Portege R700 - change order of remote start
Hi all
Is it possible to change a Toshiba Portege R700 BIOS remotely? -Specifically to change the boot order to a PXE boot (instead of HARD drive).
I intend to deploy images on our laptops using SCCM 2007 but it takes a utility to change the BIOS settings. HP and Dell, both allow you to do so, as Toshiba?
Thanks in advance
Hey,.
As I know that it is not possible to change the BIOS settings remotley s but what you can do is to use a Windows remote connection or another remote control based on Windows of the program and then use the preinstalled Toshiba HWsetup tool. Tool for configuring the BIOS, where you can change the boot order and other options based on this Windows s BIOS.
It should work! :)
Tags: Toshiba
Similar Questions
-
Portege R700-19 t - new RAM->; start is no longer
Hello together,
so I bought two new RAM sticks for my old laptop
Toshiba Portege R700-19 tBut since I installed them, the machine does not start in an operating system more.
The installed Windows 7 64 bit goes to a black screen before the windows at Startup logo (even in safe mode). And after a few seconds, the fans will quickly but nothing seems to happen.The next thing I tried was a (12.04) ubuntu live dvd. But it does not either. No error message or anything, just an automatic restart after a few seconds of black screen.
The next thing was memtest86 + v4.20:
It crashes immediately sometimes a black screen and sometimes at this http://i.imgur.com/eJqIyDp.jpg .
I tested my new two sticks together and alone, still the same problem. The old ones that work perfectly and not crash of memtest.In the BIOS is the only thing on the memory and then it sees the correct "Total memory size 8192 MB.
Plug portable-mem from toshiba:- Standard: 4 (2 + 2) GB
- Max Speicherausstattung: 8 GB
- Technology: DDR3 RAM (1,066 MHz)
link to the Toshiba product description: http://www.toshiba.de/discontinued-p...tege-r700-19t/
Cannes-old (work) ram:
2 x Samsung 2 GB 1Rx8 PC3 - 10600S - 09 - 10 - ZZZ M471B5773CHS - CH9new RAM sticks:
2 x G.Skill 4 GB DDR3-1333 (PC3-10600)
link to the shop where I bought it: https://www.alternate.de/G-Skill/SO-...roduct/1154622In my understanding of both new sticks should work well with my laptop, or am I missing something?
concerning
For me, the question is clear enough; the laptop does not start because of new RAM modules.
The new RAM modules are not totally compatible, or the RAM modules are defective.
I recommend you test an other modules; for example modules manufactured by Kingston.
-
Portege R700 - fonts in the main window of AuthenTec Truesuite changed
Hello
I installed on my Toshiba Portege R700 AuthenTec Truesuite version 3.0.1.149. After two days of good performance the police in the main window changed, becoming impossible to read. No doubt, I have change some settings in Windows and, also, this font has changed because of course I change anything in your application. Bearing in mind that my OS is Windows XP Professional SP3, pelse be so kind and help me with a solution to return to standard fonts.
I uninstalled applications records, cleaned, reinstalled software package downloaded from the Toshiba site, requestThank you
Best regards
Cristian
Can send you a link where you can see the screenshot?
I mean for a better understanding. -
Portege R700 - fonts in the main window changed
Hello
I installed on my Toshiba Portege R700 AuthenTec Truesuite version 3.0.1.149. After two days of good performance the police in the main window changed, becoming impossible to read. No doubt, I have change some settings in Windows and, also, this font has changed because of course I change anything in your application. Bearing in mind that my OS is Windows XP Professional SP3, pelse be so kind and help me with a solution to return to standard fonts.
Thank you
Best regards
Cristian
Hello
I assume you mean on the fonts in Internet Explorer window.
Right?Please check the display option in the menu bar. Zoom must be set to 100% and Textsize must be set to medium.
In addition, you can check the settings in the control panel-> display-> appearance tab
There is option called the size of the font. In my case it s set to normal.Give it a try.
-
Can Portege R700 - I change the DVD player with HARD drive?
Is it possible somehow to put a HDD drive where the DVD player is in Portege R700-1CZ?
Any help appreciated.As far as I know something like this is not possible and offers Toshiba HDD caddy for that doesn't.
-
Portege R700-S1321 - cannot set the resolution of 1366 x 768
I have exactly the same problem, as shown in:
http://forums.computers.Toshiba-Europe.com/forums/thread.jspa?threadID=64809
The resolution of the laptop to random times and intervals seems to support a maximum of 1280 x 700, which translates into a 2 inch black bar on the right side and the button start Windows 7 off the screen.
Currently its stuck in the resolution of the screen and no matter what I may not make it back to normal 1366 x 768.
External monitors very well with the laptop work.
Its 2.20 BIOS execution that seems to me later.
It seems that the intel driver must get some information that is incorrect.
Research on different forums and using moninfo, I see that the internal display does not support EDID and settings appear to be set by the registry somehow.I also tried to make an EDID override by creating an inf file that is customized with Moninfo, but appears not to the question of the effect.
I also tried to restore from the recovery many times discs without success.
During the installation of windows occurs, the screen is fine.
When Toshiba additional programs are added to the screen returns to the 1280 x 700.
I suspect that what happens when the graphics driver intel is installed.If I boot the laptop in safe mode resolution is 1366 x 768, which seems to suggest that it is the driver who has a problem.
Anyone else had this issue and understand how to fix it? I see also that intel do not support EDID override.
Any idea is appreciated. Thank you.
> If I boot the laptop in safe mode resolution is 1366 x 768, which seems to suggest that it is the driver who has a problem.
I think you are on the right track, and I think that his untimely pilot.
That's why I recommend you to uninstall the Intel graphics driver in Device Manager.PORTEGE R700-S1321 was equipped with the IntelĀ® Core i5 - 520 M processor and this processor supports the IntelĀ® HD graphics card
The latest Intel HD driver can be downloaded directly from the page of Intel:
[Driver for Intel Core with Intel HD Graphics processors | https://downloadcenter.intel.com/SearchResult.aspx?lang=eng&ProductFamily=Graphics& ProductLine = graphic + portable + pilots & ProductProduct = Intel % C2% AE + Core E2% 84% A2 + processors + with + Intel % 2 C % AE + HD + Graphics & ProdId = 3231 & LineId 1101 = & FamilyId = 39]I need to download the zip package.
Then you can install the driver through Device Manager by using the Advanced installation procedure. This allows you to link directly to this zip package. Windows system would automatically take the driver. After restarting again you that would have settled the last drivers and you should change your resolution. -
Portege R700 - original recovery image re-failed installation
Hello
I have a Toshiba Portege R700 for years.
As I have already some difficulties, I did a reinstall it a few years since the recovery partition. Directly.But, a few days ago, I had some problems with my portege.
HARD drive seems to be broken because it making the noise and was really, really, really,..., very slow.
Yes, after you perform a backup of the data for hours and hours (remember, it was really, really slow), I run a complete reinstallation of "recovery partition". It seems to be good, but... never finished the process, with the same noise from HDD and slower HARD drive IO.OK, my own diadnostic: change the HARD drive.
This done, and by using the recovery DVD Toshiba just bought (Yes cannot find the DVD of burn of factors), I have the same question.... The recovery process does not end even if im waiting for days...
And I have the same HARD drive noise. With the new!In order to have an MSDN license, I installed a Win7 Pro 32 bit, but not the Toshiba one.
And he is running for days without any problem!
But I have to reinstall all the drivers and software supplied by Toshiba.
Obviouly I prefer to find what exactly is the problem with this Portege and reinstall the version of Toshiba Windows 7 Pro.
So, if someonre read the story until the question is: NO IDEA?
How to do a HW diagnosed? How to identify the exact problem?Thanks for your help.
Joel
It is really strange. You bought brand new HARD drive or you use a old and used as a replacement?
Have you used recovery disks in the past with success? I mean maybe it's the recovery disc a troublemaker. -
Portege R700 - no autorun for CD/DVD and USB keys
In my Portege R700 there is no way to make autorun works (for key USB and CD/DVD as well). CD/DVD and USB keys work perfectely, but not the autorun.
I tried to use both the automatic repair of Microsoft and PowerToys, but the problem that it is still there. I also tried to change the registry, but it seems that the changes are not retained. I suspect that it is something related to some utilities or so.
Can someone help me?Thanks in advance.
GerlandoHey,.
> I suspect that it is something related to some utilities or so.
What utilities you have installed? Theoretically, they could block the autorunNormally if autorun doesn t work on XP, you can enable it in the Windows registry:
Start > run > regeditThe registry editor will open and go to:
HKEY_CURRENT_USER / Software / Microsoft / Windows / CurrentVersion / policies / Explorer
Double-click the NoDriveTypeAutoRun value and set the value of 91.Now he must navigate to:
HKEY_LOCAL_MACHINE / SYSTEM / CurrentControlSet / Services / CdromDouble-click the AutoRun value and set the value to 1.
Now restart your computer and try it again, usually autorun should work again.
Additionally, make sure that the latest Service Pack is installed for XP (SP3). -
Cannot get into the BIOS on my Portege R700
Hello friends,
I have laptop Portege R700-1321.
1 year a go, I was updating my version of BIOS to 2.20 and after that I have cannot get into the BIOS!
try a passer-by but noway :(When you press F2 after you restart the computer nothing add and put it back again.
try to change ro F10 boot order but still just restart :(
I need to change the boot order to install the new OS fresh and of course my BIOS setting.Please help me.
If any body had a same problem or know how to fix it :(First of all you n t need to change the boot order in the BIOS if you want to reinstall the new system.
You can press F12 all turn on/off the unit.
Then a menu should appear where you can change the boot device. -
Portege R700 - some buttons not response
Hello
I bougth Portege R700 and now I'm in trouble.
the button to turn off the touchpad that does not work.
the button on the right top of the keyboard (the Green key), do not pass the pc from normal to eco, but open windows Mobility Center.
When I press th FN key + others like volume, for example, I have no information on the screen.also why ligth for wlan is always also activate when
I disable the WiFi (orange ligth under the touchpad)Thank you
I have reinstall PVAT, but nothing changes.Please could you help me to find all the functions of my laptop.
runs in WIN7 x 64 french.
Thank you.
Post edited by: sapeur3873
There are too many different questions and if you try to fix one, it will take too long and there is no guarantee that you will have success with it.
Best thing you can do is to restore laptop to factory settings and start using it for laptop with out of the box. After doing this in a first time check it and make sure that everything works correctly.
-
Portege R700 - impossible to pass to Windows 10
I have a Portege r700 with original Windows 7 OEM installation.
Windows 7 is updated and program update Windows upgrade me to Windows 10 offer.
The upgrade process begins very well, download & pre-configures all the stuff, and then finally ask me to reboot the system to continue with the upgrade.
After a few seconds, the restart process is launched and load... the current Windows 7 system, saying that there was an error during the upgrade process.
I did some tests; I'm also a fan of Linux, so I tried to boot the system with a LiveCD of my distributions preferred: after loading of the quick menu asking what I want to do (the liveCD boot, installation, diagnose, etc), it restarts... and show me again the quick menu (quick menu is GRUB, kernel functionality has not been loaded right now).
I understand that 'something' (and I guess it's system restore Toshiba) let me start on something other than the original partition, preventing the upgrade of Windows 10.
Any idea?
I was offered the free update on my R700-12U and R930-1DK Toshibas--and did the updates without any problem. However, if I understand it right, the R700 is not on the list of evolutionary units, but it has worked very well on my own, from up-to-date W7.
concerning
/ Anders -
Cannot use 8 GB in Portege R700
Hello
I had 2 x 2 GB PC3 10600 ram in my R700 (i3) running Windows 7 x 64.
I have a few sticks of 4 GB of ram, I wanted to update my laptop 8 GB total.
I put in the memory which consists of:
1 x 4 GB PC3 12800
1 x 4 GB PC3 10600The laptop comes on the screen where it says "Starting Windows" and looks like it freezes before windows animation.
If I try to use 1 x 4 GB (two speeds) and 1 x 2 GB, then Windows starts fine, but there is a problem when I use both the 4 GB sticks.
I tested the ram with Memtest and they pass the tests.
If I put the bars of 4 GB of RAM in a R840 (Windows 8.1 Pro), it starts very well.
If I put the bars of 4 GB of RAM in a R700 (i5 running Windows 8.1 Pro), this also starts very well.If I try to put in the sticks of 2 x 4 GB of ram in the R700 i3 and trying to install Windows 7 or Windows 8.1 then happens to the screen that says "Windows is loading files" and the progress bar ends but then the screen goes all white and the fan runs but nothing else happens.
I have 8 GB of ram in the R700 i3, so I don't know that it supports. The BIOS detects it has 8 GB of ram when I inserted them and the BIOS is updated to the latest version which is 2.20 iirc.
Anyone can shed light on the problem?
Hi Borito
If the specification states that your model of laptop can handle with 8 GB of RAM, that we should not discuss this topic.
By RAM upgrade is important to use 100% compatible and two modules of identical RAM (same specifications).
I tested it on my machine using too much standard and a cheap RAM and my machine was dead. With two modules of identical RAM, everything is OK.Can you please send the name of the exact model of your laptop Portege (R700-xxx) and I'll try to find the exact reference for 4 GB of RAM for this model of laptop.
-
Portege R700 - quick as lightning!
Despite some reports of 'flaky' and similar operation, I decided to tear off my HARD drive and slap a SSD and W7 Pro 64 bit on my portege R700-184
flippin heck its the thing to the top fast!
I used a base of sandforce OCZ Vertex 2 120 GB drive and the Retail Media to install the 64-bit windows. It's with any other firmware or software update for the SSD or Laptop, so right on the box
Before starting from cold to 95 seconds, down to 23 seconds on the SSD used! and he wakes up from his sleep in 4 seconds! VERY impressed!
Similarly the 64-bit operating system has improved my WEI scores the CPU is 6.5 to 6.9, the RAM of 5.4 to 5.9 and obviously the SSD took a hard drive of 5.9 to a burning 7.4 :-)
excellent upgrade in the embryonic stages, I will present long-term stable after that I have all my drivers and running upward and restore my files!
Ben
Post edited by: 1994F7PT
> I decided to rip off my HARD drive and hit a SSD and W7 Pro 64 bit on my Portege R700-184
I have improved ever one of my laptops with an SSD, but according to your post, this should improve the performance of cell phone lot to known this thanks for sharing this info!
-
Portege R700 Wont close or install W7 SP1
Hello
I have a Portege R700 for a few months and then only a brilliant notebookI'm having some trouble that I can't find the answer to. I thought I would post the two they could possibly be interrelated.
First of all, when I am running on battery only my computer usually off. It gets to the Windows stops screen and just hangs. After all of 10 minutes, I have generally give up and manually turn off the machine by holding the power button. This is my desktop computer, it is very rarely used on battery so I have not really worried about it but I want to fix. Also when I use my machine on port replicator, at the office, when I shut down my computer what it comes up with the screen that a program is not responding and force close. I find it strange because there is no program running in time (of course there is probably a background running program).
The second problem I encounter is that I am trying to install Windows 7 SP1 via the full download of the Microsoft Web site, but when it comes to install the update I get the following error:
ERROR_SXS_ASSEMBLY_MISSING (0 x 80073701)
I did a search on the web for answers, but all of the patches described did not work. My only other option might be a complete reinstallation of Windows that I hated doing.
If anyone has solutions that would be great.
Thank you.
Hello
Why you are not allowing Windows Update to install updates to the machine? This method usually solves 90% update install problems as the update manager download only the sections of service pack required for your installation/version/version of windows 7?
How does closing? by pressing the power button or by using the windows menu Start button stop?
When on the port replicator the error message said exactly? What is the name of the program?
-
Portege R700 - external DVD Player compatibility
I have a problem with a Samsung external super-multi drive 2 year with my new Portege R700-1F3, which does not come with a DVD player. The USB powered Samsung dvd player works fine with all other computers that I have access to:
* MacBook with OS X 10.5
* Samsung NP - X 360 laptop computer with Windows XP 32-bit
* Dell Inspiron Zino HD computer desktop with Windows 7 64 bitThe symptoms are:
* When the dvd player is plugged in Portege, the green light on the dvd player goes on and out.
* This happens in the BIOS, and once that Windows 7 32-bit support.
* In Control Panel Windows 7 devices & printers, the DVD alternately appear & disappear constantly.
* When it appears, it shows up as "USB storage device" with a yellow! warning icon.I tried all 3 USB ports. The power cable is plugged Portege. I tried the turn of the digital signature when starting upwards. The external dvd came free with my old laptop from Samsung and is the model AA-ES0N09B.
Any suggestion that this is a hardware or software problem and how to fix it?
Thank you
LolaHi Lola,.
Have you tried other USB devices on your Portege R700 if they work properly?
If peripheral USB do some problems I would try to remove the USB ports from the Device Manager (right click > uninstall) and restart your computer. After that, the USB ports will be recognized again and you are able to use them.
If it doesn t help I would try a driver update from the official website of Toshiba chipset. http://EU.computers.Toshiba-Europe.com/
Maybe you are looking for
-
ICloud on one phone deleting erase others the same account delete on others
My mother asks if delete iCloud on a delete on others? I want to know.
-
xw8400: graphics windows 10
I recently set up my new processor using the advice of the old geekster and sdh. I have the os on an intel ssd 320 and 3 disks 300 GB sas for storage. Problem is now Quadro fx 3400 video card works but no driver is present, run the option to display
-
Touchpad behaves erratically when the AC is connected to the Satellite L300
Hello I have a laptop Satellite L300D and after an accident falling on the floor, the cursor of the mouse erratically when the laptop has is plugged into the power outlet. If the laptop end.I would be extremely grateful if you could help to solve thi
-
I have problems with my system.
Whenever I tried to open my system, it will say "Windows cannot find windir%\\system32\\systempropertiesadvanced.exe %' make sure you typed the name correctly and try again,"same thing happened when I tried to run any program as administrator and a m
-
Fax and scan using Windows vista
I can't create a fax account, I get a message after I chose to use a fax modem say was an error try again later or contact your administrator. I use Windows Vista Ultimate EditionMotorola SM56 speakerphone modem (does no failure in the Device Manager