Hi John,.

I would like to extract the contour of my application of planning with ODI.

When I made the extraction of the essbase, most of the properties of members is differing wrt the properties of planning.

Is it possible to extract the outline directly from planning.

As I have said that there is no use until 11.1.2.1, anyway use ODI and transform the output of an extraction of essbase outline and transform the property by its exact name.

See you soon

John
http://John-Goodwin.blogspot.com/

Tags: Business Intelligence

Similar Questions

  • Unable to load text data in planning with ODI

    Hi all

    I am able to load digital data in the planning with odi but trying to load its rejection of all lines of text data.

    I am trying to load just two records and I get this message

    org.apache.bsf.BSFException: exception of Jython:
    Traceback (innermost last): "< string >" file, line 2, in there? Planning, writer load summary: number of rows processed successfully: 0 number of lines rejected: 2

    I went through blog "ODI-get the textual data in the planning" of john and he has helped me get to this point, but I get this error at the end.

    Someone help me please and please let me know if need more information in this regard.


    Concerns

    Achyout

    If you load data, you don't need to use the operator column, it is used with loading of metadata.
    If you go through my blog shows exactly how to do and the columns that are required.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • How can I esxport / import and delete a form of planning with ODI?

    Hello!

    I am trying to export and import a part of a form of planning with ODI. I am using the OSCommand tool and I lunch the cmd 'FormDefUtil.cmd' file and I pass all the parameters trought the OS command but is foesn can't work. Why?

    ODI work in another server where the schedule is installed, but when I try to have lunch at the FormDefUtil with the OsCommand I wrote "\\PlanningServer\C$\Hyperion\Planning\bin" but it still does not work. I ping on the server and everything works, so I don't know why ODI cannot lunch it.

    Do you know a method to do? And also, does anyone know how to remove a form of planning with ODI?

    Thanks in advance.

    Good bye

    Hello

    You can install an agent on the planning server by running the standard ODI installation package, you can install custom on it then select only to install the components of the AGENT.

    Once you have created an agent on the other server, you can point to the agent of in the topology Manager.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Cannot load the metadata in Hyperion Planning with ODI

    Hello

    I'm trying to load a metadata in Hyperion Planning (11.1.2.3.500) using ODI (11.1.1.7), but does not work, I received an error message, all the records has been rejecteds.

    This is the error message:

    Could not load the dimension member, error message is: RemoteException occurred in the thread of the server; nested exception is:

    java.rmi.UnmarshalException: not recognized hash method: method not supported by the remote object

    Can anyone help?

    This is metalink

    Planning 11.1.2.3.500 with PSE 18709758 and ODI 11 G, unable to load: "Unrecognized hash method" (Doc ID 1678759.1)

    Check if you have any problem, we can fix the same.

    Thank you

    ~ KKT ~.

  • Problem of inversion of planning with ODI

    Hello

    I use ODI 10.1.3.5 with planning 11.1.2.2 in 64-bit platform.


    I'm back off to a planning application in the designer, but it is throwing error:

    org.apache.bsf.BSFException: exception of Jython:
    Traceback (innermost last):

    "< String >" file, line 32, inside?

    com.hyperion.odi.planning.ODIPlanningException: could not connect to the instance of planning on the host [hostname], [11333] port, check if connect you are correct.

    The connection information is correct.
    The register RMI Hyperion service is started.

    Can you help me?

    Thank you
    Stefania

    I don't know if 10.1.3.5 is certified with 11.1.2.2, I thought it would probably be at least + 10.1.3.6 and it is usually best to run patches later.

    Common problems of connection with the RMI are due to problems of firewall port, it is also useful to check that the RMI certainly is listening on that port, because commissioning does not always guarantee that it is fully up and running.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Failed to load dimensions to planning with ODI

    Hello experts!


    I am trying to load dimensions in planning.

    EPMA is also running before. I heard that we can not load dimensions in planning if EPMA running so I stopped the
    Services of EPMA.

    I have reverse engineering with planning and able to retrieve the dimensions.
    I traced my source file to the dimensions of planning.

    now when I try to load the account dimension members.

    I get the following error.
    When I opened the operator I am able to see it!

    get a warning in the first step itself. !!

    1 loading SS_0-Drop table work

    (warning)...
    org.apache.bsf.BSFException: exception of Jython:
    Traceback (innermost last):

    "< String >" file, line 2, in there?

    Planning, writer load summary:

    Number of rows processed successfully: 0

    Number of lines rejected: 258



    at org.apache.bsf.engines.jython.JythonEngine.exec(JythonEngine.java:146)

    at com.sunopsis.dwg.codeinterpretor.k.a (k.java)

    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.scripting (SnpSessTaskSql.java)

    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.execScriptingOrders (SnpSessTaskSql.java)

    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.execScriptingOrders (SnpSessTaskSql.java)

    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.treatTaskTrt (SnpSessTaskSql.java)

    at com.sunopsis.dwg.dbobj.SnpSessTaskSqlI.treatTaskTrt (SnpSessTaskSqlI.java)

    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.treatTask (SnpSessTaskSql.java)

    at com.sunopsis.dwg.dbobj.SnpSessStep.treatSessStep (SnpSessStep.java)

    at com.sunopsis.dwg.dbobj.SnpSession.treatSession (SnpSession.java)

    at com.sunopsis.dwg.cmd.DwgCommandSession.treatCommand (DwgCommandSession.java)

    at com.sunopsis.dwg.cmd.DwgCommandBase.execute (DwgCommandBase.java)

    at com.sunopsis.dwg.cmd.e.i (e.java)

    at com.sunopsis.dwg.cmd.h.y (h.java)

    at com.sunopsis.dwg.cmd.e.run (e.java)

    at java.lang.Thread.run (unknown Source)

    ---------------------------------------------------------------------------------------------------------

    and also get a WARNING during the 7th stage! statistics reports!

    (warning)...
    org.apache.bsf.BSFException: exception of Jython:
    Traceback (innermost last):

    "< String >" file, line 2, in there?

    Planning, writer load summary:

    Number of rows processed successfully: 0

    Number of lines rejected: 258



    at org.apache.bsf.engines.jython.JythonEngine.exec(JythonEngine.java:146)

    at com.sunopsis.dwg.codeinterpretor.k.a (k.java)

    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.scripting (SnpSessTaskSql.java)

    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.execScriptingOrders (SnpSessTaskSql.java)

    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.execScriptingOrders (SnpSessTaskSql.java)

    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.treatTaskTrt (SnpSessTaskSql.java)

    at com.sunopsis.dwg.dbobj.SnpSessTaskSqlI.treatTaskTrt (SnpSessTaskSqlI.java)

    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.treatTask (SnpSessTaskSql.java)

    at com.sunopsis.dwg.dbobj.SnpSessStep.treatSessStep (SnpSessStep.java)

    at com.sunopsis.dwg.dbobj.SnpSession.treatSession (SnpSession.java)

    at com.sunopsis.dwg.cmd.DwgCommandSession.treatCommand (DwgCommandSession.java)

    at com.sunopsis.dwg.cmd.DwgCommandBase.execute (DwgCommandBase.java)

    at com.sunopsis.dwg.cmd.e.i (e.java)

    at com.sunopsis.dwg.cmd.h.y (h.java)

    at com.sunopsis.dwg.cmd.e.run (e.java)

    at java.lang.Thread.run (unknown Source)

    -----------------------------------------------------------------------------------------------------


    any suggestions?
    I missed to follow all the steps!
    pls help me.




    Thank you
    Bibiane

    Hello

    First it does not matter if EPMA is running, what you've probably heard is that ODI interacts only with planning applications classic and not EPMA.

    You put the Journal Journal and error in the interface of the IKM options, set up and you should get logs to point to the reason why the files are getting rejected.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Drill planning with ODI

    Hello Experts!

    My Source is Oracle tables(11g) I could bone in ODI 11 g and load data in Hyperion planning application 11.1.2.

    Now, there they must drill by / back of planning for oracle tables?

    Can you please suggest me options to do?

    Thanks in advance!
    Alex keny

    If you load data from FDM then you drill - through FDM.
    If you want to learn more about Automation FDM, take a look at section in the docs batch loader - http://download.oracle.com/docs/cd/E17236_01/epm.1112/fdm_admin.pdf

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Text of loading in planning with ODI

    Hi John,.

    I need to load text values in the planning of an application. I read your blog and came across two terms

    Dimensions of loading and driver dimension

    What is a driver dimension?

    I need to load the jobs of the employees in the wrkforce cube. Position is the Member of the account dimension. Please suggest.

    When I tried to load the data directly into essbase he throwed say error

    java.lang.NumberFormatException: for input string: "rvisor, Treasury operations.

    Please advice how can I do this

    Hello

    You can choose the driver you want dimension and the members you want to load on the other hand, it is the way that is easier for you with the dataset you have.

    Ok?

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Loading flat file in planning in ODI

    Hello

    I'm trying to load data from a flat file into the planning with ODI. When I create the model planning and try to reverse using the knowledge RKM Hyperion Planning module, I get an error in step 2 of the process: start the reverse.

    This is the code in the Description tab in the operator:

    from java.util import HashMap
    import java.lang Boolean
    from com.hyperion.odi.common import ODIConstants
    from com.hyperion.odi.common import ODIModelImporter
    from com.hyperion.odi.connection import HypAppConnectionFactory

    #
    source # planning of the connection properties
    #
    serverName = "epmdemo."
    userName = "demoadmin".
    password = "< @= snpRef.getInfo ("SRC_PASS") @ >.
    request = "PhysPrac."

    srvportParts = serverName.split(':',2)
    srvStr = srvportParts [0]
    portStr = srvportParts [1]

    #
    # Set connection properties and initializes the charger of planning
    #
    srcProps = HashMap()
    srcProps.put (ODIConstants.SERVER, srvStr)
    srcProps.put (ODIConstants.PORT, portStr)
    srcProps.put (ODIConstants.USER, userName)
    srcProps.put (ODIConstants.PASSWORD, password)
    srcProps.put (ODIConstants.APPLICATION_NAME, application)

    iMod = 10001

    connection of planning #get
    hApp = HypAppConnectionFactory.getAppConnection (HypAppConnectionFactory.APP_PLANNING, srcProps);

    #get connection to the repository
    repCon = odiRef.getJDBCConnection ("DEST")

    #
    # START THE REVERSE
    #
    odiModelImporter = ODIModelImporter (imod, hApp, repCon)
    odiModelImporter.importModels)


    and the error message from the explanation tab:

    org.apache.bsf.BSFException: exception of Jython:
    Traceback (innermost last):
    "< String >" file, line 17, in there?
    IndexError: index out of range: 1

    at org.apache.bsf.engines.jython.JythonEngine.exec(JythonEngine.java:146)
    at com.sunopsis.dwg.codeinterpretor.k.a (k.java)
    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.scripting (SnpSessTaskSql.java)
    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.execScriptingOrders (SnpSessTaskSql.java)
    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.execScriptingOrders (SnpSessTaskSql.java)
    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.treatTaskTrt (SnpSessTaskSql.java)
    at com.sunopsis.dwg.dbobj.SnpSessTaskSqlC.treatTaskTrt (SnpSessTaskSqlC.java)
    at com.sunopsis.dwg.dbobj.SnpSessTaskSql.treatTask (SnpSessTaskSql.java)
    at com.sunopsis.dwg.dbobj.SnpSessStep.treatSessStep (SnpSessStep.java)
    at com.sunopsis.dwg.dbobj.SnpSession.treatSession (SnpSession.java)
    at com.sunopsis.dwg.cmd.DwgCommandSession.treatCommand (DwgCommandSession.java)
    at com.sunopsis.dwg.cmd.DwgCommandBase.execute (DwgCommandBase.java)
    at com.sunopsis.dwg.cmd.e.k (e.java)
    at com.sunopsis.dwg.cmd.g.A (g.java)
    at com.sunopsis.dwg.cmd.e.run (e.java)
    at java.lang.Thread.run(Thread.java:595)

    I should mention that I am a beginner with ODI.

    Thank you
    Adina

    Are you sure put you the port number of the rmi in the topology Manager, it does not appear that you have
    When you set the server in the topology for the Planning Manager is servername:11333
    For example:-http://4.bp.blogspot.com/__2AaArK5lW8/SNZicAzzHQI/AAAAAAAAAZw/zIdHfP0tnew/s1600-h/8.png

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Extraction of contour Essbase

    Is there another way to extract a piece of your plan without having to use the essbase OLAPUNDERGROUND Extractor?
    I currently use version 11.1.1.3 on my server and I have the Excel Add-in 9.3 on my desk. I downloaded the version 11.1.1.3 and 11.1.2 extractor and tried to use each of them (installed on my desktop). Both times I got an error message "the file of contour is a newer version that this version can handle.

    Well, if you're on 11.1.2.x, you can just use MaxL to contour to the export in xml format:
    http://download.Oracle.com/docs/CD/E17236_01/EPM.1112/esb_tech_ref/maxl_expotl.html

    Have you read dealt with our JohnG on extraction contour Essbase through ODI:
    http://John-Goodwin.blogspot.com/2008/10/ODI-series-Essbase-outline-Extractor.html

    Despite the complication that ODI implies, I personally prefer ODI - you take a plan Essbase, relationailizing (I just made that Word to the top) and then that the power of SQL apply do everything what you want.

    Kind regards

    Cameron Lackpour

  • BlackBerry Smartphones transfer phone company to the personal plan with AT &amp; T

    I start from my place of work and the allowed me to take my Blackberry "BOLD" (AT & T).  My intention is to open a family plan with AT & T and use my Blackberry "BOLD". The problem I encounter is with the configuration of the installation of Blackberry.  For example, the blocking time is set up for 2 minutes and I have to log in to be able to make a call.  I would change the time of locking and some other preferences, but it is not allowing me access and it has a locked door icon where it would happen in the Setup menu. I thought that once I transferred to a personal account that the phone would "reboot" and reset all the preferences and me be it administrative rights.  I went to an AT & T store to ask them this question and they told me that I'll never be able to change the preferences because that's the way it was installed by my company.  And even if I switch to a personal account, the phone will be always programmed / setting up in this way. It makes no sense to me.  Someone has it on this experience and could point me in the right direction. Thanks in advance for any help or thoughts!

    Hello

    First of all, I'm sorry you've been given above incorrect information. (edit: Sgardne is correct - it posted before I could!)

    The necxt lock icon to the password option is set by your political previpous companies.

    This forces the devcie to have a password so that it cannot be read by people who 'happens' to find the BB.

    If the password does not arrive, the devcie is wiped clean to the factory settings.

    The exception is that this policy is not erased when the phone wiped (agaoni, there is another parameter in the IT strategy!)

    Thus, the ONLY way to remove the restriction must replace the it policy.

    Two ways:

    (1) reactivate the handset with a political BLANK/NULL. Some companies will allow you to do as a matte rof, but you need to ask your BES administrator to do this specifically. Alternatively you can ask them to simlpy reset IT policy if you are always active on the BES.

    (2) the method unofficial here:political Non-official Removal of IT

    Hope that helps!

  • Is posible update a line with ODI 12 c?

    Hello

    I need day a line already imposed with ODI is posible? and how can I do?

    Thnaks,

    Yes it is possible!

    You can use an incremental update KM in an interface, this way it will insert new lines and update the 'old' or

    You can create a procedure with an update statement, or even a merge statement.

    You can do whatever you want with ODI

    I hope this can help you!

  • I have a plan with adobe photoshop and lightroom.  The lightroom works fine, but I can't get the photoshop to run.  I have to go back to an old copy of photoshop to do the work.  All thoughts

    I have a plan with adobe photoshop and lightroom.  The lightroom works fine, but I can't get the photoshop to run.  I have to go back to an old copy of photoshop to do the work.  All thoughts

    Thank you for your help.  I just downloaded the Photoshop CC2015 for the 7th time and it now seems to work fine.  Sorry to have bothered you... It is good to know that there are people like you who will help if necessary.

    Thanks again.

  • Hello, now that I am back to my annual plan with payment each month creative programs cloud, made the payment came the confirmation, however downloading the programs are always identified as a test version, update this information

    Hello, now that I am back to my annual plan with payment each month creative programs cloud, made the payment came the confirmation, however downloading the programs are always identified as a test version, update this information?

    allow 1 day working pst for your payment to process.

    After this time, if there is still a problem, Troubleshooting FAQ: what should I do if I have a subscription, but my application acts as if I had a trial?

  • Can someone help me please? I bought Photoshop elements 13 and were not able to install it on my computer.  I made attempts at veveral to install it and I lose connection every time.  Since I was on a package of data plan with at &amp; t, I buy e data

    Can someone help me please? I bought Photoshop elements 13 and were not able to install it on my computer.  I made attempts at veveral to install it and I lose connection every time.  Since I was on a package of data plan with at & t, I have buy the data each month.  I consume ALL my data.  To be a better way. Can someone help me please? I bought Photoshop elements 13 and were not able to install it on my computer.  I made attempts at veveral to install it and I lose connection every time.  Since I was on a package of data plan with at & t, I have buy the data each month.  I consume ALL my data.  To be a better way.

    I am well aware I could you bought the disc version. I bought the software Officemax in Vicksburg, MS I thought that the disc was included in the box.

Maybe you are looking for