Counter in the time dimension

Hello

I'm generating time such as dimensions

SELECT

separate (TO_NUMBER (to_char (DT, 'YYYY'))) AS YEAR_SK,

quarter, month, date, etc.

0 as DAYCOUNTER

Of

(

Select to_date (January 1, 2010 ',' DD-MM-YYYY "") + rownum dt-1

of the double

connect by level < = to_date (January 1, 2020 ',' DD-MM-YYYY ')-to_date (January 1, 2010 ',' DD-MM-YYYY ') + 1

)

I need to generate sort DAYCOUNTER who is the next value (1,2,3). Y at - it a function that will help me get there?

Hello

user8030080 irta:

SELECT

TO_NUMBER (to_char (DT, 'YYYY')) * 10000 + TO_NUMBER (TO_CHAR (Dt, 'MM')) * 100 + TO_NUMBER (TO_CHAR(Dt,'DD')) AS DATE_SK,

TO_NUMBER (to_char(DT,'YYYYMMDD')) AS DATEID,

TO_NUMBER (to_char (DT, 'YYYY')) * 100 + TO_NUMBER (TO_CHAR(Dt,'MM')) AS MONTH_SK,

TO_NUMBER (to_char (DT, 'YYYY')) * 100 + TO_NUMBER (TO_CHAR(Dt,'WW')) AS WEEK_SK,

TO_NUMBER (to_char (DT, 'YYYY')) * 100 + TO_NUMBER (TO_CHAR (Dt, 'Q')) AS QUARTER_SK,

TO_NUMBER (to_char(DT,'YYYY')) AS YEAR_SK,

LEVEL as DAY_COUNTER - you have not an outter connect would adopt in that's why the error message

daycounter - this is what emerges from the query online

Of

(

Select to_date (January 1, 2010 ',' DD-MM-YYYY "") + rownum-Dt, daycounter LEVEL 1

of the double

connect by level<= to_date('01-01-2020',="" 'dd-mm-yyyy')="" -="" to_date('01-01-2010',="" 'dd-mm-yyyy')="" +="">

)

gives me:

01788 00000 - 'CONNECT BY clause in this query block'

* Cause:

* Action:

Error on line: column 12: 6

Kind regards

Steve

Tags: Database

Similar Questions

  • Hour/Min column in the Time Dimension

    Please can someone help me with the script to fill in the time Dimension Table that contains a column of hours/min. Here's my Time_D structure:

    Year
    Quarter
    Month
    Name of the month
    Week
    Day
    Hour
    Min

    Also is it a good practice to have the hour/Min column in the time Dimension?


    Thanks in advance.
    Concerning
    B

    B,
    Sorry if I confused things a bit...
    I wanted to say in the MDB layer, you can model a dimension table (time) with the path complete drill (year-> quarter-> month-> day-> hour-> Min)
    This a logical table would have two sources of logical table to map required fields of your two tables of phyiscal (Date_Dim and Time_Dim)
    You must define the levels of content accordingly for each logical table source, so the user in responses can perfectly break of the year all the way up to Min, their sound a single dimension, actually its two tables and the BI server switches according to the levels of content in the LTS.

    Sorted?
    Let us know if you get the probs.
    Alastair

  • Add the quarter to the time dimension

    Hello

    We have created a time dimension using the owb wizzard, but did not include the quarter level. Is it possible to add it to the dimension later without deleting a re-creation of the entire dimension?
    A new time dimension would probably be corrupt all the cubes (data and metadata), so I would avoid that.
    Any ideas?

    See you soon,.

    Knut

    Hi Knut

    Yep, should be possible.

    Change the dimension and select the quarter level in the levels Panel, and then click quarter in hierarchies pane to add it to the hierarchy. You can then delete the link and autobind on details for the physical links to the underlying table. On the hierarchies pane, there is a button "Create map" that will regenerate the mapping to load the time dimension.

    See you soon
    David

  • How to create the time dimension?

    Hi friends...
    I'm working on OBIEE since the last 2 months.
    I created a few reports; I don't have the time dimensions in the layer of MDB.

    Now, I need to give a few zoom feature in my reports. Almost all of the reports have the time factor.
    As year, month, and day. can I still create the time dimension based on the exercise.
    (1) what is - that I think give the zoom feature in the reports.
    (2) can we have multiple time dimensions in the MDB layer?


    Thank you very much in advance.

    Toony,

    You can create a time dimension based on the fiscal year, and you can have many dimensions of time within a business model. There is a lot of documentation, of messages and articles about dimensions. If you haven't already done so, check out page 126 of the Server Management Guide and read this article. That should at least help you get started on building your time dimension.

  • Best practices for the Time Dimension

    I'm a new contour design. I need to set up a time for daily dimension, perpetually. In the past I would set up a member years i.e. 2010, 2011, 2012... and a second dimension with the days i.e. Jan 01, 02 Jan.

    Is there a better way than that? I would like if possible do so in only one dimension.

    Have you looked at the Date-Time dimension? It's ASO-only, but has a ton of features:
    http://download.Oracle.com/docs/CD/E12825_01/EPM.111/eashelp/frameset.htm?sel_cal_hier.htm

    He put everything in a single dimension, btw. I've seen similar dimensions in cubes BSO stored in sparse form. Shudder.

    Kind regards

    Cameron Lackpour

  • Modifying the time dimension - the shift cuts

    Hello

    By default the period dimension is composed of 19 members stored (12 months, 4 quarters, YearTotal BegBalance and exercise). Is it possible to remove the quarters so the size of the block on my application will become smaller and have only the YearTotal > hierarchy of the month?

    Thank you

    Published by: Icebergue on 4 / he y a/2011 06:33

    Published by: Icebergue on 4 / he y a/2011 06:33

    Minimum block size if the period is dense and a difference very little time to retrieve time for these members, because they will be calculated on the fly.
    Normally most of the Parents members of dense accounts and Dimension of the period is marked as dynamic Calc.

    @John: Me late again ;)

    See you soon...!

    Published by: Renu on August 4, 2011 20:47

  • 1 h period and the time dimension

    Hi all

    1. I'm new to OWB and I was wondering is it possible to force the default time dimension (done using Wizard) to have some 'small' level then a day (say, 1 h)?
    If this is not the case, have you tried to manually update the dimension and mapping?
    Or it is better to leave default dimension and start with my own time dim?

    2. What is the difference between the dimension created as the dimension "time" and with a similar but defined content as typicall dim? (issues / analysis performance)?

    Thanks in advance.
    See you soon,.
    B

    Hello

    OWB can create dimensions date to the level of the day.
    You can use this dimension as a source of a map of your own to create a time dimension to the level of the time (enclose it with values of 1-24).

    Have you considered using a date on the day level dimension and a second dimesion of time containing only 1-24 hours?

    With the help of the wizard makes living easier, but there is no advantage in terms of performance in relation to a normal size. Be sure to add all the clues you need.

    Kind regards
    Carsten.

  • Problem in making a chart with the time Dimension

    Hello experts! I have a problem with a specific chart.

    I have a quick TIME in my dashboard page: format: 09/07/2010

    Now I have to make a graph in LINE with two lines (actual, previous) and X axis is a week that belongs to this day in my message of General solicitation.

    My problem is that I see in my dashboard page two weeks: week 2009 containing a line (last year) and week 2010 which has another line (actual year).

    I would like to see a week with two lines together

    I have two measures in my report (actual and previous measure-> logical formula with AGO of my oracle administration)


    Any solution?

    Thank you!!

    PD: Obiee 11.1.1.5

    N ° but a 1 looks cool... I am sure that your customer will like this :)

    You can close this now... Buddy nice discussion. Try to connect on LinkedIn.

  • display the time dimension members

    Hello

    We have implemented beginning period Jan and end of period of Mar for real member of the scenario.

    in the form of planning, we want to show that these three periods but we see all periods / other periods are read-only.

    Thanks for help

    How about using essbase substitution variables, for example actPeriod1 defined as Jan, actPeriod2, defined as the Feb, actPeriod3 defined as Mar and do the same thing for months of forecasts.
    Then put these substitution variables, as in the form instead of the month.
    Then when the change of months, you can simply change the substitution variables and you won't have to touch the forms, evolution of the substitution variables can be scripted with maxl and group upward and demand.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Time Dimension type to different values in the attributes - Bug or feature?

    Not sure if this is a bug or a feature.

    But if there is a time dimension hierarchies. You have the option of specifying different values for member attributes in different hierarchies.

    For example.

    A hierarchy has MIN_ID for its members and uses MIN_END_DATE for its end_date

    Hierarchy B has MIN_ID for its members and uses SESS_END_DATE for its end_date

    According to this message and a comment by David Greenfield:

    Gender issue when several mappings for different hierarchies

    "You try to map the same attribute, SORT, on different columns in two hierarchies? In other words, what do you expect the same Member to have different values for the attribute in the two different hierarchies? If so, then this is a problem because a member must have the same value for the attribute independently of the hierarchy. »

    Unlike a dimension of the user, a time dimension seems to allow this and it seems to work as expected. Behavior in this case is the difference between a user and the time dimension?

    Your description of the structure of the dimension is very clear, but I have a question about system requirements. When you say you want to the time running from 17:00 to 16:59, do you mean that the calculation must spand day? for example "5:00 PM: Jan 1, 2012" to "4:59 PM: 2 Jan 2012".» If so, then this you is impossible by making a loop only the dimension of time-seconds. Or do you really mean it must wrap around the same day. for example "5:00 PM: Jan 1, 2012" at "11:59 PM: 1 Jan 2012", then again to "00:00 AM: 1 Jan 2012" to "4:59 PM: 1 Jan 2012"?»»»

    If you want the calculation for the period of days, then I think you need to spend TIME on the DATE dimension level. You can leave some MINUTES in the second dimension, which can be a dimension of standard user. You must then two levels of the DAY (with different members) in the date dimension - each with a different set of the child. You can assign the TIME_SPAN to the TIME level 1.

  • Time Dimension table

    Hello

    I have a requirement where I need to calculate the value of average purchase order based on the month. The problem I have here is that the custom time Dimension table that I have in my RPD has dates only until 2011 and not beyond. I downloaded this table via BI tutorials oracle schema EXAMPLE.

    I've looked everywhere on the internet for a time dimension table, but I'm unable to find it. Can someone please help me find a way to insert the time dimension table?

    Thank you

    Nicole Shepherd

    Hi Anthony,.

    You can change the SQL code to insert new rows into your table.

    Example:

    INSERT INTO your_table (your_field)

    SELECT TO_DATE('31/12/2010','DD/MM/YYYY') + NUMTODSINTERVAL (n, 'day') AS Full_Date

    FROM (SELECT level n FROM dual connect by level)<>

    The foregoing will insert lines starting at 01/01/2011 and until the 01/01/2011 + 4000 days (over 10 years).

    Of course, you must extend the code to calculate all the fields in your time dimension.

    Concerning

    Federico

  • Time dimension

    I have the CSV file as a data source. I've created tables to CSV files and then them modeled in SPR and then created time on that dimension. But the time dimension does not work. Is it because the data source is a CSV file?

    Any help appreciated

    Where is their total content large?

    This one is from SampleApp, as you can see there is a "time Total" and it is reported as "grand total" (a box set).

    So maybe just remove your and build it yet keeping the grand total and rename the level of detail of the "year".

    Add your unique column it and set it as the key level (and also key chronological).

  • error in creating time dimension OLAP in ORDM

    HI Experts

    I am trying to update the data in olap time dimension that is based in ORDM of MV and I get the error message "path of aggregation for the hierarchies of a dimension 'TIME' is incompatible," Please suggest what is at stake / soln.

    Thank you

    Prateek

    Hi David,

    Please check your hierarchies for consistency.  Because it seems that the TIME dimension is selected for the updating of the MV, the hierarchies must be consistent star.

    This means that the hierarchies must be consistent with each other in regard to members and stars according to the subject at a level.

    Compatible with each other.

    "If a dimension member appears in several hierarchies, then his descendants playing to the level of detail are exactly the same in each hierarchy." For example, if Quarter_1 consists of January, February and March at the level of detail in the Calendar hierarchy, Quarter_1 cannot be July, August and September in the Fiscal hierarchy.

    However, the members of a hierarchy can have different parents in other hierarchies. For example, these customer hierarchies are compatible if the 'Total' Member all members at the SHIP_TO level in deliveries and market Segment. »

    -helps AWM on the Details of the implementation of the Panel properties of Dimension tab

    Consistent stars with each other = in addition to being consistent with each other, such as defined above,

    "If a parent has children at the same level in multiple hierarchies, these children must be identical. For example, suppose an a H1 and H2 hierarchies dimension and level L3 appears in both entities. If X parent has children, C1, C2 and C3 at the L3 level in hierarchy H1, X also children a C1, C2 and C3 to the L3 level in hierarchy H2.

    Following customer hierarchies are consistent star only if two hierarchies, REGION has the same members (for example, Americas, Europe, Pacific), rolling among the SHIP_TO members themselves.

    Hierarchy of shipments:

    TOTAL

    REGION

    WAREHOUSE

    SHIP_TO

    Hierarchy of the country:

    TOTAL

    REGION

    SUBREGION

    DEPARTMENT / PROVINCE

    SHIP_TO ".

    -helps AWM on the Details of the implementation of the Panel properties of Dimension tab

    -Ken Chin

  • How to customize the period dimension in Hyperion Planning

    Hi guru

    We use the Hyperion Planning 11.1.2.2


    We have a requirement to customize the time dimension as follows,

    -Period

    -HalfYear1

    -Q1

    -Q2

    -HalfYear2

    -Q3

    -Q4

    How to add the first half in the Dimension of the time... Please help me with this...

    Thank you

    P1-click and click on 'Add summary period' and give it in Q1. Next, click on Q1 and click on 'Add summary period' and give HY1... The same for the 2nd quarter, HY2 etc.

    If you still facing problem, what you see in period Dimension. Expand all and give the member names.

    Thank you

    Amith

  • How to put in the time series dynamics in the planning application

    Dear all,

    I'm having a problem by implementing a series of time Dynamics (A-T-J). I put in place at the level of the generation 4. In our application, the time dimension hierarchy is as follows.

    Yeartotal-> HY1-> Q1-> Jan, Feb, Mar

    Consider the following example

    Jan-> 100
    Feb-> 200
    Mar-> 300

    If I want to recover "A-T-J February" the result should see me the sum of Jan and Feb in this case, it should be 300. What is the syntax of recovery CDA in smartview.
    In our dimension of 'Year' application name is 'year '. How can I rename the name of this dimension in the case of the requirement.

    Thanks in advance.

    Kind regards

    Saami

    You must activate DTS - http://docs.oracle.com/cd/E17236_01/epm.1112/epma_admin/epma_dts_members.html

    See you soon

    John
    http://John-Goodwin.blogspot.com/

Maybe you are looking for

  • Apple-UpNext iOS 10 music list (delete, arrange songs)

    When I play a playlist a few songs I have delete it after a while, it will appear in the list, it's a bug? How can I change songs upnext? can't see any edit button I found when I play a playlist and add a few songs to 'play the next' it will get stuc

  • Motorola Photon / texting on phone

    Hello Y at - it a setting or something I'm missing? I can't text while I'm on a phone call. I was able to do it with all my other phones.

  • I can't get my computer to do a system restore

    I have tryied and tried to get my computer to do a system restore it keeps sayinmg I have no admin privalages what I do

  • HP Pavilion L3S53EA 15: Laptop uses bad GPU

    I have a HP Pavilion L3S53EA 15 with 8 GB of RAM, CPU 2 GHz APU AMD A8-6410 and AMD R7 M260 2 GB GPU and also R5 integrated Graphics GPU. But, in games and other things, my laptop uses only one R5 and completely ignores the M260 R7. GPU - Z in GTA:V

  • EliteBook 8440p memory upgrade problem

    I have a 8440p with 2 GB installed, running Windows 7 32 bit (Yes, I know, this config sucks). I want to get all of the 4 GB addressable with Win7/32 myself a 4 GB SODIMM thinking that later, if we ever 64-bit installed, I can go up to a massive 6 GB