Inventory hardware exchanger project A project B

Dear Dina,

Kindly help me out on the underside of scenario...

I can't transfer the material of the inventory (when it is already issued to the project) A project to another project, B without return material inventory of the project, I need to transfer these documents directly to project A project B, in Oracle 11.5.10

Thanks in advance much n...

Hello

Transfer points between projects can be done in the inventory. When you issue the agenda of inventory at a project, is no longer a follow up of this element.

If you need to transfer the article issued in another project, you should receive it in the inventory and issue it once again to the other project.

When logistics tracking is not important, you have a cost of support to project A, and you want to transfer the cost of project B. To do this, you could go to expenses investigation and find the item with the initial cost. Oracle does not allow you to make adjustments to expenditures of the source of the inventory (at least, that the matter on 11i). If you're on R12, try that. Assuming that it is not allowed to your other option is to enter two offsetting items on shape of pre-approved lot. An AE for the reception of the project B and a negative EI on the initial project has.

Dina

Tags: Oracle Applications

Similar Questions

  • Problem status Microsoft 6to4 has a driver problem detected other Solutions to adapt Hardware Exchange may not detected

    Map Microsoft 6to4 has a driver problem Detected Other Solutions
    Hardware changes may not have been detected

    Hi M. - Tottimeemoo.

    According to the description of the problem, it seems that you are having problems with "Microsoft 6to4 adapt has a driver problems. I will defintiely help you with this question.

    -Did you do changes on the computer before this problem?
     
    Method 1: I suggest you to see link below and check if it helps.
    On a Windows Vista-based computer or on a Windows Server 2008-based computer, the Microsoft ISATAP map appears with a yellow exclamation mark next to it in Device Manager, and you also receive an error message
     
    Method 2: I also suggest you to uninstall and reinstall the network card and check if that helps.
     

    I hope this helps. Try the above steps and get back to us for assistance. We will be happy to help you.

  • Calculation of the costs of the project will allow GST inventory for purchase order

    I have a module for the calculation of project costs and a project is created

    I can add the cost of the inventory to the project?

    Yes you can create movements of stock as long as your tasks are charged.

    FYI, you can start using project - EBS (MOSC) that is the community of MOS and have more users so give you faster responses and more general public.

    Thank you

    Gene

  • Several project files based on a project update


    I have several projects, one for each application in the same domain.

    Some of these books share the information. I would like to have a central project where I have information shared in all (or part) of the projects and update automatically in all other projects. Is this possible?

    It is similar to the idea of having a master of the project –, but instead to have this updated project taking into account all the others, I would like to have all projects updated in view of the change in a plant project.

    Hi garcia3000 and welcome to the HR community.

    There is no way to automatically update the other projects with the modified Exchange project. If you use merged projects, you could merge the central project in the Table of contents of the other project. However this option stores a local copy of the central project in the luggage project folder. If the central project is changed, you will need to add the CHM changed in the baggage files folder.

  • PJM, purchasing, order management, project and project billing costing

    Hi guru

    We receive (purchases - draft code, task enabled code) of the items in the inventory (active PJM, project Referecen, Locators) up to now all works very well... We run collection manager of cost to get the cost of the inventory of the costing of the project interface.

    But the question how to interface of order in the billing project...? Any suggestion...

    Novel we have orders out project also who should interface AR only and we have the project of associated sales orders that should project billing interface and UI AR.

    Your valuable suggestions and advice on above features much appricated.

    Thanks and greetings
    Shameer PIT

    Hello

    There is no standard functionality of interface between order management and billing of projects.
    You can think of implementing different sales order types, a project in terms of orders, and the other to sell off project orders.
    Try to set the order of project type so he interfacera not the operations of shipment to the AR. Only the sales administrative order should be connected to the AR.
    You can also consider to stop any sale order, interface for use AR. the following steps also to non-project sales orders, by treating them as the billing of the joint project.

    Then, you will need to create events of billing to the PJB for each sales order transaction number. Ship confirm transactions are eligible for billing. There are two alternatives for the solution. Develop a customized program that takes all inventory and using the event API transactions load in the PA_EVENTs table. You can also develop the code in an extension of billing to create the automatic billing event. The extension of billing will be called by GDI / GDR when he is executed for a specific project and will search for a transaction for the shipping project in the inventory. It then creates an event billing accordingly.

  • Creative Suite - team licenses / certificates

    Dear Adobe team,

    We are a small company called enterprise creation of Skopje (Macedonia), operating in the areas of digital talent management, web development and digital production. Part of the company's business model is also an non-profit organisation Youth For Love. The Organization was founded in 2008 with mission to break the ethnic, religious, cultural and other barriers any judgment between human beings human.

    As a not-for-profit organization, we have developed a project idea that embodies the digital tools and services.

    The main and only activity of the project is Youth Exchange which will be for a duration of seven days, including workshops, debates and activities covering subjects that contribute to education in digital media of 21 participants (ages 21 to 30). It will be led by the Organization of youth for the love of Macedonia, as well as two more project partners United societies of the Balkans from projects of Thessaloniki, in Greece and one in Kaunas, Lithuania.

    The overall objective of the project is to train and educate young people to build up their knowledge of digital media through an activity of youth exchange program that will cover the digital services, tools and digital work in general.  Our agenda is the Creative Suite as well. Our participants of the youth exchange (project implemented as a response to a public call for proposals of the European Commission) will be thoughts on topics that also include the Adobe Suite.

    Therefore, we would like to request more information on the Creative Suite. In particular, information on the possibilities of issuing certificates to Adobe and to obtain licences to facilitate the teaching of seven days and the learning process. Is it possible these certificates to be published and what would be the period cost and time?   Your quick response is most welcome, given that the deadline for our project is close. We would be happy to hear from you soon.

    Thank you in advance!

    Kind regards!

    This is an open forum from user to user, not a point of contact for Adobe customer service.  The model of Creative Suite to do business is over followed by Adobe, although they might still have available licenses.  If you are looking for special attention, you must communicate directly with Adobe and see if they are able to support your business as you wish.

    To the link below, click on the still need help? the option in the blue box below and choose the option to chat...

    Make sure that you are logged on the Adobe site, having cookies enabled, clearing your cookie cache.  If it fails to connect, try to use another browser.

    Get help from cat with orders, refunds and exchanges (non - CC)

    http://helpx.Adobe.com/x-productkb/global/service-b.html ( http://adobe.ly/1d3k3a5 )

  • Physics/logic

    I have to use the EBS G/L module and the Module inventory n a project.

    What is the good config?

    Two physical schemas, two contexts, a logic diagrams

    Thank you
    PR?

    Hello

    If you follow the first approach, you don't need to put any schema.

    If you follow the second approach, you will need

    in the topology

    -Physical data store EBS 1
    -Diagram N Physics (Ontario,...)
    -Schema logic N (Ontario,...) mapped 1:1 with physics
    -Model N (Designer).

    In my opinion at this stage, given your quesiton, is better the second approach, little longer but less complex.

    Let us know.

  • Beginner please help!

    Bear with me since im a beginner at AE. Now, I have a wedding almost completed in Premiere CS4 project. ALL I want to do is to add a 3D text to a few clips in my first draft. So I imported my proj first pro in AFTER EFFECTS CS4. I then applied a "Preset" 3D text. Now first of all, After Effects import my effects and transitions that I applied first. Isn't the whole point of the After Effects? to apply effects/animation to my first project?

    Because this route has failed. I then tried to export the after effects project in Premiere Pro. But he told me that all the effects that I applied in After Effects are in the first?

    So how am I supposed to get full functionality between these two products as Adobe announced? I need to be able to apply effects in the two first and after effects, and they should appear in both programs. If I export my project completed in sequels, used to be practical because all transitions and effects that I applied to the first custom (all labour) be there! someone help me.

    Here is an overview of the various ways to make a difference between After Effects and Premiere Pro.

    Copy and paste between After Effects and Premiere Pro and exchanging projects between the two programs that rely on the conversion of After Effects elements to Premiere Pro similar items (or vice versa). It's great for the basic and simple changes things, but it does not work for things that don't have not identical characteristics in both applications.

    If you want perfect fidelity, you want to use the Dynamic Link or rendering and export and the film of an application to be imported into the other.

  • Several masters for a company

    We are Oracle EBS application in our company and we are also implementing the Oracle projects.
    Ours is an engineering and Construction company, and under the Business Unit (which is a profit centre) there are many project sites.
    Our Director suggests to us that we should consider each construction site as an organization, so it can have its inventory of the site.
    You must also copy the same material master for each organization. That means at the headquarters level while a BP for a material we buy will depend the material master of the head office organization and while receiving the equipment on site, we will depend on the material master of the Organization of the site. I think it's a bit strange that I knew, in an ERP, there will be only one instance of the master. But here we are to have multiple instances.
    Please suggest our consultant to guide us to the correct path.
    Concerning

    Hello

    I'm not aware of any connection between the material organisation of master and create a budget.
    In the Oracle projects, you can create a project budget for everything what you resources, including materials, or any other provider of expense cost. The budget entity does not relate to the physical organization of the master. Each inventory organization created for a project, must also be classified as project / expenses of task organization. Actual costs are entered on the level of expenditure management. If you budget resources projects you can enter the amount of the budget for each organization of spending as well.

    Note:
    If you implement inventory module and you intend to buy and store items in inventory, then you must decide if you want to enable the project for your organization to the inventory production.
    Without PJM, purchases of goods to inventory will charge a physical trial account in GL (the account is configured on the level of inventories org). There is no charge for the costs of the project in the projects of the Oracle, until you sending the items in stores to the project using various output transactions.
    With PJM, purchases of goods destined for the inventory are considered project costs in receiving items from suppliers and deliver them to the store (project based index). Transactions are encrypted and collected cost between inventory and projects.

    This problem would also affect the way that you want your project budget. If you use PJM you should budget for purchase orders. Otherwise, you could budget the cost and the schedule of positions expressed reservations to the project.

    Dina

  • demonstration of vision or new database?

    I am a student with E-business suite R12, I successfully installed the E-business suite database of demonstration of vision on my machine.my project is related to four modules of human resources management, finance, inventory management and project management, then I use vision demo databse or new base data?
    Regareds
    Forton Iqbal

    Hi Forton,

    If you aren't aware of the functional configuration, then the vision demonstration database should be your choice, and you do not have to do a full implementation.

    For the module you need to start with, it is not easy for a person to implement the human and financial resources. You can start with the financial (GL, AR, AR... etc), then move with HR, but it would take a lot of time.

    I suggest that you go with the demo of vision, understand the Setup program that is already implemented by using the documentation, and then install a new database and start your own implementation.

    Library of Documentation of version 12.0.4
    http://download.Oracle.com/docs/CD/B40089_09/current/HTML/docset.html

    Kind regards
    Hussein

  • Project related to inventory items

    Whenever a purchase order amounts against a project, the items are purchased as an expense. Received, delivered and expensed out receipt. Incase of surplus items, how to get back return these items in the inventory?

    What is the best way to return these items to the inventory?

    You cannot return items as inventory.

    You should do like inventory item and perform Misc/account aliases

    reception to the stock.

    In addition, you may need to perform manual reviews to adjust the calculation of project costs.

    Monday, April 13, 2015, at 13:14, community-admin

  • Specific hardware configuration for a new project of ATG

    Hi all

    We will implement a new project of ATG in my organization with ATG 10.
    Can you please suggest me the best hardware configuration to the new Setup project?

    Thank you and best regards,
    Narasimha Rao D.

    Suite of high level hardware configuration will build for dev environment.

    HARD DRIVE: 40 GB
    RAM: 3 GB
    Processor: P - IV 2.42 GHz

    ~ Raji

  • When lance to the project of the inventory project falling does not in Lov

    Hi all

    You can help on the below problem. !!


    When I'm issueing the stock of inventory through various Transaction, project does not come in the project source LOV.what Setup is missed?

    Here I placed the code of project Flexfield and Lookupsets also.

    Thank you
    Murali

    Please check your project status... whether in agreement or not? !!! Give your answer...

  • exchanging the crio since the Project Explorer controller

    I made a mistake and chose the wrong controller cRIO. Now I find I have different controller, but my whole project is built with all the modules and the screws. Is there a way to simply edit the current to the right controller!

    Ta

    Hi kwaris,

    You can add a new controller to your project and then only move the elements of the evil to the correct controller controller.

    You cannot move all the items at once, but you can move items in groups. This will ensure that the project is rebuilt correctly.

    For items you can not move, please try a copy and paste operation. This is the case for information such as the construction specifications.

    Once everything is moved or copied, you can remove the bad controller.

    Concerning
    JamesC
    NIUK and Ireland

    It only takes a second to rate an answer

  • Cannot enter project information when the destination type is inventory

    Hi team

    We implement the purchases/OM-> INV-> flow of PA.
    However, when I try to create a purchase order with the type of destination as 'Stock', I can't fill out information projects.
    As a result, I can't integrate the PO with PA any suggestions on why this behavior and no workaround for that?

    I think that you must activate the project manufacturing (PJM) for this module.
    It seems that you have enabled the module projects; but not of PJM.
    You can try this?

    Sandeep Gandhi