context of the sequence

Hi all

Is there a difference in execution time to pass a value using in Labview (v/s) son calling the sequence context and then call the property set?

kindly let me know.

Hello Padugur,

Search in this thread:

Context and sequence settings

Wire are normally and parameters are faster then by setting a value via a property node.

Tags: NI Software

Similar Questions

  • Do I have to close the 'context of the sequence' in Labview?

    Hello

    I pass the Teststand SequenceContext for Labview to access step.

    Now my question is: do I have to close the past SequenceContext-reference mentioning 'close' in Labview?

    Or this reference is automatically closed?

    Is it possible that the closure is NOT the reference takes memory?

    Thx for the help

    Hi OnlyOne,

    Any reference TestStand that you pass to your code as an input module will be automatically closed/released/managed by TestStand so you don't have to worry about the reference to the context of the sequence of your VI of closing.

  • Get the context of the sequence of other connectors (active) in the batch processing model

    TestStand 2014 - model updated the batch

    LV2014

    System controls an environmental Chamber and doing trials on 4 of the UUT.  Room Enviromental is the shared resource and is controlled by the synchronization of thread only lot.  A UI TempMonitor of Labview (also synchronized lot) pops up, until you reach the target temperature and soaking time is over (so you can monitor returns to the House and see the amount of time remaining.  It all works fine in the system of warnings in.

    Now, there is a new requirement to take permanently UUT s to ensure that they remain in the State during the temperature ramp and soak period.  The simple answer is to integrate this track in TempMonitor UI because it has access to all relevant data pads.  However, I would need to do an end run around traditional return since it is only run by one of the four (up to).

    My thought is that if I had access to all active sockets sequence contexts, I could ask them their index and State, follow up and write the results to réécrirait a local variable before leaving the user interface.  The only thing that prevents me from going forward, it's that I don't know how to get the engine to give me the sequence for each Active socket contexts (0-3 which may be disabled via the setting ContinueTesting false instead of disable flag, it is a product of use pass 3rd batch of party model, so the executions of people with disabilities are marked as completed when running rather than wait).

    Or, Alternatively, how inspect all executions and to determine what decision he belongs (if necessary, because my data acquisition engine runs in its own, hidden, execution).

    Thanks for any help,

    Mike Webster

    Actually, I was looking for a way to get the SequenceContext for the other active sockets that launched the TempMonitor GUI, so I could put results in the other sockets directly.

    However, I gave it, and instead I am launch the GUI TempMonitor in its own thread and have each socket to monitor the status of USE on its own with a separate VI until what the ramp / soak temperature is how the GUI will highlight Boolean StationGlobal that triggers the individual to continue.  More complicated, but also in the spirit of TestStand to things, I think.

    MKE

  • Context of the sequence becomes invalid when the runtime is longer

    I have a sequence that loop for about 70 k iterations (which is pretty huge). The sequence called a subsequence where the inhabitants of the sequence called are modified. Question is, around 65 th iteration k, I get an error message indicating that the reference of the local past is invalid. The number of iterations when the error occurs varies from one computer to another, but always in the 65 k range. When I try to run another sequence (a single) consecutively, I get an "out of memory" error I guess the reason why the local reference is not valid because TS execution stops when the memory TS gets the complete decision-making context of sequence and therefore the reference local section not valid.

    I would like to know how to reduce the consumption of memory of TS because I disabled the result of record for all the result of sequences (Configure-> Options of Station-> run), disabled registration for each iteration of the loop, optimize no reentrant calls thi sequence is also enabled. I even tested with just this sequence of sequence and I wonder if there is a maximum number of threads of execution when a loop.

    PC configuration

    RAM-12 GB

    LabVIEW and Teststand 2010 SP1

    I will not be able to view the code, but the closure is a custom step which has sequence call as its adapter.

    Hello

    I tried this:

    Main sequence called a sub sequence, which includes 3 stages of instruction.

    I have a loop sequence sup to 75 k with result logging enabled.

    TS runs successfully - no problems.

    Try to jump steps (one at a time) in the sequence of sub to know at what stage leads to this question.

    Also try to reproduce using a simple sequence (that you can post online).

    Ravi

  • How to understand the context of the sequence of time real labview

    Does anyone know how Labview RT to understand the context of teststand sequence? My sequence context is defined as "TS. SequenceContext' like the screenshot in attachment.

    If we point a VI for that sequence context then who use VI of teststand? and must add this VI to the Explorer of Projectr of Labview RT system to build the project?

    I use 2009 Labview and teststand 4.2.1.

    Thank you very much

    LabVIEW RT does not support the ActiveX required for TestStand.

  • store a context of teststand sequence

    Hi, I want to save a teststand sequence context in variable teststand using labview code, is it possible? If Yes, then I know how? I tried to use the property set api value in labview but I don't no what type of data structure to use.

    Hello

    I don't understand why you're ready to save the context of the sequence in a variable since it is already...

    In any case, you can use this method:

  • Executes the sequence by programming

    Hello

    I see a problem by running the file in sequence by programming. I mentioned the example VI (C:\Users\Public\Documents\National Instruments\TestStand 2014 (32 bit) \Examples\TestStand API\Executing API\LabVIEW using sequences) comes with TS2014 which crosses the sequence context of sequence by invoking TSEngine so the entries to the VI are sequence context, movie file, the process template.

    To facilitate my task, I modified the code attached to make autonomous running the sequence through TSEngine directly to entries in VI are movie file and the model of process.

    It works fine when I run like VI, but does not work during the conversion into exe.

    Please let me know if I'm something wrong or missed something

    Thanks in advance

    -Vivek

    You should look into the creation of a user interface you want to execute your order by programming. The user interface can be hidden if it works the same as your code is planned. Start with the simple graphic interface "C:\Program Files (x 86) \National 2014\UserInterfaces\Simple\LabVIEW" so see how this can be done.

    More precisely. a person does not open a reference to the engine. What is much more common is a person placing the Application Manager control, call the Start method. and then get the reference to the engine here. Be sure to stop the application subsequently and additional references nearby. I guess because you're in a development environment is the reason that your code works like a VI.

  • Discover code source timecode in the source file for the sequence clip

    I googled and searched the forums and have not been able to find an answer to the following question.

    We created a sequence from a source element and then copied a subclip of this sequence in a different sequence (final). The audio looks like a straight line, and you can't send it to Soundbooth.

    I want to easily find the original project item and its timecode to use as source and then copy at in and out source in the timeline of the new sequence. I can get to the point of entry/exit in the first source sequence to help find the sub clip, but not the original movie file. If we rub all the sequences to find each replacement.

    In addition, all new to Premiere Pro and CS5. I find a good workflow and you tutorial would be recognizing links that describe best practices. I have a lot of the tv.adobe and Lynda videos watched and have a few questions.

    My workflow is:

    I went through the original and selected source clip set marker unnumbered for each point of interest, copy the entire source to a new sequence and then cut them in the timeline panel.

    The forum research seems to indicate that the best workflow must set the entry/exit points in the source window, and then drag each item to the timeline.

    It helps me to edit if I see the audio to address my points of entry/exit, that's why I change the full source of the sequence.

    You make one sequence for each subclip so you can appoint them to know their background? I tried to use speech analysis, but it was unusable in a group setting, although, as a general rule, only one person speaks at a time. I applied a filter of noise before analysis.

    Please let me know if I use the forum properly, as this is my first post.

    Thank you

    Rob

    Assuming that the shortcuts have not changed for CS5, put your CTI at the beginning of the clip in the second sequence.  Shift + T you will get the same point in the original sequence.  M then you will get the same context of the original item in the Source monitor...

  • no difference in performance on the sequence of release compared to insert third

    Hello
    I am perhaps concerned about how to proceed,

    but y at - it overhead by using a trigger to store the unique value for a column of a sequence.
    the other option is to use the seq.netval in the insert or merge statement.

    It's a few million records per day.
    Since I have an Oracle RAC cluster on 9i, I guess I must have noordered for reasonable performance.

    To quote it's a batch of loading the several tables with unique value on several tables using insert and merge.

    Thank you
    Goo

    Yes, there is a difference. With the help of a trigger will be significantly slower that put the sequence.nextval in your INSERT statement (assuming you have no other reason to have a trigger) because you'll avoid SQL 1 million to changes in context of PL/SQL. It would probably be a substantial fraction of the cost of him actually insert the data. Of course, if your insert statement performance is dominated by the cost of select the million lines, the impact of the trigger would be proportionately less.

    As an illustration, a quick test on my machine indicates a difference factor 7. I can insert 1 million rows in 6.63 seconds

    SQL> create table foo( col1 number );
    
    Table created.
    
    SQL> create sequence foo_seq cache 10000;
    
    Sequence created.
    
    SQL> set timing on;
    SQL> insert into foo
      2  select foo_seq.nextval
      3    from dual
      4   connect by level <= 1000000;
    
    1000000 rows created.
    
    Elapsed: 00:00:06.63
    

    But if I add a trigger, it takes 47,63 seconds

    SQL> create trigger foo_trg
      2    before insert on foo
      3    for each row
      4  begin
      5    :new.col1 := foo_seq.nextval;
      6  end;
      7  /
    
    Trigger created.
    
    Elapsed: 00:00:00.70
    SQL> truncate table foo;
    
    Table truncated.
    
    Elapsed: 00:00:01.35
    SQL> insert into foo
      2    select 1
      3      from dual
      4    connect by level <= 1000000;
    
    1000000 rows created.
    
    Elapsed: 00:00:47.63
    

    47,63 / 6.63 is slightly less than 7.2

    Justin

    Published by: Justin Cave on October 6, 2009 18:21

  • How can I change the sequence of displayed in Thunderbird mail accounts?

    I need to set up a laptop computer to take on the go. How can I change the sequence (list) of e-mail accounts in the vertical pane to match my office?

    Install this add-on.
    https://addons.Mozilla.org/en-us/Thunderbird/addon/manually-sort-folders/

  • They showed me a way to do a massive bowl of spam, but I don't remember the keys and the sequence to do.

    I recently had installed Thunderbird and more 10,000 e-mails were transferred. They showed me a way that if I press Ctrl and another sequence of keys, I could scroll through many emails and send them to 'trash' collectively, instead of having to delete each message individually. I don't remember the keys and the sequence to do.

    CTRL + a (for 'all') will select all of the visible items.

    http://Xenos-email-notes.simplesite.com/417754237

  • How to change the sequence of films in iMovie Theater

    By exporting iMovie projects in iMovie Theater, the sequence of films is determined by the time of download. How to change the sequence of films in iMovie Theater list?

    HI, breeaz,

    I have not found a way to change the sequence of films shown in the movie screen.

    If you access your movies in the Finder folder, then Ctrl-click on the folder of the theatre, you will find your movies to the poster

    in the alphabetical order in archival records.   I was not able to manually rearrange it.   They can be rearranged in some categories, through the view menu item at the top of the screen and the changes applied to the entire window, but it was not carrying at the display of iMovie.  In General, I'd like to make changes to the structure of iMovie in the finder.  It can cause serious problems.

    Best,

    Rich

  • This point cannot be shared while it's still multimedia reference on the camera.  This message prevents the sharing of file in the sequence

    This message keeps me from sharing file in the sequence.  I'm done with the movie and want to print on DVD

    Your camera with multimedia files that it is connected to your Mac?

  • How can I change the sequence exported to iMovie?

    When I finished making the video and it has exported, some errors found only. How can I change the sequence exported in the application iMovie editing new, mainly texts?

    Just open the project that you exported from iMovie, make the changes necessary, then export again.  (Sod / Murphy's law always ensures that errors found only after export)

    Geoff.

  • How can I sequence photos in an album of Pad?  Pictures are sequenced by file name (for example, 10 C, 20 C, CN) within their folder (album) in Photoshop Elements on my PC to 10 Windows, but the sequence is disrupted on the iPad via iTunes import/synchron

    How can I, sequence, photos, in, one, pavement, album?, the, photos, are, sequenced, file, nam e, (e.g., AC, 10, AC, 20,...) (CNN), within, their, folder, (album), in, Photoshop, elements, on, my, Windows, PC 10, but sequencing, is, disturbed, to, import, /, synchronization, to, t it, Pad, via air, how, may, sequencing, PC, be maintained, soon, transfer, to, nth, Pad?  My PC operating system is Windows 10 and my iPad is version 9.2.1.  Photoshop Elements is version 10.

    There is no way to manually sequence on an iOS device.  You can import them to your computer and the sequence by using a photo application that has this feature.

    iOS: import personal pictures and videos of iOS devices to your computer

Maybe you are looking for

  • Pilot went Ethernet

    Today, I started my macbook and ethernet wouldn't connect.  Information system survey showed that there no driver for ethernet hardware. WiFi works fine. So nobody knows where the driver has gone and how to correct the situation.  It worked fine up u

  • Problem to connect a Macbook Air to Time Capsule

    I have a MacBook Air with 10.11.2. The TC I have 695 GB of 998 GB available. I tried several times to Run Time Machine on the TC. First it has green light in the airport and on the hardware tool, then a warning sign appears in the tool of the airport

  • The files are not available on Binatone eReader

    Title: card micro sd for e readers I copied all my books from my laptop on a micro sd card when I put it in my ereader (binatone) it is empty, I tried to put back on the micro sd chip, but he said the files are already on and I want to copy or files

  • USB cable has been disconnected during the update, update failed

    Hello

  • system calls

    How the system call types work in windows 7 call management process execute the call create file DeleteFile the date or time value Drum remove communication