graphical cluster bar

I would like to create a clustered bar chart. In Excel, it's really easy, but I can't find any graphic simular in lab mode.

I'll give you a simple example and an example of how the end result should look like.

Dear Rens

to create a sandbox is a bit more complicated. Need to add a few more points on the x-axis for the second track. For example if we draw a bar on each value of x = 5 (0,5,10,15 etc.), we add a few additional points for the second parcel; 0, 2.5, 5, 7.5, 10, 12.5; This is done with the loop on top.

For the y axis, it must add value "placeholder" (in this case NaN) for each value after the value of Y, so we get 1, NaN, NaN, 2, 3, NaN, NaN, 4. This is done by the second for loop. The second route, to add a NaN value before each value; NaN, 5, NaN, NaN, 6, 7, NaN, etc 8.

Hope this brings you more,

Best regards

Tags: NI Software

Similar Questions

  • Visual support in graphic backgrounds bars

    Hello

    is it possible to get these visual support bars in graphic backgrounds or should I create manually?

    http://tinyurl.com/graph-example

    Thank you!

    No, it is not integrated, but it is quite simple to do using conventional techniques or a combination of the two diagrams...

    Mylenium

  • Horizontal issue in graphic design bar

    Hi all experts,

    I need to establish a chart in a payment tracker I need to display the total of the payments of the year on the office locations and axis x axis y. What I had done very easily. But now I need to break each horizontal bar the company into 12 bars slim sub for monthly payments. I don't get this option in APEX.please suggest me how I can make this graph.

    Kind regards
    Shyam

    Hi Shyam,

    As mentioned in my initial post, I would recommend that you review the chart on Page 5 of the database Application example, because it is a good example of the type of chart you want to create. If you haven't already done so, install the sample Application in your workspace. Sign in to your workspace and access the Application Builder. In the area of tasks, to the right of the Application Builder homepage, click on the link "Demo Applications" and then select install the 'sample database Application". I would recommend that examine you the query of the series in the chart and review the various attributes of graphic applied to this ranking. I also recommend that you browse our OBE on this theme: building, Gantts, and maps with Oracle Application Express 4.0 - http://st-curriculum.oracle.com/obe/db/apex/r40/apexcharts/apexcharts_ll.htm.

    Kind regards
    Hilary

  • How to display the number of dynamics and the progress bar graphic on the title of the region

    Hello

    I have several show/hide parts of a report on a dashboard page. When the user comes to this dashboard page, it see areas collapsed and a status appropriate for each region and click on the region concerned the status listed in the title bar of region-based. Each region show different reports as "Exits", "Tasks", "Communiqué of progress" etc., for example, the user want to see the number of questions and tasks as a number displayed on the side right of the 'from', 'Tasks' area, in the same line as the title of the region. In addition, the user wants to see a progress bar graphic of liitle for the region 'Progress of the liberation' displayed on the right side of the area, in the same line as the title of the report. I have the return function to get these numbers and the graphic progress bar, but do not know how to post them on the right side of the area in the same line as the title of the region. all the ideas are really appreciated.

    Thanks for your time,
    Surya

    Seems interesting. Could create an example on apex.oracle.com experiment?

    Try this approach:

    Create an item hidden in each region to receive these values of synthesis (e.g. P1_DASH_TASK_COUNT) and calculate them the or some functions in regions before calculations.

    These values using the notation of substitution in the region of reference titles:

    Tasks &P1_DASH_TASK_COUNT.
    

    This can then be styled with CSS to get the look required, starting with:

    .dash-summary {
      float: right;
    }
    

    Exactly what is required in the CSS will depend on the theme/template used, why it would be a good idea to see on apex.oracle.com.

  • How do I either set channel name of a graph of cluster or get a 1 d waveform chart to start different time (t0) for each line of the waveform?

    I have a chart single 2D out a conditional of a loop indexing output such that over the rows of the table are not the same size. -Basically, they have different starting and ending points and sizes. -Not so concerned by the endpoints, because as soon as I get correctly starting points, everything shows fall in place.

    The challenge is that when I try to have the variable t0 (start time) for each line, the wave of construction vi form would always keep each line at the same starting point.

    I used the approach bundled with success (the cluster approach ensures that each waveform starts at different times according to the guidelines of my t0 defined for each line) but then I'm not able to get in the channel names I could make using the graphical approach (wave generation) waveform.

    In essence what I get here, I'm losing here.

    Because I don't want one of my mentors, Bob and Altenbach have fed up with me I have attached a vi this time

    Attached VI shows a combination of the two attempts (first with the waveform graph) and then with the graph of cluster

    1. with the first (graphical waveform), I get my channel names as you wish, but the alignment of the wave is not correct.

    2. with the second (graphical cluster), the alignment is good, but I can't do the names of channel in the chart, even if they are present in the cluster.

    I read some reviews that mentions that attributes can be displayed with waveform and data Dynamics (not clsuters) so I guess that's why.

    I saw another report indicating the start time for a waveform 1 d will always remain the same for the rest lines defined for the first line even if changed for the following lines in a loop.

    So I guess my question is: what is the way around questions like that?

    First of all, let me be the first to the congratulate and thank you for finally posting a code!  I'm not 100% certain I understand your question or your code, but I have an idea, perhaps, of what you want to do, so I wrote a little VI who made something simple that could be relevant.

    You mention waveforms of different lengths and beginning at different times.  You also want everyone to have a unique attribute (although I'm not sure what you want to do with the attribute).  So, I did the following:

    1. Generated an array of 100-sample random to represent one second of a waveform.
    2. Created 4 waveforms on this 100-sample basis.  The first waveform (channel 0) is just these 100 points.  The second, 1 channel, is the concatenation of string 0 with the base of 100 samples, or a waveform "double".  Channel 2 is 1 string concatenated with the base, and channel 3 is 2 string concatenated with the base.
    3. In order to trace the four channels that they rest 'on' the other, the waveform has the number of the channel added to it.  Channel 3 is 3 + (4 copies of the basis of 100 points), a waveform 400-point random centered around a shift of 3.
    4. All channels have dt value 0.01 (but I guess I could have varied, as well).
    5. To make the channels start at different times, I started channel N N seconds before channel 0 (by subtracting the index of the loop, I, T0).
    6. For each channel, I created an attribute called "Chan" equal to "Channel N" (where N = 0, 1, 2 or 3, as the case may be).

    This is the plot that results. Scale X is the absolute time value (no Date) using the 24-hour HH: mmS format.  You can see that the plots are 1, 2, 3 and 4 seconds of time, and are offset from each other by a second.  I used the trace attributes to change the name to the respective attribute.

    The code to do this is very simple - I almost don't need to show it, because I think it is completely described by the text above, but this is here:

    Now, it was not that much faster that some of your previous posts, when you refused to your postcode, "guess us" what you wanted (but not to not correctly guess), you tried to "push" us in the right direction (still refuses to post code), and no one seemed very happy?

    Bob Schor

  • D3 stacked creation fails Chart bar

    Hi @all,

    I need to create a stacked bar chart. I use the graphic plugin bar D3, which is used in the sample application to oracle APEX.

    My test table is:

    create the table report)

    line varchar2 (100),

    Series varchar2 (100),

    Account number);

    Enter report values ('A line', "series 1", 12 ");

    Enter report values ('A line', "series 2", 14 ");

    Enter report values ('A line', "series 3", 16 ');

    Enter report values ("B line", "series 1", 18 ");

    Enter report values ("B line", "series 2", 20 ");

    Enter report values ("Line C", "series 3", 22 ");

    Looks like my simple stmt to create the graph:

    Select the line, series, County report.

    Then, the following test works fine:

    Under table attributes, I put the following values:

    column of x values: LINE

    column values are: COUNTY

    view: vertical, side by side

    several series: enabled

    column series: SERIES

    Get a chart as I want!

    BUT if I change the display to "vertical, bunk" attribute, then table a error on line C.

    The yellow should bar be included between 0 and 22 and not between 38 and 60. It seems, that it is a bug, or?

    I use APEX 5.0.1.00.06 and Oracle 11.2.0.1 on Windows 64.

    For my own report, which has features of grouping, I don't get any card with stacked display.

    I have exported the D3 bar graphic plugin of the sample application and import them into my own application.

    concerning

    Maik

    It is a dagger in the dark, but some graphical tools like having a 'zero' file to help plot the data.

    I had problems using Anychart line graphs where data were scarce.

  • what corresponds to the 'bar graph skills' "fun widgets?

    I downloaded 'fun widgets', the exchange of muse (http://muse.adobe.com/Default.aspx?CCID=32494 & FID = 162755 & ExcludeBoolFalse = True & PageID = 1524 0812( )

    I am looking at the widget 'graphic skills bar', but I cannot see how it works and can't find it using the tab "search" on the Exchange page (see above)

    clues please? Thank you

    Hello

    You can use it as a text designed with pictures colored for the description of specific points requiring text.

    Essentially, the widget includes rectangles to filling image with text that can be used to reflect the point of discussion on the page with text.

    Try to open QooQee fun file in Muse and then found in the site, you will get the exact idea.

    Thank you

    Sanjit

  • You cannot change the chart value axis when there are several types of graphics in a single diagram

    Illustrator can do graphics with bars and lines / columns, for example in the docs:

    http://help.adobe.com/en_US/illustrator/cs/using/images/gr_15.png

    http://help.Adobe.com/en_US/Illustrator/CS/using/WS3f28b00cc50711d9fc86fa8133b3ce158e-8000 .html

    However, when I create a chart like this, I seem to lose the ability to manually set the y-axis using 'override calculated values.

    To reproduce this problem:

    1. Create a chart as in the example, with bars and an axis on the left, lines and an axis on the right. Unlike the example, don't fix the numbers as well as the lines align perfectly - have a go until just less than 20, a up to a little less than 250, therefore it do not markers and the number of divisions on each side.
    2. Try to make the markers and numbers of divisions to the height, so in fact, the side that is going up 20 going up to 25 and has the same number of divisions on the other side.

    Everything I have tried does not work:

    • If I select the entire chart and go to the "Chart Type", I can not set the options for the value axis. In earlier versions, it's gray, in CS6 I can access, but clicking on 'OK' does nothing.
    • If I select the entire chart and chose the type of a chart, I can set options for the axis value, but that the selected chart type, and then applies the entire table.
    • If I use the direct Selection tool to select one of the series and open the "Chart Type" options, changing the options of the y-axis has no effect
    • If I use the direct Selection tool to select all series that share an axis and open the "Chart Type" options, changing the options of the y-axis always has no effect
    • If I use the direct Selection tool to select the Group of ticks axis itself, or the axis line and groups of ticks axis themselves, of axis labels, axis and graduations of the axis line, or axis labels, axis line, graduations of the axis and series of related data, etc., by changing the options of the axis also has no effect

    It seems that this feature is broken and it seems that the example in the manual has been carefully chosen to use a rare combination of numbers where it would actually look right.

    I thought about it. Like everything to do with the horrible ancient neglected graphic Illustrator tool, it is ridiculously clumsy and involves the caution around what is shamefully bad programming for a professional expensive product.

    It is timing - to do things in a sequence of rigid counterintuitive that seems not to work then meets at the end:

    1. Create the chart but, for now, keep all the same chart type. If you've already set to have different graphics types, put the same thing for now.
    2. Select the entire chart and in the main window of Chart Types, set the value to "Both sides" axis
    3. In the drop-down menu, there should be a left and right axis (or top and bottom...). Set the parameters of the value axis for these now. It will look like it does for a single axis, because it will not change the other axis - naked with her...
    4. Select the data series you want to use the other axis using group selection. Go to graph Type and the value of the y-axis to the other and set the chart type that you want. All of a sudden all be put in place.
    5. If you need to change the settings for the value axis, select the entire chart, set the whole chart type to a chart, change the appropriate value axis by choosing it from the menu drop down and the re - apply types of graph as above.

    (the bug is - it should not necessary to set the graphic object to only have only one chart of type in order to access the axis options of value for two different y-axis)

  • How to control the height of the bars in a bar chart?

    I do a ton of graphics horizontal bar and must the heights are the same. By clicking on the graphic tool bar, he asked dimensions of the chart, but that the whacks out the height of the bars in a chart to a chart.

    It would also be nice to be able to remove the lower row of numbers as well...

    Thank you!

    I don't get the height thing.

    But to hide the numbers and keep the combo box, you can select with direct or group selection tool and apply fill 'none '.

  • Bar of progress Preloader problems

    If you have a second, go to http://www.madhouseent.net/

    My progress bar gets to the 50% mark, then load it the site. This isn't the end of the world, but someone on a slow connection could give up because it looks like it is slowly that it really is.

    The graphics loading bar is the right size.

    Here is my code for the first image and the second image:

    Well, it seems that the width of your loading bar is about 200 pixels. Not 100, which is what you're multiplying your % over here.

    Try this instead.

    var fullLoaderBarWidth = (what that is the actual width of your charger bar must be 100%).

    (first image)
    bytes_loaded = Math.round (this.getBytesLoaded ());
    bytes_total = Math.round (this.getBytesTotal ());
    getPercent = bytes_loaded/bytes_total;
    this.loadBar._width = getPercent * fulLoaderBarWidth;
    this.loadText = Math.round(getPercent*100) + '% ';
    If (bytes_loaded, bytes_total)) {}
    this.gotoAndPlay (3);
    }

    (the second image)
    this.gotoAndPlay (1);

  • Bar graph problem

    Hello

    I'm new to Flex so I apologize if this answer may be simple...

    I am trying to display a 3D bar graph where:

    the x-axis is the 'country '.
    the y-axis is the 'value '.
    and for each country, there are several bars showing the year value ('year' being the 3rd dimension if you wish).

    In my file function.as (script file), I read in an XML file and collect these data in an ArrayCollection collection:

    [Bindable]
    chartingData3D = new ArrayCollection();

    Sub chartData()
    {
    chartingDataTmp = new ArrayCollection();

    Number of the loop of the country
    {
    currentCountry = getCountryFromXML()
    number of years loop
    {
    Those = getCurrentYearFromXML()
    currentValue = getSingleValue()
    chartingDataTmp.addItem ({code: currentCountry, value: currentValue, year: those})
    }
    }
    chartingData3D = chartingDataTmp;
    }

    In my prototype.mxml file I plot these data (and for arguments sake lets say it is only 2 years of data):

    < mx:ColumnChart dataProvider = "{chartingData3D}" >
    < mx:series >
    < mx:ColumnSeries xField = "code" yField = "value" displayName = "year" / >
    < mx:ColumnSeries xField = "code" yField = "value" displayName = "year" / >
    < / mx:series >
    < / mx:ColumnChart >

    This currently does not work. For each country, I have 2 bars of height equal (I think that he traces two values for each measure).

    I saw a graphical demo bar that draws several bars by country. In the present, the collection of table has a country table and all associated values that the country is listed in this table. I have several paintings by country because I don't know how many years I will be traced.

    I need my table to be dynamic as possible because the XML file will be created dynamically.

    Can someone help me?

    Thanks in advance!

    Janie

    P.S. Is it possible to display the code in these positions with the spaces/tabs perservered?

    Here is an example I did. There are currently three countries with three years by country, but you don't need to change anything for the addition of countries or years. I asumed that the number of years would be constant for all countries. You may need to tweak it a bit to match your XML structure. I hope this helps and best wishes with your new baby.


    http://www.Adobe.com/2006/mxml"layout ="absolute"creationComplete =" init_chart () ">"

    Import mx.charts.series.ColumnSeries;
    Import mx.collections.ArrayCollection;

    [Bindable]
    private var countriesAC:ArrayCollection = new ArrayCollection();

    private var countriesXML:XML =

    2007
    2006
    2005


    2007
    2006
    2005


    2007
    2006
    2005

    ;

    private function init_chart (): void {}
    init_series();
    init_chartAC();
    }

    private function init_chartAC (): void {}
    var newCountry:Object;
    for each {(var pays: XML dans countriesXML.country)}
    newCountry = new Object();
    newCountry.Country = country.@code;
    for each {(var ans: XML dans country.year)}
    newCountry [years [0]] = uint (years.@value);
    }
    countriesAC.addItem (newCountry);
    }
    }

    private function init_series (): void {}
    var newSeries:ColumnSeries;
    var colSeries:Array;
    {for each var years: XML (in {countriesXML.country [0] .year})}
    newSeries = new ColumnSeries;
    newSeries.xField = "country";
    newSeries.yField = [0] years;
    newSeries.displayName = [0] years;
    colSeries = countryChart.series;
    colSeries.push (newSeries);
    countryChart.series = colSeries;
    }
    }

    ]]>







    Vygo

  • Multiple values per column in the stacked bar chart

    I want to use a bar chart stacked in a dashboard of the process, but I am wondering how I can add multiple values per column, because through the available methods, you can only add one value per column. I add some values to hardcode and I get the chart but, for example, I want to add series anocher in the table named 'Closed' and values for this in each column (January, February, etc.)

    Data source for filling
    result as a Fuego.Chart.DefaultXYDataSource
    result = Fuego.Chart.DefaultXYDataSource ("Opened");

    addValue result
    using
    value = 5,
    columnHeader = "January".

    addValue result
    using
    value = 10,
    columnHeader = "February".

    addValue result
    using
    value = 15,
    columnHeader = "March".

    addValue result
    using
    value = 7,
    columnHeader = "April".


    I enjoyed your collaboration if you have worked with graphics stacked bar.

    Hello

    You were very close.

    Try to use the Fuego.Chart.XYZDataSourceImpl object. This will give you the third dimension that your stacked bar chart needs and these attributes in the addValue method:

  • value
  • rowHeader (maybe that's where you set your month name)
  • columnHeader (maybe it's where set it to 'Open' or 'Closed' in your example)

    Dan

  • Clickable bar or data tables charts

    Hello

    I displays a chart and a table of data for an account of some statutes. : Example A 10, B status: situation C, 30: 40.

    I would like to know if there is a way to make these graphics to bars or data table lines clikable, so I can go down in the State to get detailed information. Example, by clicking on the status bar or line in the data table, I would like to redirect to another page where I can show more details such as all users who belong to State A, etc.

    Please suggest.

    Thank you
    Pradeep

    Hello

    For a chart, you need to include a link rather than the null link. For example

    select
    'f?p=&APP_ID.:21:'||:app_session||'::::P21_DB,P21_SCHEMA:'||OEU_ID||','||OET_TBL_OWN_NM||':' link,
    "OEU_ID"|| '-' ||"OET_TBL_OWN_NM"  label,
    COUNT("OEU_ID") value1
     from "IBU_DBRTUT01"
    

    APP_ID.:21 means that he runs on page 21
    P21_DB, P21_SCHEMA are hidden on this page elements that store values (you need to create your own)
    *|| OEU_ID | «, » || OET_TBL_OWN_NM | * the values from the graph

    Paste the part of link in your series and then just edit these pieces. Then you must create items hidden on the page you want and do a query on this reference page the items hidden in a where clause clause

    For an interactive report you click a column (in the attributes report) attributes, and then pass the "links" section by passing values for the items you want.

    Mike

    Published by: Gerd on October 21, 2009 10:08

  • Satellite M70-187 - recovery made a blunder in place now will not boot

    My Satellite M70 - 187 (PSM 70) has XP on its first Linux and Ubuntu partition on the second, GRUB, Linux boot manager, on the MBR.

    I made a blunder seriously - I just wanted to inspect the contents of the recovery disc, so I booted from it. I was expecting to see some sort of dialogue (he says: 'follow the instructions on the screen' on the disk), but instead apparently he immediately away without asking for any intervention by the user. Firstly, secondly it reversed order on a terminal screen lines, a few seconds later a graphic progress bar is appeared, labeled.

    At this point, I panicked - I had not saved correctly everything, and it looked to me he was already written back his picture over my data. So I hard - power the computer off. On reboot, it wouldn't find his BONES, he had nothing except a blinking cursor. In addition, a Ubuntu Live CD says that it could not mount the hard drive. Then, I stopped to do anything to not make things worse.

    I understand that I can probably easily 'recover' my PC using the recovery again disc, but can I still save my data first? I do not think that he had time to replace the partition data, maybe it only replaced the MBR. But what really that this in the first place, without any dialogue, without asking me? Or it was all well, if only I had been patient for a few seconds? Would it help even if I ran the recovery disc again?

    I understand there is also a recovery console from MS that is included on a CD of Windows and has commands like * fixboot * and * fixmbr * who might or might not be useful, but I realize only now I do not have + have + a Windows CD, given that the recovery disk is anything but that.

    I would really appreciate some help. I'm not at total loss - I have a backup, but as for users more semi experienced, it is neither complete nor perceive...

    I wouldn't change the MBR or any other thing at this point.

    Your best solution would be to connect the HARD drive to another PC and run the recovery software to scan the HARD drive and retrieve your documents.

    Google search for "format data recovery", there are many tools you can try.

  • Folding of the composition when you use the key light

    Hello all,.

    My office was seen and the question when we composite green images screen in AE with keylight.  We are all on the new Mac Pro, running Yosemite 10.9.5 or newer version and the latest version of CC.  We generally work with images on a Sony EX 3 in 1080 / 23,97 p, (even if I ran into this problem on several systems with different types of sequences going forward was mentioned in 4 K of red.)  It happened when go out us return of Avid MC as well as when we fill footage in Premiere Pro.

    It is, when we touch something, or if we add a frozen layer bugs or lower third graphics, a bar gray will appear for a frame, in general, in the upper third of the screen extending over the whole width and about 20 pixels high.  Anyone encountered this?  What are the causes and how fix us it so that it doesn't happen.

    I guess there is something in our process that is the cause, since I was able to replicate on Orlando systems in Michigan and all 3 of our systems in my office. Any information would be most useful.

    Transcode the sequences to be matched to an intermediate codec before using Keylight.  Do not use the images straight out of the camera.  And empty your cache frequently.

    I presume you are aware that the first step in a good w4ell key is good lighting and you have it.

Maybe you are looking for