but nothing else. I thought that this person below, has the same question, so I followed the answer and bought the Muse Supply widget of Blend Modes, but it doesn't have the setting I was looking for. This widget only allows me to select two or more items and define ways of merging with them. (Like, by selecting an image and color) What I'm trying to do, is simply to change the mode of fusion of a unique shape. For example, I have a rectangular shape and I want it to be "multiply" mode, the background image will appear through it.
2. another question, I bought BackBlend as well, because I thought it's the widget to solve my problem, but this one isn't either. But it seems to be an interesting tool, so I am now, but I have no idea how to use. Anyone know how to use it? There is no manual of the user on the site. !
3. is it possible to open what I did with Muse in Dreamweaver and make changes there? Or y at - it another way, I can make changes to the file Muse with more flexibility?
4. oh, and what is the difference between Muse and the design of the experiment? I've seen some tutorials for two of them, but have not yet understood the difference.
Sorry for all the questions, I'm trying to learn them now!
Thank you in advance for your help!
1 muse does not support blending modes, because blend modes are not supported by the real browsers
2.?
3. you can open the output files of Muse (not the file .muse itself), in Dreamweaver, but this isn't the expected workflow. Changes that you make here are not part of your document of Muse and will be overwritten during the next export.
4. Design experience is no application to create web sites, it is an application to create interfaces user and application/site plans.
-
My site (godaddy) is not updated after I made changes in the muse of adobe.
I took images down that I don't want anymore, but when I re upload to FTP host, the images are still there.
The folder it goes to is public_html.
How can I get rid of these images
Very common question of GoDaddy... isn't the effect just to Muse. Even Wordpress users complain. Try refreshing your browser.
A lot of info about it on Google: Web sites shows the change on GoDaddy
-
Hello to everyone.
I am creating a site of photography, and with it customers can order books online (I hope). So I got the formats of the photo albums, I have them ready for the customer to choose leather or the cover photo, leather with or without photo, etc, but how they will download the form they choose? How to be saved? Because it looks to hard for me to create a program that will allow customers to download and design by them self and make an order, I use my photoshop skills to do drawings of loan coverage and allow the design of the Interior to do by me.
So any help or idea would be highly appreciated.
Kind regards
Kanun
Hi Kanun,
At the moment, Adobe Muse does not function "upload file". But there are some Web forms from third parties which can be incorporated into the Muse and you can receive details of web form on your email.
I add a Web Form site, with multiple options, which can be useful
Let me know if you have any question.
-
Problem with download of change site with Muse CC
Hello
When downloading from my site, everything is out of place on the home page and a product page. I get the following message: "MuseJSAssert: error calling the function switch: TypeError: $(...)." toBrowserWidth is not a function"on these two pages, others are fine.
I downloaded it initially through Muse. When it did not work, I tried to download with Dreamweaver, Filezilla and Cyberduck, nothing helps... I get the same result every time.
I checked all my belongings have been correct and that they are.
It works perfectly when I publish in British Colombia.
I'm at a loss to know what to do. Can anyone help?
Thank you!
Hi again,
The site is now in ".com" and for this I changed my host.
I downloaded Muse, empty the cache of my browsers (Safari and Firefox), and it works now!
The problem must come from my previous host I guess.
Aish thank you want to study the issue, don't need her now.
Kind regards
Pascale
-
How can my customer changes in the Muse herself?
I think his website in Muse, plans to publish in British Colombia. Does need his Muse account to be able to make its own changes once the site is published? How would she go to a site I designed?
Then use this:
In the browser edition of Web sites using third-party providers of hosting services
-
You can change order of pictures in the Contact sheet in the LR4 print Module?
You can change the order of images in a contact sheet in the print from Lightroom 4 module?
Frans is OK, but it must also be in a collection or folder of the lowest level of the tree of user access. If you just file located above this level, you will not be able to sort.
-
Windows Photoshop - change order they come?
This problem has been annoying me for YEARS and I don't know if it can even be changed... but thought I would ask.
I use CS3.
I change 50 + images at once. I opened about 20 of them, so they have all displayed on the tab of the window in the toolbar at the top. For example:
P100046. JPG
P100047. JPG
P100048. JPG
P100049. JPG
P100050. JPG
P100051. JPG
P100052. JPG
P100053. JPG
etc.
I selected the top one and modify it. When I CLOSE that window, it jumps to the BOTTOM of the list (I edit and close P100046.) JPG and the following if poster is the one downstairs, P100053. (JPG). I really have to change for this to go quickly. Sometimes, I edit hundreds of photos in one day and it really slows the duty me to go to the window tab and click on the image at the top of the list EVERY time.
I hope that makes sense... sort of fix it if it's still going in order rather than at the end of the line?
Thank you!!
In the browser, click on the name (highlighted in Post 6). It will toggle between Ascending and Desending. You will not see as a choice.
-
Change order/work plan numbers
I am currently working on a project that involves more than 16 plans to work in the same document, but when I want to change the order of the work plans [for registration in PDF format] I have to move all the contents of my work to the new plan of work plans, etc.etc.
It's really annoying, especially when I want to insert a new work plan between some wonderful ones.
So is it possible to change something of the order of the work plans, or well they numbers [essentially the same]?
Please let me know as soon as POSSIBLE!
Yes, you can create or modify the security settings in Acrobat. It's really something Acrobat, in any case. Illustrator can do go save as PDF dialog, but it really is to call on the features of Acrobat to do.
If you open the PDF in Acrobat and do a right click anywhere on the page you can access document properties. One of the tabs in this context menu is for security. It should seem familiar and manageable.
Good luck.
Maybe you are looking for
-
How to use the Camileo H30 with Power Supply
Hello First: Excuse my English, im from Germany ;) I have a Camilio: 30. its has been purchased used. I've only had the camera & the original battery.No supplements (such as usb or power supply cable original) what I want: I need to shoot for a few h
-
fake disconnected ' HP Photosmart Wireless B109n-z. ' message
Hi all Using the center of HP sollution, I see the message offline wireless HP Photosmart B109n-z. However, I can print, I can see the cardriges levels filling and I have no problem to reach the printer via IP address. However, this issue would preve
-
How HTTP to listen to IPv6 in Windows XP SP3?
Hi all I'm developing a web service and you want to access on the IPv6 network. I use Windows XP service pack 3. I read that more articles related to this and find that we can do through configuration HTTP using HttpCfg.exe to these URLs: http://msdn
-
Notebook optical mouse 3000 does not totally work with Windows 7
laptop optical mouse 3000 not totally work as it is in win 7 64 bit, but very well under win xp. Hi, a problem with my laptop optical mouse 3000 with windows 7 64 bit. the problem is that I am not able to scroll in the yahoo mail Inbox and in the Fav
-
Can I install Windows RT on an iPad or any ARM based device?
Can I install Windows RT on an iPad or any ARM based device?